Loading...
HomeMy WebLinkAboutC4.01 Roadway Utilities Plan & Profile I Sheet Notes: 9t 1. CONTRACTOR SHALL COMPLY WITH ALL NOTES ON SHEET C1.00. rj W_ THE 1 LAND W. Grand Mogul Dr. (Phase 1 ) Sewer Keynotes: - GROUP ' U J [0 H 1. CONNECT TO EXISTING SSMH AND INSTALL KOR-N-SEAL BOOT. ADJUST z 2 y SSMH CHANNEL AS REQUIRED. ' ow wC/) o 2. POTABLE WATER MAIN CROSSING-SEE SEWER NOTE NO. 2/C0.00. EP 'd IL P " 3. POTABLE/NON-POTABLE WATER SERVICE CROSSING-SEE SEWER NOTE 6"PIRR 6"PIRR 611PIRR 6"PIRR 6"PIRR 6"PIRR oO ="PIRR 6"PIRR 6"PIRR 6"PIRR < 6"PIRR "PIRR N0. 3/C0.00. - - - - - - - -o - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - -=- -- - �- - I I o 11 11 3: 4. CONSTRUCT 6-IN SEWER SERVICE PER ISPWC SD-511,TYPE A. CAP AND 11 T INSTALL 8-LF 6-IN C900 11 11 ' F I I 11 T MARK END OF STUB PER CITY OF MERIDIAN SUPPLEMENTAL DRAWING 1-FIRE HYDRANT ASSEMBLY PER CITY OF MERIDIAN DETAIL W8 SW3. > 11 II CLCt) II — R/W R/W- R/'o R R/W R/� R/W R/W R/W R/W � R/W � — — — — — — — — — — — — — Water Ke notes: # ■ LL y — 12"W "W 12"W X X 12"W 12"W 12"W 12"W 12"W 12"W 12" �� 230 LF 12-IN C900 26-LF 12 IN C900 X 1 221-LF 12-IN C900 1. INSTALL 1-12"x8"TEE (FLG), 1-12"GATE VALVE (FLGxMJ), 1-8"GATE 3 EXISTING SSMH 20 � I VALVE (FLGxMJ), 1-12"ADAPTER (FLGxMJ).THRUST BLOCK AS REQUIRED. SSMH 21 W. Grand Mogul Dr i — 2. INSTALL FIRE HYDRANT ASSEMBLY PER CITY OF MERIDIAN — — — — — — — — + — — — — 1 — — I — — —W — SUPPLEMENTAL DRAWING W8. INSTALL 1-12"x12"x6"TEE (MJxMJxFLG) T 0.60% h 31+00 2 30+00 209-LF OF 8-IN PVC AT 0.40% 29+00 28 00 p �+�+ 27� WITH 1-6"GATE VALVE (FLGxMJ) PER CITY OF MERIDIAN SUPPLEMENTAL 8"SS W "SS 8"SS SAN 8"SS 8"SS 8"SS 8"SS 8"SS SAN 8" S I 8"SS 8"SS H I DRAWING SD-W11.THRUST BLOCK AS REQUIRED. ' 1906 O �' I 3. INSTALL 2"BLOW-OFF ASSEMBLY PER CITY OF MERIDIAN SUPPLEMENTAL DRAWING W12.THRUST BLOCK AS REQUIRED. FUTURE CONTINUATION OF -� o WATER MAIN BY OTHERS. — R/W R/W R/W R/W o ao R/W R/W R/W R/W R/W T R/W a a 4. LOCATE EXISTING WATER LINE STUB IN THIS APPROXIMATE AREA. i o ii ii II 18"SD REMOVE BLOW-OFF AND VALVE TO EXTEND LINE AS SHOWN. O oioe I I co I I ■ 11 — — — — avoe O° z 11 11 11 5. POTABLE WATER MAIN CROSSING-SEE WATER NOTE NO. 2/C1.01. 1 vaee — eves J j J J 6. INSTALL 1-12"CROSS (FLG), 2-12"GATE VALVES (FLGxMJ), 1-12" ■� 6"PIRR 6"PIRR 6"PIRR X 6" IRIti X 6"PIRR 6"PIRR 6"PIRR 6"PIRR `; 6"PIRR 6"PIRR 6"PIRR ADAPTER (FLGxMJ),AND 1-8"GATE VALVE (FLGxMJ). 5 Pi ■ 1 CO 7 "T'TYPE CLEAN-OUT PER 4 6-IN PVC CITY OF MERDIAN SD SW1 I 3 IE: 2546.98 ' STA: 30+42.90, 58.00'L ' RIM: 2552.84± L - - - - - - J IE OUT: 2547.55, 8-IN PVC (N) y 30'PROPOSED CITY ' UTILITY EASEMENT I I 1 I c ■ Roadway Utilities Plan & Profile 20' 40' _ cc Horizontal Scale: 1" = 20' — O y 2564 2564 = _ W. Grand Mogul Dr.: Sta. 27+60 - 31 +60 HORIZONTAL SCALE: 1" = 20' Q Rom VERTICAL SCALE: 1" = 4' CD C z 2560 2560 O ■ o w PROPOSED GROUND AT CENTERLINE 2556 2556 Revisions 1. 2552 -------- --------- --- — ---- ---- ----- ---- -- — ----- ---- ---- ----- _--- -- -- ----- 2552 z O a�8-IN WATER MAIN EXISTING GROUND AT CENTERLINE 2548 328-LF OF 8-IN PVC AT 0.60% 2548 209-LF OF 8-IN PVC AT 0.40% 0 SSMH 21 48-IN MH PER ISPWC SD-501 1 EXISTING SSMH 20 2544 RIM: 25°5545190, 6.00'L 48-IN MH PER ISPWC SD-501 2544 SUMP: 2547.24 STA: 28+33.71, 6.00 E RIM: 2554.57± IE IN: 2547.34, 8-IN PVC (W) SUMP: 2546.30 ANAL �5g1 ENG IE IN: 2547.34, 8-IN PVC ( ) IE IN: 2546.40, 8-IN PVC (W) ,� �C,\ST 2540 IE OUT: 2547.24, 8-IN PVC (E) IE OUT: 2546.30, 8-IN PVC (E) 2540 10961 s� �o 9Tf \QP EXISTING GROUND ELEVATION PROPOSED GROUND ELEVATION �F Jq�NDEI`1 AT CENTERLINE AT CENTERLINE 2536 2536 11/Z4/Z025 t` CO Lf) � co N N co � U') CO r_ ) O N co "I- LC) CO M r M N coco co � coU_" coCO coCfl coU_" � � � co � CV LO r U') C7 U') m co m co W Cfl r­ CO CO � LC) � � ~ co Project No.: 124186 i CV L6 CV L6 CV L6 CV L6 CV U') CV Ln CV L6 CV L6 CV L6 CV L6 CV L6 CV ui CV ui CV V CV V CV CV CV CV CV CV P)L!") L LP) Lo Lo L U LP) _" ) ) )L!') L!') U') L!') Lf L!') U') LP) U_" LP) P) U') LO U') LO U') LO U_" LO LO U) LO L!7 L!') L!') Lr, LO LO U') LO LO LO U') LO LO LO LO LO � LO � LO � LO � LO U') LO U') LO U') LO U') LO U') LO LO � LO L0 LO LO LO LO LO LO Date of Issuance: 11-24-2025 CV N CV N CV N CV N CV N CV N CV N CV N CV N CV N CV N CV N CV N CV N CV N CV CV CV N CV N CV CV CV N CV N Project Milestone: PERMIT SUBMITTAL a 31+60 31+00 30+00 29+00 28+00 27+60 _ - Roadway Utilities Plan E v E Profile QEo 4.001