Loading...
HomeMy WebLinkAboutC1.55 SWPPP Details 50' MINIMUM EXISTING STORM SEWER GRATE \\ /I.► ; O PAVEMENT CONSTRUCTION SPECIFICATIONS �O��DO v_iw► THE - DD 1. STONE SIZE-USE CRUSHED 2" STONE OR RECLAIMED OR RECYCLED �00�0��0��0 SEE WOOD STAKEjM O O �O �O �O CONCRETE EQUIVALENT FOR TOP LAYER, 2" 8" DIAMETER FOR BASE �O�OO�OOOD LIFT STRAPS, FRAME OR OTHER DETAIL THIS SHEET LAN D LAYER. �0�� \ METHOD OF LIFTING BAG FOR . FILTER CLOTH MOUNTABLE BERM 2. LENGTH-AS REQUIRED, BUT NOT LESS THAN 50 FEET (EXCEPT ON A REINFORCED CORNERS OR MAINTENANCE GROUP (OPTIONAL) SINGLE RESIDENCE LOT WHERE A 30 FOOT MINIMUM LENGTH WOULD METAL FRAME REQUIRED OVERFLOW PORTS OR FIBER WATTLES APPLY). CII� )' 3. THICKNESS-NOT LESS THAN 6 INCHES. l METHOD FOR OVERFLOW IN EXISTING GRADE PROFILE 4. WIDTH-10 FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT ® LARGE STORM EVENTS SEE WOOD STAKE O POINTS WHERE INGRESS OR EGRESS OCCURS. ® ® DETAIL THIS SHEET D 5. FILTER CLOTH-WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO 2-FT MINIMUM CONTAINMENT BAG 50'MINIMUM PLACING OF STONE. FILTER WILL NOT BE REQUIRED ON A SINGLE FAMILY RESIDENCE LOT. O �O �O 6. ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION 0 0 0 0 0 ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS &cc' L �D D D D D IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE WOOD STAKE O O O O O O PERMITTED. Rbkcb) ` %DaD D D D D 7. MAINTENANCE-THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION STORM INLET z O&C, 10') WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTOv � C 1D &D � ^D5DD�D _ `' PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING D�QD c acc'ac') D� �D Dabab��DCLITH EANO DITIOFAANYONE AS MEASUROS IUIOD NS DEMAND TO TRAP NSEDEMENTPAIR ANDAOR NOTES:LL 1. APPROVED MANUFACTURES: O O O C O O O O O SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC DANDYSACKTM OR FLEXSTORMTM Ll)oD 0O RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 2. INSPECT AT FREQUENCY DESCRIBED IN D&D 8. WASHING-WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR REPLACE AESC/SWPP DOCUMENTS. REPAIR OR O TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REPLACE AS NEEDED. D REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE 3. REMOVE SEDIMENT ACCUMULATIONS PLAN VIEW O AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. WHEN FILTER CAPACITY IS REDUCED 9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED BY 50%. AFTER EACH RAIN. Stabilized Construction Entrance (BMP 40) Drop Inlet Protection Type I (BMP 13) Fiber Roll (BMP 64)3 0 Scale: NTS Scale: NTS Scale: NTS y WOOD STAKE FIBER WATTLE y DOWNS -.- S4op CIS '';r Lr DS IM0513 111I 'E ABOUT EPA,-�— . -• Department of Envilron menta l Quality SLOPE SURFACE Final 202,2 5305 (b) Integrated Report cc Zoom In I I Il Zave>rrI Prewr IEacte t k Next Exf�ent I Ran elect I34aF F Iden XY CI�r Print H�Ipf r// 0 TRENCH \� = -id Sea by Ei;sji 1qr Map Leger I, I I. I. 1 h.� �. **Please Note: aEQ§30'5(b) NHD I:I OOK GIS � I Lakeview�G aIf � �'. SEARCH � L� 0 .. ► ®� B �ll�ap� waters may not refle�c t a complete J representation of hydrolgraphti� in Idaho. � � � L � � � CD List S305(b) Waters by C rr �Ln W Cfi'errs C � e ry Ln f Q Su I 1bbair�i�*�y : e O Q r•rr � College Df � El G ato � Meridian � °C Slubbasin bar Name.. '� Western 1. ho I' �� Pine Ave E LU Fiber Roll Stake Section (BMP 64) L , `1 , t Meridian 2E 4 f Scale: NTS I c� r r ` Revisions Subbasin by 'Code. . aJ . �,� is I crest GQIf �Iclub �Q E Franklin Rd L��� et' Br�:i5 I Franklin Rd vc� Franklin Rya E F POST SIGN NEAR BASIN Lavers Activate as the Scale Increases ��eek I I PROJECT AREA+ US C:itie5 Et BoundariesE Flan-iinc a v I CONCRETE US Streets R Highways WASHOUT Stamm Lni aI -ID World Transpoi tatiun 4— � � �; � 55 G9 C� Je Map Co ntents,-0305� 2022 �: � W OVerland Ind m fD overland Rid 13- Idaho Ci ties-Towns m : 72, z a 0 IDEQ Sltrm Monitoring (BURP) a W Lament Rd /0k Cyr rpolo 10 MIL (MIN.) 0.5 1mi PLASTIC LINER Not Monitored '� a IDEo II z�`3 I Sari, N, tlSA, GA, USGS, FEMA. I City cxf Meridian, Caunt�q Df Ada, Esri, H.._ N 43.56001, W - 1 1'6.33754 S��GSAL w - \�Q 10961 OF 0 �SoN DEN Waters of the US Map 11/24/2D25 a G9�Fs Project No.: 124186 Date of Issuance: 11-24-2025 Project Milestone: PERMIT SUBMITTAL NOTES 1. DIMENSIONS VARY. RESPONSIBLE PERSON SHALL SIZE BASIN APPROPRIATELY. SWPPP Details E R. R_ii o Concrete Washout (BMP 49) 5 1 . 55 Scale: NTS