HomeMy WebLinkAboutCC - Certified Street Elevations --; TH E
LAND
GROUP
January 22, 2026
Mr. Warren Stewart, PE
City of Meridian
33 E. Broadway Ave.
Meridian, ID 83642
RE: CenterCal Expansion Subdivision
Street Centerline Elevation Certification PN 124038
Dear Mr. Stewart:
As required by the City's short plat application requirements, please accept this statement certifying that
all street finish centerline elevations for this project are set a minimum of three (3) feet above the highest
established normal groundwater elevation.
According to the initial test pit investigations and recent construction activities, groundwater within this
project was not encountered within a depth of three (3)feet of the existing ground.
Based on the above information, I certify that groundwater would be greater than three (3) feet below
the designed finished street centerline elevations throughout the project.
Sincerely,
�$XONAL ENG
G\ST r�
109 1
s o
Jason Densmer, PE �qTF OF \OXX
Principal, Project Civil Engineer 'l9SONDh'S
The Land Group, Inc. D1/22/2D2(v