HomeMy WebLinkAboutC4.01 Roadway Utilities Plan & Profile I
Sheet Notes: 9t
1. CONTRACTOR SHALL COMPLY WITH ALL NOTES ON SHEET C1.00. rj W_ THE
1 LAND
W. Grand Mogul Dr. (Phase 1 ) Sewer Keynotes: - GROUP
' U
J
[0 H
1. CONNECT TO EXISTING SSMH AND INSTALL KOR-N-SEAL BOOT. ADJUST
z
2 y SSMH CHANNEL AS REQUIRED.
' ow
wC/)
o 2. POTABLE WATER MAIN CROSSING-SEE SEWER NOTE NO. 2/C0.00.
EP
'd IL P " 3. POTABLE/NON-POTABLE WATER SERVICE CROSSING-SEE SEWER NOTE
6"PIRR 6"PIRR 611PIRR 6"PIRR 6"PIRR 6"PIRR oO ="PIRR 6"PIRR 6"PIRR 6"PIRR < 6"PIRR "PIRR N0. 3/C0.00.
- - - - - - - -o - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - -=- -- - �- -
I I o 11 11 3: 4. CONSTRUCT 6-IN SEWER SERVICE PER ISPWC SD-511,TYPE A. CAP AND
11 T INSTALL 8-LF 6-IN C900 11 11
' F I I 11 T MARK END OF STUB PER CITY OF MERIDIAN SUPPLEMENTAL DRAWING
1-FIRE HYDRANT ASSEMBLY PER CITY OF MERIDIAN DETAIL W8 SW3.
> 11
II CLCt) II
— R/W R/W- R/'o R R/W R/� R/W R/W R/W R/W � R/W � — — — — — — — — — — — — — Water Ke notes: #
■ LL y
— 12"W "W 12"W X X 12"W 12"W 12"W 12"W 12"W 12"W 12" ��
230 LF 12-IN C900 26-LF 12 IN C900 X 1 221-LF 12-IN C900 1. INSTALL 1-12"x8"TEE (FLG), 1-12"GATE VALVE (FLGxMJ), 1-8"GATE
3 EXISTING SSMH 20 � I VALVE (FLGxMJ), 1-12"ADAPTER (FLGxMJ).THRUST BLOCK AS REQUIRED.
SSMH 21 W. Grand Mogul Dr i — 2. INSTALL FIRE HYDRANT ASSEMBLY PER CITY OF MERIDIAN
— — — — — — — — + — — — — 1 — — I — — —W — SUPPLEMENTAL DRAWING W8. INSTALL 1-12"x12"x6"TEE (MJxMJxFLG)
T 0.60% h 31+00 2 30+00 209-LF OF 8-IN PVC AT 0.40% 29+00 28 00 p �+�+ 27� WITH 1-6"GATE VALVE (FLGxMJ) PER CITY OF MERIDIAN SUPPLEMENTAL
8"SS W "SS 8"SS SAN 8"SS 8"SS 8"SS 8"SS 8"SS SAN 8" S I 8"SS 8"SS
H I DRAWING SD-W11.THRUST BLOCK AS REQUIRED.
' 1906 O
�' I 3. INSTALL 2"BLOW-OFF ASSEMBLY PER CITY OF MERIDIAN SUPPLEMENTAL
DRAWING W12.THRUST BLOCK AS REQUIRED. FUTURE CONTINUATION OF
-� o WATER MAIN BY OTHERS.
— R/W R/W R/W R/W o ao R/W R/W R/W R/W R/W T R/W
a a 4. LOCATE EXISTING WATER LINE STUB IN THIS APPROXIMATE AREA.
i o ii ii II 18"SD REMOVE BLOW-OFF AND VALVE TO EXTEND LINE AS SHOWN. O
oioe I I co I I ■
11 — — — — avoe O° z 11 11 11 5. POTABLE WATER MAIN CROSSING-SEE WATER NOTE NO. 2/C1.01.
1 vaee
— eves
J j J J 6. INSTALL 1-12"CROSS (FLG), 2-12"GATE VALVES (FLGxMJ), 1-12" ■�
6"PIRR 6"PIRR 6"PIRR X 6" IRIti X 6"PIRR 6"PIRR 6"PIRR 6"PIRR `; 6"PIRR 6"PIRR 6"PIRR
ADAPTER (FLGxMJ),AND 1-8"GATE VALVE (FLGxMJ).
5 Pi ■
1
CO 7
"T'TYPE CLEAN-OUT PER 4 6-IN PVC
CITY OF MERDIAN SD SW1 I 3 IE: 2546.98
' STA: 30+42.90, 58.00'L
' RIM: 2552.84± L - - - - - - J
IE OUT: 2547.55, 8-IN PVC (N) y
30'PROPOSED CITY
' UTILITY EASEMENT
I
I
1
I c ■
Roadway Utilities Plan & Profile 20' 40' _
cc
Horizontal Scale: 1" = 20'
—
O
y
2564 2564 = _
W. Grand Mogul Dr.: Sta. 27+60 - 31 +60
HORIZONTAL SCALE: 1" = 20' Q
Rom
VERTICAL SCALE: 1" = 4'
CD C z
2560 2560 O ■ o
w
PROPOSED GROUND AT CENTERLINE
2556 2556 Revisions
1.
2552 -------- --------- --- — ---- ---- ----- ---- -- — ----- ---- ---- ----- _--- -- -- ----- 2552
z
O
a�8-IN WATER MAIN EXISTING GROUND AT CENTERLINE
2548
328-LF OF 8-IN PVC AT 0.60% 2548
209-LF OF 8-IN PVC AT 0.40% 0
SSMH 21
48-IN MH PER ISPWC SD-501 1 EXISTING SSMH 20
2544 RIM: 25°5545190, 6.00'L
48-IN MH PER ISPWC SD-501 2544
SUMP: 2547.24 STA: 28+33.71, 6.00 E RIM: 2554.57±
IE IN: 2547.34, 8-IN PVC (W) SUMP: 2546.30 ANAL
�5g1 ENG
IE IN: 2547.34, 8-IN PVC ( )
IE IN: 2546.40, 8-IN PVC (W) ,� �C,\ST
2540 IE OUT: 2547.24, 8-IN PVC (E) IE OUT: 2546.30, 8-IN PVC (E) 2540 10961
s� �o
9Tf \QP
EXISTING GROUND ELEVATION PROPOSED GROUND ELEVATION �F
Jq�NDEI`1
AT CENTERLINE AT CENTERLINE
2536 2536 11/Z4/Z025
t` CO Lf) � co N N co � U') CO r_ ) O N co "I- LC) CO
M r M N coco co � coU_" coCO coCfl coU_" � � � co � CV LO r U') C7 U') m co m co W Cfl r CO CO � LC) � � ~ co Project No.: 124186
i CV L6 CV L6 CV L6 CV L6 CV U') CV Ln CV L6 CV L6 CV L6 CV L6 CV L6 CV ui CV ui CV V CV V CV CV CV CV CV CV
P)L!") L LP) Lo Lo L
U
LP) _" ) ) )L!') L!') U') L!') Lf L!') U') LP) U_" LP) P) U') LO U') LO U') LO U_" LO LO U) LO
L!7 L!') L!')
Lr, LO LO U') LO LO LO U') LO LO LO LO LO � LO � LO � LO � LO U') LO U') LO U') LO U') LO U') LO LO � LO L0 LO LO LO LO LO LO
Date of Issuance: 11-24-2025
CV N CV N CV N CV N CV N CV N CV N CV N CV N CV N CV N CV N CV N CV N CV N CV CV CV N CV N CV CV CV N CV N
Project Milestone: PERMIT SUBMITTAL
a 31+60 31+00 30+00 29+00 28+00 27+60
_ - Roadway Utilities Plan
E v
E
Profile
QEo
4.001