Loading...
HomeMy WebLinkAboutCobblefield Crossing CUP BEFORE THE PLANNING AND ZONING COMMISSION IN THE MATTER OF THE ) Case No. CUP-02-032 REQUEST FOR CONDITIONAL ) USE PERMIT FOR A PLANNED ) RECOMMENDATION TO CITY DEVELOPMENT IN AN R-8 ZONE ) COUNCIL ) CMD, INC., ) Applicant 1.The property is located at 4450 N. Linder Road, Meridian. 2.The owners of record of the subject property are Frank Fisher, 4450 N. Linder Road, Meridian and Don Huffman, 4035 Meadowwood, Meridian. 3.Applicant is CMD, Inc., 1661 Shoreline Drive, Ste. 200, Boise, Idaho 83702. 4.The subject property is currently zoned RUT. The proposed zoning district of R-8 is defined within the City of Meridian Zoning and Development Ordinance, Section 11-7-2. 5.The Applicant requests the Conditional Use Permit for a Planned Development. The R-8 zoning designation within the City of Meridian Zoning and Development Ordinance requires a Conditional Use Permit be obtained for most uses including those requested by the Applicant. (Meridian City Zoning and Development Ordinance, Section 11-8-1). 6.The Applicant requests zoning of the subject real property as R-8, which is consistent with the Meridian Comprehensive Plan Generalized Land Use Map which designates the subject property as Low Density Residential, or Medium Density Residential, in accordance with note number two (2) on the Land Use Map (allowing for an increase in density without a Comprehensive Plan Amendment). 7.The use proposed which is the subject of this will, in fact, constitute a conditional use as determined by City policy. 8.The Planning and Zoning Commission recognized the concerns of Brian English expressed in his letter dated November 18, 2002 . RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A PLANNED DEVELOPMENT FOR COBBLEFIELD CROSSING SUBDIVISION- CUP-02-032 - Page 1 RECOMMENDATION The Meridian Planning and Zoning Commission hereby recommends to the City Council of the City of Meridian that they approve the requested Conditional Use Permit as requested by the Applicant for the property described in the application, subject to the following: A. Adopt the Recommendations of the Planning and Zoning and Engineering staff as follows: Site Specific Comments (Conditional Use Permit) 1. Applicant shall meet all of the requirements of the preliminary plat as a condition of the Conditional Use Permit. 2. Applicant shall submit a Certificate of Zoning Compliance application for the proposed common/park lot and its associated amenities prior to applying for building permits. 3. All development shall comply with the Americans with Disabilities Act and the Fair Housing Act. B. Adopt the Recommendations of ACHD as follows: Site Specific Conditions of Approval 1. Dedicate 48-feet of right-of-way from the centerline of Linder Road and McMillan Road abutting the parcel by means of a warranty deed. The right-of- way purchase and sale agreement and deed must be completed and signed by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD right-of-way if the owner submits a letter of application to the impact fee administrator prior to breaking ground, in accordance with the ACHD Ordinance in effect at that time (currently Ordinance #195). OR Dedicate 38-feet of right-of-way from the centerline of Linder Road and McMillan Road abutting the parcel by means of a warranty deed. The right-of- way purchase and sale agreement and deed must be completed and signed by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A PLANNED DEVELOPMENT FOR COBBLEFIELD CROSSING SUBDIVISION- CUP-02-032 - Page 2 dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD right-of-way if the owner submits a letter of application to the impact fee administrator prior to breaking ground, in accordance with the ACHD Ordinance in effect at that time (currently Ordinance #195). 2. Construct a 5-foot concrete sidewalk located 2-feet within the right-of-way (if the dedicated right-of-way is 48-feet from centerline) or if the sidewalk is outside of the right-of-way, place the sidewalk within an easement. 3. Construct the main entrance, Cobblefield Drive, to intersect Linder Road approximately 140-feet north of the south property line, as proposed. 4. Construct all of the internal roadways as 36-foot street section with curb, gutter and 5-foot concrete sidewalk within 50-feet of right-of-way, as proposed. 5. Construct a stub street to extend to the south property line approximately 1,000- feet east of Linder Road, as proposed. Install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 6. Construct a stub street to extend to the north property line approximately 1,340- feet east of Linder Road, as proposed. Install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 7. Dedicate a “temporary stub street” to the District in the form of an easement. The “temporary stub street” will be a 50-foot easement located within the 50-foot flag approximately 760-feet north of the south property line and will extend from the east property line to the west property line. This easement may become a right- of-way in the future (at the sole discretion of the District) at no cost to the District and the costs associated with the construction of the street will be paid by the owner/developer and placed within a Public Right’s-of-Way Road Trust deposit. If the 50-foot easement is not utilized to construct a stub street within five years from the date of the signed final plat, the easement and the road trust deposit will expire and revert back to the Owner/developer. 8. Construct two knuckles with islands within the subdivision, as proposed. Construct the islands within the knuckles to provide a minimum of 4-feet in width with a minimum area of 100-square feet and provide a minimum of a 29-foot street section for the roadway around the traffic island. 9. Any proposed landscape islands/medians within the public right-of-way dedicated by this plat shall be owned and maintained by a homeowners association. Notes of this are required on the final plat. 10. Provide a minimum of 21-feet measured from back of curb to back of curb on either side of a proposed island or median. RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A PLANNED DEVELOPMENT FOR COBBLEFIELD CROSSING SUBDIVISION- CUP-02-032 - Page 3 11. Enter into a development agreement regarding the location, costs and terms associated with the “temporary stub street”. 12. Other than the access that has been approved with this application, direct lot access to Linder Road and McMillan Road is prohibited. 13. Comply with all Standard Conditions of Approval. Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact Construction Services at 387-6280 (with file numbers) for details. 5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 7. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 8. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #195, also known as Ada County Highway District Road Impact Fee Ordinance. 9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to ACHD. The applicant shall be required to call DIGLINE RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A PLANNED DEVELOPMENT FOR COBBLEFIELD CROSSING SUBDIVISION- CUP-02-032 - Page 4 (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387- 6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant’s authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 11. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. C. Adopt the Recommendations of the Meridian Fire Department as follows: 1.One and two family dwellings will require a fire-flow of 1,000 gallons per minute available for a duration of 2 hours to service the entire project. Fire hydrants shall be placed an average of 400’ apart. 1997 UFC Appendix III-A 2. Acceptance of the water supply for fire protection will be by the Meridian Water Department. 3.Final Approval of the fire hydrant locations shall be by the Meridian Fire Department. 4. The phasing plan may require that any roadway greater than 150’ in length that is not provided with an outlet shall be required to have a turn around. 5. All roads shall have a turning radius of 28’ inside and 48’ outside. 6. Insure that all yet undeveloped parcels are maintained free of combustible vegetation per section 1103.2.4 of the Uniform Fire Code. 7.Operational fire hydrants and temporary or permanent street signs are required before combustible construction begins. UFC 901.4.2 & 901.3 8. A minimum of two points of access will be required for any portion of the project, which serves more than 50 homes. It is recommended that a stub street be extended to the East between Lots 16-18 on Block 3, to provide a second point of access to the RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A PLANNED DEVELOPMENT FOR COBBLEFIELD CROSSING SUBDIVISION- CUP-02-032 - Page 5 project. UFC 902.2.1 Revised plans that have been submitted indicate a connection on the East end of the project. 9. The proposed 73-lot subdivision with an estimated 2.9 residents per household would have a total estimated population of 211 residents at build out. The Meridian Fire Department has experienced 2069 responses in the year 2000 and 2251 calls for service in 2001. According to a report completed by Fire & Emergency Services Consulting Group in February of 2000 our requests for service are projected to reach 2800 in the year 2005 and 3800 by the year 2010. 10. The roadways shall be built to Ada County Highway Standards and shall have a clear driving surface, available at all times, which is 20’ wide. Lots 8, 9, 10, 11, 12, 13, 14, 15 on Block 4 shall be posted “No Parking Fire Lane”. UFC 902.2 11. Building setbacks shall be per the Building Code for one and two story construction. 12. The roadways shall be built to Ada County Highway Standards and shall have a clear driving surface, available at all times, which is 20’ wide. The lots adjacent to the knuckles on Blocks 6, 7, 8 & 9 shall be posted “No Parking Fire Lane”. UFC 902.2 RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF CONDITIONAL USE PERMIT FOR A PLANNED DEVELOPMENT FOR COBBLEFIELD CROSSING SUBDIVISION- CUP-02-032 - Page 6