ADDENDUM TO CONSTRUCTION CONTRACT FOR
URBAN IRRIGATION SYSTEM IN CEDAR SPRING SUBDIVISION NO. 3
1. DEFINITIONS. In this Agreement certain words appear which have the following
�+ meaning;
1 "Owner" means the City of Meridian, an Idaho municipal corporation, the
owner of the land to which irrigation water will be distributed by the urban irrigation
system that is the subject of this Addendum.
"District"means Nampa&Meridian Irrigation District.
"Addendum"means this written and signed Addendum(contract)entered into
between the Owner and District.
"Agreements" or "Prior Agreements" mean the written and signed
Agreements (contracts) that have previously been entered into pertaining to Cedar
Springs Subdivision No. 3.
"Subject Property" means Lot 11, Block 25 Cedar Springs Subdivision No. 3,
according to the official plat thereof.
2. STATUTORY AUTHORITY. This Addendum is made under the authority of
Idaho Code § 43-330A through 43-330G.
3. PRIOR AGREEMENTS. Howell-Murdoch Development Corporation, an Idaho
corporation, and Nampa & Meridian Irrigation District have entered into a Construction Contract
for Pressurized Urban Irrigation System in Cedar Springs Subdivision No. 1 on the 15th day of
October, 2002, recorded on the 17th day of October, 2002 in the records of Ada County,Idaho as
instrument member 102119513 and Agreement for Pressurized Urban Irrigation System(PUIS)with
Restrictive Covenants Running with the Land as to Cedar Springs Subdivision No. 1 on the 15th
day of October,2002,recorded on the 17th day of October,2002 in the records of Ada County,Idaho
ADDENDUM TO CONSTRUCTION CONTRACT-Page I
as instrument number 1021 19514. The parties further entered into an Addendum to Construction
Contract for Urban Irrigation System in Cedar Springs Subdivision No. 1 and Agreement for
Pressurized Urban Irrigation System(PUIS)with Restrictive Covenants Running with the Land as
to Cedar Springs Subdivision No. 1 to Include Cedar Springs Subdivision No. 2 on the 19"' day of
November,2002,recorded on the 22"d day of November,2002 in the records of Ada County,Idaho
as instrument number 10213 8257 and an Addendum to Construction Contract for Urban Irrigation
System in Cedar Springs Subdivision No. I and Agreement for Pressurized Urban Irrigation System
(PUIS)with Restrictive Covenants Running with the Land as to Cedar Springs Subdivision No. 1
to Include Cedar Springs Subdivision No.3 on the 5"clay of August,2003, recorded on the 8t'day
of August,2003 in the records of Ada County,Idaho as instrument number 103132413.
4. PROPERTY COVERED BY THIS ADDENDUM. This Addendum is intended
for the benefit of the Subject Property.
5. PURPOSE. The purpose of this Addendum is to allow the vacation and relocation
of the existing pressurized irrigation mainline in the Subject Property as more particularly described
herein.
6. PUMP STATION. The pump station to serve the Subject Property is located in the
Pump Station#47 Cedar Springs. It is understood and agreed by the Owner that the capacity of the
irrigation pump(s)and facilities will be sufficient for the delivery of pressurized water to the subject
Property and that the delivery of pressurized water to the Subject Property will not adversely impact
the delivery of pressurized water to the other existing properties served by the pump station.If the
delivery of pressurized water to the Subject Property adversely impacts the delivery of pressurized
water to the existing properties served by the pump station the Owner agrees to pay their
proportionate share of the cost to upgrade the pumps.
7. EASEMENT. The PriorAgreement, Addendum to Construction Contract for Urban
Irrigation System in Cedar Springs Subdivision No. 1 and Agreement for Pressurized Urban
Irrigation System (PUIS) with Restrictive Covenants Running with the Land as to Cedar Springs
Subdivision No. 1 to Include Cedar Springs Subdivision No.3 entered into on the 5"'day of August,
2003, recorded on the 8"' day of August, 2003 in the records of Ada County, Idaho as instrument
number 103132413, paragraph 8G, provides that the District has an easement for the installation,
operation, maintenance, repair and replacement of the irrigation mainline within the Subject
ADDENDUM TO CONSTRUCTION CONTRACT-Page 2
Property.The location of the easement shall be determined by the location of the pipe]ines and other
facilities,as finally installed, with the width of the easement being five(5)feet on either side of the
centerline of each pipeline, for a total of ten (10)feet.
8. RELOCATION OF PIPELINE. EASEMENT. Upon receiving all necessary
permits and other documents or approvals that may be required by the Public Authorities for the
performance of the work,Owner will remove the existing pressurized irrigation main line that runs
along the east boundary line of the Subject Property. The irrigation main line will be relocated
slightly east of the existing pressurized irrigation main line of the Subject Property which will run
approximately 900 LF.The pipe used will be 6" Class 200 PVC main line.A 6-inch gate value will
be installed on each end of the newly installed main line.
The general location of the existing pressurized irrigation main line and the general location
of the relocated irrigation main line are shown on the Plan which is attached hereto as Exhibit A
and incorporated herein by reference.The relocated main line will run north and south along the east
boundary line of the Subject Property line. All products and worlananship shall be done in
accordance with the current District Standards and Specifications.
Upon completion of the relocated main line to the satisfaction of the District,the District will
relinquish the easement pertaining to the existing pipeline. Owner hereby grants to District an
easement for the installation, operation, maintenance, repair and replacement of the relocated
pressurized irrigation main line. The actual location of the easement shall be determined by the
location of the pipeline and other facilities,as finally installed, and the width of the easement shall
be five (5) feet on either side of the centerline of each pipeline, for a total of ten (10) feet. The
easement shall be ten(10)feet in width irregardless of property lines,fences or other obstructions.
Owner shall not place any obstruction, encroachment, crossing or vegetation in the easement of
District that would hinder or impair the operation,maintenance or repair of the main line by District.
All costs of construction shall be paid in frill by Owner.
9. OWNERSHIP, OPERATION AND MAINTENANCE OF DISTRIBUTION
SYSTEM. The relocated pressurized irrigation mainline constructed under this Addendum shall be
the property of, and shall be owned by, District upon completion and acceptance of the work by
District. District shall, pursuant to Idaho Code Section 43-330F, upon acceptance of the relocated
ADDENDUM TO CONSTRUCTION CONTRACT-Page 3
pressurized irrigation mainline, maintain, repair, operate and replace the pressurized irrigation
mainline which is the subject of this Addendum.
10. ENTIRE AGREEMENT. This Addendum and the Prior Agreements contain the
entire agreement between the parties hereto with respect to the subject matter of this Addendum.
11. GOVERNING LAW. This Addendum shall be construed under,and governed by,
the laws of the State of Idaho.
12. BINDING EFFECT. This Addendum shall bind the parties hereto and their
respective heirs,personal representatives,successors and assigns.
13. AUTHORIZATION OF SIGNATURE. Owner hereby warrants that the person
signing this Addendum has been authorized to do so by Owner.
14. AMENDMENTS. Amendments to this Addendum shall be made only by written
instrument executed by each of the parties hereto.
IN WITNESS WHEREOF, the parties have hereunto caused their names to be subscribed
this 12 day of _, 202�.
o�pTEDAU(; CITY OF MERIDIAN
an Idaho municipal corporation
�`9
ECif ID ell,
TiAN%-
ICAko B T�
SEAL obe't E. 'this n,Mayor 1-27-2026
Atte-
R°r1he7Rr--
Christ Jo n ,City Clerk 1-27-2026
NAMPA &MERIDIAN IRRIGATION DISTRICT
13y
L•�
Its President
ATTEST:
z-7 It cretaty
ADDENDUM TO CONSTRUCTION CONTRACT-Page 4
STATE OF IDAHO
County of Ada
This record was acknowledged before me on January 27,_202_6_______,(date)by
Robert E, Simison and Chris Johnson on behalf of the CITY OF MERIDIAN,in their capacities as
Mayor and City Clerk, respectively.
FS1ATE
ARLLNE WAIF �hd- v I
MISSION No.67,390 Notary'Public. for the State ol'Id-.ti
OTARY MBLIC My commission expires:_3-28-2ta28
OF IDAHO —�
STATE OF IDAHO
County of Canyon
This record was acknowledged before me on �� � � 207(o _, (date),by,
1I%\ 0. and Lor 3. President and
Secretary,respectively,of NAMPA&MERIDIAN IRRIGATION DISTRICT. T
%Alf Sol lgf+f
14
I.
&A.
v;IOTA � Notary Public for Idaho
e
My Commission Expires:
UBLXCP
w i 1b� w
OF
•
+f�fflfAf AtRf7t■\
ADDENDUM TO CONSTRUCTION CONTRACT-Page 5
-Existing Main Line in Red
aw Relocated Main Line in Black
' Il...�..r_�_!-����yL{�--hr -Lam_--:�.��_ ��,�. r>t`1 -,.»..,�.,,1,,,.,1•� �-
al� ..,. ,..,.W 7-�iw�a nu• 1
' �. •'�-'
t.
746
I'mrl
r.1N4uw— 1•a.l - - {
1 1 din,vi.r
_ . , r#
E ;
Jrli�iil�.-1JI-.ki�,t.rJcr.�+`�Ty -r •��
'1• PP
,-! l-._.,•__�1. • 1,
NMID PRESSURE 1RMATi0N
Exhibit A