February 5',2026
MEMORANDUM
TO: Planning and Zoning Commission
CC: City Clerk, City Attorney
FROM: Nick Napoli,Associate Planner
RE: St. George(H-2025-0004)
On November 6t'',2025, The St. George project was presented before the Planning and Zoning
Commission. The Planning and Zoning Commission continued the project to have the applicant work
with city staff to fix outstanding issues to gain Commission favorable recommendation to City Council.
The applicant has submitted revised drawings and documents based on this direction. Staff has reviewed
the revised plans and offers the following summary:
Resolved Issues/Concerns:
• The applicant did not decrease the unit count and remains at 23 total residential unit on the site.
• Resolved the issues with Public Works regarding water and sewer easements and separation
requirements.
• Provided updated floor plans meeting the requirements for private usable open space for the multi-
family units.
• Revised the landscape plan to incorporate additional landscape details and elements. However, the
landscape plan and site plan still do not match. These plans will need to match 15 days prior to the
City Council hearing.
Outstanding Issues/Concerns:
• Much of the concern continues to focus on open space around the creek. The exhibit below shows
that a significant portion of this area is located within the floodway. Since the Commission hearing,
the applicant has been discussing with the irrigation district the possibility of developing this area
and incorporating it into the project's open space. However, because the property lies within the
floodway, options are very limited and construction of a bridge is not feasible. In addition, the
applicant is considering piping the creek, which is supported by the irrigation district but not
permitted under the UDC. Staff has consulted with the City's Floodplain specialists, who indicated
that any such proposal would require several permits including: a hydrologic and hydraulic
analysis demonstrating how piping the creek would affect base flood elevations within the
floodplain and floodway; a Conditional Letter of Map Revision (CLOMR) approved by FEMA,
followed by a Letter of Map Revision (LOMR); an approved Section 404 Permit from the U.S.Army
Corps of Engineers; an approved Stream Alteration Permit from the Idaho Department of Water
Resources; and an approved variance from MCC 11-3A-6. Obtaining these permits may require a
significant amount of time and coordination.
Natural waterways are intended to be preserved as natural amenities, and stafffinds that leaving
this area undisturbed and in its natural state is preferable. A balance must be achieved between
open space preservation, maintaining the creek in an open condition, and the proposed project
density. Staff recommends prioritizing the preservation of Five Mile Creek in its natural state, even
if this results in the loss of a unit and providing additional open space elsewhere on the site.
Alternatively, the Planning and Zoning Commission may consider counting the creek corridor as
open space under the code. If the Commission supports the project, staff recommends that Five
Mile Creek remain open without a bridge, the northernmost unit in Building A be removed to
incorporate additional open space, and three (3) amenities, one from each category, be relocated to
the open space north of Building A.
• The applicant revised the landscape plan to address the water conserving design that is being
requested along the Overland Road frontage. However, the landscape plan still does not meet the
water conserving design standards.
• Concerns persist regarding functional integration with the surrounding properties in the future.
• In addition, the Planning and Zoning Commission should carefully consider whether the traffic
generated by the development is appropriate given the existing conditions and access points.
Development Agreement and Conditions to Consider:
Below are conditions of approval and development agreement provisions for the Planning and Zoning
Commission to consider IF they are going to recommend approval of the application to City Council.
A. A Development Agreement(DA)is required as a provision of annexation of this property. Prior
to approval of the annexation ordinance, a DA shall be entered into between the City of Meridian,
the property owner(s) at the time of annexation ordinance adoption, and the developer. A
Certificate of Zoning Compliance and Design Review Application will not be accepted until the
Ordinance and Development Agreement are recorded.
Currently, a fee of$303.00 shall be paid by the Applicant to the Planning Division prior to
commencement of the DA. The DA shall be signed by the property owner and returned to the
Planning Division within six(6)months of the City Council approval of the annexation Findings.
The DA shall, at minimum,incorporate the following provisions IF City Council determines
annexation is in the best interest of the City:
B. Future development of this site shall be consistent with the site plan, landscape plan, qualified
open space,and a total of three(3) site amenities one(1) from each category; one(1)vertically
-integrated residential structures featuring four(4)dwelling units and 8,000 square feet of
commercial space along with three(3)multi-family building consisting of 19 dwelling units(for a
total of 23 residential units); and conceptual building elevations and renderings as proposed in
Section VII and the provisions contained herein.
C.'..The Development shall comply with the Specific Use Standards for a multi-family development
outlin-ed in-UDC.11 4-3-27 and a vertically integrated residential project as outlined in UDC 1I-
4-3-4 1
/ D. The applicant shall submit written documentation to Jason Korn to Pipe Five Mile Creek if
allowed by City Council -
-E--The existing homes and accessory structures shall be removed prior to submittal of the first
Building Permit.
F. Restaurants and Drinking Establishments shall be a prohibited use in the commercial space in the
vertically integrated building.
G. Any future development of the site must comply with the City of Meridian ordinances in effect at
the time of the development
Conditional Use Permit
1. The site and landscape plan shall include the following revisions:
- Depict all proposed fencing and provide a fencing exhibit.
- Implement directional signs and striping to indicate the northern entrance off of Topaz Avenue as
one-way.
- In order to count the buffer along the arterial street, it has to meet the enhanced buffer
requirements in UDC 11-4-3-27C.9, 11-3B-5, 11-3G-3, and 11-3B-7C.3f.
- Provide parking lot landscaping in accordance with UDC 11-3B-8 or apply for alternative
compliance to relocate the trees to the buffer along Overland Road.
- Provide bicycle parking for the multi-family and non-residential uses in compliance with UDC
11-3C.
- Leave Five Mile Creek in its natural state and remove the northernmost unit in Building A to
incorporate additional open space, and three(3)amenities, one from each category,be relocated
to the open space north of Building A.
2. The proposed plat and subsequent development are required to comply with the dimensional
standards listed in UDC Table 11-2A-7 for the R-15 zoning district.
3. The Applicant shall obtain a Certificate of Zoning Compliance(CZC) and Administrative Design
Review(DES)approvals before submitting any building permit within this development.
4. Off-street parking is required to be provided by the standards listed in UDC Table 11-3C-6 for
multi-family dwellings based on the number of bedrooms per unit.
5. No recreational vehicles, snowmobiles,boats,or other personal recreation vehicles shall be stored
on the site unless provided for in a separate,designated and screened area.
6. Upon completion of the landscape installation, a written Certificate of Completion shall be
submitted to the Planning Division verifying all landscape improvements are in substantial
compliance with the approved landscape plan as outlined in UDC 11-313-14.
7. With the submittal of the first certificate of zoning compliance application,the applicant shall
provide a maintenance agreement for the development.
8. With the submittal of the first certificate of zoning compliance application,the applicant shall
submit and get the 14 foot pedestrian easement for the future pathway.
9. The Conditional Use Permit approval shall become null and void unless otherwise approved by
the City if the applicant fails to 1) commence the use, satisfy the requirements, acquire building
permits and commence construction within two years as outlined in UDC 11-5B-6F.1; or 2)
obtain approval of a time extension as outlined in UDC 11-513-6F.4.
10. Fifteen(15)days prior to the City Council hearing,the applicant shall provide the revised
concept plan,landscaping plan and open space exhibit to match,provide details for the
amenities, and relocate the open space.
11. The Applicant shall comply with all ACHD's conditions of approval.
12. Staff's failure to cite all relevant UDC requirements does not relieve the applicant from
compliance.
Revised Site Plan
SNESf HO'IES:
s
COVERAGE AREA CALCULATION
�orEs:Q�ve—eye�x
___ ^❑0 ® r �anoc '�I ++ : Ra,nnmoxs..n.wc uor,eo..ao.
RID
'•,,lam m..,,�� + I ��..,��s�'s�'.,.
�ic •, •\ BLOGC a +' menvic�.s
,1
g
d m.nw.
;1
�l
u"n -a
EcoOVERALL LAYOUT�I.V I-P TOPAZ DEVELOPMENT
vo
—--------------
Revised Landscape Plan Rendering
0 . r
o
.,.'r ' N'/lIlLW-IFI�n6 rC�-0�.B,f•L&C\fA'S• !1J a
1 ��
i y iV 9
'mod ys -- -
-
l
Revised Open Space Exhibit
��?�' � % ■ � sne co�eee�zr �
yT�i^f,. ■
_ hu
� 0 7
ry's
b cw+�yaw
� u
Site Plan with Floodplain Overlayed
P
Z' r k
f l a r
a'S
J r�
F
4S R
h FEMA Flood
ZONE SUBTY X; .
Ir./ FLOOMM
0.2PCT4NNLLAL _
CHANCE FLGOD t
HAZARD
1 PO'ANNUAL(I—MU
CONTAINED IN .r a + u
.. CHANNEL
AREA OF M]NL*ML
fL"HAZARD
[all other walur.? - ,•��_r` ww Y R
i[
• ..T - -- "- _--�E;Querlaaiti:Rd�
---4r
1
Revised Building Elevation
-------------------------------------------------------
..
O
.. . La a
5 &Aa °
ggp a
b 6!a 664
' j
LaA0151
_ ______—._._._.—.____._.________________--.__.._--.___—._
_____._._.___._.___---._._._._._._._-----
l Y
y � 6
b b]
00 .Q 2�:_ h"
Amp
ieo.axn swm-rvnarca � LLl �
r.
/ �.. t
ti
S
a
rl
�. II�0 3I'lli jm U.Q mIDm,; mm��1 mmil
AB212
- a
Iwo MAIM
Pm
so.mr rrw .rr�nnwarv:a.,
U
7 �
4! a
m m i-
-
lrnm•-�- --—� �iy,rJyyil•n�r, �m
VIEWS
v AA212
a
mom
mnF,Y. `b.m ne,liW.i 2
I ] m
k
EXTERIOR
VIEWS
MI lwo imo Nil qo �
AC212
/ - - - --- _ -j;