HomeMy WebLinkAbout2025-12-16 Special Meeting
Mayor Robert E. Simison
City Council Members:
Luke Cavener, President
Liz Strader, Vice President
Brian Whitlock
Doug Taylor
John Overton
Anne Little Roberts
NOTICE OF SPECIAL MEETING: CITY COUNCIL SPECIAL
MEETING
City Council Chambers, 33 East Broadway Avenue Meridian, Idaho
Tuesday, December 16, 2025 at 5:00 PM
The City of Meridian is committed to providing equal access to all public meetings. If you need accommodation, an alternative
format, or language assistance to fully participate, please contact the City Clerk’s Office at cityclerk@meridiancity.org 72 hours
prior the scheduled meeting. Materials presented at public meetings are subject to disclosure pursuant to the Idaho Public
Records Act. Public Meetings of the Meridian City Council are streamed live at https://meridiancity.org/live and can be joined
virtually at https://bit.ly/meridianzoommeeting
Minutes
ROLL CALL ATTENDANCE
PRESENT
Councilman John Overton
Councilwoman Anne Little Roberts
Councilman Brian Whitlock
Councilwoman Liz Strader
Councilman Luke Cavener
Mayor Robert E. Simison
ABSENT
Councilman Doug Taylor
ADOPTION OF AGENDA Adopted
DEPARTMENT REPORTS \[Action Item\]
1. Addendum to State & Local Agreement Between City of Meridian and the Idaho
Transportation Board by and through the Idaho Transportation Department for
the Rail with Trail Pathway Approved
Motion to approve made by Councilman Whitlock, Seconded by Councilman Cavener.
Voting Yea: Councilman Overton, Councilwoman Little Roberts, Councilman Whitlock,
Councilman Cavener
2. Fiscal Year 2026 Budget Amendment in the Amount of $183,955.00 for Rail with
Trail Pathway Construction Approved
Motion to approve made by Councilman Whitlock, Seconded by Councilman Cavener.
Voting Yea: Councilman Overton, Councilwoman Little Roberts, Councilman Whitlock,
Councilman Cavener
3. Agreement Between Owner and Contractor for Construction Contract (Stipulated
Price) Between City of Meridian and Mountain Companies, LLC for the Rail with
Trail Pathway Approved
Motion to approve made by Councilman Whitlock, Seconded by Councilman Cavener.
Voting Yea: Councilman Overton, Councilwoman Little Roberts, Councilman Whitlock,
Councilman Cavener
4. Employee Health Benefits Trust Quarterly Update
5. Fiscal Year 2026 Budget Amendment in the amount of $781,110.00 for Employee
Benefits Trust Plan Approved
Motion to approve made by Councilman Cavener, Seconded by Councilman Overton.
Voting Yea: Councilman Overton, Councilwoman Little Roberts, Councilman Whitlock,
Councilman Cavener
ADJOURNMENT 5:52 PM
Meridian City Council Special Session December 16, 2025.
A Meeting of the Meridian City Council was called to order at 5:30 p.m. Tuesday,
December 16, 2025, by Mayor Robert Simison.
Members Present: Robert Simison, Luke Cavener, John Overton, Anne Little Roberts
and Brian Whitlock.
Members Absent: Liz Strader and Doug Taylor.
Other Present: Chris Johnson, Bill Nary, Mike Barton, Christena Barney, Jamie Leslie,
Steve Taulbee and Dean Willis.
ROLL-CALL ATTENDANCE
Liz Strader X Brian Whitlock
X Anne Little Roberts X John Overton
Doug Taylor _X_Luke Cavener
X Mayor Robert E. Simison
Simison: Council, we will call this special meeting of the City Council to order. For the
record it is Tuesday, December 16th, 2025, at 5:30 p.m. We will begin tonight's special
City Council meeting with roll call attendance.
ADOPTION OF AGENDA
Simison: Next up is adoption of the agenda.
Cavener: Mr. Mayor?
Simison: Councilman Cavener.
Cavener: No changes, we are going to get to as many as we can and, then, carry over
to our next meeting. So, I move that we adopt the agenda as published.
Overton: Second.
Simison: Motion and second to adopt the agenda as published. Is there any
discussion? If not, all in favor signify by saying aye. Opposed nay? The ayes have it
and the agenda is agreed to.
MOTION CARRIED: FOUR AYES. TWO ABSENT.
DEPARTMENT REPORTS [Action Item]
Meridian City Council Special Session
December 16,2025
Page 2 of 10
1. Addendum to State & Local Agreement Between City of Meridian and
the Idaho Transportation Board by and through the Idaho
Transportation Department for the Rail with Trail Pathway
Simison: First item up is Item 1 addendum to state and local agreement between City
of Meridian and the Idaho Transportation Board by and through the Idaho
Transportation Department for the Rail with Trail pathway and turn this over to Mr.
Barton.
Barton: Thank you, Mr. Mayor and Members of Council. Appreciate your time this
evening. We are -- after kind of a long journey with this project we are happy to -- really
happy to be here and the first -- the first item is tied to the second item and the second
item is -- they are all interconnected. So, we will take them one by one and the first one
is -- we are asking for approval to an addendum to the state-local agreement that was
originally approved in 2016 and amended in 2022. So, this -- this addendum will solidify
grant funding in the amount that's on the -- on the agreement. So, I'm happy to answer
any questions you have.
Simison: Council, any questions that are on the addendum?
2. Fiscal Year 2026 Budget Amendment in the Amount of $183,955.00
for Rail with Trail Pathway Construction
Simison: Okay. Then with we will go on to Item 2, which is a Fiscal 2026 Budget
Amendment in the amount of 183,905 dollars for Rail with Trail Pathway construction.
Turn this over to Mr. Barton for comments.
Barton: Mr. Mayor, Members of Council, thank you. We are asking for a budget
amendment to approve our proportionate share to the grant funding for 183,955 dollars.
Simison: Is there discussion? Councilman Whitlock.
Whitlock: Mr. Mayor?
Simison: Councilman Whitlock.
Whitlock: I would move that we approve agenda Item No. 2, fiscal year 2026 budget
amendment in the amount of 183,955 dollars.
Cavener: Second.
Simison: Have a motion and second to approve Item 2. Is there any discussion on the
motion?
Cavener: Mr. Mayor?
Meridian City Council Special Session
December 16,2025
Page 3 of 10
Simison: Councilman Cavener.
Cavener: Real quick want to thank Mike and Kim. I had -- had memories of this project,
it's been going on a long time and I appreciate Kim setting me straight, getting me
educated today and really hope that we get this project moved forward and wrapped
and lots to celebrate, so thank you, Mr. Mayor, thank you, team. Appreciate it.
Barton: Appreciate you.
Simison: And if I can, if Kim, Steve, John -- if we -- if we can also give an appreciation
to COMPASS. We have -- we have taken COMPASS back and forward and through
and in and out over the years for trying to make this happen through all the challenges
we have had and they have been really good to us to help keep this project moving
forward and us staying online. So, if we can send our appreciation to them would really
appreciate it, so --
Barton: Thank you.
Simison: With that ask the clerk to call the roll.
Roll Call: Cavener, yea; Strader, absent; Overton, yea; Little Roberts, yea; Taylor,
absent; Whitlock, yea.
Simison: All ayes. Motion carries and the item is agreed to.
MOTION CARRIED: FOUR AYES. TWO ABSENT.
3. Agreement Between Owner and Contractor for Construction Contract
(Stipulated Price) Between City of Meridian and Mountain
Companies, LLC for the Rail with Trail Pathway
Simison: So, with that we will move on Item 3, which is an agreement between the
owner and contractor for construction contract between the City of Meridian and
Mountain Companies, LLC, for Rail with Trail Pathway.
Barton: Mr. Mayor, Members of Council, if you approve this final item that we have for
you this evening our contractor is ready to start, so we are asking for your approval of
Mountain Companies to build the Rail with Trail Pathway in the amount of 949,269
dollars.
Whitlock: Mr. Mayor?
Simison: Councilman Whitlock.
Whitlock: I move that we approve agenda Item No. 3, the agreement to move forward
on the Rail with Trail Pathway.
Meridian City Council Special Session
December 16,2025
Page 4 of 10
Cavener: Second.
Simison: Have a motion and second to approve Item 3. Is there any discussion? If not,
all in favor signify by saying aye. Opposed nay? The ayes have it and the item is
agreed to.
MOTION CARRIED: FOUR AYES. TWO ABSENT.
Barton: Thank you.
Simison: Thank you. Good luck.
4. Employee Health Benefits Trust Quarterly Update
Simison: With that we will move on to Item 4, which is Employee Health Benefits Trust
quarterly update. Christen? Scott? Who -- both? Either? Neither? Good evening.
Barney: Good evening, Mayor, Council. I have Scott Howell here with me from
Gallagher. We are going to team -- tag team this presentation. As soon as it comes up.
All right. So, we have been before you a couple times. One of the things that I wanted
to just reiterate with all of you the trust commitments is to provide you quarterly
financials, annual statements and audit results, so that you are aware of what's going on
with the trust. Part of that is my return here today to provide you the latest update that
we have and, then, provide overall analysis of the financial status of the trust. Again,
another reason we are here today. And provide any answers to any questions that you
might have along the way. So, as we were working through this, working through the
presentation and the executive summary, there were some questions that came up
about how did we get to where we are and so I know this is really small, but I kind of
wanted to go back to when the trust actually was in a good spot financially. And so that
was quarter three of '24. We had 765,000 and some change in the account that
credited, you know, our reserve and our surplus funding. We, then, had quarter four
additional claims and there is a typo. That should be Q4, not Q3 -- that came in at
877,000 dollars. So, at ate up all of that surplus that we had and put us in a deficit and
we have remained in a deficit ever since. Q1 we had additional claims of 437,000 and
so those claims really ran from quarter one and to quarter two. Now, we are at 550,000,
which we came to you and asked for the funding to rectify that deficit. That funding was
not received and accredited until Q3, which you can see there. And, then, in Q3 we had
additional claims of 565,000. So, again, putting us into deficit. We reported to the
Department of Insurance for Q3 a 748,000 dollar deficit. We had requested 182 to
satisfy the -- the deficit that was remaining from quarter two. We received that in
quarter three. So, it's all about kind of timing of when we get these funds, so that we
can make sure that we are adequately funding and in an appropriate -- appropriate time
frame. So, that leaves a deficit of 565,000. We project there will be a deficit in quarter
four of 314,000. We have received a rebate for our pharmacy of 900 -- or 99,000.
Excuse me. Getting us to the 781 ,000 that we are requesting this evening. I will pause
Meridian City Council Special Session
December 16,2025
Page 5 of 10
there, because I know there is a lot of confusion and trying to track this and trying to
explain it, so I want to make sure I answer any questions.
Cavener: Mr. Mayor?
Simison: Councilman Cavener.
Cavener: Christena, this is helpful. So, when we are really reporting a Q3 deficit, it's
actually a combination of previous quarters' deficits that haven't been paid entirely
because the deficits exceeded more than we projected.
Barney: Correct.
Cavener: That piece alone I think is really really helpful. When I see a piece of
information that says Q3 deficit, that's the number that I'm starting -- we are starting with
zero and it's really --
Barney: Yeah. Not --
Cavener: It's not, it's -- it's Q2, Q1 in the past, so --
Barney: Correct.
Cavener: -- that to me helps me really understand how we got to this particular number,
because it -- from a Council standpoint if it was like we are chipping away at this each
quarter and the dollars are getting bigger and bigger and bigger. So, that at least
satisfies my initial question. How do we get the 748,956 dollars. It would be helpful I
think just -- Mr. Mayor, if I may. In the future the -- the previous contribution of 550,000
dollars isn't really reflected, whereas you reflect the 182,000 -- at least -- and I
apologize, I have got three different memos that I'm trying to kind of track off of. In one
memo -- the one -- one of them from today we recognize the previous funding from the
city of 182,988, but we don't reflect, at least in this memo that I'm holding -- the 550,075
that we previous -- so, just feedback I think to the trust is the more clarity, the more
transparency -- I don't know if you were here for the conversation about staff reports,
but trying to make it easy for us to understand -- what's easy for us to understand --
there is probably less questions we are able to track and my other just piece of
feedback is words are used kind of interchangeably, like in -- I'm thinking this one here
we talk about additional claims, but additional claims is really building towards our
deficit; right?
Barney: Based on our financial status right now, yes.
Cavener: So, I think it would be helpful for us to understand, okay, these additional
claims resulted in X amount of additional dollars deficit, because later on you do reflect
deficit, but up at the top you don't. So, just -- I think those are some feedback that will
Meridian City Council Special Session
December 16,2025
Page 6 of 10
help make it easier for me to understand and where I have had some real frustrations
and challenges with getting information. The easier we can get it the better it is.
Barney: Thank you. I appreciate that feedback.
Cavener: I appreciate that. Thank you.
Barney: And I'm going to continue to keep this chart that you are seeing now, so it -- it
can become familiar and I can just keep it rolling as we go on and as these debits and
credits come in that way we have a familiar format that everyone understands moving
forward.
Cavener: Perfect. And -- Mr. Mayor?
Simison: Council Cavener.
Cavener: I know we have still got some other action on this, but at end of the year what
our total deficit was and -- versus what we projected it was going to be would be helpful,
because I think it's important for us if we are -- we are going to probably spend over a
million dollars and we projected on this and as we are getting ready to go into budget
we want to make sure you guys have -- the trust has the dollars they need, so you are
not having to keep them coming back, because I know that's not a fun thing for you
guys either. I want to avoid that for you all as well. But if we can have -- and I
recognize this is all driven by claims and we can't predict who is going to get sick and
how extreme those claims are, but it's good for us to get a good sense of like, oh, we --
we spent a million dollars more than we anticipated, as we go into budget we should
maybe probably plan to increase our budget by a larger amount, so that we are not
finding ourselves in this situation.
Simison: And your CFO -- he does -- he does that.
Cavener: Okay.
Simison: He -- when these come in they are over what he thought they were going to
be based upon the previous years increases their expectations, so --
Cavener: Mr. Mayor, he may want to have a -- a larger just trust conversation as part of
our budget planning for this year, just so that we can be caught in the loop as to what
those trends are, what's driving costs. I think that's --
Simison- I think that's the next part of this conversation.
Cavener: Okay.
Barney: Absolutely. So, what we anticipate is -- and Scott's going to get more into that
as we get further into this presentation, but we tried to anticipate not ending in a deficit
Meridian City Council Special Session
December 16,2025
Page 7 of 10
and we had several factors this particular year starting actually in quarter three of last
year that contributed to things that we just -- we could not foresee. So, like the city
budget, you plan that out a year and a half in advance. We do the same thing and so
we are trying our best at the estimates, looking at previous data, those types of things,
but there are factors outside of our control. What I wanted to try to do and what I had
committed to do, you know, from the trust is to make sure we are bringing that
information to you a little more timely, that you guys are getting those updates quarterly,
so that you aren't blindsided as you were this year.
Cavener: Great. Thank you.
Barney: Yeah. So, we have talked about this and I kept this in that slide, because it is
still relevant. The remainder of 2025 we have got claims through this week. We know
that those are exceeding our contributions to date and October through January are
usually our highest months. So, I will turn it over to Scott here.
Howell: Yeah. So, this is just a snapshot of our monthly claims versus funding. You
can see on the -- each month we have a fair amount of volatility based on the claims
that come in. We also have some stop loss reimbursements for claims that are large
enough to trigger the stop loss. You can see that most of the months of this year our --
our claims costs have exceeded our funding. We have talked a little bit in the past
about what led to this. As Christena mentioned, we set these projections about a year
and a half in advance at the end of the plan year. So, we are talking about setting these
numbers in -- like the '26 numbers we were setting in the summer of '25 and so the tools
and the information that we have is all historical and we make some projections
assuming that things will kind of stay the same as they are, just with some inflation and
as Christena mentioned in the fourth quarter of '24 things took a really serious turn for --
towards the more expensive and have -- have remained there. So, that's kind of what
led to this. This chart -- we developed it just thinking that it would be a helpful
illustration to show what the Department of Insurance requires us to maintain as far as a
balance in the trust and that's the shaded green part on the bottom and that's composed
of two -- two items. One is the surplus. The department gives us a couple of different
ways to calculate that -- those two calculations. One of them is -- results in a 2.4 million
dollar number and the other results in a three and a half million dollar number. We used
the two -- 2.4 million dollar number and, then, the million dollar number. And then the
other component is -- IBNR, which is incurred, but not reported claims. So, that's
reserved to cover claims that -- where services have been rendered, but we haven't
seen the bills yet and that amount right now is 479,000. So, between those two the
Department of Insurance requires that we have a balance of just under three million
dollars in the trust and you can see that since the fourth quarter of '24 we have dipped
below that and we have a funding increase, a contribution increase coming in January
and, then, with the request -- the amendment request to contribute to surplus, our hope
is that we get above that green and stay there. Just some language from the State
Code. I kind of wish I was a lawyer reading this, because it doesn't make a ton of
sense. The bottom line is that they do have an amount that they require us to have.
The requirement is also that we maintain that amount at all times. So, not only is
Meridian City Council Special Session
December 16,2025
Page 8 of 10
coming back every quarter not fun, it is not in compliance with -- with the department's
requirement that we -- that we keep that at all times. So, our -- our thoughts to -- well,
will let Christena get into some more numbers and, then, we will talk about kind of some
thoughts in the future to --
Barney: So, I just want to -- I just wanted to reiterate the financial status and really what
we are looking at funding is that Q3 forward through the end of the year, so that we can
get in compliance with the Department of Insurance and the state regulations that say
we need to maintain that reserve and surplus at all times. So, it's really the request that
we have here today. But in addition to that we also have some things for you to
consider in the future and, again, we will be coming back and having these
conversations, but just kind of wanted to kind of plant the seed and maybe have a little
bit of conversation about the direction you guys feel is appropriate moving forward.
Howell: Yeah. So, again, our hope with the projections that we made for '26 is that we
are adequately funding month to month, because of timing again we made those '26
projections in the summer of '25. The historical data that we had wasn't -- you know, we
still had some of the good months from -- from late '23 and early '24 in that historical
data that we used for the projection. So, there still is a chance that the '26 funding
doesn't adequately maintain the trust balance that we need and so rather than coming
every quarter and asking for one time infusions, our thought is, you know, would it be
better to update our projections, you know, maybe quarterly if -- if we see that they are
-- they are off by a certain margin and that could mean that we come and say, hey, we
don't need to fund as much, because we have -- we have reached a surplus that's
healthy and -- and we can reduce what we are contributing on a month or if it's another
year like this we -- we would come and say, hey, based on how things are going we
know that -- we think we know that the costs are going to continue to be above what we
are funding and we would recommend just an ongoing increase in the funding, rather
than trying to resolve it every quarter with -- with a budget amendment.
Barney: That's all we had for you, so I will stand for any questions.
Simison: Thank you. Council, any questions?
Cavener: Mr. Mayor?
Simison: Councilman Cavener.
Cavener: No questions, but just for feedback that I'm going to only be supportive of
seeing you guys on a quarterly basis for right now. We have had some struggles with
getting clear and concise and accurate information. Until I feel that that's going to be
satisfied I think -- unfortunately I think the funding request is the mechanism that
ensures that we are doing these types of conversations right now. So, at least for me
that's where I would be sitting tonight.
Meridian City Council Special Session
December 16,2025
Page 9 of 10
Barney: And to that point I think I would like to reiterate regardless of what our financial
status is, a commitment is to bring this back quarterly. I think the idea is to not have to
ask for money each quarter, to be able to adequately fund it, but in the event that we do
need funding we want to provide you as many options as possible and instead of maybe
a one-time infusion it's a mid-year rate change where maybe the city contributes a
certain percentage higher for the remainder of the year to keep us out of that deficit.
There is just some other options we wanted to explore with you.
Simison: Yeah. I think the goal -- how do we stay in compliance with the state and
meet the Council's desire for information.
Barney: Correct.
Simison: How do we -- how do we achieve that. I think that's what I'm going to
challenge everyone to think about between now and the next time we have a
conversation. You know, I wish the state would go on record to more clearly define what
we know is in their viewpoints based on the code, but we want to have a good partner in
the state, we don't want to have a state partner that doesn't appreciate working with us,
so how we -- how we bridge that gap, that's what we need to figure out, so --
5. Fiscal Year 2026 Budget Amendment in the amount of $781,110.00 for
Employee Benefits Trust Plan
Simison: Okay. With that we will move on to Item 5, which is the fiscal year 2026
budget amendment in the amount of 781 ,110 dollars for employee benefits trust plan.
Technically I don't know if I'm presenting the budget amendment.
Cavener: Mr. Mayor?
Simison: Councilman Cavener.
Cavener: I signed it and --
Simison: Okay.
Cavener: -- so I'm happy to do that. This is -- covers a lot of what Christena and the
team just shared, so, Mr. Mayor, I move that we approve the fiscal year 2026 budget
amendment in the amount of 781,110 dollars for employee benefits trust plan.
Overton: Second.
Simison: Have a motion and a second to approve Item 5. Is there discussion on the
motion? If not, clerk call the roll.
Roll Call- Cavener, yea; Strader, absent; Overton, yea; Little Roberts, yea; Taylor,
absent; Whitlock, yea.
Meridian City Council Special Session
December 16,2025
Page 10 of 10
Simison: All ayes. Motion carries and the item is agreed to.
MOTION CARRIED: FOUR AYES. TWO ABSENT.
Simison: Council, that's the end of our agenda. Do I have a motion?
Nary: Mr. Mayor, one more thing. Mr. Siddoway did contact me. We took up Item 1 on
the Rails with Trail. It was an agreement, but we didn't approve the agreement. We
simply asked for if there was any questions, but we didn't get -- so we need to approve
the agreement with Item 1 in addition to the one that we just approved under Item 3.
Simison: Okay.
Whitlock: Mr. Mayor?
Simison: Councilman Whitlock.
Simison: Rewind the clock and approve agenda Item No. 1, an agreement on the Rail
with Trail Pathway.
Cavener: Second.
Simison: Have a motion and second to agree to the addendum to the state and local
agreement between City of Meridian and the Idaho Transportation Board and through
the Idaho Transportation Department with the Rail with Trail Pathway. Is there any
discussion? If not, all in favor signify by saying aye. Opposed nay. The ayes have it
and the item is agreed to.
Cavener: Mr. Mayor?
Simison: Councilman Cavener.
Cavener: Move we adjourn our special meeting.
Overton: Second.
Simison: Motion and seconded to adjourn. All in favor signify by saying aye. Opposed
nay? The ayes have it and we are adjourned.
MEETING ADJOURNED AT 5:52 P.M.
(AUDIO RECORDING ON FILE OF THESE PROCEEDINGS)
1 / 6 / 26
MAYOR ROBERT E. SIMISON DATE APPROVED
ATTEST:
CHRIS JOHNSON - CITY CLERK
E IDIAN
'aAHO
AGENDA ITEM
ITEM TOPIC: Addendum to State & Local Agreement Between City of Meridian and the
Idaho Transportation Board by and through the Idaho Transportation Department for the Rail
with Trail Pathway
C� f1E RIDIA4,
MEMO TO CITY COUNCIL
Request to Include Topic on the City Council Agenda
From: Mike Barton / Kim Warren Meeting Date: December 16, 2025
Parks &Recreation
Presenter: Mike Barton, Park Superintendent Estimated Time: 5 min
Topic: Rail With Trail Pathway-Addendum to State and Local Agreement
Recommended Council Action:
Approve addendum to the existing State and Local Agreement for the Meridian Rail With Trail
Pathway
Background:
Federal grant funding for the Rail With Trail Pathway has been obligated in the amount of
$1,271,000.00 that will be memorialized in this addendum to the previously approved State and
Local Agreement (dated 6.15.2016, amended 8.9.2022).
ADDENDUM
STATE/LOCAL AGREEMENT
(DESIGN AND CONSTRUCTION)
PROJECT NO. A013 (918)
RAIL WITH TRAIL PATHWAY, MERIDIAN
ADA COUNTY
KEY NO. 13918
THIS ADDENDUM is made and entered into this day of
, by and between the IDAHO TRANSPORTATION BOARD by and
through the IDAHO TRANSPORTATION DEPARTMENT, hereafter called the
State, and the CITY OF MERIDIAN, acting by and through its MAYOR
AND COUNCIL, hereafter called the Sponsor.
PURPOSE
This Addendum will modify the State/Local Agreement Addendum
entered into on the 22nd day of August 2022, (hereinafter
"Agreement") between the same parties .
The parties agree to the following revisions :
Section I Paragraph II of the agreement will be amended by changing
the following.
Federal participation in the Federal-aid portion of this
project is at the rate of 92 . 660; local participation is
7 . 340 . Scheduled local participation funds are 100% Sponsor
responsibility. Scheduled funding for this project is listed
on the approved Idaho Transportation Investment Program, and
subsequent revisions . Current estimated funding is as
follows :
a. Project Development - $121, 000
• (PE-$2,000 PL-$5,000 PC-$114,000)
b. Right-of-Way - $0
C. Project Development Local Participation
(100o sponsor responsibility) - $75, 000
d. Utilities - $0
e . Construction - $964, 945
• (Bid-$949, 000) (Fed Aid Contingency $15, 945)
f. Construction Local Participation (Contingency)
(100o sponsor responsibility) - $108, 955
g. Construction Engineering - $185, 055
• (CE-$4,745 CL-$37, 960, CC-$142,350
State/Local Agreement(TAP)Addendum
Rail with Trail Pathway,Meridian
Key No. 13918
Page I
h. Total Estimated Project Costs - $1, 454, 955
• (Fed Aid-$1, 271, 000)
• (Local Participation- $183, 955)
EXECUTION
This Addendum is executed for the State by its Division
Administrator, and executed for the Sponsor by the Board of
Commissioners, attested to by the City Clerk, with the imprinted
Corporate Seal of the City of Meridian.
IDAHO TRANSPORTATION DEPARTMENT
Division Administrator
ATTEST: CITY OF MERIDIAN
City Clerk Mayor
(SEAL)
By regular/special meeting
on
xx: 13918 SLA TAP ADDENDED
State/Local Agreement(TAP)Addendum
Rail with Trail Pathway,Meridian
Key No. 13918
Page 2
State/Local Agreement(Construction)
Addendum to State/Local Agreement
Transportation Plan, Sandpoint Area
Key No. 23033
Page No. 3
ADDENDUM
STATE/LOCAL AGREEMENT
(DESIGN AND CONSTRUCTION)
PROJECT NO. A013(918)
RAIL WITH TRAIL PATHWAY, MERIDIAN
ADA COUNTY
KEY NO. 13918
THIS ADDENDUM is made and entered into this day of
______, by and between the IDAHO TRANSPORTATION BOARD by and
through the IDAHO TRANSPORTATION DEPARTMENT, hereafter called the
State, and the CITY OF MERIDIAN, acting by and through its MAYOR
AND COUNCIL, hereafter called the Sponsor.
PURPOSE
This Addendum will modify the State/Local Agreement Addendum
entered into on the 22nd day of August 2022, (hereinafter
"Agreement")between the same parties.
The parties agree to the following revisions:
Section I Paragraph II of the agreement will be amended by changing
the following.
Federal participation in the Federal-aid portion of this
project is at the rate of 92.66%; local participation is
7.34%. Scheduled local participation funds are 100% Sponsor
responsibility. Scheduled funding for this project is listed
on the approved Idaho Transportation Investment Program, and
subsequent revisions. Current estimated funding is as
follows:
a. Project Development - $121,000
(PE-$2,000 PL-$5,000 PC-$114,000)
b. Right-of-Way - $0
c. Project Development Local Participation
(100% sponsor responsibility) - $75,000
d. Utilities - $0
e. Construction - $964,945
(Bid-$949,000) (Fed Aid Contingency $15,945)
f. Construction Local Participation (Contingency)
(100% sponsor responsibility) - $108,955
g. Construction Engineering - $185,055
(CE-$4,745 CL-$37,960, CC-$142,350
h. Total Estimated Project Costs - $1,454,955
State/Local Agreement (TAP) Addendum
Rail with Trail Pathway, Meridian
Key No. 13918
Page 1
(Fed Aid-$1,271,000)
(Local Participation- $183,955)
EXECUTION
This Addendum is executed for the State by its Division
Administrator, and executed for the Sponsor by the Board of
Commissioners, attested to by the City Clerk, with the imprinted
Corporate Seal of the City of Meridian.
IDAHO TRANSPORTATION DEPARTMENT
_________________________________
Division Administrator
ATTEST: CITY OF MERIDIAN
________________________________
City Clerk Mayor
Chris Johnson
Robert E. Simison 12-16-2025
12-16-2025
(SEAL)
By regular/special meeting
12-16-2025
on ______________________.
wd: 13918 SLA TAP ADDENDED
State/Local Agreement (TAP) Addendum
Rail with Trail Pathway, Meridian
Key No. 13918
Page 2
E IDIAN
'aAHO
AGENDA ITEM
ITEM TOPIC: Fiscal Year 2026 Budget Amendment in the Amount of$183,955.00 for Rail
with Trail Pathway Construction
C�/((1E RIV3
MEMO TO CITY COUNCIL
Request to Include Topic on the City Council Agenda
From: Mike Barton / Kim Warren Meeting Date: December 16, 2025
Parks &Recreation
Presenter: Mike Barton, Park Superintendent Estimated Time: 5 min
Topic: Rail With Trail Pathway- Budget Amendment/ Spending Authority Request
Recommended Council Action:
Approve the budget amendment for the Rail With Trail Project
Background:
Grant funding for the Rail With Trail Pathway has been approved in the amount of$1,271,000.
This was memorialized in the previously discussed addendum to State and Local Agreement.
We have a total project cost of$1,454,955 of which $70,178 has already been paid leaving a
balance to start and finish construction of$1,384,776.28. The existing budget of$403,000 leaves
an additional amount of$981,462.96 of spending authority needed to execute the project.
Because the project cost has exceeded the obligated grant funding,the City contribution or
"match" needed to execute the project is $183,955.00. See breakout below.
Fund20 Fund01
87 4% 1 6% 100.0' 0
Grant Funding City Match Total Project
Pros cct Cast $ 1,271,000.00 183,955.00 $1,454,955.00
FY2025Actu@1Spmt 70.178.72 S - 70,178.72
FY2025Project Cost Rcrmining S 1,200,821.28 S 183,955.00 S1,384,775.28
FY2026C@rry10rw@rdBudgOt $ 403,313.32 - $ 403,313.32
Additional Budget Needed 797,507.96 18305.00 W1,462.96
Budget Amendment Form attached
12/5/2025 3:52 PM City of Meridian FY2026 Budget Amendment Form
Personnel Costs Full Time Equivalent(FTE):
Fund# Dept.# G/L# Proj.# G/L#Description Total E IDIAN°_-
01 5290 41200 6009.c.1 Wages
01 5290 41206 6009.c.1 PT/Seasonal Wages
01 5290 41210 6009.c.1 Overtime Please only complete the fields
01 5290 41304 6009.c.1 Uniform Allowance highlighted in Orange.
01 5290 42021 6009.c.1 FICA $ Amendment Details
01 5290 42022 6009.c.1 PERSI $ Title: Rail With Trail Pathway Spending Authority Request
01 5290 42023 6009.c.1 Worker's Comp $ Department Name: Parks&Recreation
01 5290 42025 6009.c.1 Employee Insurance $ Presenting Department Name: Parks&Recreation
Total Personnel Costs $ Department#: 5290
Operating Expenditures Primary Funding Source: 1
Fund# Dept.# G/L# Proj.# G/L#Description One-Time On-Going Total CIP#:
01 5290 6009.c.1 $ - Project#: 6009.c.1
01 5290 6009.c.1 $
01 5290 6009.c.1 $ Is this for an Emergency? ❑ Yes ❑✓ No
01 5290 6009.c.1 $ New Level of Service? ❑ Yes ❑ No
01 5290 6009.c.1 $
01 5290 6009.c.1 $ Clerks Office Stamp
01 5290 6009.c.1 $
01 5290 6009.c.1 $
01 5290 6009.c.1 $
01 5290 6009.c.1 $
01 5290 6009.c.1 $
01 5290 6009.c.1 $
01 1 5290 6009.c.1 $ Date of Council Approval 12-16-2025
Total Operating Expenditures $ - $ $
Capital Outlay
Fund# Dept.# G/L# Proj.# G/L#Description Total Acknowledgement Date
20 5290 93401 6009.c.1 JPathway Construction(Reimbursed) $ 797,508 �L
01 5290 93401 6009.c.1 Pathway Construction-(City Cost) $ 183,955 12/5/25
01 5290 6009.c.1 Department Director
01 5290 6009.c.1 REVIEWED fields 12.5.25
01 5290 6009.c.1 By Todd Lavoie at 5:03 pm,Dec 05,2025
01 5290 6009.c.1 Chi Financial Office
Total Capital Outlay $ 981,463
Revenue/Donations a
Fund# Dept.# G/L# Proj.# G/L#Description Total Co ci ' on /
_201 5290 1 33105 1 6009.c.1 JGrant Funds $ 797,508 C�j
01 5290 33105 6009.c.1 12-8-25
01 1 5290 6009.c.1 Mayor
Total Revenue/Donations $ 797,508
Total Amendment Request $ 183,955
City of Meridian FY2026 Budget Amendment Form C:\Users\ssiddoway\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\R6ROAVQ8\FY2026 Budget Amendment Form_Parks_Rail With Trail Pathway Final Version
12/5/2025 3:52 PM City of Meridian FY2026 Budget Amendment Form
Total Amendment Cost-Lifetime
Prior Year(s) Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Department Name: Parks&Recreation
Funding 2026 2027 2028 2029 2030 Title: Rail With Trail Pathway Spending Authority Request
Personnel $ - $ $ $ $ InstnrctionsforSu➢nniningRndgetArne.ndmentcc
Operating $ - $ $ $ $ ➢Department will send Amendment with Directois signature to Finance(Budget Manager)for review
Capital $ 981,463 i Finance will send Amendment to council liaison for signature
Total $ - $ 981,463 $ $ $ $ ➢Council Liaison will send signed Amendment to Mayor
Total Estimated Project Cost: $ 981,463 !Mayor will send signed Amendment to Finance(Budget Manager)
Evaluation Questions ➢Finance(Budget Manager)will send approved copyof Amendment to Department
Please answer all Evaluation Questions using the financial data referenced above. ➢Department will add copy of Amendment to Council Agenda u5ing Municode Agenda Manager
..........g _,. ._,.r__... _
Grant funding for the Rail With Trail pathway hs been obligated in the amount of$1,271,000 that will be memorialized in an addendum to the previously approved State and Local
Agreement dated 6.15.2016 and amended 8.9.2022.We have a total project cost of$1,454,955 of which$70,178 has already been paid leaving a balance to start and finish
construction of$1,384,776.28.We have an existing budget of$403,000 which leaves an additional amount of$981,463 of spending authority needed to execute the project.
Because the project cost has exceeded the obligated grant funding the City contribution or"match"needed to execute the project is$183,955.
2. Why was this budget request not submitted during the current fiscal year budget cycle?
i
Design was complete at the end of FY 2025,bids were advertised and received 11.3.2025.
3. What is the explanation for not submitting this budget request during the next fiscal year budget cycle?
Grant funds are obligated in the 2026 fiscal year.
4.Describe the proposed method of funding? If funding is split between Funds(i.e. General,Enterprise,Grant),please include the percentage split. List the amounts and sources
of anticipated additional revenue that will result from approval of this request.
j General Fund.
5.Does this request align with the Department/City's strategic plan? If not,please explain how this request was not included in the Department/City strategic plan?
Yes
6. Does this request require resources to be provided by other departments? If yes,please describe the necessary resources to be provided by other departments.
No
7.Does this Amendment include any needed Equipment or Software that will utilize the Cit 's network? Yes or No no_._
8.Is the amendment going to result in the disposal of an asset?(Yes or No) no
9.An additional comments?
No
Total Amendment Request $ 183,955
Every effort should be made to avoid reopening the budget for an amendment. Departments will need to provide backup and appear before the City Council to justify budget amendments.
Budget amendments are intended for emergency or mandatory changes to the original balanced budget. Changes to the original balanced budget may cause a funding shortfall.
City of Meridian FY2026 Budget Amendment Form C:\Users\ssiddoway\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\R6ROAVQ8\FY2026 Budget Amendment Form—Parks—Rail With Trail Pathway Final Version
E IDIAN
'aAHO
AGENDA ITEM
ITEM TOPIC: Agreement Between Owner and Contractor for Construction Contract
(Stipulated Price) Between City of Meridian and Mountain Companies, LLC for the Rail with Trail
Pathway
C� f1E RIDIA4,
MEMO TO CITY COUNCIL
Request to Include Topic on the City Council Agenda
From: Sandra Ramirez, Procurement Meeting Date: December 16, 2025
Presenter: Mike Barton, Park Superintendent Estimated Time: 6 min
Topic: Rail With Trail Pathway-Construction Contract
Recommended Council Action:
Staff request that the attached construction contract with Mountain Company, LLC,be approved in
the amount of$949,269.00
Background:
Bids for the Meridian Rail With Trail Pathway were publicly opened on November 3, 2025.
Of the three bids received,the responsive low bidder was Mountain Company, LLC,with a bid of
$949, 269.00. Parks and Recreation Staff request Council approval (contingent upon approval of
the preceding budget items) to enter into a contract with Mountain Company, LLC, for
construction of the Meridian Rail With Trail Pathway.
Signed Construction Contract Attached.
AGREEMENT BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)
This Agreement is by and between The City of Meridian ("Owner") and Mountain Companies, LLC
("Contractor").
Terms used in this Agreement have the meanings stated in the General Conditions and the Supplementary
Conditions.
Owner and Contractor hereby agree as follows:
ARTICLE 1—WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents.The Work
is generally described as follows: The construction of a 10-ft wide asphalt pathway with 2-foot
gravel shoulders. The construction of pedestrian ADA compliant ramps at the crossing of E
Broadway Ave. The construction of irrigation improvements involve; a concrete headwall,
irrigation structures, piping the Rutledge Lateral, and partial piping of the Nine-Mile Creek.
ARTICLE 2—PROJECT
2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as
follows: The City has a need for services involving the construction of a 10' wide multi-use
pathway to provide access to non-motorized or multi-modal users and will increase access
between communities. The project will construct a multi-use pathway between NW 3rd Street
and 891h Street South of Broadway Avenue. Project actions also include piping the Rutledge
Lateral within the project limits, and part of the Nine-Mile Creek.
2.02 This is a Davis Bacon project, funded by Transportation Alternatives Program (TAP) from Federal
Highways (FHWA) and administered by the Local Highway Technical Assistance Council (LHTAC).
Federal testing, compliance, and environmental requirements must be followed.
2.03 Compliance with Laws:
In performing the scope of work required hereunder, the Contractor must comply with all
applicable laws, ordinances, and codes of Federal, State, and local governments. This
agreement will be governed by and construed and enforced in accordance with the laws of
the State of Idaho, and the ordinances of the City of Meridian.
2020 ISPWC 00 52 13
Modified from EJCDC®C-520 Agreement Between Owner and Contractor for Construction Contract
Page 1 of 10
ARTICLE 3—ENGINEER
3.01 The Owner has retained Keller Associates ("Engineer")to act as Owner's representative, assume
all duties and responsibilities of Engineer, and have the rights and authority assigned to Engineer
in the Contract.
3.02 The part of the Project that pertains to the Work has been designed by"Engineer".
ARTICLE 4—CONTRACT TIMES
4.01 Time is of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness
for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Contract Time
A. Refer to the ITD Special Provisions for Contract Time details.
4.04 Milestones
A. Parts of the Work must be substantially completed on or before the following Milestone(s):
1. Milestone 1: Substantial Completion July 15`", 2026
4.05 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above
and that Owner will suffer financial and other losses if the Work is not completed and
Milestones not achieved within the Contract Times, as duly modified. The parties also
recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration
proceeding, the actual loss suffered by Owner if the Work is not completed on time.
Accordingly, instead of requiring any such proof, Owner and Contractor agree that as
liquidated damages for delay (but not as a penalty):
1. Substantial Completion: Contractor shall pay Owner$250 for each day that expires after
the time (as duly adjusted pursuant to the Contract) specified above for Substantial
Completion, until the Work is substantially complete.
2. Completion of Remaining Work:After Substantial Completion, if Contractor shall neglect,
refuse,or fail to complete the remaining Work within the Contract Times(as duly adjusted
pursuant to the Contract)for completion and readiness for final payment,Contractor shall
pay Owner $250 for each day that expires after such time until the Work is completed
and ready for final payment.
4. Liquidated damages for failing to timely attain Milestones, Substantial Completion, and
final completion are not additive, and will not be imposed concurrently.
B. If Owner recovers liquidated damages for a delay in completion by Contractor, then such
liquidated damages are Owner's sole and exclusive remedy for such delay, and Owner is
precluded from recovering any other damages, whether actual, direct, excess, or
consequential,for such delay,except for special damages(if any)specified in this Agreement.
2020 ISPWC 00 52 13
Modified from EJCDC®C-520 Agreement Between Owner and Contractor for Construction Contract
Page 2 of 10
4.06 Special Damages
A. Contractor shall reimburse Owner(1)for any fines or penalties imposed on Owner as a direct
result of the Contractor's failure to attain Substantial Completion according to the Contract
Times,and (2)for the actual costs reasonably incurred by Owner for engineering,construction
observation, inspection, and administrative services needed after the time specified in
Paragraph 4.02 for Substantial Completion (as duly adjusted pursuant to the Contract), until
the Work is substantially complete.
B. After Contractor achieves Substantial Completion, if Contractor shall neglect, refuse, or fail to
complete the remaining Work within the Contract Times, Contractor shall reimburse Owner
for the actual costs reasonably incurred by Owner for engineering, construction observation,
inspection, and administrative services needed after the time specified in Paragraph 4.02 for
Work to be completed and ready for final payment (as duly adjusted pursuant to the
Contract), until the Work is completed and ready for final payment.
C. The special damages imposed in this paragraph are supplemental to any liquidated damages
for delayed completion established in this Agreement.
ARTICLE 5—CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract
Documents,the amounts that follow, subject to adjustment under the Contract:
B. For all Unit Price Work, an amount equal to the sum of the extended prices (established for
each separately identified item of Unit Price Work by multiplying the unit price times the
actual quantity of that item).
Unit Price Work
Item Estimated Unit Extended
No. Description Unit
Quantity Price Price
202-005A SELECTIVE REM OF TREES INCLUDING EACH 10 $1,200 $12,000.00
STU M PS
203-003A REMOVAL OF OBSTRUCTIONS—RCP, FT 163 $40 $6,520.00
IRRIGATION
203-060A REMOVAL OF CONCRETE SIDEWALK SY 12 $14 $168.00
203-070A REMOVAL OF CURB&GUTTER FT 48 $5 $240.00
203-080A REMOVAL OF GUARDRAIL FT 19 $75 $1,425.00
203-122A REMOVAL OF MISCELLANEOUS ITEMS— EACH 1 $3,500 $3,500.00
IRRIGATION BOX
203-122B REMOVAL OF MISCELLANEOUS ITEMS— EACH 1 $2,000 $2,000.00
CONCRETE HEADGATE
205-005A EXCAVATION CY 720 $26 $18,720.00
205-030A BORROW CY 1417 $28 $39,676.00
205-060A WATER FOR DUST ABATEMENT MG 50 $1 $50.00
212-011A FIBER WATTLE FT 4119 $7 $28,833.00
212-060A STABILIZED CONSTRUCTION ENTRANCE EACH 2 $4,500 $9,000.00
2020 ISPWC 00 52 13
Modified from EJCDC®C-520 Agreement Between Owner and Contractor for Construction Contract
Page 3 of 10
Unit Price Work
Item Estimated Unit Extended
No. Description Unit
Quantity Price Price
212-105A WATER AND POLLUTION CA 2000 $1 $2000.00
301-005A GRANULAR SUBBASE TON 1340 $24 $32,160.00
405-240A MISCELLANEOUS PAVEMENT SY 17 $60 $1,020.00
604-025A 12" IRRIGATION PIPE—RCP FT 22 $200 $4,400.00
604-035A 18" IRRIGATION PIPE—RCP FT 21 $220 $4,620.00
604-065A 36" IRRIGATION PIPE—RCP FT 1591 $202 $321,382.00
604-105A 60" IRRIGATION PIPE—RCP FT 207 $550 $113,850.00
605-455A MANHOLE TYPE A—SIZE 48" EACH 1 $5,000 $ 5,000.00
609-025A MINOR STR—IRRIGATION BOX,SIZE EACH 4 $13,000 $52,000.00
5'X5'
609-025B MINOR STIR—IRRIGATION BOX,SIZE EACH 1 $22,000 $22,000.00
15'X5'
609-025C MINOR STIR—IRRIGATION BOX,SIZE EACH 1 $19,000 $19,000.00
8'X8'
609-025D MINOR STIR—IRRIGATION STEEL GRATE EACH 1 $2,500 $2,500.00
609-025E MINOR STIR—IRRIGATION BOX,SIZE EACH 1 $18,000 $18,000.00
614-015A SIDEWALK SY 115 $36 $4,140.00
614-025A CURB RAMP—PERPENDICULAR SY 13 $107 $1,391.00
614-025B CURBRAMP—PARALLEL SY 14 $107 $1,498.00
615-490A CURB&GUTTER—ROLLED FT 47 $30 $1,410.00
616-010A SIGN TYPE B-1 SF 25 $25 $625.00
616-040J STEEL SIGNPOST E-1 FT 40 $45 $1,800.00
626-010A TEMPORARY TRAFFIC CONTROL SIGNS SF 85 $5 $425.00
626-035A BARRICADE TYPE 2 EACH 2 $120 $240.00
626-050A DRUMS EACH 20 $28 $560.00
630-010A T,W,S,A PAVEMENT MARKINGS— SF 162 $14 $2,268.00
PREFORMED THERMOPLASTIC
5637-10A AGGREGATE BASE FOR SHARED-USE TON 684 $32 $21,888.00
PATH
S637-15A PLANT MIX FOR SHARED-USE PATH TON 364 $115 $41,860.00
5900-50A CONTINGENCY AMOUNT— CA 5000 $11 $5,000.00
MISCELLANEOUS WORK
5901-05A SSPDX CONNECT TO EXISTING IRRIGATION EACH 2 $5,000 $10,000.00
5901-05B SP CONCRETE HEADWALL EACH 1 $25,000 $25,000.00
5901-05C SP 12" CANAL GATE (C-10) EACH 1 $2,000 $2,000.00
2020 ISPWC 00 52 13
Modified from EJCDC®C-520 Agreement Between Owner and Contractor for Construction Contract
Page 4 of 10
Unit Price Work
Item Estimated Unit Extended
No. Description Unit
Quantity Price Price
S901-05D SP DETECTABLE WARNING DOMES EACH 1 $1,500 $1,500.00
S901-05E SP PERMANENT BARRICADE EACH 1 $600 $600.00
S904-05A SP DRAIN BYPASS AND DEWATERING LS 1 $15,000 $15,000.00
Z629-05A MOBILIZATION LS 1 $92,000 $92,000.00
Total of all Extended Prices for Unit Price Work (subject to final adjustment
based on actual quantities) $949,269.00
The extended prices for Unit Price Work set forth as of the Effective Date of the Contract are
based on estimated quantities. As provided in Paragraph 13.03 of the General Conditions,
estimated quantities are not guaranteed, and determinations of actual quantities and
classifications are to be made by Engineer.
ARTICLE 6—PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General
Conditions.Applications for Payment will be processed by Engineer as provided in the General
Conditions.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on the basis of Contractor's Applications for Payment
on or about the 5th day of each month during performance of the Work as provided in
Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submitted
in a timely manner and otherwise meet the requirements of the Contract. All such payments
will be measured by the Schedule of Values established as provided in the General Conditions
(and in the case of Unit Price Work based on the number of units completed) or, in the event
there is no Schedule of Values, as provided elsewhere in the Contract.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to
the percentage indicated below but, in each case, less the aggregate of payments
previously made and less such amounts as Owner may withhold, including but not limited
to liquidated damages, in accordance with the Contract.
a. 95 percent of the value of the Work completed (with the balance being retainage).
1) If 50 percent or more of the Work has been completed, as determined by
Engineer, and if the character and progress of the Work have been satisfactory to
Owner and Engineer, then as long as the character and progress of the Work
remain satisfactory to Owner and Engineer,there will be no additional retainage;
and
b. 95 percent of cost of materials and equipment not incorporated in the Work (with
the balance being retainage).
2020 ISPWC 00 52 13
Modified from EJCDC®C-520 Agreement Between Owner and Contractor for Construction Contract
Page 5 of 10
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total
payments to Contractor to 100 percent of the Work completed, less such amounts set off by
Owner pursuant to Paragraph 15.01.E of the General Conditions, and less 200 percent of
Engineer's estimate of the value of Work to be completed or corrected as shown on the punch
list of items to be completed or corrected prior to final payment.
6.03 Final Payment
A. Upon final completion and acceptance of the Work, Owner shall pay the remainder of the
Contract Price in accordance with Paragraph 15.06 of the General Conditions.
6.04 Consent of Surety
A. Owner will not make final payment, or return or release retainage at Substantial Completion
or any other time, unless Contractor submits written consent of the surety to such payment,
return, or release.
6.05 Interest
A. All amounts not paid when due will bear interest at the rate of 6.0 percent per annum.
ARTICLE 7—CONTRACT DOCUMENTS
7.01 Contents
A. The Contract Documents consist of all of the following:
1. This Agreement.
2. Bonds:
a. Performance bond (together with power of attorney).
b. Payment bond (together with power of attorney).
3. General Conditions.
4. Supplementary Conditions.
5. Specifications as listed in the table of contents of the project manual (copy of list
attached).
6. Drawings listed on the attached sheet index.
8. Addenda 1, inclusive).
9. The following which may be delivered or issued on or after the Effective Date of the
Contract and are not attached hereto:
a. Notice to Proceed.
b. Work Change Directives.
c. Change Orders.
d. Field Orders.
e. Warranty Bond, if any.
B. The Contract Documents listed in Paragraph 7.01.A are attached to this Agreement (except
as expressly noted otherwise above).
2020 ISPWC 00 52 13
Modified from EJCDC®C-520 Agreement Between Owner and Contractor for Construction Contract
Page 6 of 10
C. There are no Contract Documents other than those listed above in this Article 7.
D. The Contract Documents may only be amended, modified, or supplemented as provided in
the Contract.
ARTICLE 8—REPRESENTATIONS,CERTIFICATIONS,AND STIPULATIONS
8.01 Contractor's Representations
A. In order to induce Owner to enter into this Contract, Contractor makes the following
representations:
1. Contractor has examined and carefully studied the Contract Documents, including
Addenda.
2. Contractor is familiar with all Laws and Regulations that may affect cost, progress, and
performance of the Work.
3. Contractor has considered the information known to Contractor itself; information
commonly known to contractors doing business in the locality of the Site; information and
observations obtained from visits to the Site;the Contract Documents; and the Technical
Data identified in the Supplementary Conditions or by definition, with respect to the
effect of such information,observations,and Technical Data on (a)the cost, progress,and
performance of the Work; (b)the means, methods, techniques, sequences, and
procedures of construction to be employed by Contractor; and (c) Contractor's safety
precautions and programs.
4. Based on the information and observations referred to in the preceding paragraph,
Contractor agrees that no further examinations, investigations, explorations, tests,
studies, or data are necessary for the performance of the Work at the Contract Price,
within the Contract Times, and in accordance with the other terms and conditions of the
Contract.
5. Contractor is aware of the general nature of work to be performed by Owner and others
at the Site that relates to the Work as indicated in the Contract Documents.
6. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or
discrepancies that Contractor has discovered in the Contract Documents, and of
discrepancies between Site conditions and the Contract Documents, and the written
resolution thereof by Engineer is acceptable to Contractor.
7. The Contract Documents are generally sufficient to indicate and convey understanding of
all terms and conditions for performance and furnishing of the Work.
8. Contractor's entry into this Contract constitutes an incontrovertible representation by
Contractor that without exception all prices in the Agreement are premised upon
performing and furnishing the Work required by the Contract Documents.
9. The Contractor is an appropriately licensed public works contractor per Idaho Cod Section
54-1902.
10. Contractor shall comply with all Laws and Regulations applicable to the performance of
the Work. Except where otherwise expressly required by applicable Laws and
2020 ISPWC 00 52 13
Modified from EJCDC®C-520 Agreement Between Owner and Contractor for Construction Contract
Page 7 of 10
Regulations, neither Owner nor Engineer shall be responsible for monitoring the
Contractor's compliance with any Laws or Regulations.
8.02 Contractor's Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive
practices in competing for or in executing the Contract. For the purposes of this
Paragraph 8.02:
1. "corrupt practice" means the offering, giving, receiving, or soliciting of anything of value
likely to influence the action of a public official in the bidding process or in the Contract
execution.
2. "fraudulent practice" means an intentional misrepresentation of facts made (a) to
influence the bidding process or the execution of the Contract to the detriment of Owner,
(b)to establish Bid or Contract prices at artificial non-competitive levels, or(c)to deprive
Owner of the benefits of free and open competition.
3. "collusive practice" means a scheme or arrangement between two or more Bidders, with
or without the knowledge of Owner, a purpose of which is to establish Bid prices at
artificial, non-competitive levels; and
4. "coercive practice" means harming or threatening to harm, directly or indirectly, persons
or their property to influence their participation in the bidding process or affect the
execution of the Contract.
B. Contractor certifies that it is not currently engaged in and will not, for the duration of this
Agreement,engage in a boycott of goods or services from Israel or territories under its control
pursuant to Idaho Code Section 67-2346. The provisions of this statute do not apply to
contracts less than one hundred thousand dollars ($100,000) or to contractors with fewer
than ten (10) employees.
C. Pursuant to Idaho Code 67-2359 and 67-2346, Contractor hereby certifies:
1. The Contractor is not currently owned or operated by the government of China and will
not,for the duration of this contract, be owned or operated by the government of China.
2. The Contractor is not currently engaged in and will not for the duration of the contract
engage in, a boycott of goods or services from Israel or territories under its control.
3. The Contractor is not currently engaged in, and will not for the duration of the contract
engage in a boycott of any individual or company because the company engages in or
supports the exploration, production, utilization,transportation,sale,ore manufacture of
fossil fuel-based energy, timber, minerals, hydroelectric power, nuclear energy, or
agriculture; or Engages in or supports the manufacture, distribution, sale, or use of
firearms, as defined in section 18-3302(2)(d), Idaho Code.
8.03 Standard General Conditions
A. Owner stipulates that if the General Conditions that are made a part of this Contract are
ISPWC Division 100, Standard General Conditions for the Construction Contract, published by
the Engineers Joint Contract Documents Committee, and if Owner is the party that has
furnished said General Conditions, then Owner has plainly shown all modifications to the
standard wording of such published document to the Contractor, through a process such as
highlighting or"track changes" (redline/strikeout), or in the Supplementary Conditions.
2020 ISPWC 00 52 13
Modified from EJCDC®C-520 Agreement Between Owner and Contractor for Construction Contract
Page 8 of 10
IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement.
This Agreement will be effective on December 2, 2025 (which is the Effective Date of the Contract).
Guidance Notes—Signing and Dating Agreement:
1. See Article 20 of the Instructions to Bidders and correlate procedures for format and signing of the
documents.
2. The Effective Date of the Contract stated above and the dates of any construction performance bond
ISPWC 00610 (€165C-1 6619, Performance Bond ('� or other) and construction payment bond
(ISPWC 00615 €165C' 6 61-57 Payment Bond "� or other) should be the same, if possible. In no
case should the date of any bonds be earlier than the Effective Date of the Contract.
Owner: Contractor:
City of Meridian Mountain Companies, LLC
(typed or printed name of organization) (typed or printed name of organization)
By: By:
(individual's signature) (individual's signature)
Date: Date:
(date signed) (date signed)
Name: Keith Watts Name: Jessee Rosin
(typed or printed) (typed or printed)
Title: Procurement Manager Title: Owner
(typed or printed) (typed or printed)
(If[Type of Entity]is a corporation,a partnership,or a
joint venture,attach evidence of authority to sign.)
Attest: Attest:
(individual's signature) (individual's signature)
Title: Title:
(typed or printed) (typed or printed)
Address for giving notices: Address for giving notices:
City of Meridian Mo
33 East Broadway Ave., Ste 106 P.O. Box 191285
Meridian, ID 83642 Boise, ID 83719
Designated Representative: Designated Representative:
Name: Kimberly Warren Name: Kevin Seely
(typed or printed) (typed or printed)
Title: Pathways Project Manager Title: Financial Manager
(typed or printed) (typed or printed)
Address: Address:
City of Meridian, Parks& Recreation Mountain Companies, LLC
33 East Broadway,Ave., Ste. 206 839 E. Fairview Ave., Ste. 100
Meridian, ID 83642 Meridian ID, 83642
Phone: 208-489-0553 Phone: 208-861-1699
2020 ISPWC 00 52 13
Modified from EJCDC®C-520 Agreement Between Owner and Contractor for Construction Contract
Page 9 of 10
Email: kwarren@meridaincity.org Email: kevin@mtncompanies.com
(If[Type of Entity]is a corporation,attach evidence of
authority to sign.If[Type of Entity]is a public body, License NO.: 053533
attach evidence of authority to sign and resolution or (where applicable)
other documents authorizing execution of this State: ID
Agreement.)
2020 ISPWC 00 52 13
Modified from EJCDC®C-520 Agreement Between Owner and Contractor for Construction Contract
Page 10 of 10
E IDIAN
'aAHO
AGENDA ITEM
ITEM TOPIC: Employee Health Benefits Trust Quarterly Update
E IDIAN1__-_.ft_-*'
MEMORANDUM
DATE: DECEMBER 16, 2025
TO: MAYOR AND CITY COUNCIL
FROM: CITY OF MERIDIAN EMPLOYEE BENEFITS PLAN TRUST BOARD
RE: CITY OF MERIDIAN EMPLOYEE BENEFITS PLAN TRUST: FINANCIAL STATUS AND
FUNDING DISCUSSION
Purpose:
Update the Mayor and City Council on the financial status of the Employee Benefits Plan Trust and
request funding to stabilize the plan through year-end 2025.
Current Financial Summary:
Trust Balance
Q3 2024 Reported to DO. $ 765,351.00
Q32024AdditionalClaims $ (877,726.00)
Q4 2024 Reported to DOI(rolled into Q12025) $ (112,375.00)
Q1 2025 Additional Claims $ (437,700.00)
Q12025 Reported to DOI(rolled into Q2 2025) $ (550,075.00)
Q2 2025 Additional Claims $ (182,988.00)
Q2 2025 Reported to DOI $ (733,063.00)
Budget Amendment Approved for funding in the amount of$550,075-
Reported to DOI Q3 2025(Credited to Trust Account on 7125125) $ 550,075.00
Q2 Remaing Deficit(rolled into Q3 2025) $ (182,988.00)
Q3 2025 Ad d iti on a I Cla 1 m s $ (565,968.00)
Q3 2025 Reported to DOI $ (748,956.00)
Budget Amendment Approved for funding in the amount of$182,988-Will
be reported to DOI Q42025(Credited to Trust Account on 10131/25) $ 182,988.00
Q3 Rem aing Deficit(rolled into Q42025) $ (565,968.00)
Q4DeficitforTrust-Projected $ (314,353.00)
Rebates $ 99,211.00
Fotal Remaining Deficit $ (781,W.06)
Fotal New Funding Request $ (781,M.00)
• Claims continue to outpace contributions. October—January are historically high claim months.
Funding Request:
Q3 deficit($748,956)—funding credit($182,988)—Rx Rebate ($99,211) +Q4 projected deficit
($314,353). Total$781,110 additional funding needed.
Recommendation:
Approve an additional$781,110 funding to satisfy the Trust deficit through year-end 2025 and support
long-term financial stability.
CA--- (E N������--
City of Meridian Employee
Benefits Plan Trust
December 76, 2025
Financial Status and Funding Discussion
Trust Commitment
The Trust Board will :
• Provide Quarterly Financials, Annual Statements and Audit Results to the
Council as they become available.
• Provide an analysis of the overall Financial Status of the Trust quarterly by
way of Executive Summary.
• Be available to answer any questions or concerns of the Council .
CA--- (E N��
i
Trust
Trust Balance Trust Balance
Q3 2024 Reported to DOI $ 765,351.00 Q3 2025 Additional Maims t �565,968.00)
Q3 2024 Additional Maims $ (877,726.00) Q3 2025 Reported to DOI $ (748,956.00)
Budget Amendment Approved for funding in the amount of$182,988 -Will
Q4 2024 Reported to DOI (rolled into Q120,25. $ (112,375.00) be reported to DOI Q4 2025 (Credited to Trust Account on 10131}25) $ 182,988.00
Q3 Remaing Deficit(roLLed into Q4 2025) $ �565,968.00)
Q12025 Additional laims $ (437,700.00)
Q12025 Reported to DOI (rolled into Q2 2025) $ (550,075.00) Q4 Deficit for Trust-Projected $ (314,353.00)
Rebates $ 99,211.00
Q2 2025 Additional Maims $ (182,988.00) Total Remaining Deficit (781,1L0.00)
Q2 2025 Reported to DPI $ (733,063.00)
Budget Amendment Approved for funding in the amount of$550,075 - Total New Funding Request (7 1,11�.00�
Reported to D0I Q3 2025 (Credited to Trust Account on 7125125) $ 550,075.00
Q2 Rem aing Deficit(rolled into Q3 2025) $ (182,988.00)
www.meridiancity.org
Remainder o 2025
• Based on the trend data claims are expected to continue outpace
contributions
• October-January are typically the highest claim months of the year
I'sw.w
I,GW.W .1....... .... ............ ... ....... .... ................. ............ ..............11. ................ ............ ...... ....................
1,4W.00
1,200.OD
I'aw.0D —
900,00
600.00 ................. ........... ...... ........... ........... ........... ...............I. ............ ......
400.00
200,00
j an-25 reh-25 Mar-25 AV r-25 May-25 Jun-25 1ul-25 Aue-2 5 Sep,-25 Oct-25 Nov-25 Der-25
■Net Claims 1pelpm ■Net Claims pmpm
www.meridiancity.org
■
$1,200,000 ■Funding ?I Net Claims Fixed Casts
$1,000,000
$80,000
$600,aoa -
$400,000
$200,000 �f —
I
$0
Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 Avg
*OtherAdmin
Employees Members Fee Fees Fees Fixed Funding flaims Claims Pd Claims Claims Pd Claims Ratio
Jan-25 479 1,377 $25,989.96 $3,900.48 %0,261.46 $90,150.80 $705,011.92 $355,105.92 $162,500.93 $517,606.95 $904.79 $516,702.06 86,09%
Fcb-25 481 1,384 26,151.97 1,924,96 60,639.67 90,71&60 710,753.05 756,287.63 164,423.06 920,710.69 25,877,65 894,833.04 139.66%
Mar-25 479 1,375 26,043.23 3,909,64 60,387.53 90,339.40 707,168.84 821,513.57 113,942.23 935,455.80 242.10 935,213,70 145,02%
Apr-25 487 1,392 26,478.19 3,973,92 61,396.09 91,849.20 712,892.41 503,897,23 152,258.60 656,155.83 -0,90 656,156,73 104,93%
May-25 490 1,394 26,641.30 2,999,40 61,774.30 92,414.00 714,507.13 583,151.12 176,917.20 760,068.32 79.91 759,988,41 119,30%
Jun-25 495 1,364 26,369.45 3,957,60 61,143.95 91,471.00 704,821.34 668,684,04 165,712.49 834,396.53 5,624,39 928,772.14 130,56%
Jul-25 481 1,354 26,151.97 3,924,96 60,639.67 90,716,60 699,446.65 545,440.70 144,304.49 689,745.19 85,229,19 604,516,00 99,40%
Aug-25 490 1,352 26,097.60 3,916.80 60,513.60 90,528.00 697,812.42 687,191.07 205,594.31 892,775.38 216,656.63 676,118.75 109.86%
Sep-25 475 1,328 25,825.75 3,876,00 59,893.25 89,585,00 687,854.28 759,815.58 112,640.71 892,456.29 76,809,10 915,648,19 131,60%
Oct-25 477 1,333 25,934.49 3,892.32 60,135.39 89,962.20 691,204.10 434,411.05 256,555.15 690,966.20 22,035.05 668,931.15 109.79%
Nov-25
Dec-25
Avg 481 1,363 $26,168.28 $3,927.4I $60677.49 $90,773.18 $703,147.21 $611,549.79 $167453.92 $779,032.71 $43,345.69 $735,688.02 117.54!
Gross loss Ratio 123.70%
Total 4,823 13,633 $261,682.81 $39,274.09 $606,774.91 $907,731.80 $7,031,472.14 $6,125,497.91 $1,674,839.17 $7,790,337.08 $433,456.91 $7,356,880.17 117.54%
CA--- (E N��
i
ON EBT Surplus and I B N R Req ui rer ent
iiiiiiiilllllllllllliilillllllllllllpm
,OW,WO
MEMPM
,oc*,Wo
s1 ,ow,wo
,60
Tote 4 Fie qU iredl -I BN R -Minimum Required Sure Lus -Actu aL Assets -MiB XjMU M aeSired
www.meridiancity.org
CA'-- (E
Idaho State Code
Chapter 40 Title 41
• ( 1)(c) If future claims payments plus future costs of operation are greater
than future contributions plus current reserves, there shall be a reserve in
an amount equal to future claims payments plus future costs of
operation, less future contributions, less current reserves.
• (7) The trust fund shall maintain the minimum surplus requirements at all
times throughout the year.
CA--- (E N��
i
Trust
Trust Balance I Trust Balance
Q3 2024 Reported to DOI $ 765,351.00 Q3 2025 Additional Claims (565,968.00)
Q3 2024 Additional Claims $ (877,726.00) Q3 2025 Reported to DOI (748,956.00)
Budget Am en d m ent Ap p roved for funding in the amount of$182,988 -Will
Q42024 Reported to DOI (rolled into Q120,25. $ (112,375.00) be reported to DO1 Q4 2025 Credited to TrustAccount on 1013L75) $ 182,988.00
Q3 Rem airig Deficit(rolled into Q42025) $ �565,968.00)
Q12025 Additional Claims $ (437,700.00)
Q 12025 Reported to DOI (rolled into Q2 2025) $ (550,075.00) Defi cit for Tru st-P roj ected �314,353.00)
Rebates $ 99,211.00
Q2 2025 Additional Claims $ (182,988.00
Total Remaining Deficit $ (781,110.00)
Q2 2025 Reported to DOI $ (733,063.00)
Budget Amendment Approved far funding in the amount of$550,075 - Total Now Funding Request $ (781,110.00)
Reported to D01 Q3 2025 (Credited to Trust Account on 7125125) $ 550,075.00
Q2 Rem aing Deficit(rolled into Q3 2025) $ (182,988.00)
www.meridiancity.org
IC/- ((E N������-_
Request of Council
• Approve trust funding in the amount of $781, 110 to cure the anticipated
2025 plan year deficit.
• Consider if future deficits are anticipated :
• Funding the anticipated deficit at the time it is known through the remainder of the
plan year.
OR
• Moving to mid-year rate changes to cure the anticipated deficit for the remainder
of the plan year.
CA--- (E
N��
A
%--
Questions?
www.meridiancity.org
E IDIAN
'aAHO
AGENDA ITEM
ITEM TOPIC: Fiscal Year 2026 Budget Amendment in the amount of$781,110.00 for
Employee Benefits Trust Plan
12/12/2025 8 :30AM City of Meridian FY2026 Budget Amendment Form
Total Amendment Cost - Lifetime
Prior Year(s) Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Department Name : COMEBP Trust
IN Funding 2026 2027 2028 2029 2030 Title : City of Meridian Employee Benefits Plan Trust (COMEBPT)
Personnel $ - $ - $ - $ - $ - rnstrut -traas�' for Si �, miterME 1- 1idget Alno �s�t �x .pn s .
Operating $ 781, 110 $ - $ - $ - $ - > Department will send Amendment with Directors signature to Finance ( Budget Manager) for review
Capital $ - > Finance will send Amendment to Council Liaison for signature
Total Is $ - $ 781, 110 $ - $ - $ - $ > Council Liaison will send signed Amendment to Mayor
Total Estimated Project Cost: $ 781, 110 > Mayor will send signed Amendment to Finance (Budget Manager)
Evaluation Questions > Finance (Budget Manager) will send approved copy of Amendment to Department
Please answer all Evaluation Questions using the financial data referenced above . > Departmentwill add copyofAmendmenttoCouncliAgenda Using MunicodeAgendaManager
1. Describe what is being requested ?
_. ,.
Due to additional health care claims costs the COMEBPT has a deficit in the surplus that is required by the Department of Insurance ( DOI ) rider Idaho Code, 414010(3 ) . The
amount requested includes the current deficit in the surplus through year-end 2025 .
1
t
{
2 Why was this budget request not submitted during the current fiscal year budget cycle?
_. .. ,� � _.w. . ., _�..w .. .._.v ..
Health benefit costs are incurred throughout the calendar year and cannot always be adequately anticipated despite acturial studies, audits, benchmarks and reviews,
r
a
3 . What is the . explanation for not submitting this budget request during' the next fiscal year budget cycle?
ellThe deficit needs to be maintained per DOI requirements under Idaho State Code Chapter 40 Title 41 throughout the current year. Speficically Section 7 : The trust fund shall
maintain the minimum surplus requirements at all times throughout the year.
4. Describe the proposed method of funding? If funding is split between Funds ( i . e . General , Enterprise, Grant), please include the percentage split. List the amounts and
sources of anticipated additional revenue that will result from approval of this request.
General Fund and Enterprise Fund .
r
s
i
5 . Does this request align with the Department/City's strategic plan ? If not, please explain how this request was not included in the Department/City strategic plan ?
. . . ,: . . _ �: 'l . .. � m.: .. Al , .. . . . . . ti _ _ . . . .. - _. . . ell, -Ile
Yes, Government excellence in attracting and retaining employees .
6 . Does this request require resources to be provided by other departments ? If yes, please describe the necessary resources to be provided by other departments.
Noe .... m . _ m . _
i
7 . Does this Amendment include any needed Equipment or Software that will utilize the Cit 's network? Yes or No No rnw
reel, _ n,. .. . .. ; 1 . 11 . .. 1 lAII
8 . Is the amendment going to result in the disposal of an asset? Yes or No) � No
9 . Anv additional comments ?
e �. . . _ . . m. . .
The City of Meridian has contributed $ 2,702,063 to the Trust for State Reserve requirements to date . Adding this $781, 110 will put the additional contribution from the City at
$3,483, 173 .
Total Amendment Request781, 110
Every effort should be made to avoid reopening the budget for an amendment. Departments will need to provide backup and appear before the City Council to justify budget amendments.
Budget amendments are intended for emergency or mandatory changes to the original balanced budget Changes to the original balanced budget may cause a funding shortfall.
City of Meridian FY2026 Budget Amendment Form J :\New J Drive\COMEBPT - Trust\Correspondence, Administrative - Semipermanent - 5 Years\Budget Amendment 12A &2025
Employee Benefit Costs Employee Benefits Plan Trust
Source:Questica>Position Allocation $ 781,110
Fund Code Dept Code Department FY2026 Budget FTE %Allocation Allocation Across Departments
01 1120 Council 6.00 1.16% $ 9,030
01 1140 City Clerk 7.00 1.35% $ 10,535
01 1310 Mayor's Office 5.00 0.96% $ 7,525
01 1500 Finance Department 12.00 2.31% $ 18,060
01 1510 Information Technology 19.00 3.66% $ 28,596
01 1520 Legal Dept 6.00 1.16% $ 9,030
01 1540 Human Resources 7.00 1.35% $ 10,535
01 1840 Other Government 1.00 0.19% $ 1,505
01 1841 Communications 2.00 0.39% $ 3,010
01 1842 Capital Projects 1.00 0.19% $ 1,505
01 1850 City Hall 4.00 0.77% $ 6,020
01 1860 Street Lighting 1.00 0.19% $ 1,505
01 1900 Community Development Depts 47.00 9.06% $ 70,736
01 2110 Police Department 197.00 37.96% $ 296,491
01 2210 Fire Department 15.00 2.89% $ 22,575
01 5200 Parks&Recreation 53.00 10.21% $ 79,767
60 3200 Public Works 49.00 9.44% $ 73,746
60 3300 Meridian Utility Billing 7.00 1.35% $ 10,535
62 3400 Water Department 31.00 5.97% $ 46,656
65 3500 WasteWater Facility 49.00 9.44% $ 73,746
Total Employee Benefit Costs 519.00 100.00% $ 781,110
Fire Union Members are not on City's Benefits Plan
General Fund 74% $ 576,426
Enterprise Fund 26% $ 204,684