Loading...
HomeMy WebLinkAboutState and Local Agreement Rail with Trail Agreement - Draft. Mike Barton will bring in Original 12-17 C� f1E RIDIA4, MEMO TO CITY COUNCIL Request to Include Topic on the City Council Agenda From: Mike Barton / Kim Warren Meeting Date: December 16, 2025 Parks &Recreation Presenter: Mike Barton, Park Superintendent Estimated Time: 5 min Topic: Rail With Trail Pathway-Addendum to State and Local Agreement Recommended Council Action: Approve addendum to the existing State and Local Agreement for the Meridian Rail With Trail Pathway Background: Federal grant funding for the Rail With Trail Pathway has been obligated in the amount of $1,271,000.00 that will be memorialized in this addendum to the previously approved State and Local Agreement (dated 6.15.2016, amended 8.9.2022). ADDENDUM STATE/LOCAL AGREEMENT (DESIGN AND CONSTRUCTION) PROJECT NO. A013 (918) RAIL WITH TRAIL PATHWAY, MERIDIAN ADA COUNTY KEY NO. 13918 THIS ADDENDUM is made and entered into this day of , by and between the IDAHO TRANSPORTATION BOARD by and through the IDAHO TRANSPORTATION DEPARTMENT, hereafter called the State, and the CITY OF MERIDIAN, acting by and through its MAYOR AND COUNCIL, hereafter called the Sponsor. PURPOSE This Addendum will modify the State/Local Agreement Addendum entered into on the 22nd day of August 2022, (hereinafter "Agreement") between the same parties . The parties agree to the following revisions : Section I Paragraph II of the agreement will be amended by changing the following. Federal participation in the Federal-aid portion of this project is at the rate of 92 . 660; local participation is 7 . 340 . Scheduled local participation funds are 100% Sponsor responsibility. Scheduled funding for this project is listed on the approved Idaho Transportation Investment Program, and subsequent revisions . Current estimated funding is as follows : a. Project Development - $121, 000 • (PE-$2,000 PL-$5,000 PC-$114,000) b. Right-of-Way - $0 C. Project Development Local Participation (100o sponsor responsibility) - $75, 000 d. Utilities - $0 e . Construction - $964, 945 • (Bid-$949, 000) (Fed Aid Contingency $15, 945) f. Construction Local Participation (Contingency) (100o sponsor responsibility) - $108, 955 g. Construction Engineering - $185, 055 • (CE-$4,745 CL-$37, 960, CC-$142,350 State/Local Agreement(TAP)Addendum Rail with Trail Pathway,Meridian Key No. 13918 Page I h. Total Estimated Project Costs - $1, 454, 955 • (Fed Aid-$1, 271, 000) • (Local Participation- $183, 955) EXECUTION This Addendum is executed for the State by its Division Administrator, and executed for the Sponsor by the Board of Commissioners, attested to by the City Clerk, with the imprinted Corporate Seal of the City of Meridian. IDAHO TRANSPORTATION DEPARTMENT Division Administrator ATTEST: CITY OF MERIDIAN City Clerk Mayor (SEAL) By regular/special meeting on xx: 13918 SLA TAP ADDENDED State/Local Agreement(TAP)Addendum Rail with Trail Pathway,Meridian Key No. 13918 Page 2 State/Local Agreement(Construction) Addendum to State/Local Agreement Transportation Plan, Sandpoint Area Key No. 23033 Page No. 3