DRAINAGE FACILITY INFILTRATION RATE sq 0�21/2�5�0
0 F OF
SAND WINDOW O�/N RONNpP
MONITERING WELL PER ACHD IPWC SUPPLEMENTAL SD-627 DRAINAGE INFILTRATION 5AND WINDOW 5WALE DEPTH
&DETAIL 1 THIS SHEET 5WALE RATE AREA REQUIRED REQUIRED
z 1 0.6 I WHR 410 SOFT 1.0 FT o
2 0.6 I WHR 410 SOFT 1.0 FT w
3 8.0 IN/HR 630 SOFT 1.0 FT
b �-`"` b b •• `�` 4 8.0 IN/HR 630 SOFT 1.0 FT
D ° ° Z CO) 0 0�0 0 .. o E
in
0 0 0 o o o PERFORATED 18"PVC, OR CORRUGATED HDPE PIPE. FINISHED GRADE °' o o 0 z
kkkk •• PERFORATION PER PERFORATION SCHEDULE, THIS SHEET. REFER TO PLANS 10' t .2 N o o
oo�oo�o o o0 2"WASHED DRAIN ROCK N
IIIIIII z 2:1 MAX a�, E W co a w
0 0 0 0 0 0 0 0 0 0 .. o o 2:1 MAX g 11 IIIIIIIIII, a� cCD �� Yco0 L '
•• NONWOVEN FILTER FABRIC.TOP AND SIDES ONLY. III III III III III III III III 1 1 III III-11' a c°i o -° ILL
m m N
p o 0 0 0 0 0 0 0 0 0 0 0 - 11IIIIIII"- w W._ ra z =
w u� OVERLAP JOINTS MINIMUM OF 12" l l l l 1 1 11 N 11=III=ITI= - o 0.m N °' E
O m z o b b b b b b b b b o` b =1I 1I1 1I I I11 i ' f° ` ` ° 3 L CWo `m 0
H w o��0(Q0 Q�0(Q0 Q�0(Q0 Q�0(�0 Q�0 .. o Q�0 11I II II II II II II II ? Il l 11 l 11 l 11 FINISH GRADE w
d `l7 'O `l7 'O `l7 6 `l7 6 `l7 •• `( U J W C7 J 3 x
J •• • • • • • • LL W =C7 a
= o 0 0 0 0 0 0 0 0 0 0 0 1IIIIIIIII11 g -III- w
KIIIIII-III - II _ ■ ■ x
Q LU w o o o -6o o •• o I1, 1 11 111 11 I-
U 18° U U d li o 0 0 0 0 0 0 0 6 0 •• o o II III-III SLOPE FINISHED GRADE TO SAND
= p p p p p p p p p pIIIII -III= DRAIN W
z 0 0 0 0 0 0 0 0 0 0 0 0 o PROVIDE MINIMUM OF 18"OF CLEAN ASTM C-33 SAND =III LGI 0
O o 0 05�0 05�0 05�0 05�c0 •• o o THROUGHOUT THE BOTTOM OF SEEPAGE BED. 11 -III=
w �� b�� b�� b�� b •• -III- I-
ELL EL ." o oho BOTTOM OF GRAVEL BED. -III IIIIIIIII - - - - = - W
65 �b =I1=1I-FULL BOTTOM= 1I 1I 1I - ASTM C-33 SAND , 0
CAP CAP 12 Ow orb ��b ��b ��b�b�b oho NATIVE UNDISTURBED SOIL, 'I-III WIDTH 1IIIIII11.
- 0 .. bb GRADE SMOOTH AND AVOID II 1=i 1=i 1=i 1=i 1=i 1=1 1=1 1=1 1=1
° .. o 0 0 0 0 0 0 0 0 0 0 0 EXTEND SAND TRENCH INTO a
pom� m�m� •• ,Y b COMPACTION lllllllllllllllllllllllllllllllllllllllllllll FREE-DRAINING
w '• IIIIIIIIIIIIIIIIII= o
z •• — MATERIALS, PER GEOTECH REPORT -
PLAN VIEW •• =1 111111111111III11 11 —
• •••' • `• • .. - 1IIIIIIIIIIIIIII1 i AND NOTE 8
CONCRETE COLLAR NON-TRAFFIC AREAS PLAN VIEW z r° ••
g _ _ _ 2 t OVER EXCAVATE TO FREE DRAINING MATERIAL AND
BACKFILL WITH 2'ASTM C-33 SAND AND PIT RUN IF MINIMU M HIGH
J 12" 12" g^ 12" PER PLANS REQUIRED. (ISPWC SECTION 801) GROUNDWATER ELEV(FIELD o
- _= MINIMUM HIGH GROUNDWATER LEVEL, VERIFY) o
•• Z
a, '• FIELD VERIFY NOTE: z
w
1. THE USE OF SILTY LOAM OR CLAY IS PROHIBITED FROM USE AS BASIN BOTTOM MATERIAL.
NOTE: 2. DO NOT COMPACT BASIN AREA WITH HEAVY EQUIPMENT. IF COMPACTION OCCURS, RIP TO 12"AND REGRADE. 'I
3. REFER TO SPECIFICATIONS FOR SWALE PERCOLATION TESTING REQUIREMENTS. o
WELL COVER IN SECTION 1 CONTRACTO PRESENCE OR SHALL F THE DESIGN ORM DFESS ONAL PRIOR TO CONSTEPTH TO FREE DRAINING ORUCTIONUNDWATER&PERCOLATION RATE IN THE 4. CONTRACTOR SHALL EXCAVATE A TEST PIT AT SWALE LOCATION TO CONFIRM THE DEPTH TO FREE DRAINING SOILS w
AND GROUNDWATER IN THE PRESENCE OF THE DESIGN PROFESSIONAL. Lu
SIDEWALK CONCRETE COLLAR TRAFFIC AREAS 2. IF GROUND WATER IS LESS THAN 1'-0"TO THE BOTTOM OF SEEPAGE BED, CONTACT DESIGN PROFESSIONAL 5. SAND WINDOW TO REMAIN UNVEGETATED. PROVIDE 2"DEPTH OF EXPOSED SAND OVER TOP OF FILTER FABRIC. w
IMMEDIATELY FOR REDESIGN. SEE SOILS REPORT FOR ADDITIONAL INFORMATION. 6. A MINIMUM OF 18"OF C33 SAND IS REQUIRED AT TOP OF SAND WINDOW. Copyright CO 2025
LOCKABLE WELL COVER,8"DIAMETER WATER 3. CONTRACTOR TO CONTACT DESIGN PROFESSIONAL IF SITE VARIATION DIFFER TO THAT WHICH IS SHOWN IN All rights reserved. Reproduction or use in any form o
HAPPROVED PLANS. or by any means without written permission of 2
TIGHT GALVANIZED STEEL COVER AND 4. REFER TO ACHD STORMWATER BMP 20 FOR ADDITIONAL INFORMATION &REQUIREMENTS. Breckon Land Design,Inc. and subject to 0
CANISTER.
a
Lu
FINISHED GRADE. TYPICAL SEEPAGE BED TYPICAL SWALE z
=III-III-III-11 ' '•.•°'•:• PVC CAP, GASKETED(WATERTIGHT). o
��1 °• 1�1=1�1=1�11�1_ 3 5 z=IIII Y 11 Y 1111 1 1SIT1 11 Y i- CROSS SECTION- - CROSS SECTION
'�I11-III=11 I-III- CONCRETE(COLLAR),CLASS 3000(ISPWC z
'I I-III-III IIIIIII I�
il_ III=1I =III=111- SECTION703) rn
1111111 IIII�IIII r n C / 0
II III- 3/4"MINUS CRUSHED AGGREGATE FOR BASE V,
a
-11111 II III (ISPWC SECTION 802)OR MATERIAL w o
G+ 11 1_I REQUIRED FOR STORM DRAINAGE FACILITYLu
LL (LE DRAIN ROCK, FILTER SAND). � z � &
O z
g Q w
O J W 0
U PVC PIPE,4"DIAMETER ASTM D-3034 SDR 35 w
ILL
O
CID o
Lu
2-STAINLESS STEEL HOSE CLAMPS AT 3"
z - SPACING. SECURE GEOTEXTILE IN PLACE. Lu
w ih
LO Vn W a
= i M
O M2 z UJ 0
FILTER SAND(ISPWC SECTION 801) v LL
0
F O •• VARIES-SEE PLAN VARIES-SEE PLAN CD Q r w
w U " PERFORATED PVC PIPE,ASTM D-3035 SDR 35 v =
oo ••
WITH 6-3/8" HOLES AT 3"ON CENTER. i
.. III o� z z
'
CY) I-1 I I�r-
•• DRAINAGE GEOTEXTILE,TYPE 1 (ISPWC -III—III 2' _< l`III=1I -
-I 4' 1' —I IR I—I I—
.. SECTION 2060) -ITI=ITI=ITI�I- ��TI=ITI=ITI=III=1il=PVC CAP, SOLVENT WELDED OR GASKETED 'I=1=I III II II=IIIII II II—IIIiIII Ii—I I ITI l lei l-I I=—ITI-1 --I I I=i—1 - 11I--11I1-TI1I I1 I1IT=-111-TI1I1IT11 I1--I1I1I1=I11 1'1�I II=11 1-
III=-
Q
— I I I I= IT = '-I I Ii
(WATERTIGHT)
Q Ir
0 <
NOTES: 12" 4:1 MAXIr W CO
E G C G
� 1. WELLS ARE FOR OBSERVATION OF GROUNDWATER LEVEL NEAR STORM DRAINAGE FACILITIES. NOTES:
- 2. LOCATION OF GROUND OBSERVATION WELLS SHALL BE APPROVED BY CITY ENGINEER. C I UJ
3. REFER TO ACHD ISPWC SUPPLEMENTAL SD-627 FOR MORE INFORMATION. 1. ALL COMPACTION OF FACILITIES SHALL COMPLY WITH DIVISION 200 OF THE ISPWC z
CO
� r O
MONITORING AND OBSERVATION WATKINS DRAIN O
1 4
z
U
WELL SECTION CROSS SECTION0
D
Q
D_
�_ a Qoo= W Z
Q o ` y2WIW2
_ O
r � WmQ LL 0z0►
0 / H ZV0W?oz U
�QC9QCWW
J Q C k��
U o %zzW O
C 0
d-
O
REVISIONS
0 LL
No. Date Description
i
0
s LIJ
Q
PROJECT NO.: O
0 25027
B DRAWN
SEEPAGE BED PIPE CR2 BY:
PERFORATION SCHEDULE CHECJB