Loading...
HomeMy WebLinkAboutPZ - Applicant's Response to Staff Report DC Management and Consulting Applicant Response: St. George Mixed Use November 5, 2025 Attn: Nick Napoli Associate Planner— City of Meridian Delivered via email - comment@meridiancity.org RE: Response to Staff Report The Applicant will provide testimony at the Planning and Zoning Commission hearing regarding the project, specifically addressing the following issues which were identified in the Staff report dated October 31, 2025. 1.) The multifamily buildings do not meet the 80 square feet of private usable open space for the residences to use in the multi-family portion of the property. Currently, they are proposing 68 square feet, below the requirement in the UDC. Revised plans for proposed buildings A, B, C, and D will be submitted, meeting the standard. For dimension purposes, a plan snip shown meeting the requirements: ----- 15 9 Wo, Lo' 8'-61X ° f I PATIO ,,20 - ROOF OVERHANG,ABOVE Project Architect will provide testimony at the hearing regarding this issue. 2.) Water main placement on the west side does not meet the required 4' setback from the curb; inadequate separation from the infiltration trench; fire hydrants not shown, raising easement and spacing concerns; easement area limits the ability to meet landscaping and tree requirements. Applicant will revise the site plan to meet the referenced setback and dimensional standard. Project Engineer will provide testimony at the hearing regarding this issue. 3.) Proposed balconies/porches may encroach into 20' sewer easement; landscaping within the easement is not allowed, preventing compliance with UDC 11-313-12. Project Architect will provide testimony at the hearing regarding this issue. 4.) The open space proposed for the development does not meet the standards of the Multi-Family Specific Use Standards. The project meets overall open space standards, including the multi-use pathway in calculating overall width along Five Mile creek will satisfy dimensional standards. 5.) The landscape buffer along Overland Road does not meet the water conserving design standards, which then does not justify the 50% reduction in the landscape buffer. Project Landscape Architect will revise the buffer landscape plans to meet the specific water conserving design standards. 6.) The application lacks critical comprehensive plan elements such as functional integration, a regional park to support recreational needs, and future integration with neighboring properties. The site is 2 acres, and would not be large enough for a regional park. Future access to the western adjacent parcel is anticipated through the commercial area of this project, allowing for connectivity. 7.) Multiple alternative compliance requests will be necessary to accommodate the project on the site. The first involves reducing the required landscaping adjacent to the drive aisle from five (5) feet to two (2) feet, and the second involves decreasing the private usable open space requirement. The adjacent property will likely redevelop in a similar mixed use pattern. Staff communicated to the Applicant that the proposed two foot buffer, with alternative compliance, was an appropriate accommodation for the site. Private open space requirement will be met (see Item 1). Sincerely, Shaun Wardle DC Management and Consulting LLC shaun(a)_vipere.com