Loading...
HomeMy WebLinkAboutCC - Engineer Statement Lra� MIN E N G I N E E R I N G January 30,2026 Project No.24-287 City of Meridian 33 E Broadway Ave.,Ste.210 Meridian, Idaho 83642 RE: Apex Cadence Subdivision No.1 Meridian,Idaho To Whom It May Concern: Please accept this letter as certification that the centerline elevations of the proposed streets within Apex Cadence Subdivision No. 1 are designed a minimum of three (3) feet above the seasonal high ground water elevation. The geotechnical engineering report, "Geotechnical Investigation — Apex Cadence Subdivision", prepared by Atlas and dated September 9, 2024, was used to determine the approximate groundwater elevations relative to the street centerline elevations. Please feel free to contact me at 208.639.6939 should you have questions or require any additional information. Sincerely, KM Engineering,LLP SSotA A L FNG �oFF �\G E N SF Digitally signed by 16860 Lachlin Kinsella,P.E. s 1/30/26 o Date:2026.01.30 Ty 13:18:38-07'00' �0 TF OF /N C. Y, Lachlin Kinsella, P.E. Project Manger 5725 North Discovery Way 9 Boise,Idaho 83713 208.639.6939 kmengllp.com