HomeMy WebLinkAboutC2.10 Street Lighting Cover THE
Baratza Subdivision Phase 2 LAND
- GROUP
Lenn r Homes of Id ho , LLC
City of Meridian - Standard Notes: Engineer's Standard Notes: ACHD Standard Notes: Vicinity Map:
CITY OF MERIDIAN STANDARD NOTES RESIDENTIAL AND COMMERCIAL 1. TECHNICAL SPECIFICATIONS ARE AN INTEGRAL PART OF THESE DRAWINGS. UPON SUBMITTAL OF A BID PRICE BY THE (SEE ACHD POLICY MANUAL SECTION 3000 FOR ALL APPLICABLE DESIGN STANDARDS) s
REV. MARCH 2O18 CONTRACTOR, IT IS RECOGNIZED THAT THE CONTRACTOR HAS REVIEWED THE TECHNICAL SPECIFICATIONS AND THE
CONTRACTOR AGREES TO ABIDE BY THE REQUIREMENTS AND CONDITIONS CONTAINED THEREIN. ACHD STANDARD CONDITIONS: '
GENERAL CONSTRUCTION 1. ANY EXISTING IRRIGATION FACILITIES SHALL BE RELOCATED OUTSIDE OF THE RIGHT-OF-WAY. _
1. ALL CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT VERSION OF THE IDAHO STANDARDS FOR 2. THE CONTRACTOR SHALL AT ALL TIMES COORDINATE HIS WORK WITH THAT OF OTHERS ON THE SITE. THE CONTRACTOR 2 PRIVATE EWER R WATER SYSTEMS ARE PROHIBITED FROM BEING LOCATED WITHIN ANY ACHD ROADWAY R RIGHT-OF-WAY. "4 ! 4+•� *A11 .11
TBM #1
PUBLIC WORKS CONSTRUCTION (ISPWC), THE CITY OF MERIDIAN SUPPLEMENTAL SPECIFICATIONS OTHE ISPWC (AND ANY SHALL HAVE A RESPONSIBLE PARTY WHO SHALL HAVE THE AUTHORITY TO REPRESENT AND ACT FOR THE CONTRACTOR ON S 0 S S S 0 0 G OC C 0 0i W. I cUnl I . --
ADDENDUMS), MERIDIAN DESIGN STANDARDS, THE REQUIREMENTS OF THE ADA COUNTY HIGHWAY DISTRICT (ACHD), AND/OR THE JOB SITE DURING ALL WORKING HOURS. - _ -
THE REQUIREMENTS OF THE IDAHO TRANSPORTATION DEPARTMENT (ITD). THE MORE STRINGENT OF ANY OF THESE 3. REPLACE ANY EXISTING DAMAGED CURB, GUTTER AND SIDEWALK AND ANY THAT MAY BE DAMAGED DURING THE - - - --
STANDARDS SHALL BE THE CONTROLLING STANDARDS OR SPECIFICATIONS. 3. THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING ALL WORK INDICATED IN THESE PLANS AND SPECIFICATIONS. ANY ITEM CONSTRUCTION OF THE PROPOSED DEVELOPMENT. CONTACT ACHD INSPECTION SERVICES AT 387-6284. 'TBM
RE #2
INDICATED IN THESE PLANS, BUT NOT ITEMIZED IN THE BID DOCUMENTS, WILL BE INCLUDED UNDER A BID SCHEDULE ITEM TO ~ FUTU PHASE
TBM#3
2. THE CONTRACTOR SHALL HAVE A COPY OF THE LATEST CITY OF MERIDIAN STANDARD SPECIFICATIONS AND DRAWINGS ON WHICH IT MOST PERTAINS. 4. COMPLY WITH DISTRICT'S TREE PLANTER POLICY. 0 1
SITE OR READILY ACCESSIBLE AT ALL TIMES DURING CONSTRUCTION (AVAILABLE ON THE WEBSITE). FAILURE TO HAVE ACCESS ii' oc I�� 0JJ ►
TO A CURRENT COPY OF THE STANDARD SPECIFICATIONS ON SITE COULD BE GROUNDS FOR A STOP WORK ORDER UNTIL THE 4. THE CONTRACTOR SHALL EXAMINE THE SITE, COMPARE IT WITH THE PLANS AND SPECIFICATIONS, CAREFULLY EXAMINE ALL OF 5. CONSTRUCT ALL UTILITY CUTS AND STREET REPAIRS PER ISPWC SD-301, ISPWC (ACHD SUPPLEMENT) SD-303, AND SD-806. A i
VV
SITUATION IS RESOLVED. THE CONTRACT DOCUMENTS, AND SATISFY HIMSELF AS TO THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED TRAFFIC CONTROL PLAN WILL ALSO BE NECESSARY FOR ANY UTILITY CUT. SUBMIT ALL TRAFFIC CONTROL PLANS TO THE Y
BEFORE ENTERING INTO CONTRACT. NO ALLOWANCE SHALL SUBSEQUENTLY BE MADE ON BEHALF OF THE CONTRACTOR ON DISTRICT'S CONSTRUCTION SERVICES DIVISION FOR REVIEW AND APPROVAL. IT IS STRONGLY RECOMMENDED THAT THE C") BARATZA SUBDIVISION-PHASE 1
7
3. THE CONTRACTOR SHALL HAVE PLANS STAMPED "APPROVED FOR CONSTRUCTION" BY THE CITY OF MERIDIAN ON SITE AT ALL ACCOUNT OF AN ERROR ON HIS PART AND/OR HIS NEGLIGENCE AND/OR FAILURE TO ACQUAINT HIMSELF WITH THE CONDITIONS NUMBER OF UTILITY CUTS WITHIN A STREET BE REDUCED TO THE FEWEST POSSIBLE. AEO
TIMES. OF THE SITE. .z R/W FUTURE
6. UTILITY STREET CUTS IN PAVEMENT LESS THAN FIVE YEARS OLD ARE NOT ALLOWED UNLESS APPROVED IN WRITING BY THE l„r' ' cc
-"� PHASE i
4. ALL CONTRACTORS, SUBCONTRACTORS, AND UTILITY CONTRACTORS SHALL ATTEND A PRE-CONSTRUCTION CONFERENCE 5. THE LOCATION OF EXISTING UNDERGROUND UTILITIES ON THESE PLANS ARE APPROXIMATE. A REASONABLE EFFORT HAS BEEN DISTRICT. CONTACT THE DISTRICT'S UTILITY COORDINATOR AT 387-6258 (WITH FILE NUMBERS) FOR DETAILS.
PRIOR TO START OF WORK. MADE TO LOCATE AND DELINEATE ALL UNDERGROUND FACILITIES, HOWEVER THE LAND GROUP, INC. OR IT'S CONSULTANTS
ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THE EXISTING FACILITIES SHOWN HERE OR FOR THE 7. CONSTRUCTION, USE AND PROPERTY DEVELOPMENT SHALL BE IN CONFORMANCE WITH ALL APPLICABLE REQUIREMENTS OF THE f
5. CONTRACTORS SHALL NOTIFY THE APPROPRIATE AGENCY WHEN MATERIALS ARE ON SITE OR INSPECTION OF THE WORK IS EXISTENCE OF OTHER UNDERGROUND UTILITIES OR OBJECTS WHICH MAY BE DISCOVERED BUT ARE NOT SHOWN ON THESE ACHD PRIOR TO DISTRICT APPROVAL FOR OCCUPANCY.
REQUIRED. NO WORK MAY BEGIN ON ANY PROJECT WITHOUT TWENTY FOUR (24) HOUR PRIOR NOTICE. PLANS. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ANY EXISTING UTILITIES BEFORE COMMENCING WORK,
AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGE DUE TO CONTRACTOR'S FAILURE TO EXACTLY LOCATE 8. THE APPLICANT SHALL CONTACT ACHD TRAFFIC OPERATIONS 387-6190 IN THE EVENT ANY ACHD CONDUITS (SPARE OR FILLED) {
6. CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR 48 HOURS PRIOR TO THE REQUIRED TESTING. THE CONTRACTOR AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. THE CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY ARE COMPROMISED DURING ANY PHASE OF CONSTRUCTION. ownPROJECT SITE
MAY NOT OPEN OR CLOSE WATER VALVES. COMPANIES OR DIG-LINE (1-800-342-1585) OR 811 FOR EXACT LOCATIONS A MINIMUM OF 48-HOURS PRIOR TO DIGGING. ".
ACHD ROADWAY NOTES:
7. ALL MATERIAL FURNISHED ON, OR FOR THE PROJECT MUST MEET THE MINIMUM REQUIREMENTS OF THE APPROVING 6. ALL CONTRACTORS WORKING WITHIN THE PROJECT BOUNDARIES ARE RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE 1. ALL CONSTRUCTION IN THE PUBLIC RIGHT-OF-WAY SHALL CONFORM TO THE CURRENT EDITION OF THE ISPWC AND ACHD
AGENCIES. AT THE REQUEST OF THE APPROVING AGENCY OR THE DESIGN ENGINEER, CONTRACTORS SHALL FURNISH PROOF SAFETY LAWS OF ANY JURISDICTIONAL BODY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BARRICADES, SAFETY SUPPLEMENTAL SPECIFICATIONS. NO EXCEPTIONS TO DISTRICT POLICY, STANDARDS AND THE ISPWC WILL BE ALLOWED UNLESS Sheet Index:
THAT ALL MATERIALS INSTALLED ON THIS PROJECT MEET THE SPECIFICATION REQUIREMENTS SET FORTH IN GENERAL DEVICES AND CONTROL OF TRAFFIC WITHIN AND AROUND THE CONSTRUCTION AREA. ALL TRAFFIC CONTROL SHALL BE IN SPECIFICALLY AND PREVIOUSLY APPROVED IN WRITING BY THE DISTRICT. sheet List Table
CONSTRUCTION NOTE NO. 1. ACCORDANCE WITH THE MUTCD.
1.1. ACTUAL FIELD CONDITIONS DURING TRENCHING MAY REQUIRE ADDITIONAL PAVEMENT REPAIR BEYOND THE LIMITS SHEET NUMBER SHEET TITLE
8. WORK SUBJECT TO APPROVAL BY ANY GOVERNMENTAL AGENCY MUST BE APPROVED PRIOR TO (A) BACKFILLING TRENCHES 7. ALL MATERIAL FURNISHED ON OR FOR THE PROJECT MUST MEET THE MINIMUM REQUIREMENTS OF THE APPROVING AGENCIES SHOWN ON THE PLANS. THE FOLLOWING CONDITIONS ARE LISTED IN SECTION 6000 OF ACHD POLICY MANUAL:
FOR PIPE; (B) PLACING OF AGGREGATE BASE; (C) PLACING OF CONCRETE; (D) PLACING OF ASPHALT PAVING. OR AS SET FORTH HEREIN,WHICHEVER IS MORE RESTRICTIVE. CONTRACTORS MUST FURNISH PROOF THAT ALL MATERIALS N
INSTALLED ON THIS PROJECT MEET THIS REQUIREMENT AT THE REQUEST OF THE APPROVING AGENCY AND/OR THE DESIGN 1.2. ALL ASPHALT MATCH LINES FOR PAVEMENT REPAIR SHALL BE PARALLEL TO THE CENTERLINE OF THE STREET AND C2.00 STREET LIGHTING COVER
9. INSPECTION, APPROVAL AND FINAL ACCEPTANCE OF ALL WATER AND SEWER CONSTRUCTION SHALL BE BY THE PUBLIC ENGINEER PRIOR TO FUND DISBURSEMENT COVERING SAID WORK. INCLUDE ANY AREA DAMAGED BY EQUIPMENT DURING TRENCHING OPERATIONS.
WORKS DEPARTMENT, AND THEIR DECISION SHALL BE FINAL. SUCH INSPECTIONS SHALL NOT RELIEVE THE CONTRACTOR FROM C2.10 STREET LIGHTING PLAN
THE RESPONSIBILITY OF PERFORMING THE WORK IN AN ACCEPTABLE MANNER IN ACCORDANCE WITH THE DEQ/QLPE 8. WORK SUBJECT TO AGENCY OR PROJECT ENGINEER'S APPROVAL MUST BE APPROVED PRIOR TO (A) BACKFILLING TRENCHES 1.2.1. IF THE CUMULATIVE DAMAGED PAVEMENT AREA EXCEEDS 50% OF THE TOTAL ROAD SURFACE, CONTRACTOR SHALL y
APPROVED CONSTRUCTION PLANS. FOR PIPE; (B) PLACING OF AGGREGATE BASE; (C) PLACING OF CONCRETE; (D) PLACING OF ASPHALT PAVING. WORK DONE REPLACE THE ENTIRE ROADWAY SURFACE. Cc
MIJ
WITHOUT SUCH APPROVAL SHALL NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF PERFORMING THE WORK AS
10. ANY DEVIATION FROM THE APPROVED PLANS AND SPECIFICATIONS MUST HAVE THE APPLICABLE AGENCY APPROVAL IN SPECIFIED. 1.2.2. CONTRACTOR SHALL REPLACE THE PAVEMENT SURFACE TO ENSURE MATCH LINE DOES NOT FALL WITHIN THE
WRITING PRIOR TO CONSTRUCTION. WHEEL PATH OF A LANE. MATCH LINE SHALL ONLY FALL IN THE CENTER OR EDGE OF A TRAVEL LANE.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING STREETS, SIDEWALKS, OR STRUCTURES DURING O
11. PRIOR TO BEGINNING INSTALLATION OF STREET LIGHTS, THE ELECTRICAL CONTRACTOR SHALL OBTAIN AN ELECTRICAL PERMIT THE CONSTRUCTION OF THIS PROJECT, AND SHALL REPAIR SUCH DAMAGE TO THE SATISFACTION OF THE GOVERNING 1.2.3. FLOWABLE FILL OR IMPORTED MATERIAL MAY BE REQUIRED IF THE NATIVE TRENCH MATERIAL IS DEEMED
FROM THE BUILDING DIVISION OF THE MERIDIAN PUBLIC WORKS DEPARTMENT. ANY DEVIATION IN STREET LIGHT LOCATIONS AGENCY,AT NO EXTRA COST TO THE OWNER. UNSUITABLE BY ACHD INSPECTOR, DOES NOT MEET COMPACTION STANDARDS OR TIME IS A CRITICAL FACTOR. '
FROM THE APPROVED PLANS MUST BE APPROVED IN WRITING FROM THE CITY ENGINEER.
10. ALL MATERIALS AND FINISHES SHALL BE AS PER DRAWINGS, DETAILS AND SPECIFICATIONS. SOME MATERIALS MAY REQUIRE 1.2.4. ANY EXCEPTIONS TO THESE RULES SHALL BE PRE-APPROVED IN WRITING BY DISTRICT STAFF BEFORE CONSTRUCTION cc
ROADWAY SEVERAL WEEK ORDER LEAD TIME. CONTRACTOR IS RESPONSIBLE FOR DETERMINING ANY AND ALL ORDERING LEAD TIMES, BEGINS.
1. ALL CONTRACTORS WORKING WITHIN THE PUBLIC ROAD RIGHT-OF-WAY ARE REQUIRED TO SECURE A RIGHT-OF-WAY AND PROVIDING REQUIRED MATERIALS AT THE PROJECT SITE IN A TIMELY MANNER. NO UNAPPROVED SUBSTITUTIONS WILL O
CONSTRUCTION PERMIT FROM ACHD OR ITD AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION. BE ALLOWED. CONTACT THE LANDSCAPE ARCHITECT IMMEDIATELY IF A SPECIFIED MATERIAL IS NOT AVAILABLE. 1.2.5. CONSTRUCT ALL PAVEMENT MATCHES (INCLUDING DRIVEWAY APPROACHES AND UTILITY CUT STREET REPAIRS)
WITHIN ACHD RIGHTS-OF-WAY TO MATCH THE EXISTING STREET PAVEMENT SECTION OR THE SECTION NOTED ON THE
2. ACHD OR ITD WILL INSPECT ALL WORK WITHIN THE PUBLIC RIGHTS-OF-WAY TO INCLUDE UTILITY TRENCHES ABOVE THE PIPE 11. ALL EXISTING CONDITIONS AND STRUCTURES, NOT SPECIFICALLY NOTED FOR REMOVAL, SHALL BE RETAINED AND PROTECTED. ASPHALT PAVING SECTION DETAIL 1, SHEET C2.20. USE WHICHEVER SECTION IS GREATER. �- O
ZONE. EXISTING CONDITIONS AND STRUCTURES THAT ARE DAMAGED DURING THE COURSE OF CONSTRUCTION SHALL BE REPLACED
BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 2. PIPE TRENCH SHALL CONFORM TO THE LATEST EDITION OF THE I.S.P.W.C. DIVISION 300 AND SD-301. BEDDING AND BACKFILL
PRESSURIZED IRRIGATION SHALL BE CONSTRUCTED PER SECTIONS 305 AND 306 OF THE I.S.P.W.C.
1. THE PRESSURIZED IRRIGATION SYSTEM MUST BE BUILT TO THE STANDARDS OF THE IRRIGATION DISTRICT IN WHICH IT IS BEING 12. ALL CONTRACTORS WORKING WITHIN THE PUBLIC RIGHT-OF-WAY ARE REQUIRED TO SECURE A RIGHT-OF-WAY
CONSTRUCTED. CONSTRUCTION PERMIT FROM ADA COUNTY HIGHWAY DISTRICT AT LEAST 24-HOURS PRIOR TO ANY CONSTRUCTION. 3. ANY WORK IN THE PUBLIC RIGHT-OF-WAY REQUIRES INSPECTION AND APPROVAL BY ACHD CONSTRUCTION DIVISION. CONTACT
INSPECTION SERVICES AT 387-6284 TO OBTAIN A PERMIT TO WORK IN THE RIGHT-OF-WAY. INSPECTION REQUESTS REQUIRE A mc
2. INSTALL A REDUCED PRESSURE BACKFLOW PREVENTER IN ANY CONNECTION BETWEEN THE POTABLE WATER SYSTEM AND 13. ALL CONSTRUCTION IN THE PUBLIC RIGHT-OF-WAY SHALL CONFORM TO THE LATEST EDITION OF THE IDAHO STANDARDS FOR MINIMUM OF 24-HOUR PRIOR NOTICE.
THE PRESSURE IRRIGATION SYSTEM. THE DEVICE MUST BE APPROVED BY THE IDAHO DEPARTMENT OF ENVIRONMENTAL PUBLIC WORKS CONSTRUCTION (ISPWC), LATEST EDITION, AND THE ACHD SUPPLEMENTAL SPECIFICATIONS. NO EXCEPTIONS O
QUALITY(DEQ) AND THE CITY OF MERIDIAN WATER DEPARTMENT. TO THESE STANDARDS WILL BE ALLOWED UNLESS SPECIFICALLY AND PREVIOUSLY APPROVED IN WRITING BY THE GOVERNING 4. PRIOR TO PLACEMENT OF ANY PAVEMENT MARKINGS, COORDINATE WITH ACHD INSPECTION STAFF. ALL PAVEMENT MARKINGS y
AGENCY. SHALL COMPLY WITH ACHD POLICY AND ISPWC SECTION 1100. MARKINGS SHALL TRANSITION SMOOTHLY WITH EXISTING
STREET LIGHTING PAVEMENT MARKINGS.
1. ALL STREET LIGHT CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH THE CURRENT VERSION OF THE ISPWC, THE 14. THE CONTRACTOR SHALL PERFORM ALL CLEARING AND SITE PREPARATION NECESSARY FOR THE PROPER EXECUTION OF ALL
MERIDIAN SUPPLEMENTAL SPECIFICATIONS TO THE ISPWC, AND THE NATIONAL ELECTRIC CODE. WORK INDICATED ON THESE PLANS AND SPECIFICATIONS 5. ABANDONED BUILDINGS, TEST PITS OR WATERWAYS LOCATED WITHIN CURRENT OR FUTURE RIGHT-OF-WAY SHALL BE IV
RE-EXCAVATED TO NATIVE SOIL AND BACKFILLED WITH STRUCTURAL FILL PER ISPWC SPECIFICATIONS. CONTRACTOR SHALL CO
-
2. A STREET LIGHTING ELECTRICAL PERMIT SHALL BE OPENED PRIOR TO STARTING WORK. USE THE ONLINE CITIZEN PORTAL AT 15. ALL WORK IS TO BE PERFORMED BY LICENSED CONTRACTORS AND EXPERIENCED WORKERS. PROVIDE SOILS DATA TO VERIFY THAT NATIVE MATERIAL MEETS THE REQUIREMENTS FOR ENGINEERED FILL PER ISPWC cc 0
HTTPS://CITIZENPORTAL.MERIDIANCITY.ORG/CITIZENACCESS/TO OPEN A PERMIT AND REQUEST INSPECTIONS. SPECIFICATIONS AND A COPY OF THE COMPACTION TESTS.
16. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS NECESSARY TO COMPLETE THE WORK, UNLESS OTHERWISE NOTED. Certification of Compliance with Design Standards: .`�
3. INSTALLATION WILL REQUIRE INSPECTIONS FOR THE CONCRETE BASE REINFORCING, BEDDING, BACKFILL, AND FOR THE POLE p g
AND ASSOCIATED WIRING. 17. CONTRACTOR SHALL CONFORM TO ALL LOCAL CODES.
THE ENGINEER OF RECORD CERTIFIES THAT THE PLANS ARE PREPARED IN SUBSTANTIAL CONFORMANCE WITH THE ACHD POLICY AND
4. STREET LIGHT BASES SHALL BE LOCATED 10' MIN. FROM TREES, 5' MIN. FROM FIRE HYDRANTS AND 2' MIN. FROM WATER 18. THE LAND GROUP, INC. DOES NOT AND CANNOT GUARANTEE THE ACCURACY OF WORK DONE BY OTHERS AND INCLUDES THIS STANDARDS IN EFFECT AT THE TIME OF PREPARATION. THE ENGINEER ACKNOWLEDGES THAT ACHD ASSUMES NO LIABILITY FOR
METERS. INFORMATION FOR THE CONVENIENCE OF THE CONTRACTOR ONLY. THE CONTRACTOR IS RESPONSIBLE TO CONTACT THE ERRORS OR DEFICIENCIES IN THE DESIGN. ALL VARIANCES FROM ACHD POLICY SHALL BE APPROVED IN WRITING. THE FOLLOWING
OWNER'S REPRESENTATIVE TO REQUEST CLARIFICATION OF DISCREPANCIES BETWEEN THE INFORMATION SHOWN ON THIS VARIANCES, LISTED BY DATE AND SHORT DESCRIPTION,WERE APPROVED FOR THE PROJECT: NONE Revisions Q
5. KEEP ACCURATE NOTES OF CONDUIT, JUNCTION BOX LOCATIONS. ATTACH A REDLINED AS BUILT DRAWING OF THIS PLAN PLAN AND INFORMATION SHOWN ELSEWHERE. IN THE EVENT THE CONTRACTOR PROCEEDS WITH CONSTRUCTION WITHOUT 1. AGENCY COMMENTS- 10/24/25
SHEET TO THE STREET LIGHTING ELECTRICAL PERMIT, OR SUBMIT A HARD COPY TO THE MERIDIAN PUBLIC WORKS SUCH CLARIFICATION FROM THE OWNER'S REPRESENTATIVE, HE SHALL BE LIABLE FOR THE COST OF CORRECTIVE WORK AND
DEPARTMENT PRIOR TO REQUESTING FINAL INSPECTION. SHALL REPAIR OR RECONSTRUCT THE FAULTY WORK TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE AT NO �+
ADDITIONAL COST TO THE OWNER.
6. CONTACT THE CITY TRANSPORTATION AND UTILITY COORDINATOR (208) 898-5500 FOR QUESTIONS REGARDING UTILITY Client / Developer: Property Owners:
CONFLICTS, OR TO ACCESS LOCKED METER PEDESTALS. 19. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING, ERECTING AND MAINTAINING THE REQUIRED MATERIALS, EQUIPMENT AND LENNAR HOMES OF IDAHO LLC STEVE CARRIGAN
MANPOWER NECESSARY FOR PUBLIC SAFETY AND TRAFFIC CONTROL, INCLUDING PEDESTRIAN TRAFFIC, WITHIN THE PROJECT 408 S EAGLE ROAD, SUITE 100 1510 PARKSIDE DRIVE E
LIMITS AND ON THE APPROACHES TO THE PROJECT. EAGLE, ID 83616 SEATTLE,WA 98112
CONTACT:JEFF CLEMENS PH: 452.614.8088
20. THE CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR PH: 208.803.3500
SHALL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THE PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND THAT THIS REQUIREMENT
SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. CONTRACTOR FURTHER Planning and Design:
AGREES TO DEFEND, INDEMNIFY, AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL AND
ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE THE LAND GROUP, INC.
SOLE NEGLIGENCE OF THE DESIGN PROFESSIONAL. 462 E. SHORE DR., SUITE 100
EAGLE, ID 83616
21. IF ANY ARCHAEOLOGICAL, CULTURAL OR HISTORICAL RESOURCES, OR ARTIFACTS OR OTHER FEATURES ARE DISCOVERED PH: 208.939.4041
DURING THE COURSE OF CONSTRUCTION ANYWHERE ON THE PROJECT SITE, WORK SHALL BE SUSPENDED IN THAT LOCATION
UNTIL A QUALIFIED PROFESSIONAL ARCHAEOLOGIST ASSESSES THE SIGNIFICANCE OF THE DISCOVERY. THE OWNER SHALL BE CIVIL ENGINEER: JAMES W. GUTE, PE (jgute@thelandgroupinc.com)
APPROPRIATE MEASURES OR PRESERVATION SHALL BE ESOTABLISHED PRIOR TO ARCHAEOLOGIST
COMMENCEDMENT OF WORK (
NOTIFIED IMMEDIATELY OF ANY FINDS. IN THE GOVERNING AGENCY, LANDSCAPE ARCHITECT: MATTHEW T.ADAMS, PL (matipthelandgroupinc.com)m) pSAL G
LAND SURVEYOR: JAMES R.WASHBURN, PLS lmhelandgoupicom 22. CONTRACTOR SHALL HAVE A STAMPED AND APPROVED SET OF PLANS, A COMPLETE COPY OF THE IDAHO STANDARDS FOR 568
PUBLIC WORKS CONSTRUCTION (I.S.P.W.C.), LATEST EDITION, ACHD SUPPLEMENTAL SPECIFICATIONS AND CITY OF MERIDIAN 10/24/2025
STANDARDS AT THE WORK SITE AT ALL TIMES. �`� ,Zo
7- OF �pP
23. CONTRACTOR SHALL KEEP AN APPROVED SET OF PLANS ON-SITE AT ALL TIMES AND RECORD AS-BUILT INFORMATION DURING COO., SStr,G
3 THE COURSE OF CONSTRUCTION. UPON COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL PROVIDE THE MARKED UP
AS-BUILT PLANS TO THE DESIGN ENGINEER FOR PREPARATION AND SUBMITTAL OF RECORD DRAWINGS.
Project No.: 123200
24. A PRECONSTRUCTION CONFERENCE SHALL BE HELD A MINIMUM OF THREE (3) WORKING DAYS PRIOR TO THE START OF ALL Date of Issuance: 09.02.2025
WORK INCLUDING WORK ON CITY UTILITIES AND ADA COUNTY HIGHWAY DISTRICT (ACHD) INFRASTRUCTURE. THE GENERAL Project Milestone: PERMIT
CONTRACTOR SHALL COORDINATE THE PRECONSTRUCTION CONFERENCE. THE DESIGN ENGINEER, REPRESENTATIVE FROM THE
CITY OF MERIDIAN PUBLIC WORKS DEPARTMENT, ACHD, ALL CONTRACTORS, SUBCONTRACTORS AND/OR UTILITY C��E IDR IAN'L
aorc wares ioneo
CONTRACTORS SHALL BE PRESENT.
e oar ° pe Street Lighting Cover
° '�'° DigLine, Inc.
25. CONTRACTOR SHALL COMPLY WITH ALL ADA ACCESSIBILITY REQUIREMENTS IN THE PUBLIC R.O.W THROUGHOUT THE
DURATION OF THE PROJECT AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION. �:'�,�` .4
Call Before You DigC2ml
M 811
0