TO: Land Pro Development
2364 S. Titanium PI.
Meridian, ID 83642
OWNER: Kevin Amar
__. .._ -_--_ ---..:-2400 W. Wapoot Dr.- -
Meridian, ID 83642
SUBJECT: MAZ-07-007
2400 West Wapoot Drive
ANNEX & Rezone: RUT to R-8
John 5. Franden, President
Rebecca W. Arnpld, vice President
Sherry R. Huber, Commissioner
Dave Bivens, Commissioner
Carol A. McKee, Commissioner
RECEIVED
J1~~1:.-~ 4- X007, _... -= -,.
City of Meridian
City Clerh Offlte
The Ada County Highway District has reviewed your application for the above referenced development
and determined the following FINDINGS OF FACT:
Goddard Creek is currently improved with 2 travel lanes with curb, gutter,
and sidewalk abutting the site
• The property has approximately 185 feet of frontage on Goddard Creek.
• The property is accessed from two streets: W. Wapoot Dr and N. Gossard Way.
This application is far annexation and rezone. Listed below are some of the relevant policies that the
District may administer when it reviews a future development application (additional policies maybe
considered with a specific redevelopment application):
RELEVANT POLICIES:
+ District policy 7203.6 requires the applicant of a proposed development to make improvements
to existing damaged sidewalk; curb and gutter construction or replacement; replacement of
unused driveways with standard curb, gutter and sidewalk; installation of pedestrian ramps;
_ pavement repairs; signs; traffic control devises; and other similar items. in order to correct
deficiencies or replace deteriorated facilities.
• Approval by the ACHD Cut Committee will be required to disregard the 5 year moratorium
placed on all improved roads. The no cut moratorium applies to Wappot between Goddard/Lolo
Pass and Goddard Creek between McMillan/Tignes until 2011.
Staff recommends that the applicant and/or representative schedule apre-application meeting with
District Staff prior to design and submittal of a formal development application.
Please feel free to contact me if you have any questions or concerns (208)387-6174.
Sincerely
Coby ar d
Planner I
Right-of-Way 8~ Development Services
Cc: Project File, City of Meridian
Ada Cpunty Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208 387 6100 • FX 345-7650 • www.achd.ada.id.us
MAZ-07-007
:«
Development Process Checklist
®Submit a development application to a City or to the County
®The City ar the County will transmit the development application to ACHD
®The ACHD Planning Review Division will receive the development application to review
®The Planning Review Division will do ar~g of the fallowing:
^Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time.
^Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part
of a previous development application and that the site specific requirements from the previous development also
bpply to this development application.
®Write'a Staff Level report analyzing the impacts of the development on the transportation system and evaluating
the proposal for its conformance to District Policy.
^Write a Commission Level report analyzing the impacts of the development on the transportation system and
, evaluating the proposal for its conformance to District Polity. •~
^The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
^For ALL development applications, including those receiving a "No Review" or "Comply With" letter:
• The applicant should submi# one (1) set of engineered plans directly to ACHD for review by the Development
Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required
by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.)
• The applicant is required tv get a permit from Construction Services (ACHD) for ANY work in the right-of--way,
including, but not limited to, driveway approaches, street improvements and utility cuts.
^Pay Impact Fees prior tv issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DlD YOU REMEMBER:
Construction (Zone)
^ Driveway or Properly Appraach(s)
• Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by
Development Services & Traffic Services). There is a one week turnaround for this approval.
^ Working in the ACHD Rightrof-Way
• Faur business days prior to starting work have a bonded contractor submit a "Temporary Highway ll'se Permit Application"
to ACHD Construction -Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is X50' or you are
placing X600 sf of concrete or asphalt.
Construction (Subdivisions)
^ Sediment S Erosion Submittal
• At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative ~ Plat, done by a Certified Plan
Designer, must be turned into ACRD Construction -Subdivision to be reviewed and approved by the ACHD Drainag®
Division.
^ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being
scheduled.
^ Final Approval from Development Services
ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre-Con.