Loading...
HomeMy WebLinkAbout2025-10-24 Boise Project Board of ControlRICHARD MURGOITIO CHAIRMAN OF THE BOARD DAN SHEIRBON VICE CHAIRMAN OF THE BOARD ROBERT D. CARTER PROJECT MANAGER THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYLGARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER City Clerk's Office 33 E Broadway Avenue Meridian ID, 83642 BOISE PROJECT BOARD OF CONTROL (FORMERLY BOISE U.S. RECLAMATION PROJECT) 2465 OVERLAND ROAD BOISE, IDAHO 83705-3155 21 October 2025 RE: Apex Zenith PP H-2025-00-11 E Lake Hazel and South Meridian Rd, Meridian Boise-Kuna Irrigation District BK446 Rawson Canal 259+90 Sec. 06, T2N, RIE, BM. Nick Napoli: OPERATING AGENCY FOR 167,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL: (208) 344-1141 FAX: (208) 344-1437 RECEI�T�D OCT 2 q 2025 CITY OFGGf��in>,r„, - CITY CLERKS OFFICE There are no Boise Project or Boise-Kuna Irrigation District facilities located on the above - mentioned property, however it does in fact possess a valid water right. Per Idaho Statutes, Title 42, local irrigation/drainage ditches that cross this property, to serve neighboring properties, must remain unobstructed and protected by an appropriate easement by the landowner, developer and contractors. Landowner/developer must do their due diligence to contact all owners of neighboring properties on this matter Storm Drainage and/or Street Runoff must be retained on site. NO DISCHARGE into the live irri atg_ ion system is permitted. Whereas this property lies tivithin the Boise-Kuna Irrigation District it is important that representatives of this development contact their office as soon as possible to discuss the pressure system prior to anv costly desizn work. Ifanplicable, the irrigation system will have to be built to specific specifications as set by the District/Project. Written confirmation from the Boise-Kuna Irrigation District and the Cit�ofMeridian is regtcired as to who Vvill own and operate the irri atg ion s sy tem. If the district is to own and operate this Pressurized irrigation system, Boise Project Board of Control will require a set of plans be sent to Jim Money, Civil Survey Consadtants, Inc. at 1400 F. Watertower Street, Meridian, Idaho 83642-3513 for his review, comments and approval. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting afull- size hard copy of the irrigation and drainage plans. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right to require changes when our easements and/or facilities are affected by unknown factors even during the approved construction phase. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Thomas iZittthaler Assistant Project Manager, BPBC for/tr cc: Kevin Reeves Watermaster, Div. 2 BPBC Alicia Havel Secretary — Treasurer, BKID W ca OC .� = G Q 'a O N Cl) w L � d � O N LU Cl) M N N 40, O O a-' (n a. N d � L va m =� a� Mm a= r J .E L a d x Oa L 0 0• Q..s w =. =3Y �Nc o dm v+ 69 mOf d� v d c i v Y Mul 10 Gl 3s o a) 5° m z L. Ch c Lu OW V z3 a N a la- H z 0 o W Ln LN E i r) Od N co C CO a O ai c (a d N p .0 — O z . I U Z r) tcp 4� L Q U Z