Landscape Notes and Details
1 2 3 4 5 6 7 8 9 10 LANDSCAPE NOTES: 1. REGULATIONS & STANDARDS 1.1. All contractor work shall be conducted in accordance with ISPWC (Idaho Standard Public Works Construction), 2020 (or most recent published); and STACK ROCK = City of Meridian, ID codes, standards and state and local regulations. NOTE: 2. EXISTING CONDITIONS NOTE: BACKFILL SHALL BE 100%TOPSOIL. *CURB&ADJACENT PAVEMENT PER CIVIL OR HARDSCAPE PLANS G R O U P NOTES: REMOVE ALL TAGS,TWINE OR WATER SETTLE ALL PLANTINGS TO *TREE&SHRUB TO BE INSTALLED PER RESPECTIVE DETAILS LANDSCAPE 2.1. All utilities shall be located prior to construction and protected. Any damage 1. DO NOT DAMAGE OR CUT LEADER OTHER NON BIODEGRADABLE ENSURE PLANT ROOTBALL PLANTS& MULCH PER PLAN ARCHITECTURE to structures, utilities or concrete will be replaced at contractor's expense. 2. DO NOT DISTURB ROOT OR DAMAGE ROOT BALL WHEN INSTALLING TREE OR TREE STAKES. MATERIALS ATTACHED TO PLANT OR MAINTAINS I" HEIGHT ABOVE 2.2. The site has man existing improvements such as underground utilities, 3. TREE STAKING SHALL BE AT THE DISCRETION OF CONTRACTOR. HOWEVER ANY TREES DISTURBED z ARCHITECTURE PLANNING Y g p g ROOT MASS. EXISTING SOILS WHEN COMPLETE. curb and gutter, light poles and sidewalks. FROM PLUMB DURING THE PLANT WARRANTEE PERIOD WILL BE REPAIRED OR REPLACED AT 2.3. See Engineer's plans for information about existing features. CONTRACTOR'S EXPENSE. (208) 345-0500 2.3.1. Refer to civil plans for all existing and/or proposed drainage pipes & 4. WATER PLANTS THOROUGHLY IMMEDIATELY AFTER INSTILLATION. 404 S 8th St.#300A1 locations, utilities. Protect all drainage at all times, protect all utilities at 5. REMOVE ALL BURLAP, TWINE, ROPE, OR MATERIAL FROM THE TOP 3 OF THE ROOTBALL. Boise, ID 83702 all times. 6. 5' DIAMETER PLANTER BED/MULCH RING AROUND THE TRUNK OF THE TREE. 3"OF MULCH MIN. DO StackRockGroup.com 3. GRADING & SITE PREPARATION NOT PLACE MULCH WITHIN 2"OF TRUNK OF TREE. MOUND PLANTER 3.5"ABOVE TOP 3.1. Prepare finish grades for planting by grubbing and removing weeds. If CUB WILLET C HOWARD, PLA necessary apply Round-Up (or equivalent herbicide), using a certified OFFICE: (208)345.0500 EMAIL: applicator. Remove rocks and other materials over 2". PROVIE V MIN STEP SPACE WILL@STACKROCKGROUP.COM 3.2. All gravel overprep to be removed and disposed of off site. FOR ADJACENT PARKING TOP SOIL DEPTH AS www.STACKROCKGROUP.COM 3.3. Finish grade to be smooth transition to allow for entire site to be a natural MULCH 2" MIN. EACH SIDE, TYP SPECIFIED flowing space. TOP TWO STRUCTURAL AWAY FROM TRUNK TOP SOIL DEPTH AS U' ROOTS: <3" BELOW TOP FINISHED GRADE .5" THE GRAPHICS AND DESIGNS 3.4. Fine grade lawn areas to elevations set by Engineers plans with positive GRAFT VISIBLE ABOVE SOIL FOLD BURLAP FROM TOP OF PLANT. SPECIFIED OF ROOTBALL. BELOW TOP OF ON THIS SHEET A R E drainage away from structures. LINE OF ROOT BALL DOWN 3" DEEP MULCH MIN. CURB,TYP DELIVERABLES THAT REMAIN 3.5. Refer to Engineer's plans for grading information &for all drainage pipes LOWEST STRUCTURAL INTO GROUND; SET TOP 1'-0" CURB, 6"OR AT ALL TIMES PROPERTY OF and locations. Protect and retain drainage at all times. SOIL LINE OF THE TOP OF OF BALL FLUSH WITH OTHER PER ROOT<5" BELOW TOP OF THE ROOT BALL AFTER FINISH GRADE CIVIL,TYP STACK ROCK GROUP, INC. 3.6. No pooling or standing water will be accepted per industry standards. ROOT BALL REMOVING EXCESS SOIL. LAWN OR PAVING 4. SOILS REPRODUCTION OR REUSE OF 2 z 2-3"OF MULCH 4.1. Lawn areas shall receive 12" min depth of screened topsoil. a THIS PRODUCT CONTAINED 19 4.2. All planter beds shall receive 18" min depth of screened topsoil. _.... BACKFILL MIX SEE / //\//\\ // //\// / FG HERE IN IS PROHIBITED NOTES AND 12"TO 18" FOR FG /\/\/\/\ /\/\/\ 4.3. Reuse of existing topsoil that has been stockpiled on site is permitted if: SPECIFICATIONS. LARGER SHRUB \\//\\//\\//\\// //\\//\\//\\//\\ WITHOUT THE WRITTEN 4.3.1. Topsoil is tested and analyzed to ensure a proper growing medium. Provide I ROOT BALLS, /\\/\\/\\/\\ \/\ CONSENT OF STACK ROCK additional amendments as determined by soil tests. MAKE DEPTH MIN. \//\//\//\//\ //\//\//\//\ G R O U P I N C SOIL SAUCER>3" HIGH /\\/\\/\\/\\/\ \ \ /\\/\\/ 4.3.2. Topsoil is to be loose, friable sandy loam that is clean and free of toxic REM4" DEEPER THAN materials, noxious weeds, weed seeds, rocks, grass or other foreign PROJECT matVE erials. END OF BALL) J /\\//\\//\\//\\//\\ \ \//\\//\\//\\//\\ \ \//\\//\\//\\//\\//\\ ©2025 STACK materials. _ /�//��///// // // // // // // // // // // // // // // ROCK GROUP, INC. \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 4.3.3. Topsoil shall have a ph of 6.5 to 8.0. BALL AND BURLAP PLANT(IF \/\\ \\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\��\\�\ �� CONTAINER-GROWN PLANT \/\/\/\/\/� CUT AND FOLD WIRE - 4.3.4. If on respite onsible blesoil dfoeS not providingse minimum imported topards soil ororais sonsite BASKET FROM TOP OF SOIL SURFACE WITH ROOTS LOOSENED AND LL p g pp p pimproving ROOTBALL COMPACT SOIL UNDER ROUGHENED TO PULLED OUT TO PREVENT \��\�\\��\�\ Seals PRELIMINARY topsoil per the approval of the project manager. ROOTBALL TO 90% PROCTOR. BIND WITH NEW SOIL PLANT FROM BECOMING ROOT 4.4. If imported topsoil is used it must be from a local source and be screened BOUND) 0 F free of any debris or foreign matter. Topsoil must not contain rocks, sticks, lumps, or toxic matter and has a pH of 6.5-8.0. 4.5. Smooth, compact, and fine grade topsoil in lawn areas to smooth and ,� BALL & BURLAP TREE PLANTING 2 SHRUB PLANTING 3 PLANTER ISLAND DETAIL uniform grade .5" below adjacent surfaces. p 4.6. Amend all new plantings with 2 parts topsoil, 1 part compost. 3/4"= 1'-0" 3293-01 V. = 1'-0" 329333-03 3/4"= 1'-0" P-CO-01 5. LAWN AREAS `W 5.1. Sodded lawn to be tall turf-type fescue, or approved other. LA-16733 5.2. Sodded lawn to be regionally/locally harvested, lay sod within 24 hours of FO 10.19.2 P� harvesting. ORNAMENTAL GRASSES OR WOODY SHRUBS TO 4 gNDSCAP� 5.3. Lay sod to form a solid mass with offset, tightly fitted joints on even grades. CONCEAL 85% MIN HEIGHT OF CABINET 5.4. Any existing lawn that is damaged shall be replaced with sodded lawn of NOT FOR CONSTRUCTION the same type of existing lawn. TRANSFORMER/JUNCTION BOX, ETC 5.5. All lawn areas adjacent to planter beds, gravel areas, or aggregate CONCRETE PAD,VARIES pathways shall have 4" black steel edging installed per manufacturer - CLEARANCE recommendations. Other applications to be approved by owner and LLI landscape architect. 5.6. Lawn adjacent to buildings, structures shall be a minimum of 18" away from + + foundations. Lawn adjacent to fences or other screening elements shall be + a minimum of 9" away. 5.6.1. Install 2" chips or other approved gravel mulch type in mow strip at a depth of 3" over commercial grade weed barrier fabric installed per manufacturer recommendations. 12" FLAT LANDING, + 5.7. Provide tree rings with a minimum 3' diameter around all trees located in 2% MAX SLOPE lawn, mulch type & installation/application to match all other planter beds. 6. PLANTER BED MULCH 12" FLAT LANDING, 6.1. All planter beds to receive 3" depth of black&tan mini rock mulch or 2% MAX SLOPE I U) 10'-0" approved equal, submit for approval prior to placement. Install over �N FRONT commercial grade weed barrier fabric per manufacturer recommendations. 3. PREP + 1 i q 7. PLANTS .75% +/-0.25% C Of 7.1. All plant material shall be installed per industry standards. 3 w :� 7.2. All plant material shall meet or exceed the minimum federal standards as F/��q�q/V + regulated by ANSI z60.1, American Standard for Nursery Stock. Plants not meeting these standards for quality, or plants determined to be unhealthy by Owner's representative, will be rejected. N 7.3. All Ball and Burlap trees to be installed per Balled and Burlapped planting — — — — — — — — — — — — — — detail. All shrubs to be installed per detail. + 7.4. Trees and shrubs over 30" shall not be planted within clear vision triangles. CONCRETE SIDEWALK 7.5. Fertilize all trees and shrubs with 'Agriform' planting tablets or approved PER ACHD SUPPLEMENTAL + + equal. Apply per manufacturers recommendations. DRAWING SD-709 J 8. IRRIGATION NOTE: J 8.1. Irrigation system shall be built to the following specifications: REFERENCE ACHD SUPPLEMENTAL DRAWING SD-709&CIVIL DRAWINGS 8.2. Adhere to city codes when connecting to city water. 8.3. All irrigation material to be new with manufacturers'warranty fully intact. 8.4. Install outdoor rated controller in specified location on plan, in a lock box with 2keys. Coordinate with project manager and general contractor on 4 CONCRETE SIDEWALKS ADJ LANDING-12" 5 TRANSFORMER SCREENING z o exact location. 8.4.1. Controller to have On/Off rain switch or rain shut off device that does not 3/8"= 1'-0" 329320-05 1/4"= 1'-0" 32 9339-01 Z alter program. J Q 8.5. All remote control valves (including master control valve)to have flow J 0 U control device. 8.6. Irrigation system piping to be minimum class 200 PVC or approved equal, W sleeves to be double the size of pipes located within, all wires to be contained in separate sleeves 1-1/2" dia min. 8.7. All pipe above 3" caliper to be gasketed, with approved joint restraints at all 45, TEE, ELL, 22, 11. REVISIONS 8.8. Use common trenching where possible.. 8.9. All PVC located under hardscapes to be schedule 40 PVC with same req's MRK DATE Description as above. ® ** ** 8.10. All wires to be Paige wire 7350 or 7351 direct bury wire at a minimum of 12" below finished grade. 8.11. Connect mainline to point of connection in approximate location shown on plan. 8.12. Contractor is responsible complying with all codes and paying all permits necessary. 8.13. Sprinkler heads shall have matched precipitation within each control circuit. Velocities shall not exceed 5 feet per second. 137 8.14. All drip irrigation to be buried 2" below finished grade. 8.15. Water schedule to be provided at a min of 80% evapotranspiration as determined by the local ET. JOB NO: 25-3272 8.16. Install all irrigation per irrigation drawings. utilize material specified or DATE: 10.24.2025 approved equal. DRAWN BY: TB 8.17. Contractor shall confirm the static water pressure at least five days before CHECKED BY: XX construction begins and to contact the landscape architect in writing if the pressure Is below 80 psi. DRAWING TITLE 8.18. If any discrepancies are found, then local codes shall prevail. 9. CONTRACTOR RESPONSIBILITIES 9.1. Estimated quantities are shown for general reference only. Contractor shall be responsible for all quantity estimates. LANDSCAPE 9.2. All plant material and workmanship shall be guaranteed for a period of one NOTES & year beginning at the date of Acceptance by Owner. Replace all dead or unhealthy plant material immediately with same type and size at no cost to DETAILS U) Owner. w 9.3. Landscape contractor to turn in as built drawings at the end of project. w Q Substantial completion will not be granted until 2 copies @ 1"=20' scale are r turned in and approved by owner's representative. 10. In the event of a discrepancy, notify the Landscape Architect immediately. SHEET NUMBER IL Z) O W Ll UYU50 O Y U Q H U 1 2 3 4 5 6 7 8 9 10