Loading...
HomeMy WebLinkAboutL1.6 LANDSCAPE DETAILS C21G NAB SUTV-Y ON AT ACCURATE SURVEYING & MAPPING DRYLAND SEEDING REQUIREMENTS ° ° � �°F�r�°°°°°° GENERAL OVERVIEW MAINTENANCE 000°° 5`� �giTz 00 THIS REPORT OUTLINES RECOMMENDED REVE6ETATION AND SLOPE IMMEDIATELY RESEED AREAS WHIGH SHOW BARE SPOTS. MINIMUM ACCEPTABLE o STABILIZATION MEASURES FOR DISTURBED GUT AND FILL SLOPES WITHIN THE PLANT GOVERAGE IS 50 PERCENT AFTER ONE GROWING SEASON. PROTECT SEEDED LA- 6536 cwLD o w PROJECT LIMITS AS DEFINED ON THE ACCOMPANYING PLAN WHIGH WILL BE SEEDED AREAS WITH WANING SIGNS DURING MAINTENANCE PERIOD. THE SEED WILL REQUIRE (I)-I" HORIZONTAL o 0 0 3" 50. GATE FRAME - CONTRACTORS ARE REQUIRED TO HOLLOW STEEL °oo �I/I-1/2025 oo° WITH THE DRYLAND SEED MIX AND NOT IRRIGATED. THESE RECOMMENDATIONS ARE APPROXIMATELY NINETY (q0) DAYS OF FAVORABLE GROWING CONDITIONS TO PROVIDE STRUCTURALLY APPROVED HINGES AND FRAME o°od 000 MADE TO PREVENT SHORT TERM AND LONGTERM SOIL EROSION AS WELL AS TO GERMINATE AND BECOME ESTABLISHED FOR 5000E55FUL SURVIVAL WITH NORMAL FOR GATE. PROVIDE SHOP DRAWINGS FOR LANDSCAPE 5"x 5"x Y4" TUBE °OOO SCA oo° o PROVIDE AN AESTHETIG REVE6ETATION WHIGH WILL BLEND WITH THE EXISTING ARCHITECT REVIEW. STEEL POST WITH ° �00000000 o w MINIMAL SUMMER PRECIPITATION. I" HOLLOW STEEL o NATURAL SURROUNDING AREA. THE MEASURES INCLUDE REVE6ETATION AND 1 SOLID WELDED Z HYDROMULGHIN6 PROCEDURES FOLLOWING TOPSOIL DISTRIBUTION AND FINE SEEDING TIME CLEAR GAP. FILL WITH o 4,. CONCRETE. WELD w L GRADING. THE AREA TO BE REVE6ETATED CONSISTS OF ALL DISTURBED AREAS THE OPTIMAL SEEDING TIME SHALL BE IN FALL, BETWEEN MID SEPTEMBER AND GATE HINGES RELATED TO GRADING FOR CONSTRUCTION AND ANY OTHER AREAS DISTURBED IN MID OCTOBER. IF SEEDING IS APPLIED TOO EARLY OR TOO LATE AND PROPER o DIRECT TO POST ° in o THE PROCESS OF CONSTRUCTION. THE SLOPES TO BE AFFECTED VARY WIDELY IN GERMINATION IS NOT REALIZED PRIOR TO FALL DORMANCY, THEN RESEEDING SHALL ' ' o Z DEGREE AND ASPECT. BE APPLIED IN EARLY SPRING, AS SOON AS SO 1 L 15 WORKABLE (NOT MUDDY) zz J I"x " STRAP (D C .0 iT 00 (0 o M o d WELDED TO BACK a 2 a N o °� BETWEEN MARCH AND MID MAY. THIS PLANTING TIME PROVIDES THE OPTIMUM cn C .E _ T o n 3 z a z OF DECKING OF a E.N a m M = m W GENERAL EARTHWORK WEATHER CONDITIONS FOR SEED GERMINATION AND SEEDLING SURVIVAL RATE. a) a °7 E m ._ = co a w o EACH DOOR LEAF � 00 ALL WORK SHALL BE LIMITED TO THE AREA REQUIRED FOR CONSTRUCTION WITH F s Q 0 �� = Y co 0 SEEDING AFTER NOVEMBER 20, DORMANT SEEDING INSURES THAT THE SEED DOES m o 0 MINIMAL, IF ANY, DISTURBANCE TO THE SURROUNDING NATURAL SLOPE OR FG w N._°- - a o N z° ° NOT GERMINATE PRIOR TO FREEZING WINTER TEMPERATURES AND SEED SHOULD BE IN o m� 3 N Q VEGETATION. ALL FINISHED GRADES SHALL BE SMOOTH AND ROUNDED TO ENSURE A PLACE FOR THE EARLY SPRING RAINS. 5'_2" PROVIDE t� w` c� 3 L cc) 0 NATURAL TRANSITION BETWEEN NEW AND EXISTING GRADES. REFER TO GRADING N LOCKABLE ' ' ' ' ' ' 3 " a C0 N AND DRAINAGE PLANS FOR ADDITIONAL REQUIREMENTS. CONCRETE FOOTING GATE LATCH. _ K WATER THE CONTRACTOR WILL PROVIDE SUPPLEMENTAL WATER TO ENSURE PROPER s 6" AGGREGATE BASE DROP BAR. SITE PREPARATION SEED GERMINATION. _ o EARTHWORK PROCESS SHOULD BEGIN WITH GLEARIN6 LARGE SHRUBS FROM THE COMPACTED SUB6RADE 4.5" GATE AREAS TO BE DISTURBED. WOODY STEMS AND BRANCHES SHALL BE CHIPPED ON FERTILIZATIONWHEEL, BOLT SITE TO IMPROVE THE AMOUNT OF OR6ANIG MATERIAL IN THE TOP SOIL. NATURAL FERTILIZATION IS NOT RECOMMENDED FOR RECLAMATION SEEDING DUE TO W2'—8 TO FRAME. , TOPSOIL OCCURS AT VARYING DEPTHS ON THE PROJECT SITE. THE TOPSOIL SHOULD PROMOTION OF WEED COMPETITION. IF WEEDS ARE APPARENT, CONTACT DE516N NOTE. BE EXCAVATED AND STOCKPILED AT DESIGNATED STORAGE AREAS PRIOR TO THE PROFESSIONAL FOR WEED REMOVAL REQUIREMENTS. 1. CONTRACTORS ARE RESPONSIBLE FOR SHOP DRAWINGS TO BE REVIEWED BY LANDSCAPE ARCHITECT ° PROPOSED GRADING OPERATIONS. BEFORE INSTALLATION. WROUGHT IRON GATE TO BE PAINTED W/ ELECTROSTATIC PAINT - COLOR AS EROSION CONTROL DIRECTED BY OWNER. TOPSOIL DISTRIBUTION UNDER NORMAL CIRCUMSTANCES AND ADHERENCE TO THE CONSTRUCTION 2. PROVIDE FIRE DEPARTMENT KNOX BOX ON BUILDING WALL. MODEL AND LOCATION TO BE APPROVED BY J ONCE THE GENERAL EARTHWORK IS COMPLETE AND ROUGH GRADING HAS BEEN PRACTICES DESCRIBED IN THE SPECIFICATIONS, THE ABOVE RECOMMENDED EROSION BOTH FIRE DEPARTMENT AND OWNER. ACCOMPLISHED, THE TOPSOIL SHOULD BE REDISTRIBUTED OVER THE AREA TO CONTROL MEASURE SHOULD PROVIDE A STABLE SLOPE CONDITION. TO AVOID OPEN VISION WROUGHT IRON DOUBLE ° MINIMUM DEPTHS AS SPECIFIED. WHERE NEEDED, SLOPES SHOULD BE GRADED WITH INCIDENTAL EROSION, IT IS IMPERATIVE THAT THE SLOPES, ONCE PREPARED, REMAIN o SERRATION TO HOLD TOPSOIL ADEQUATELY. TOPSOIL SHOULD BE SPREAD AND UNDISTURBED UNTIL SEEDING GERMINATES AND IS ESTABLISHED. Coale: 1/4 = 1'-0 w L16HTLY COMPACTED UTILIZING A SMALL CLEATED TRACTOR MOVING AN SOgo VEGETATION COVER IS RECOMMENDED TO CONTROL EROSION. SWING GATE PERPENDICULAR TO THE CONTOURS OR ANOTHER METHOD WITH EQUAL CAPABILITY. IT SURFACE CONDITIONS SHOULD BE MONITORED DAILY. IF EROSION DETRIMENTAL TO 10 IS OUR RECOMMENDATION THAT ANY NEGE55ARY MECHANICAL MEANS OF EROSION THE SLOPE IS OBSERVED OR ANTICIPATED DUE TO EXCESSIVE RAINFALL, REMEDIAL w CONTROL BE IN PLACE PRIOR TO BEGINNING SITE DISTURBANCE. MEASURES SHALL BE IMPLEMENTED AS REQUIRED. REFER TO THE STORM WATER w ONCE TOPSOIL HAS BEEN DISTRIBUTED AND GRADED, REVE6ETATION SEEDING POLLUTION PREVENTION PLAN FOR ADDITIONAL REQUIREMENTS. w SHALL FOLLOW IMMEDIATELY. IN ORDER TO ELIMINATE SURFACE GRU5TIN6 AND TO Copyright CO 2025 Z FACILITATE BETTER ROOT PENETRATION THE SURFACE SHOULD BE SCARIFIED PRIOR All rights reserved. Reproduction or use in any form o or by any means without written permission of 2 H TO SEEDING. Breckon Land Design,Inc is unlawful and subject[0 0 criminal prosecution. a w SEEDING a APPLY SEED TO THE PROJECT SITE BY HYDR05EEDIN6. THE FOLLOWING INFORMATION PROVIDES MATERIAL AND EXECUTION FOR SEEDING. 10 UPLAND DRYLAND SEED MIX W O z SEED MIXTURE: RATE: PURE LIVE SEED LBS / ACRE ♦ ^ vJ ALKALI 5AGATON 0.1 W o (� BLUE WILDRYE 2A GREAT BASIN WILDRYE 2.0 r^ 10 IDAHO FESCUE 0.6 C\JLJ J z NEEDLE-AND-THREAD 0.2 Q /r SLENDER WHEATGRASS 3.3 \L SGUIRRELTRAIL 2.1 Q WESTERN WHEAT6RA55 3.6 (`Y1J Q ° TOTAL SEED INSTALL a 15.4 LEIS / ACRE ` ' ` W cc < r n 0 DRYLAND SEED MIX FOR PERENNIALLY FLOODED OR SATURATED AREAS v/ W 0 0 c' SEED MIXTURE: RATE: PURE LIVE SEED LBS / ACRE F � W � 0 o ALKALI BULRUSH 2.4 ., W INLAND 5ALT6RA55 O.5 m n MEADOW BARLEY 4.6 O MEADOW SE06E O.q Q NEBRASKA SEDGE 1.1 cn ROUGH BENT6RASS 0.2 U _ TUFTED HAIR6RASS 0.5 Q E TOTAL SEED INSTALL o 10.4 LB W COS ACRE � Q o C � FIBER MULCH MATERIAL WITH TAGKIFIER G W WOOD WITH TACK BY 'PROFILE' OR APPROVED EQUAL FOR AREAS LESS THAN 4:1 N Z SLOPES WITH A 3 MONTH LONGEVITY. APPLIED AT 2,000 LBS PER ACRE �^ PROMATRIX EFM BY 'PROFILE' OR APPROVED EQUAL FOR 3:1-2:1 SLOPES WITH A �J 6-12 MONTH LONGEVITY. APPLIED AT 3,000 LBS PER ACRE. T 0 FLEXTERRA BY 'PROFILE' OR APPROVED EQUAL FOR 4:1-I:I SLOPES WITH AN 15 Q rn MONTH LONGEVITY. APPLIED AT 4,000 LBS PER ACRE. a ORGANIC SOIL AMENDMENT z U) PROGANIGS BIOTIG SOIL MEDIA BY 'PROFILE' OR APPROVED EQUAL. INSTALL AT O D 4,000 LBS PER ACRE. HYDROSEED I NG MIX SPECIFIED SEED AND ORGANIG SOIL AMENDMENT IN WATER PER MANUFACTURER'S RECOMMENDATIONS. APPLY SEEDED SLURRY EVENLY IN TWO tLi INTERSECTION DIRECTIONS. DO NOT HYDROSEED AREA IN EXGE55 OF THAT WHIGH Q Q GAN BE MULCHED ON SAME DAY. KEEP OFF ROADS, WALKS, STRUCTURES AND rr v AREAS NOT TO BE SEEDED. GLEAN UP THESE AREAS. AFTER HYDROSEED, TRACK IN cf)� SEED USING A CLEATED CRAWLER WITH TRACK MARKS PERPENDICULAR TO THE 0 z 0 SLOPE. AFTER TRACKED, MULCH SLOPE WITH 2O00 LBS. PER ACRE OF FERTILE-FIBER MULCH MATERIAL AND 50 LBS. PER ACRE OF TAGKIFIER. C 0 o O cn REVISIONS U No. Date Description (0 1 3/11/25 MERIDIAN COMMENTS r a) cn fl Q PROJECT NO.: 0 24054 (n B DRAWN BY: z CR. KS CHECKED BY: O CR, JB U DATE: 0 09/17/2025 C* O SHEET NUMBER O o T L1.6 I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15