Loading...
HomeMy WebLinkAboutITD Rail with Trail Addendum sent to Kim Warren on 1-5 for sign. ADDENDUM STATE/LOCAL AGREEMENT (DESIGN AND CONSTRUCTION) PROJECT NO. A013(918) RAIL WITH TRAIL PATHWAY, MERIDIAN ADA COUNTY KEY NO. 13918 THIS ADDENDUM is made and entered into this day of ______, by and between the IDAHO TRANSPORTATION BOARD by and through the IDAHO TRANSPORTATION DEPARTMENT, hereafter called the State, and the CITY OF MERIDIAN, acting by and through its MAYOR AND COUNCIL, hereafter called the Sponsor. PURPOSE This Addendum will modify the State/Local Agreement Addendum entered into on the 22nd day of August 2022, (hereinafter "Agreement")between the same parties. The parties agree to the following revisions: Section I Paragraph II of the agreement will be amended by changing the following. Federal participation in the Federal-aid portion of this project is at the rate of 92.66%; local participation is 7.34%. Scheduled local participation funds are 100% Sponsor responsibility. Scheduled funding for this project is listed on the approved Idaho Transportation Investment Program, and subsequent revisions. Current estimated funding is as follows: a. Project Development - $121,000 (PE-$2,000 PL-$5,000 PC-$114,000) b. Right-of-Way - $0 c. Project Development Local Participation (100% sponsor responsibility) - $75,000 d. Utilities - $0 e. Construction - $964,945 (Bid-$949,000) (Fed Aid Contingency $15,945) f. Construction Local Participation (Contingency) (100% sponsor responsibility) - $108,955 g. Construction Engineering - $185,055 (CE-$4,745 CL-$37,960, CC-$142,350 h. Total Estimated Project Costs - $1,454,955 State/Local Agreement (TAP) Addendum Rail with Trail Pathway, Meridian Key No. 13918 Page 1 (Fed Aid-$1,271,000) (Local Participation- $183,955) EXECUTION This Addendum is executed for the State by its Division Administrator, and executed for the Sponsor by the Board of Commissioners, attested to by the City Clerk, with the imprinted Corporate Seal of the City of Meridian. IDAHO TRANSPORTATION DEPARTMENT _________________________________ Division Administrator ATTEST: CITY OF MERIDIAN ________________________________ City Clerk Mayor Chris Johnson Robert E. Simison 12-16-2025 12-16-2025 (SEAL) By regular/special meeting 12-16-2025 on ______________________. wd: 13918 SLA TAP ADDENDED State/Local Agreement (TAP) Addendum Rail with Trail Pathway, Meridian Key No. 13918 Page 2