Parks and Recreation
Reviewer: Kim Warren/ Pathways Project Manager
Planner Assigned: Nick Napoli
Project Name: Apex-Zenith File No: H-2025-0041—PP Date: 9.9.2025
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL- PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location and
specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document
Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways
Project Manager.
2. Priorto final plat approval the applicant shall dedicate a public access easement for 10'wide detached multi-
use pathways (concrete sidewalks) along E. Lake Hazel Rd., S. Meridian Rd, and the mid-mile collector
roadway and roundabout at the east edge of the project. Easements shall be a minimum of 14'wide (10'
pathway+2'shoulder each side). Easement need only be dedicated for multi-use pathways that lie outside
the public ROW.
Use standard City template for public access easement. Submit all easements online through Citizen's
Access Portal.
3. Construct multi-use pathways per paving section based on existing site conditions as recommended by
project civil engineer in accord with UDC 11-3A-8 and 11-313-12. Prior to final approval the applicant's
engineer shall provide written documentation (stamped plans depicting recommended paving section)that
the pathway segment was constructed per the recommended specifications.
4. The owner (or representative association) of the property affected by each public access easement shall
have an ongoing obligation to maintain the multi-use pathway.
S. Project developer shall be responsible for obtaining license agreement and other permission(s)as required
for constructing within or across irrigation district easements.