Loading...
HomeMy WebLinkAboutC6.01 Sewer Plan & Profile N. Sunny Side Ave. & N.Palio Ave. Sheet Notes: = T H E 6,600 SF 1. COMPLY WITH ALL NOTES ON SHEET C1.00. LAND °- 2. ALL CONSTRUCTION AND MATERIAL SHALL BE IN ACCORDANCE WITH THE GROUP C6.05 LATEST EDITION OF THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC), CITY OF MERIDIAN STANDARDS,AND ADA COUNTY HIGHWAY DISTRICT STANDARDS. NO EXCEPTIONS ARE PERMITTED WITHOUT PRIOR APPROVAL. 3. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL COMPLY WITH IDAHO CODE, 00 CHAPTER 22,TITLE 55 REGARDING UNDERGROUND FACILITIES DAMAGE B2 L40 PREVENTION. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF B3 L17 °° 6,930-SF EXISTING UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR AGREES TO 6,600-SF _ _ BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE W W a a I 6,s27 sF OCCASIONED AS A RESULT OF FAILURE TO EXACTLY LOCATE AND PRESERVE ANY JL� � Q y 0 88l&b Y O- Hal&b AND ALL UTILITIES. THE CONTRACTOR SHALL CONTACT THE APPROPRIATE C6.06 UTILITY COMPANIES OR DIG-LINE (208.342.1585) FOR EXACT LOCATIONS A z MINIMUM OF 48-HOURS PRIOR TO DIGGING. �! �FIId 9 0 ■ 4. CONTRACTOR TO FIELD VERIFY ALL EXISTING CURB AND GUTTER, STORM DRAIN, B3 L1 B3 L18 1 11 CHANNEL CROSSINGS AND SEWER ELEVATIONS OR INVERTS PRIOR TO — I L — — — — —2330 — — — — — — — — — — — — —2,444 SF— — — — — — o CONSTRUCTION AND NOTIFY ENGINEER WHEN ELEVATIONS OR INVERTS DO NOT JI& `� � MATCH PLANS. 00 B2 L39 co 6,920-SF B16 L11 B16 L10 B16 L9 B16 L8 B16 L7 Q B10 L21 5. ALL PIPE INSTALLATION AND TRENCHING SHALL CONFORM TO THE LATEST _ C.2 �, - 4,000-SF 4,000-SF 4,000-SF 4,000-SF 5,128-SF > 6 817 SF EDITION OF THE ISPWC DIVISION 300 AND SD 301. BEDDING AND BACKFILL I I � I N. SUNNY SIDE AVE. - M 8 o I a z SHALL BE CONSTRUCTED PER SECTIONS 305 AND 306 OF THE ISPWC. cc �' o Z 11+00 5 ti -12+00 �'12+67 T N � o COP) o 6. ALL SEWER SERVICE LINES SHALL HAVE A 2°/ MINIMUM GRADE TO THE (] + J � + J N + J CD0 SS $ T SSO SS L�CJ N L�CJ N 'Zr L�CJ 129-LF OF 8-IN PVC AT 0.45% a N N a N N a N N J PROPERTY LINE. "" 3 w � 3 w � 3 o 1 100 � 0 _ �0 � 0 _ �0 � C) M _ r r _ I 7. STATIONING REPRESENTS SEWER MAIN ALIGNMENT. SSMH 28 4.1 1 FT I I I I 1 ­1_ 1 I I I I • - - - — 8. SEWER PIPE SLOPES ARE CALCULATED USING LENGTH OF RUN FROM CENTER TO B2 L17 B2 L18 \ B2 L38 O° CENTER OF MANHOLES. E2,684-SF _ — — — — — — —2,799-SF — — — — 6,909 SF 2 2 2 B1°L22 CIO co M�� �? M $ al0�� y 6,807-SF Sewer Keynotes: N - ^ < 31+00 r 32+00 _ 33+(33+11.28 1. POTABLE WATER MAIN CROSSING-SEE CITY OF MERIDIAN SEWER NOTE NO. 2 - - - SS 11 SS 8 SS119 ° SS. � ON SHEET C1.00. N. PALIO AVE. 5 173-LF OF 8-IN PVC AT 0.45/° 1 00 z 9 SSMH 33 4.1 2. POTABLE/NON-POTABLE SERVICE CROSSING-SEE CITY OF MERIDIAN SEWER � NOTE NO.3 ON SHEET C1.00. B2 L19 CD J 6,600-SF o 3. INSTALL 4-IN SEWER SERVICE PER ISPWC SD-511 AND MARK PER MERIDIAN SD 64 L6- °O coB2 L37 2,000-SF 2,958-SF \ �'O SW3 Iz Cl) 6,899-SF Hdld" i I B10 L23 4. INSTALL 48-IN STANDARD MANHOLE TYPE A PER ISPWC SD-501. - r 0 6,946 SF N 4.1. THREE-WAY SEWER MANHOLE CHANNEL. L+ U+ IL SSMH 34ca O 0 MIN MIN MM 11111 off Is ME I 5. REMOVE EXISTING"T"-TYPE CLEANOUT AND CONNECT TO EXISTING SEWER MAIN ME OR B4 L7 * STUB. y `0 B2 L20 C6.04 8,790-SF Cc mmi 6,600-SF C6.06 O 0 30' 60' _� ' Sewer Plan & Profile - N. Sunnyside Ave. Sewer Plan & Profile - N. Palio Ave. 30 60 cc Horizontal Scale: 1" = 30' Horizontal Scale: 1" = 30' 0 2550 2550 ■y 0 SEWER - SUNNY SIDE SOUTH: Sta. 10+50 - 12+90 SEWER - PALIO. Sta. 30+90 - 33+30 HORIZONTAL SCALE: 1" = 30' HORIZONTAL SCALE: 1" = 30' ■� y VERTICAL SCALE: 1" = 3' 2553 VERTICAL SCALE: 1" = 3' 1 2553 2547 PROPOSED GRADE ELEVATION 2547 AT PIPE CENTERLINE EXISTING GROUND ELEVATION CAO AT PIPE CENTERLINE 2550 2550 PROPOSED GRADE ELEVATION 2544 _————————— 2544 AT PIPE CENTERLINE (0 ——— — ————— EXISTING GROUND ELEVATION m M — AT PIPE CENTERLINE 00 2547 2547 2541 2541 C L CY) CD 2544 2544 Revisions 1Q 08-IN PVC WATER CROSSING 2538 2538 1. AGENCY COMMENTS- 10/24/25 2541 O 8-IN PVC WATER CROSSING 2541 2535 2535 2538 2538 2532 5 0 2532 129-LF OF 8-IN PVC AT 0.45% 5 138-LF OF EXISTING 8-IN PVC AT 0.45% 71 2535 ///�/ /��j��/;//�/ 2535 2529 9SSMH 28 2529 STA: 12+67, 0.00, 138-LF OF EXISTING 8-IN PVC AT 0.45% 4'1 SSMH 33 pNAL E� 5 .7 ± STA: 33+11.28, 0.00 G\S G'1 DEPTH: 12.31' 2532 RIM: 2545.42± 2532 DEPTH: 10.64' IE IN: 2531.03, 8-IN PVC (W) IE IN: 2535.38, 8-IN PVC (E) 568 2526 IE IN: 2531.03, 8-IN PVC (E) 2526 H CO) IE OUT: 2530.93, 8-IN PVC (N) IE IN: 2535.38, 8-IN PVC (W) s�0/24/2025 0 a IE OUT: 2535.28, 8-IN PVC (N) JUTE OF \OPT 2529 r N 2529 W. W W 2523 2523 a a Project No.: 123200 a a EXISTING GROUND ELEVATION PROPOSED GRADE ELEVATION Date of Issuance: 09.02.2025 AT PIPE CENTERLINE AT PIPE CENTERLINE EXISTING GROUND ELEVATION PROPOSED GRADE ELEVATION Project Milestone: PERMIT AT PIPE CENTERLINE AT PIPE CENTERLINE 2526 2526 Sewer Plan & Profile co r � O � O � 2520 2520IZYIZY N. Sunny Side Ave. & M O O N N N N N GV N N CO C . u) l!". N co co N co O N N N N N N N.Palio Ave. M M M co co co co co N N N N N N N N N N N N N 30+90 31+20 31+80 32+40 33+00 33+30 10+50 10+80 11+40 12+00 12+60 12+90 C6m01