Loading...
HomeMy WebLinkAboutPZ - Applicant Presentation for 3-5ROLLING HILL City of Meridian Planning and Zoning March 5, 2026 Professional Team: TAO, The Architects Office –Architect (Boise, ID) KM Engineering –Civil Engineer (Boise, ID) Stack Rock Group –Landscape Architect (Boise, ID) Wright Brothers Construction –General Contractor (Eagle, ID) Commercial Northwest –Property Management (Boise, ID) Green Mountain Resources and Planning –Planning (Star, ID) 2023 Process Began 2024 October 2024 Hearing 2025 Assess and Improve 2026 Application to Meridian 22 History of Rolling Hill Development Rolling Hill Project Timeline Area of Annexation 3 184 Units 18,226 SF Non-Residential (17,643 SF required) 332 Parking Spaces (272 spaces required) 90 Bicycle Spaces (14 spaces required) Community Building/Clubhouse 53,000 SF of Open Space (0 SF required) Exterior Amenities: Pickleball Court, Outdoor Seating, Pergola, Firepit, Outdoor Kitchen, Lawn Areas, Playground, Bike Repair Station, Dog Run, Community Pathway Promotes Live-Work Environment Located within 1/3 of a mile from bus stops at Overland Road and Eagle Road Current Rolling Hill Development Current Parking Plan: Red –Non-Residential; Green – Residential; Yellow –Flexible; Blue –Operations/New Tenants Denial of 2024 Rolling Hill Project Primary reasons for the 2024 Planning and Zoning recommendation of denial: County Enclave in the Center of the Site Building Height Transition to Surrounding Single Family Homes Previous Site Plan Inclusion of County Enclave Overview of Changes Since 2024 Updated Site Plan: Parcel IncludedPrevious Site Plan: Missing Parcel Building Height Transitions Overview of Changes Since 2024 Updated Site Plan: Building HeightsPrevious Site Plan: Building Heights 1-story 2-stories 3-stories 4-stories Line of Sight Study conducted for neighbors 270’ from front of home to edge of building –nearly the length of a football field 20’ height of roof from 270’ away Sight Line Study Building Height Transitions Overview of Changes Since 2024 Northern single-family neighbors requested more visual privacy between them and the proposed building. In response, additional fast-growing evergreen trees were added at the northern edge of property. More open space was added for active and passive recreation. A Shade Study was completed for neighbors which resolved concerns over the proposed buildings shading neighboring properties. Overview of Changes Since 2024 Transitional Landscaping Updated Area 1 Landscape Plan 9 Staff Concern #1 –Landscape Buffer East of Site Movado’s extension onto private property was an oversight and should have been planned for Rolling Hill Drive. Team has attempted to engage with Corey Barton Homes, which owns the parcel to the east, regarding the potential purchase or partnership of the landscape buffer; however, the Owner is not interested in pursuing any agreement. The buffer is insignificant from a planning perspective; width decreases from approx. 40’ on the south end to 5’ on the north end. Additional open space is not bad.Landscape Buffer Diagram 10 Staff Concern #2 –Movado Way Collector road (Movado Way) has not been constructed and is on private property. Applicant over years has exhausted all efforts to purchase, joint venture, or work together with the eastern neighbor for the Movado Way extension. The proposed subject development is planned for connection to Movado Way once built. ACHD and FD had/have no issue with the 2024 Proposed Project nor this 2026 Proposed Project. They find it acceptable to ingress and egress off only Rolling Hill Drive. Future Movado Way Diagram 1111 A denial of this project limits the subject property owners and numerous surrounding property owners to effectively one buyer, Corey Barton Homes. A denial prevents a free and open market to exist, which will, in principal, drive property value downwards. A denial consolidates control of access and development timing to a single developer, Corey Barton Homes. Annexation is contiguous and within the City’s designated path of growth: Conforms to the Comprehensive Plan. Provides a unified, coordinated plan across multiple parcels. Expands needed market-rate housing near transit, commercial, and employment centers. Property Rights City of Meridian Future Land Use Map 12 2026 Developments & Projects Approved in the Area by P&Z Revolution Concert House (470 yards from site) St. George (2 acres mixed-use development) Continued growth of Eagle View Landing, Silverstone and El Dorado + more 2026 City of Meridian Approved Developments Timing and Integration to Greater Plans Market and Timing 13 Costar Meridian Market Report Vacancy rate within 1-mile radius is steady at <5%. Meridian leads region in net absorption with 819 units leased in 2025. Decrease in project deliveries over the last 18 months causing demand to rise. Number of units under construction results in low future supply. Summary + Conclusion 14 Our team firmly believes the time is right for the Proposed Project to be approved. We have invested significant effort into refining and resubmitting a comprehensive plan and development framework that supports a successful, well-structured project in this rapidly growing transitional area. This is a thoughtful and good project for the City of Meridian. Thank you Rolling Hill Project Team