Loading...
HomeMy WebLinkAboutCC - Road CL Statement CIVIL SIT E W O R K S February 2, 2026 City of Meridian 33 E. Broadway Ave. Meridian, ID 83642 RE: Newkirk Subdivision No. 2 Roadway Centerline Elevations To Whom It May Concern: I certify that all design street finish centerline elevations within Newkirk Subdivision No. 2 as shown in the stamped and signed subdivision improvement plans are set a minimum of three feet above the highest established normal groundwater elevation. Respectfully, Corinne M. Graham, PE \oN,\L Principal F \pENS� 16970 �O��gTE OF PO BOX 6059 BOISE, ID 83707 (208) 946-3874 cgraham@cswengineering.com