Loading...
HomeMy WebLinkAboutPZ - ITD Approval Letter Sewer Line Installation IDAHO * Your Safety • Your Mobility IDAHO TRANSPORTATION DEPARTMENT P . O . Box 8028 • Boise, ID 83707-2028 Your Economic Opportunity ( 208 ) 334-8300 • itd . idaho . gov a �2�q ptii O T� IION OEQP June 2&, 2025 Hawkins Attn : Ethan Mansfield 855 W Broad St, Ste 300 Boise, ID 83702 Re : Conditional Approval — Sewer Line Installation within SW69 State Right-of-Way for Syringa Crossing Subdivision Dear Ethan, The Idaho Transportation Department ( ITD ) grants conditional approval for the Syringa Crossing Subdivision to install a sewer line within the State right-of-way ( ROW ) along State Highway 69 ( SH -69 ) . The proposed installation will be located on the west side of SH -69, extending approximately 153 . 5 feet south from the development' s parcel at the southwest corner located at the intersection of SH -69 and Amity Road . This installation is intended to temporarily support utility infrastructure for the Syringa Crossing development . Please note that this approval is conditional and subject to the following requirements : Permit Application : A fully completed utility permit application must be submitted to ITD for review and approval prior to any construction activity. The permit shall demonstrate the following requirements : • Measurements from the edge of pavement to the temporary sewer line . • Measurements showing the depth of the sewer line as it runs down ITD ROW . • Materials used in the construction if the temporary sewer line must conform to Standard Specifications for Highway Construction 2023 . • Approved set of Temporary Traffic Control Plans • Approved plan for the abandonment of the temporary sewer line . Guarantee of Temporary Status : The Developer shall submit documentation from the City of Meridian demonstrating that it shall require the necessary easements for a permanent location for the sewer line as a condition of development for neighboring parcels . No work shall commence within the State ROW until ITD has issued the final approved permit . All construction activities must comply with ITD standards and specifications . Please coordinate with Josh Nopens, iosh . nopens@itd . idaho . gov for submittals and further guidance . Sincerely, Moe Luke Rudolph Development Services Staff Engineer Idaho Transportation Department I District 3