Loading...
HomeMy WebLinkAboutCC - Engineer Statement km E N G I N E E R I N G August 5,2025 Project No.24-296 City of Meridian 33 E Broadway Ave.,Ste.210 Meridian, Idaho 83642 RE: Pollard North Subdivision No.2 Meridian,Idaho To Whom It May Concern: Please accept this letter as certification that the centerline elevations of the proposed streets within Pollard North Subdivision No. 2 are designed a minimum of three (3) feet above the seasonal high ground water elevation. The geotechnical engineering report, "Pollard Lane Realignment", prepared by Materials Testing& Inspection and dated August 31,2016,was used to determine the approximate groundwater elevations relative to the street centerline elevations. Please feel free to contact me at 208.639.6939 should you have questions or require any additional information. Sincerely, KM Engineering,LLP Sc,\ONAL fNc ENSF Digitally signed by 6860 Lachlin Kinsella, P.E. U�, 8/5/25 Q Date: 2025.08.05 �0 qTF OF \oP 17:53:04-06'00' Lachlin Kinsella, P.E. Project Manger 5725 North Discovery Way • Boise,Idaho 83713 208.639.6939 kmengllp.com From: Zach Meyers Sent: Wednesday, October 15, 2025 5:17 PM To: Eli Benski Subject: Fw: [EXTERNAL] Pollard North and Alden Ridge Zach Meyers I Director I Brighton Development Brighton.co From:Warren Stewart<wstewart@meridiancitV.org> Sent:Tuesday, November 5, 2024 2:23 PM To:Zach Meyers<zmeyers@brightoncorp.com> Cc:Vicki Ly<vly@meridiancity.org>; Clint Dolsby<cdolsby@meridiancity.org> Subject: RE: [EXTERNAL] Pollard North and Alden Ridge Zach After further review of this and similar situations, I will not require that you build the sewer extension in Pollard Lane north of W. Flat Rock St. Please work with Vicki to ensure that the sewer main extension in Woodhead Ave is deep enough to serve the balance of the sewer shed north of your project. Have a great day, Warren Stewart, P.E.I City Engineer �E III7� From: Zach Meyers<zmeyers@brightoncorp.com> Sent: Monday, November 4, 2024 10:42 AM To:Warren Stewart<wstewart@meridiancity.org> Subject: RE: [EXTERNAL] Pollard North and Alden Ridge External Sender-Please use caution with links or attachments. Warren, appreciate the consideration. Thankyou, Zach Meyers I Director I Brighton Development Brighton.co From: Warren Stewart<wstewart@meridiancity.org> Sent: Friday, November 1, 2024 4:11 PM To:Zach Meyers<zmeyers@brightoncorp.com> Subject: RE: [EXTERNAL] Pollard North and Alden Ridge have been giving this some thought and I'm giving your request some serious consideration. I will get back to you next week with a final answer. Warren Stewart, P.E.I City Engineer C��fE ID From: Zach Meyers<zmeyers@brightoncorp.com> Sent:Tuesday, October 29, 2024 8:32 AM To:Warren Stewart<wstewart@meridiancity.org> Subject: Pollard North and Alden Ridge External Sender-Please use caution with links or attachments. Warren, I've been looking Pollard North a little bit more and had a follow up. Obviously,we don't want to extend more sewer than is needed.There's additional cost to us to install, and if it is never utilized there is additional cost to the city to maintain.With the removal of property served west of Hwy 16 from the master sewer plan, one stub is adequate to feed the property north currently pre-platted as Alden Ridge.We discussed the sewer stub already shown at the Woodhead Ave. stub street which is located at the midpoint of the Alden Ridge project. think what I struggle with is why are we not building the system for what is approved today? I understand that your concern is the lack of movement from the Alden Ridge project, but diving into approval and document processing, it appears that they have a history of waiting until the last minute. I believe your concern,though unlikely, can be addressed with the stub that is located within the public right of way in Pollard Ln. Is there a reason that this existing stub provided would not be considered accessible to the western most parcel? I appreciate you taking the time last Tuesday to talk and your time looking at this again. Thankyou, **On a side note,the easement you and I talked about after. Looks like there was confusion during the submittal and review and it was never processed. It was never intended to be a vacation of easement nor did that ever happen.We've officially submitted the easement to extend and cover what is needed per the record drawings out at Ten Mile.** EP E¢— _P •EP •EP— d3 a: EP - - ii sii I LL FC3 SSMH 15 ( 6—INGFt} RIM;2528.3- DEPTLi:8.2' I 8"hh1- 1+130 $ 2+00 INS IN;2520,51 a' (N) � INV OUT;25MA8 8" (E) MERIDIAN RESEARCH — SEWERALIGfJMENT'C" 400.0' of S" PVG i PARK LLC REFER TO PP3.2 FOR PROFILE r • - - SSMH #1 Q (48—I1411CH) RIM;2578-98 . . DEPTH:8,3' + y 1+00 - Q '�2s2t00 3+00 y INV IN:2521.06 4- (N) � ' INV I1%1;2521.06 4" (S) IM11V OUT:2520.73 8" (E) — — — — — — — v I' J16 �f 46 46 A SEWER ALI-,NMENT'R'- ty EXISTING SSCO #29 '� �� REFER TOPP3.LFOR PROFILE 352-5, pf e_ PVC 0 0.50% RI M;2530.80 DEPTH:20.6' 49 40 INV OUT;2510.22 5" (S) CONNEOt 1-0 EXI — —— —— — — — — PRESSURE IRRIGATION SSTs i a 63.0' of 8" PVC 0 0.63 "9 347.0' Qf 5- PVC Ik 0.4396 ra fi 12 12 12-W 12-W 12''+—�-12-w t z LLJi Z3 i (A{ m EXISTING SSWA 02 (60—INCH)—aros #ems +�S r a�as— i 64.2' of 8" PVC 0 G.45 4 RIM:2531.07 DEPTH;21.3' m INV IN: 509-82 8- (N) - -T—— — 18B—INCH c INV IN:25C9.82 8" Q SSMH � ( ) r� I l.ni ni.r.'9Gnn 'M e" erl RIM;2534.57 Zach Meyers I Director I Brighton Development 2929 W. Navigator Dr. Suite 400 Meridian ID 83642 Direct: 208-901-4264 1 Main: 208-378-4000 1 Website: Brighton.co BRIGHTON NOTICE: Please update your records with my new email address and website(brighton.co). This message was sent by someone outside the organization. Please do not click links or open attachments unless you recognize the source of this email and know the content is safe. This message was sent by someone outside the organization. Please do not click links or open attachments unless you recognize the source of this email and know the content is safe.