HomeMy WebLinkAboutC0.00 Cover Sheet ■ = THE
Mogul Industri I P rk Subdivision Phs 2 pww�_ ,
LAND
- GROUP
W . Gr nd Mogul Dr .
Constructmion Plans
City of Meridian - Standard Notes: Sheet Index: Vicinity Map: N
GENERAL CONSTRUCTION WATER Sheet Sheet Title
1. ALL CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT VERSION OF THE IDAHO 1. CONSTRUCTION OF THE WATER SYSTEM SHALL CONFORM TO THE STANDARDS IN THE "IDAHO RULES FOR Number y
STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC), THE CITY OF MERIDIAN SUPPLEMENTAL PUBLIC DRINKING WATER SYSTEMS (IDAPA 58.01.08)"AS WELL AS THE STANDARDS AND SPECIFICATIONS CONSTRUCTION DRAWINGS
SPECIFICATIONS TO THE ISPWC (AND ANY ADDENDUMS), MERIDIAN DESIGN STANDARDS, THE REFERRED TO IN GENERAL CONSTRUCTION NOTE NO. 1. FRANKLIN RD
REQUIREMENTS OF THE ADA COUNTY HIGHWAY DISTRICT (ACHD), AND/OR THE REQUIREMENTS OF THE C0.00 COVER SHEET
IDAHO TRANSPORTATION DEPARTMENT(ITD).THE MORE STRINGENT OF ANY OF THESE STANDARDS SHALL 2. THE HORIZONTAL SEPARATION OF POTABLE WATER MAINS AND NON-POTABLE WATER MAINS (SANITARY C1.50 SWPPP PLAN
BE THE CONTROLLING STANDARDS OR SPECIFICATIONS. SEWER, STORM DRAIN, AND IRRIGATION) SHALL BE A MINIMUM OF TEN (10) FEET. WHERE IT IS
NECESSARY FOR A POTABLE WATER MAIN AND NON-POTABLE WATER MAIN TO CROSS WITH LESS THAN C1.55 SWPPP DETAILS
2. THE CONTRACTOR SHALL HAVE A COPY OF THE LATEST CITY OF MERIDIAN STANDARD SPECIFICATIONS EIGHTEEN (18) INCHES OF VERTICAL SEPARATION, THE CROSSING SHALL BE CONSTRUCTED IN O
AND DRAWINGS ON SITE OR READILY ACCESSIBLE AT ALL TIMES DURING CONSTRUCTION (AVAILABLE ON ACCORDANCE WITH SECTION 542.07 OF THE IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA C2.00 PROJECT OVERVIEW PLAN
THE WEBSITE). FAILURE TO HAVE ACCESS TO A CURRENT COPY OF THE STANDARD SPECIFICATIONS ON 58.01.08) AND SECTION 430.02 OF THE WASTEWATER RULES (IDAPA 58.01.16). ■
C201 ROADWAY PLAN &PROFILE
SITE COULD BE GROUNDS FOR A STOP WORK ORDER UNTIL THE SITUATION IS RESOLVED. . NOT TO SCALE F
y
3. THE HORIZONTAL SEPARATION OF NON-POTABLE SERVICES AND POTABLE WATER SERVICES OR POTABLE C2.02 ROADWAY PLAN &PROFILE 3. THE CONTRACTOR SHALL HAVE PLANS STAMPED "APPROVED FOR CONSTRUCTION" BY THE CITY OF WATER MAINS SHALL BE A MINIMUM OF SIX (6) FEET. WHERE IT IS NECESSARY FOR A POTABLE WATER
MERIDIAN ON SITE AT ALL TIMES. MAIN AND NON-POTABLE WATER MAIN TO CROSS WITH LESS THAN EIGHTEEN (18) INCHES OF VERTICAL C2.03 ROADWAY PLAN &PROFILE TB#2
SEPARATION, THE CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 542.07 OF THE4. ALL CONTRACTORS, SUBCONTRACTORS, AND UTILITY CONTRACTORS SHALL ATTEND A IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA 58.01.08) AND SECTION 430.02 OF THE C2.50 ACHD DRAINAGE DETAILSPRE-CONSTRUCTION CONFERENCE PRIOR TO START OF WORK. WASTEWATER RULES (IDAPA 58.01.16). C2.51 INTERSECTION &TYPICAL SECTION DETAILS
5. CONTRACTORS SHALL NOTIFY THE APPROPRIATE AGENCY WHEN MATERIALS ARE ON SITE OR INSPECTION 4. PLACE WATER SERVICE LINES IN A TWO (2) INCH DIAMETER PIPE SLEEVE WHEREVER THE SERVICE LINE C4.01 ROADWAY UTILITIES PLAN &PROFILE
------- TB#1
OF THE WORK IS REQUIRED. NO WORK MAY BEGIN ON ANY PROJECT WITHOUT TWENTY FOUR (24) HOUR CROSSES A STORM WATER TREATMENT FACILITY(I.E. SEEPAGE BEDS, DRAINAGE SWALES). C4.02 ROADWAY UTILITIES PLAN &PROFILE
PRIOR NOTICE. PROJECT y
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONTINUOUS WATER SERVICE TO ALL C4.03 ROADWAY UTILITIES PLAN &PROFILE
6. CONTACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR 48 HOURS PRIOR TO THE REQUIRED TESTING. EXISTING WATER USERS AFFECTED BY CONSTRUCTION. IF WATER SERVICE MUST BE INTERRUPTED, THE
THE CONTRACTOR MAY NOT OPEN OR CLOSE WATER VALVES. CONTRACTOR SHALL COORDINATE WITH THE PUBLIC WORKS INSPECTOR. C4.50 STREETLIGHT PLAN LOCATION
7. ALL MATERIAL FURNISHED ON, OR FOR THE PROJECT MUST MEET THE MINIMUM REQUIREMENTS OF THE C5.01 ROADWAY SIGNING &STRIPING INTERSrATE84--------
APPROVING AGENCIES. AT THE REQUEST OF THE APPROVING AGENCY OR THE DESIGN ENGINEER, ROADWAY
CONTRACTORS SHALL FURNISH PROOF THAT ALL MATERIALS INSTALLED ON THIS PROJECT MEET THE C5.02 ROADWAY SIGNING &STRIPING
SPECIFICATION REQUIREMENTS SET FORTH IN GENERAL CONSTRUCTION NOTE NO. 1. 1. ALL CONTRACTORS WORKING WITHIN THE PUBLIC ROAD RIGHT-OF-WAY ARE REQUIRED TO SECURE A cc
C601 PRESSURE IRRIGATION MAIN
RIGHT-OF-WAY CONSTRUCTION PERMIT FROM ACHD OR ITD AT LEAST
.
TWENTY-FOUR (24) HOURS PRIOR Q
8. WORK SUBJECT TO APPROVAL BY ANY GOVERNMENTAL AGENCY MUST BE APPROVED PRIOR TO (A) TO ANY CONSTRUCTION. C6.02 PRESSURE IRRIGATION MAIN
BACKFILLING TRENCHES FOR PIPE; (B) PLACING OF AGGREGATE BASE; (C) PLACING OF CONCRETE; (D)
PLACING OF ASPHALT PAVING. 2. ACHD OR ITD WILL INSPECT ALL WORK WITHIN THE PUBLIC RIGHTS-OF-WAY TO INCLUDE UTILITY C6.03 PRESSURE IRRIGATION MAIN DETAILS cc
TRENCHES ABOVE THE PIPE ZONE. L1.00 LANDSCAPE OVERVIEW Benchmarks: NAVD 88 Datum � ■� �
9. INSPECTION, APPROVAL AND FINAL ACCEPTANCE OF ALL WATER AND SEWER CONSTRUCTION SHALL BE PRESSURIZED IRRIGATION L1.01 GRAND MOGUL DRIVE LANDSCAPE �
BY THE PUBLIC WORKS DEPARTMENT, AND THEIR DECISION SHALL BE FINAL. SUCH INSPECTIONS SHALL BENCHMARK#1 EL. = 2558.89 CM
NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF PERFORMING THE WORK IN AN 1. THE PRESSURIZED IRRIGATION SYSTEM MUST BE BUILT TO THE STANDARDS OF THE IRRIGATION DISTRICT L1.02 184 CORRIDOR BUFFER WEST LANDSCAPE DESCRIPTION: SET 5/8" REBAR O
ACCEPTABLE MANNER IN ACCORDANCE WITH THE DEQ/QLPE APPROVED CONSTRUCTION PLANS. IN WHICH IT IS BEING CONSTRUCTED. N: 704541.4100 E: 2438614.7550
L1.03 184 CORRIDOR BUFFER EAST LANDSCAPE
10. ANY DEVIATION FROM THE APPROVED PLANS AND SPECIFICATIONS MUST HAVE THE APPLICABLE AGENCY 2. INSTALL A REDUCED PRESSURE BACKFLOW PREVENTER IN ANY CONNECTION BETWEEN THE POTABLE =FINAL PLAT BENCHMARK#2 EL. 2547.92
APPROVAL IN WRITING PRIOR TO CONSTRUCTION. WATER SYSTEM AND THE PRESSURE IRRIGATION SYSTEM. THE DEVICE MUST BE APPROVED BY THE IDAHO
DEPARTMENT OF ENVIRONMENTAL QUALITY(DEQ)AND THE CITY OF MERIDIAN WATER DEPARTMENT. SHT 1 SHEET 1 DESCRIPTION: SET SET 5/ REBAR
E: 2436102.8600
11. PRIOR TO BEGINNING INSTALLATION OF STREET LIGHTS, THE ELECTRICAL CONTRACTOR SHALL OBTAIN AN N: 705891.5120 N:
ELECTRICAL PERMIT FROM THE BUILDING DIVISION OF THE MERIDIAN PUBLIC WORKS DEPARTMENT. ANY SHT 2 SHEET 2
DEVIATION IN STREET LIGHT LOCATIONS FROM THE APPROVED PLANS MUST BE APPROVED IN WRITING DRAINAGE SHT 3 SHEET 3 ALL ELEVATIONS AND DISTANCES ARE EXPRESSED IN U.S. SURVEY FEET.
FROM THE CITY ENGINEER.
� cc O
1. FOR ANY DRAINAGE FACILITIES WITHIN A PUBLIC RIGHT OF WAY, ACHD OR ITD SHALL BE RESPONSIBLE 0
SEWER FOR INSPECTION. FOR ANY PRIVATE DRAINAGE FACILITIES THE PROJECT ENGINEER OR ARCHITECT SHALL
BE RESPONSIBLE FOR INSPECTION AND CERTIFICATION OF DRAINAGE FACILITIES; HOWEVER ANY ROOF C
1. CONSTRUCTION OF THE SEWER SYSTEM SHALL CONFORM TO THE STANDARDS IN THE WASTEWATER DRAINAGE AND PIPING TO THE DRAINAGE FACILITIES WILL BE INSPECTED BY THE MERIDIAN PLUMBING z
RULES (IDAPA 58.01.16) AS WELL AS THE STANDARDS AND SPECIFICATIONS REFERRED TO IN GENERAL OFFICIAL UNDER THE APPROPRIATE PERMIT. Q
CONSTRUCTION NOTE NO. 1. Owner/Developer: O CD
w
2. THE HORIZONTAL SEPARATION OF POTABLE WATER MAINS AND NON-POTABLE WATER MAINS (SANITARY
SEWER, STORM DRAIN, AND IRRIGATION) SHALL BE A MINIMUM OF TEN (10) FEET. WHERE IT IS OWNER: AT SAW GP, LLC
NECESSARY FOR A POTABLE WATER MAIN AND NON-POTABLE WATER MAIN TO CROSS WITH LESS THAN ACHD Standard Notes: ACHD Roadway Notes: 12709 E. MIRABEAU PKWY, SUITE 10
EIGHTEEN (18) INCHES OF VERTICAL SEPARATION, THE CROSSING SHALL BE CONSTRUCTED IN SPOKANE VALLEY, WA 99216
ACCORDANCE WITH SECTION 542.07 OF THE IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA Revisions
58.01.08) AND SECTION 430.02 OF THE WASTEWATER RULES (IDAPA 58.01.16). ACHD STANDARD CONDITIONS: 1. ALL CONSTRUCTION IN THE PUBLIC RIGHT-OF-WAY SHALL CONFORM TO THE CURRENT EDITION OF THE PRIMARY CONTACT: CLAY SAMMIS 1
1. ANY EXISTING IRRIGATION FACILITIES SHALL BE RELOCATED OUTSIDE OF THE RIGHT-OF-WAY. ISPWC AND ACHD SUPPLEMENTAL SPECIFICATIONS. NO EXCEPTIONS TO DISTRICT POLICY, STANDARDS clay@sawtoothdevelopment.com
3. THE HORIZONTAL SEPARATION OF NON-POTABLE SERVICES AND POTABLE WATER SERVICES OR POTABLE AND THE ISPWC WILL BE ALLOWED UNLESS SPECIFICALLY AND PREVIOUSLY APPROVED IN WRITING BY PH: (858) 229-3506
WATER MAINS SHALL BE A MINIMUM OF SIX (6) FEET. WHERE IT IS NECESSARY FOR A POTABLE WATER 2. PRIVATE SEWER OR WATER SYSTEMS ARE PROHIBITED FROM BEING LOCATED WITHIN ANY ACHD THE DISTRICT.
MAIN AND NON-POTABLE WATER MAIN TO CROSS WITH LESS THAN EIGHTEEN (18) INCHES OF VERTICAL ROADWAY OR RIGHT-OF-WAY. 1.1. ACTUAL FIELD CONDITIONS DURING TRENCHING MAY REQUIRE ADDITIONAL PAVEMENT REPAIR Design Team:
SEPARATION, THE CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 542.07 OF THE BEYOND THE LIMITS SHOWN ON THE PLANS. THE FOLLOWING CONDITIONS ARE LISTED IN
IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA 58.01.08) AND SECTION 430.02 OF THE 3. REPLACE ANY EXISTING DAMAGED CURB, GUTTER AND SIDEWALK AND ANY THAT MAY BE DAMAGED SECTION 6000 OF ACHD POLICY MANUAL: THE LAND GROUP, INC
WASTEWATER RULES (IDAPA 58.01.16). DURING THE CONSTRUCTION OF THE PROPOSED DEVELOPMENT. CONTACT ACHD INSPECTION SERVICES 1.2. ALL ASPHALT MATCH LINES FOR PAVEMENT REPAIR SHALL BE PARALLEL TO THE CENTERLINE OF
AT 387-6280. THE STREET AND INCLUDE ANY AREA DAMAGED BY EQUIPMENT DURING TRENCHING CIVIL ENGINEER: JASON DENSMER, PE
4. PLACE SEWER SERVICE LINES IN A SIX (6) INCH DIAMETER WATER CLASS PIPE SLEEVE WHEREVER THE OPERATIONS. jason@thelandgroupinc.com
SERVICE LINE CROSSES A STORM WATER TREATMENT FACILITY(I.E., SEEPAGE BEDS, DRAINAGE SWALES). 4. COMPLY WITH DISTRICT'S TREE PLANTER POLICY. 1.2.1. IF THE CUMULATIVE DAMAGED PAVEMENT AREA EXCEEDS 50% OF THE TOTAL ROAD SURFACE,
CONTRACTOR SHALL REPLACE THE ENTIRE ROADWAY SURFACE. LANDSCAPE ARCHITECT: DUPERAULT, RLA
5. CONSTRUCT ALL UTILITY CUTS AND STREET REPAIRS PER SD-301, SD-303, AND SD-806. A TRAFFIC 1.2.2. CONTRACTOR SHALL REPLACE THE PAVEMENT SURFACE TO ENSURE MATCH LINE DOES NOT tlduperault@thelandgroupinc.coc.com
CONTROL PLAN WILL ALSO BE NECESSARY FOR ANY UTILITY CUT. SUBMIT ALL TRAFFIC CONTROL PLANS FALL WITHIN THE WHEEL PATH OF A LANE. MATCH LINE SHALL ONLY FALL IN THE CENTER OR SURVEYOR:JIM WASHBURN, PLS
TO THE DISTRICT'S CONSTRUCTION SERVICES DIVISION FOR REVIEW AND APPROVAL. IT IS STRONGLY EDGE OF A TRAVEL LANE. jim@thelandgroupinc.com
RECOMMENDED THAT THE NUMBER OF UTILITY CUTS WITHIN A STREET BE REDUCED TO THE FEWEST 1.2.3. FLOWABLE FILL OR IMPORTED MATERIAL MAY BE REQUIRED IF THE NATIVE TRENCH MATERIAL
City of Meridian - Link to POSSIBLE. IS DEEMED UNSUITABLE BY ACHD INSPECTOR, DOES NOT MEET COMPACTION STANDARDS OR 462 EAST SHORE DRIVE, SUITE 100
TIME IS A CRITICAL FACTOR. EAGLE, IDAHO
Design & Construction Supplemental Specifications: 6. UTILITY STREET CUTS IN PAVEMENT LESS THAN FIVE YEARS OLD ARE NOT ALLOWED UNLESS APPROVED IN 1.2.4. ANY EXCEPTIONS TO THESE RULES SHALL BE PRE-APPROVED IN WRITING BY DISTRICT STAFF PHONE: 208.939.4041
WRITING BY THE DISTRICT. CONTACT THE DISTRICTS UTILITY COORDINATOR AT 387-6258 (WITH FILE BEFORE CONSTRUCTION BEGINS. ANAL
NUMBERS) FOR DETAILS. 1.2.5. CONSTRUCT ALL PAVEMENT MATCHES (INCLUDING DRIVEWAY APPROACHES AND UTILITY CUT 5g1 E1V0
ACCELA (CITIZEN ACCESS PORTAL) STREET REPAIRS)WITHIN ACHD RIGHTS-OF-WAY TO MATCH THE EXISTING STREET PAVEMENT ��\ST 1,�
RECORD ID/PERMIT NUMBER: 7. CONSTRUCTION, USE AND PROPERTY DEVELOPMENT SHALL BE IN CONFORMANCE WITH ALL APPLICABLE SECTION OR THE SECTION NOTED ON THE ASPHALT PAVING SECTION DETAIL 1, SHEET C2.20.
LD-CSUB-2025
REQUIREMENTS OF THE ACHD PRIOR TO DISTRICT APPROVAL FOR OCCUPANCY. USE WHICHEVER SECTION IS GREATER. 10961
RI
as1 0 8. THE APPLICANT SHALL CONTACT ACHD TRAFFIC OPERATIONS 387-6190 IN THE EVENT ANY ACHD 2. PIPE TRENCH SHALL CONFORM TO THE LATEST EDITION OF THE I.S.P.W.C. DIVISION 300 AND SD-301. Dig Line, Inc. s/X O%
i a : ! F!l
CONDUITS (SPARE OR FILLED)ARE COMPROMISED DURING ANY PHASE OF CONSTRUCTION. BEDDING AND BACKFILL SHALL BE CONSTRUCTED PER SECTIONS 305 AND 306 OF THE I.S.P.W.C. r J £OF
a '� 3. ANY WORK IN THE PUBLIC RIGHT-OF-WAY REQUIRES INSPECTION AND APPROVAL BY ACHD CONSTRUCTION �I Call Before You Dig! SON DEN
� `
a Eilam
11/24/2025DIVISION. CONTACT INSPECTION SERVICES AT 387-6284 TO OBTAIN A PERMIT TO WORK IN THE f�11
RIGHT-OF-WAY. INSPECTION REQUESTS REQUIRE A MINIMUM OF 24-HOUR PRIOR NOTICE. �, vProject No.: 124186
Certification of Compliance with Design Standards■ Date of Issuance: 11-24-2025
4. PRIOR TO PLACEMENT OF ANY PAVEMENT MARKINGS, COORDINATE WITH ACHD INSPECTION STAFF. ALLProject Milestone: PERMIT SUBMITTAL
THE ENGINEER OF RECORD CERTIFIES THAT THE PLANS ARE PREPARED IN SUBSTANTIAL CONFORMANCE WITHPAVEMENT MARKINGS SHALL COMPLY WITH ACHD POLICY AND ISPWC SECTION 1100. MARKINGS SHALL
a THE ACHD POLICY AND STANDARDS IN EFFECT AT THE TIME OF PREPARATION. THE ENGINEER ACKNOWLEDGESTRANSITION SMOOTHLY WITH EXISTING PAVEMENT MARKINGS.
THAT ACHD ASSUMES NO LIABILITY FOR ERRORS OR DEFICIENCIES IN THE DESIGN. ALL VARIANCES FROM ACHD
e a
POLICY SHALL BE APPROVED IN WRITING. THE FOLLOWING VARIANCES, LISTED BY DATE AND SHORT Cover Sheet
DESCRIPTION,WERE APPROVED FOR THE PROJECT: NONE
E
A�
C0000