Loading...
HomeMy WebLinkAboutCC - Certified Street Elevations --; TH E LAND GROUP January 22, 2026 Mr. Warren Stewart, PE City of Meridian 33 E. Broadway Ave. Meridian, ID 83642 RE: CenterCal Expansion Subdivision Street Centerline Elevation Certification PN 124038 Dear Mr. Stewart: As required by the City's short plat application requirements, please accept this statement certifying that all street finish centerline elevations for this project are set a minimum of three (3) feet above the highest established normal groundwater elevation. According to the initial test pit investigations and recent construction activities, groundwater within this project was not encountered within a depth of three (3)feet of the existing ground. Based on the above information, I certify that groundwater would be greater than three (3) feet below the designed finished street centerline elevations throughout the project. Sincerely, �$XONAL ENG G\ST r� 109 1 s o Jason Densmer, PE �qTF OF \OXX Principal, Project Civil Engineer 'l9SONDh'S The Land Group, Inc. D1/22/2D2(v