HomeMy WebLinkAbout2025-11-17 Boise Project Board of ControlRICHARD MURGOITIO
CHAIRMAN OF THE BOARD
DAN SHEIRBON
VICE CHAIRMAN OF THE BOARD
ROBERT D. CARTER
PROJECT MANAGER
THOMAS RITTHALER
ASSISTANT PROJECT MANAGER
APRYL GARDNER
SECRETARY -TREASURER
MARY SUE CHASE
ASSISTANT SECRETARY -
TREASURER
BOISE PROJECT BOARD OF CONTROL
City Clerk's Office
33 E Broadway Avenue
Meridian ID, 83642
(FORMERLY BOISE U.S. RECLAMATION PROJECT)
2465 OVERLAND ROAD
BOISE, IDAHO83705-3155
14 November 2025
RE: Syringa Crossing Mixed use H-2025-0007
S Meridian Rd. and West Amity Rd.
Boise-Kuna Irrigation District BK-90 A, 90 Al, 96
Carlson Lateral 31+40, 18+90, 19+00 Belle Lateral 15+00, 28+00
Sec. 25 and 36, T3N, Rl W, BM.
Sonya Allen, Planner,
OPERATING AGENCY FOR 167,000
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BEND DISTRICT
TEL: (208) 344-1141
FAX: (208) 344-1437
RECEIVE
NOV 17 2025
CITY OFC�f�lID�r1�-
�1TY CLERKS OFFICE
The United States' Belle, Carlson and Tumbler Laterals lie within the boundary of the
above -mentioned location. The easement for these laterals is held in the name of the
United States through the Bureau of Reclamation under the authority of the Act of
August 30, 1890. (26 Stat. 391; 43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain these laterals.
We assert the federal easement 25 feet both directions from centerline of the Carlson and
Belle Laterals and 20 feet both directions from centerline of the Tumbler Lateral.
Whereas this area is for the operation and maintenance of our facility, no activity should
hinder our ability to do so.
If the original landscape is planned to be excavated more than 10 feet (20% or 11.3
degrees) within 50 feet of the above quoted federal easement, Boise Project will
require that the canal/lateral be piped/concrete lined by the landowner or developer
to include all required box structures and deliveries within the project boundaries.
Piped canals/laterals could get a reduced easement if agreed upon by Boise Project
and the landowner/developer.
The Boise Project does not approve landscaping other than gravel within its easements, as
this will certainly increase our cost of maintenance. Easements must be left a flat
drivable surface. No variances will be granted.
All fences, gates, pathways and pressurized irrigation lines must be just off the edge of all
Boise Project easements. No variances will be granted.
Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement
over Project facility easements must be approved by Boise Project Board of Control prior
to construction.
Project facilities and/or easements that parallel and are within and/or intended to be
within road right-of-ways due to any development of this property must be relocated
outside of road right-of-ways.
The construction of any roadway crossings must be conducted only during the non -
irrigation season when the canal is dewatered. In any case no work shall take place
within the easement before the proper crossing agreements have been secured through the
Bureau of Reclamation and the Boise Project Board of Control.
Utilities planning to cross any project facility must do so in accordance with the master
policies now held between the Bureau of Reclamation and most of the utilities. In any
case, no work shall take place within the easement before proper crossing agreements
have been secured through both the Bureau of Reclamation and the Boise Project Board
of Control.
Crossing agreements must be secured and signed by all parties prior to March 1st of each
year. A time schedule for the construction to be done during the non -irrigation season
must be approved by Boise Project prior to any activity within Project easements. No
construction will be allowed within the easement boundaries of the Boise Project Board
of Control facilities after March 1" of each year. However, on a case -by -case basis,
overhead utilities crossing a Project facility may be allowed after March 1" if reviewed
and approved by the Boise Project.
The piping and relocation of any Lateral, Canal Al Drain must be reviewed and
approved by the Project and is to include all appurtenant boxes and/or structures) and
must be warranted by the landowner for a period of (5) five years. The Warrantee
Agreement must be secured prior to ANY disturbance to that facility. A relocation
agreement must also be procured through the Bureau of Reclamation prior to any
construction within the above -mentioned easement.
Boise Project Board of Control must approve any requests and/or relocation of delivery
points prior to construction.
Storm Drainage and/or Street Runoff must be retained on site.
NO DISCHARGE into any live irrigation system is permitted.
Per Idaho Statutes, Title 42, local irrigation/drainage ditches that cross this property, to
serve neighboring properties, must remain unobstructed and protected by an appropriate
easement by the landowner, developer and contractors. Landowner/developer must do
their due diligence to contact all owners of neighboring properties on this matter.
This development is subject to Idaho Code 31-3805, in accordance, this office is
requesting a hard copy of the irrigation and drainage plans.
Whereas this property lies within Boise-Kuna Irrigation District it is important that
representatives of this development contact the BKID office as soon as possible to
discuss a pressure system prior to any costly design work. If applicable, the irrigation
system will have to be built to specific specifications as set by the District / Project.
Boise Project Board of Control must receive a written response from the Boise-Kuna
Irrigation District and the City of Meridian as to who will own and operate the pressure
irrigation system prior to review and approval of an irrigation plan by Boise Project
Board of Control.
Wording on the preliminary and final recorded plat needs to state that any proposed
and/or future usage of the Boise Project Board of Control facilities are subject to Idaho
Statues, Title 424209.
Future preliminary and final plats must call out the Project easements, and the plats must
also note which lots have surface irrigation water rights and which lots do not.
Whereas this development is in its preliminary stages, Boise Project Board of
Control reserves the right to require changes when our easements and/or facilities
are affected by unknown factors even during the construction phase.
If you have any further questions or comments regarding this matter, please do not
hesitate to contact me at (208) 344-1141.
Si
Ritthaler
Assistant Project Manager, BPBC
for/tr
cc: Kevin Reeves Watermaster, Div; 2 BPBC
Alicia Flavel Secretary -Treasurer BKID
File
O0
v
E
(n r o
�- Z >
= MLM
o
O
V r X
W
0 m
Z N o
0
06 U)
Z m G
U
r z %
CO)
d W o
LU
U
Q
N
}r
ch
QtYCY �tYtYtY
O as aa aa
> cC (D (D (D C7 C7
i ww LU LUwww
rq 0 0)
ova- CDCDCoCoM a,
CC �f PI 00
G � �
U �
O C
� � co 0) (o
ui aim aq
QQ �-QQ ra
N F- �
0�-�OPIN
_
O � cL a o
V W W QQww E O
J J o
IT PVT
. i N N C N N O M
>+ 0O0O �g0O0O +TLn�
W W N
C
ti u� co co o,.Ln
O Uo 0
p IN n.
CD U " c^
N � O
J J O C Ln
N O
_ o
w IN
v
QQ co
2 2 Q N
M m t
LL (D (D U ai
;�0+,J
U fy
Q Q t
O O \D 4 •L
YY Y 0)o a)
Q U =
`W , `.Y`
'` C k"
Z \\\ id) m
M
Y14
m \4 m
Q m If)
Y m
to y 49 N8 LC�
w Y m
aw
C �
y m \\\7 co
4444
Z9-Na U OWN N8 �
- L 4tlZ9-N8_Y�m
I C046t/-m
n � tffi
Y %� Cti8-N8
O t1 N Cb9cN8� 99�N9
m Y V,44 1Y9 N8 Y
85 �8 m 4tlZ9 N8 }�a6gNs
Y OCb9;N8
uri :1� mIC69tf_79'NB--
1 t 5tlZ9-N8�n
m i �L9tl-79; N�I
i o�99V Y9-H8
t C' �� � {tl17N9 II II
I 1 °" I Jlll
I
S� Ltl
Y
pit p%. � � I _.._..__'__-.--•�:1 .a.'.
v 06 N8P'
0 59
o� mjTI� use
YI a wAll �� OYtI so
CYJC '
DMI b6906 N8
�o�i9, y, m
lio��� Lp
...
mom- -°_--_ (4,Vi06,N8' l.'
o w rn 10Z806,N8 - �i�5�)irT ----
ry I uin —
m190Z806 N8
rF==
� u�lOZa06•N8IZ9 094806sN870 ZS0II
E94806=N 8ZOZ806•N8 8 96•N8]I tlL i' I - 1 N8
££u6_N8IOL64806wMa m m�
�ocsi4806'tNBi
£Z4806 N8 ficgh 06•N8 Y 96 •
�4DO
Z4806=N8 OG564806-N8 � r%
C1C71 o=" lul u
l �O�L916806�>{�£6L06 N8 0
1111 1
ZS
Poo m�°°(n'�nnnnLV L6•N8 m
mjo.Qo�
imlY.Y_Y-pYp HM m
££806;N81 >
m Moo
n.G8ti806�N8 IM m m
o:m m M m:
m o o pp I o 6b806-N8
°� m-m Y m m-EE806-N8 m tl L6 N8 -� N
unul�nJu��nnLl ��do
see :)PIS
- N O
U -
�' O U C
00 400 tiE0 AN �;J^ o' i c O
\co 00 > Q
O
4 00-400•ti£0•AN to 3 0 7 > m
xux
tv
d
c o
N Z000 Z00 7£0 AN c I 004•N8 —
� Z-Z04-N8
E z