Loading...
HomeMy WebLinkAboutPlan Review - Review Comments Plan Review - Review Comments Report Project Name: H-2026-0001 Workflow Started: 1/7/2026 3:28:53 PM Report Generated: 03/04/2026 02:40 PM REVIEW COMMENTS REF# CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 Permit Techs Checklist Item Responsed by:CONGER MANAGMENT- 1/9/26 7:32 Resolved Paula Middleton Please provide all drawings and documents, as required by Submittal AM 1/8/26 1:41 PM Standards located at https:Hmeridiancity.org/community- its in the documents labeled rezone exhibit. development/planning/current-planning/applications-and-checklists/.Your Submittal is missing the follwing drawings/documents: Rezone Exhibit listed ---------------------------------------------------------- in Rezone Submittal Checklist. Reviewer Response: Paula Middleton - 1/8/26 2:16 PM I don't see any new drawings or documents. ---------------------------------------------------------- Responsed by:CONGER MANAGMENT- 1/8/26 2:00 PM Rezone Exhibit uploaded. 2 1 Planning Review Comment Responsed by:CONGER MANAGMENT- 1/16/26 10:52 Resolved Linda Ritter The application does not address the amendment to the approved PUD as AM 1/16/26 10:40 AM discussed throughout the preapplication meetings. Update the narrative to An update letter to the Narrative has been uploaded to include the modification of the PUD and pay the appropriate fee. the system. Please send a payment request for the fees. Thank you 3 1 Planner Comment Responsed by:CONGER MANAGMENT-2/9/26 2:15 Unresolved Linda Ritter We need to meet to discuss your narrative and other items that haven't been PM 1/30/26 1:12 PM addressed. Please let me know a time that works for you so we can get this Linda, please let us know what time works best for you. project moving forward. Hethe and I would be glad to meet with you.Thank you 4 2 GIS Review Comment Unresolved Stacy Sirotnak Please upload AutoCAD file that includes utility linework, parcel/boundary 2/27/26 1:37 PM lines, and lot lines. 5 2 Water Modeling Changemark Public utility Plan 1.pdf Unresolved Review TLG#01 Tyson Glock Since this configuration of Skybreak Rim requires a modification to the site 3/3/26 9:01 AM to the south (Skybreak) please provide what is being proposed on this plan sheet so it can be commented on. 6 2 Water Modeling Changemark Public utility Plan 1.pdf Unresolved Review TLG#02 Tyson Glock Water and sewer in parallel require a minimum of 30'wide easement.Water 3/3/26 9:01 AM must be a minimum of 5'from the edge of easement and sewer should be a minimum of 10'. Separation between water and sewer currently is around 15'.Since the water and sewer to the south has not been approved yet the design should be updated to bring the utilities closer together. Unless there is a reason not to the water and sewer should have 10' separation and be centered in the easement. 7 2 Water Modeling Changemark Public utility Plan 1.pdf Unresolved Review TLG#03 report from Project ^v by Avolve Software Plan Review - Review Comments Report Project Name: H-2026-0001 Workflow Started: 1/7/2026 3:28:53 PM Report Generated: 03/04/2026 02:40 PM Tyson Glock A vault to be located at the bottom of the hill right up against the road so it 3/3/26 9:40 AM can be accessed with a truck easily.Vault to be our standard size 7' by 16' vault for a Water Control Valve. Install the valves inside the vault and then provide a straight DIP pipe between valves. City will install the WCV at a later time. If you need a figure for the vault let me know. 8 2 Water Modeling Changemark Public utility Plan 1.pdf Unresolved Review TLG#04 Tyson Glock Show how connection is going to be made to existing water in Pera Vida 3/3/26 9:42 AM Ranch. In the City's GIS there appears to be a gap between the property line and road. Make sure that there is a way to connect or get easements as needed. 9 2 Water Modeling Changemark Public utility Plan 1.pdf Unresolved Review TLG#05 Tyson Glock Line connecting Skybreak and Pera Vida should be 12". 3/3/26 9:43 AM 10 2 Land Development Comment Unresolved Review There are unresolved items from other departments. PW staff comments will Steve O'Brien be completed once comments are resolved. 3/3/26 10:44 AM 11 2 MFD Plan Review Comment Unresolved Steven Taulbee Provide Fire Department Access Exhibit for the Whole Subdivision indicating 3/3/26 1:36 PM compliance with the 2018 IFC, Chapter 5 and Appendix D. 12 2 Wastewater Comment Info Only(old) Modeling Review Proposed sewer connection does not connect to existing sewer Vicki Ly infrastructure.Sewer is 300ft to the south in Skybreak Subdivision 4 3/3/26 1:52 PM 13 2 Legal Description Comment Unresolved Review The legal description closes but appears to be shifted to the west about a Hayden Smith foot when I draw it. I drew it a couple of times just to be sure GIS wasn't 3/4/26 7:58 AM being buggy but it was consistently off.Could I get the tie points, datum, and projection to double check everything lines up on my end?Thank you. report from Project'i^v by Avolve Software