HomeMy WebLinkAbout2025-09-2022 ACHD Miranda Gold,President
Alexis Pickering,Vice-President
ACHDKent Goldthorpe,Commissioner
Dave McKinney,Commissioner
/ wm� Patricia Nilsson,Commissioner
September 22, 2025
To: Amanda McNutt, via email
Brighton Corporation
2929 W Navigator Drive, Suite 400
Meridian, ID 83642
Subject: MPP25-0023 / H-2025-0041
Southeast Corner of Lake Hazel Road and Meridian Road
Apex Zenith Phase 1
This is a staff level approval of a preliminary plat for Apex Zenith Phase 1. On August 26, 2025, the Ada
County Highway District reviewed and approved this site as part of MER25-0080/A-2025-0078 Costco at
Meridian for a new warehouse, fuel facility, and distribution center on 23.6-acres. The site-specific
conditions of approval also apply to MPP25-0023/H-2025-0041 Apex Zenith Phase 1 for the development
of 7 commercial lots.
The applicant will be required to pay all applicable platting and review fees prior to final approval.
If you have any questions, please contact me at (208) 387-6391.
Sincerely,
KaraLeigh Troyer
Planner
Development Services
cc: City of Meridian (Nick Napoli), via email
connecting you to more
Ada County Highway District•5800 N Meeker Avenue•Boise,ID•83713•PH 2O8-387-6100•Fx 345-7650•www.achdidaho.org
Development Services Department
'ACHD
connecting you to more
Project/File: Costco at Meridian / MER25-0080 /A-2025-0078
This is a design review and certificate of zoning compliance application for the
development of a new warehouse, fuel facility, and distribution center on 23.6-acres.
Lead Agency: City of Meridian
Site address: Southeast corner of Lake Hazel Road & Meridian Road
Staff Approval: August 26, 2025
Applicant: Abbey Hahn, via email
1100 W Idaho Street
Boise, ID 83702
Representative: John Shaw, via email
Costco
730 Lake Drive
Issaquah, WA 98027
Staff Contact: KaraLeigh Troyer, Planner
Phone: 208-387-6391
E-mail: ktroyer(a)achdidaho.org
Report Summary:
ACHD Planned Improvements............................................2
Level of Service Planning Thresholds.................................2
A. Site Specific Conditions of Approval ............................3
B. Vicinity Map.................................................................5
C. Site Plan ......................................................................6
D. Traffic Impact Study— Summary and Findings.............7
E. Findings for Consideration.........................................15
F. Policy.........................................................................19
G. Attachments...............................................................26
H. Standard Conditions of Approval ...............................27
I. Conclusions of Law....................................................27
Request for Appeal of Staff Decision ................................28
1 Costco at Meridian / MER25-0080 /A-2025-0078
ACHD Planned Improvements
1. Capital Improvements Plan (CIP)/ Five Year Plan (FYP):
• The intersection of Lake Hazel Road and Meridian Road is listed in the CIP to be widened to
6-lanes on the north leg, 6-lanes on the south leg, 7-lanes on the east leg, and 7-lanes on the
west leg, and signalized between 2036 and 2040.
Level of Service Planning Thresholds
1. Condition of Area Roadways
Traffic Count is based on Vehicles per hour(VPH)
Roadway Frontage Functional PM Peak Hour PM Peak Hour
Classification Traffic Count Level of Service
**SH-69 (Meridian 2,486-feet Principal Arterial 1,700 N/A
Road)
Lake Hazel Road 2,370-feet Principal Arterial 167 Better than "E"
Locust Grove Road 0-feet Minor Arterial 181 Better than "E"
Amity Road 0-feet Minor Arterial 326 Better than "E"
* Acceptable level of service for a two-lane principal arterial is "E" (690 VPH).
* Acceptable level of service for a five-lane principal arterial is "E" (1,780 VPH).
* Acceptable level of service for a three-lane minor arterial is "E" (720 VPH).
** ACHD does not set level of service thresholds for State Highways.
2. Average Daily Traffic Count (VDT)
Average daily traffic counts are based on ACHD's most current traffic counts. Traffic counts along
abutting roadways are older due to road closures in the area
• The average daily traffic count for SH-69 (Meridian Road) was 28,576 on October 17th, 2023.
• The average daily traffic count for Lake Hazel Road east of SH-69 (Meridian Road)was 3,747
on June 12th, 2018. Updated traffic counts for Lake Hazel Road are not available due to
roadway construction in the vicinity of the site.
• The average daily traffic count for Locust Grove Road south of Amity Road was 2,582 on
August 29, 2019.
• The average daily traffic count for Amity Road east of Linder Road was 4,672 on October 5,
2021.
2 Costco at Meridian / MER25-0080 /A-2025-0078
A. Site Specific Conditions of Approval
1. Prior to plan submittal, submit a revised preliminary plat showing the redesigned roadways to
reduce the length of the roadways or to include the use of passive design elements. The ultimate
locations and design will be determined during plan review by Development Review staff. The
roadways greater than 750-feet in length are as follows:
• Spire Street
• Prevail Avenue
Speed humps/bumps, valley gutters, stop signs, and cross drains are not an acceptable tool for
traffic calming on new collector streets and will not be accepted as traffic calming.
2. Repair or replace any transportation facilities abutting the site on Lake Hazel Road consistent with
the current version of PROWAG.
3. Install a traffic signal at the Lake Hazel Road/Prevail Avenue intersection with 2/3-lanes on the
north leg, 5-lanes on the south and east legs, and 6-lanes on the west leg. Enter into a signal
agreement with ACHD to ensure that the traffic signal is installed with the above configuration. The
signal agreement shall note that the applicant is responsible for all costs associated with the
hardware, design, and installation of the traffic signal, and that that this improvement is not eligible
for reimbursement by ACHD. The applicant will need to order and purchase the signal hardware as
ACHD does not have these materials available for this project.
In order to ensure the traffic signal with an exclusive southbound right-turn lane at the Lake Hazel
Road/Prevail Avenue intersection is installed, the following items must be in place prior plan
approval for the first phase of the development.
• Signal Agreement
• Full design and approved plans for the intersection
4. Construct a single-lane roundabout at the intersection of Prevail Avenue and Costco Way/Private
Street "A" with southbound and eastbound right-turn lanes and vertical curb, gutter, 8-foot wide
planter strips, and 10-foot wide multi-use pathways surrounding the roundabout. The roundabout
shall be designed and constructed consistent with District policies 5108 Roundabouts and 5188
Roundabout Design Guide.
Enter into a signal agreement for the installation of RRFB's (Rectangular Rapid Flashing Beacon)
to be constructed at pedestrian crosswalks at the intersection.
5. Construct Spire Street as a 3-lane collector roadway with 11-foot wide travel lanes, vertical curb,
gutter, 8-foot wide planter strip, and 10-foot wide multi-use pathways on either side of the roadway.
6. Construct Prevail Avenue from Lake Hazel Road south to the proposed roundabout as a 5-lane
collector roadway with 11-foot wide travel lanes, vertical curb, gutter, 8-foot wide planter strips, and
10-foot wide multi-use pathways on either side of the roadway.
7. Construct Prevail Avenue running south of the roundabout at Costco Way/Private Street "A" as a
3-lane collector roadway with 11-foot wide travel lanes, vertical curb, gutter, 8-foot wide planter
strips, and 10-foot wide multi-use pathways on either side of the roadway.
8. Construct Prevail Avenue to intersect Lake Hazel Road as a quarter-mile collector.
9. Construct Spire Street to intersect Prevail Avenue as a quarter-mile collector.
10. Construct Spire Street located a quarter-mile south of Lake Hazel Road to stub to the site's eastern
property line.
3 Costco at Meridian / MER25-0080 /A-2025-0078
Install a sign at the terminus of Spire Street stating, "THIS IS A DESIGNATED COLLECTOR
ROADWAY. THIS STREET WILL BE EXTENDED AND WIDENDED IN THE FUTURE."
11. Construct Prevail Avenue located a quarter-mile east of Meridian Road/SH-69 to stub to the site's
south property line.
Install a sign at the terminus of Prevail Avenue stating, "THIS IS A DESIGNATED COLLECTOR
ROADWAY. THIS STREET WILL BE EXTENDED AND WIDENDED IN THE FUTURE."
12. For any stub streets which extend to a length greater than 150-feet past the nearest public street
intersection, terminate the stub street in a temporary cul-de-sac turnaround with a minimum turning
radius of 50-feet.
13. Construct a 36-foot wide curb-return type driveway on Prevail Avenue located 360-feet south of the
proposed Private Street "A".
14. Construct two 31-foot wide paved curb-return type driveways on Spire Street located 439-feet and
985-feet east of Meridian Road/SH-69.
15. If the City of Meridian approves Costco Way/Private Street "A" and Costco Way/Private Street "B",
pave the private roads a minimum of 20 to 24-feet wide and at least 30-feet into the site beyond the
edge of pavement of all public streets and install pavement tapers with 15-foot curb radii abutting
the existing roadway edge.
Street name and stop signs are required for the private road. The signs may be ordered through
the District. Verification of the correct, approved name of the road is required
16. Other than the access specifically approved with this application, direct lot access is prohibited to
Lake Hazel Road, Spire Street, and Prevail Avenue.
17. Submit civil plans to ACHD Development Services for review and approval. The impact fee
assessment will not be released until the civil plans are approved by ACHD.
18. There will be an impact fee that is assessed and due prior to issuance of any building permits. The
assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The
impact fee assessment will not be released until the civil plans are approved by ACHD.
19. Comply with all Standard Conditions of Approval.
4 Costco at Meridian / MER25-0080 /A-2025-0078
B. Vicinity Map
- _ OF
Hazel Rd .Zr l_
• fit.
a
L
I
5 Costco at Meridian / MER25-0080 /A-2025-0078
C. Site Plan
I IIi41YlYll IYIYII IYI'f _ _ __ ...... ... . � -
-
— r .rLAIME I ---------- - ---- - - - - - - - - -
�= �- - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - -
_1lal1p1111e1{11111 .::-�----------- -- - -
FULLO
9pULQEa I o
I
I I
NEFl RDfrD BYDEVUQKR a. �a e4Rwnre I u
ALL FTTE n , yl
RfPo}tENENrS
gY DEVELOP4R I o��ru TYeYovror Y
Fi r.4OMPI'1TION per. W urt 'Md ram
+'xY
rPhk6A3WATICN; I I I vnr-IYq/r&]LTr j Y'meo¢i.rRaaYrl llYifA� - --
GCF.iRiR6xT AIV nFUFJ OPEN--
iil i4m G'1 sir n.6 ammx I I $' oa+b c[F�ro
•YrtTacLurE'rtw+",.r. 1 I rumnw I9C5
I FULL A4GE5� � I
LFlR.�"J1l 8uFFH" hGif'4 LG•F n.nWF4Jl --� �j��l l
JI1IJACfMT0C1X.LEC11DN k j II
FSnL A40E€s fl
PuTu4E
74M M"' x FJTERF04
PEVE
, PEYELOFIE9 � {
FYAi1 IN
Rr�{r LYR I - " A' IyrHl yrlgplT94'I
_ Coe A Yam! h
NEW RDUgDABLUT
uLrtiF ea I � wYn noi'cwP'+r er
s , I ■„� g x e DELIELCPER
I I yl ACCEF klenll - Y - {i�Fi�FCVBTBYER+
It
35'LAND4GAPE I WD CI ERYFGHr rk"
�uFFER I
9TCIPw'.t I rt FnCE9
ADIa{EhT T9 i IA&LK
aRT�lO{R4�4}6 � #YnkM u'k.'��as*- � max ";.", � I.JN66C�3E aIIP1'ER
a WINE _ � E�TS
' y
*� � - I PEsaGENrnuueea
'S Y F
CNUBCRJEEIITYUk AT
GFAB su.WdIiL
�l-H�-1-EI-N� � � I* h3
r.nµ-' RO jr
a
�'� .r —IErr ROAD Br
""�". `��.., � bevE4.Ek
L"Ceckm EL!'FER
REQU ALUACENT TO
I kESoexru'i LYJf B
I x�--�• k• RiU EFIHEHlYYiLL AT
R15YET RI LA
lJ08CAPE BUFFER Ld IWQ BDUK WELL
n,w OUT ' +AAAGENF TO CDLLECTDR
LFFr-N - M J '' F 1
' FULL ACCE" ___ �`•.II�.SY _rt _
ALL RTE 69 , I = ir i I CMU 80EEN WnL RT
71KDEVE OPER
8Y DE5iELOPER—�r 'F.{I LAIOEGTJ!CIYRen I
AD-ACEWT TO CCISECTORJ NE*31DMSYDE'h1dRER— —TRANSHRER
6 Costco at Meridian / MER25-0080 /A-2025-0078
D. Traffic Impact Study — Summary and Findings
1. Traffic Impact Study
Kittelson & Associates prepared a traffic impact study (TIS) for the proposed Lake Hazel & SH-69
Mixed-Use Development. An executive summary of the findings as presented by Kittelson &
Associates can be found as an attachment. ACHD has reviewed the submitted traffic impact study
for consistency with ACHD policies and practices and may have additional requirements beyond
what is noted in the TIS. Staff comments and recommendations on the submitted traffic impact
study can be found below.
a. Policy:
Mitigation Proposals: Mitigation recommendations shall be provided within the report. At a
minimum, for each roadway segment and intersection that does not meet the minimum
acceptable level of service planning threshold or v/c ratio, the report must discuss feasible
measures to avoid or reduce the impact to the system. To be considered adequate, measures
should be specific and feasible. Mitigation may also include:
• Revision to the Phasing Plan to coincide with the District's planning Capital Projects.
• Reducing the scope and/or scale of the project.
Alternative Mitigation Measures: 7106.7.3 states that if traditional mitigation measures such
as roadway widening and intersection improvements are infeasible as determined by ACHD,
the TIS may recommend alternative mitigation measures. Alternative mitigation measures shall
demonstrate that impacts from the project will be offset.
• If the impacted roadway segments and/or intersections are programmed as funded in
the Five Year Plan (FYP) or the Capital Improvements Plan (CIP); no alternative
mitigation is required.
• If the impacted roadway segments and/or intersections are not programmed in either
the FYP or the CIP; the applicant may (i) analyze the shoulder hour, defined as the hour
prior to after the determined peak hour within the two-hour peak period, (sometime
analyzed as hour before or after peak period) and (ii) provide a safety analysis to
determine alternative mitigation requirements.
o If the impacted roadway segments and intersections meet the minimum acceptable
level of service planning thresholds in the shoulder hour, the applicant may suggest
feasible alternative mitigation measures beyond improvements from District policy,
such as: off-site sidewalks, off-site bike facilities, connectivity, safety improvements,
etc. within 1.5 miles of the proposed development.
o If the shoulder hour planning thresholds are exceeded the applicant may request to
enter into a Development Agreement and pay into the Priority Corridor Fund an
amount determined by the ACHD to offset impacts from the project.
• Alternative Mitigation may also include:
o Revision to the Phasing Plan to coincide with the District's future Capital Projects.
o Reducing the scope and/or scale of the project.
Level of Service Planning Thresholds: District Policy 7205.3.1 states that Level of Service
Planning Thresholds have been established for principal arterials and minor arterials within
ACHD's Capital Improvement Plan and are also listed in section 7106. Unless otherwise
required to provide a Traffic Impact Study under section 7106, a proposed development with
site traffic less than 10% of the existing downstream roadway or intersection peak hour traffic
7 Costco at Meridian / MER25-0080 /A-2025-0078
shall not be required to provide mitigation for a roadway or intersection that currently exceeds
the minimum acceptable level of service planning threshold or V/C ratio.
b. TIS Findings: Staff has reviewed the submitted traffic impact study (TIS)
Recommended Mitigations
The following has been recommended as per the TIS for existing intersections:
• Lake Hazel Road /Ten Mile Road Intersection
o Year 2026 Phase 1 Background — installation of an interim traffic signal assumed
to include left-turn lanes on each approach. The following should be considered:
■ Intersection only exceeds V/C threshold in Saturday midday peak hour and
operates acceptable in should peak hour.
■ Intersection is included in FYP for multilane roundabout, although
construction year has not been identified.
■ Phase 1 site traffic is under 10%
o Year 2035 Total Traffic— Site traffic percentage of the total 2035 entering volume
is approximately 6.9% in the AM peak hour and 10.4% in the PM peak hour.
o As the site traffic percentage is not estimated to be over 10% until the 2035 total
buildout and this intersection is programmed as a funded improvement in the CIP
and in the FYP no mitigation is required consistent with District policy 7205.3.1.
• Lake Hazel Road / Linder Road Intersection
o Year 2035 Buildout Background & Total Traffic — installation of a signal with left-
turn lanes on each approach if the roundabout programmed in the CIP is not
constructed.
o Site traffic percentage of the total 2035 entering volume is approximately 9.2% in
the AM peak hour and 15.2% in the PM peak hour.
o As the intersection meets ACHD's level of service planning thresholds under Year
2026 Phase 1 Total traffic conditions, then no mitigation should be required as part
of this application.
• Meridian Road / Lake Hazel Road Intersection
o Existing —Westbound right-turn lane.
o Year 2026 Phase 1—striping and signal head change to utilize the two westbound
left-turn lanes that are being constructed, but not striped for use, to provide dual
westbound left-turn lanes with protected signal phasing; approximately two
seconds of signal timing split changes for the protected left-turn phase results in
acceptable operations.
o Site traffic percentage of the year 2026 phase 1 total traffic conditions is
approximately 13.1% in the weekday PM peak hour. As site traffic exceeds 10%
typically staff would recommend mitigation per District policy 7205.3.1, however,
as the recommended mitigations include changes to ITD's signal at the intersection
and the applicant is entering into a STAR agreement with ITD then no mitigation
is required.
8 Costco at Meridian / MER25-0080 /A-2025-0078
o Year 2035 Buildout Background —addition of northbound and southbound through
lanes, eastbound right-turn lane, westbound right-turn lane overlap signal phase.
■ Intersection programmed in the CIP for construction in 2036-2040 and ITD
is studying Meridian Road for future widening.
o Year 2035 Total Traffic—second southbound left-turn lane, second eastbound and
westbound through lanes, & northbound right-turn lane.
o Site traffic percentage of the total 2035 entering volume is approximately 12.2% in
the AM peak hour and 18.1% in the PM peak hour.
o Mitigation at this intersection is not feasible unless the applicant is able to acquire
additional right-of-way for Lake Hazel Road on the west side of Meridian Road/SH-
69 and on Meridian Road/SH-69 to allow for widening of the intersection as
recommended in the TIS.
• Meridian Road / Hubbard Road Intersection
o Existing—dual eastbound left-turn lanes with protected eastbound left-turn phasing
and adjustments.
o Year 2026 Phase 1 Background — southbound right-turn lane & adjusting signal
timing split times to provide two additional seconds to the eastbound left-turn signal
phase
■ Phase 1 site traffic percentage is under 10%.
o Year 2035 Buildout Background & Total Traffic— addition of third northbound and
southbound through lane, signal timing split adjustments
■ ITD is studying Meridian Road for future widening.
o Site traffic percentage of the total 2035 entering volume is approximately 7.6% in
the AM peak hour and 11.9% in the PM peak hour.
o As the site generates less than 10% of traffic under year 2026 phase 1 total traffic
conditions, then the applicant should not be required to construct mitigation as a
part of this application. However, the intersection may be assessed with future
development of the site to determine if mitigation may be required.
• Meridian Road / Columbia Road Intersection
o Existing —eastbound right-turn lane and signal timing phase split adjustments.
Due to the existing right-of-way available and the location of the power poles, staff
does not recommend this mitigation as it is infeasible.Additionally, this intersection
was not included in year 2026 background or total traffic recommendations leading
staff to conclude that the site traffic generated at this intersection is less than 10%
in year 2026.
o Year 2035 Buildout Background &Total Traffic—third northbound and southbound
through lane, second eastbound and westbound through lane, second left-turn
lane on the eastbound and westbound approaches to create dual left-turn lanes,
and signal timing split adjustments (no change to cycle length).
■ ITD is studying Meridian Road for future widening.
o Site traffic percentage of the total 2035 entering volume is approximately 7.4% in
the AM peak hour and 11.9% in the PM peak hour.
9 Costco at Meridian / MER25-0080 /A-2025-0078
• Meridian Road /Amity Road Intersection
o Existing —eastbound through lane and westbound right-turn lane.
o Year 2026 Phase 1 Background — eastbound right-turn lane, a third southbound
through lane, additional two seconds to the northbound left-turn movement
■ Site traffic under 10%
o Year 2035 Buildout Background — third northbound through lane, westbound
through lane, second northbound left-turn lane for dual left-turn lanes, westbound
right-turn overlap phase, and signal timing split adjustments (no change to cycle
length).
■ Intersection in CIP for construction in 2036-2040 and ITD is studying
Meridian Road for future widening.
o Year 2035 Total Traffic — southbound right-turn lane, eastbound right-turn lane
overlap phase, & additional signal timing split adjustments (no change to cycle
length).
o Site traffic percentage of the total 2035 entering volume is approximately 6.7% in
the AM peak hour and 10.0% in the PM peak hour.
o As the site generates less than 10% of traffic under year 2026 phase 1 total traffic
conditions and the intersection is programmed as a funded improvement in the
CIP, therefore no mitigation is required as a part of this application. However, the
intersection may be assessed with future development of the site to determine if
mitigation may be required.
• Meridian Road /Victory Road Intersection
o Existing — third through lane on Meridian Road in northbound and southbound
directions.
o Year 2026 Phase 1 Background — Phase 1 site traffic is under 10%
o Year 2035 Buildout Background — second eastbound and westbound through
lanes; northbound and eastbound right-turn lanes; eastbound, westbound, and
southbound dual left-turn lanes; westbound right-turn lane overlap phase; and
signal timing split adjustments in the weekday PM peak hour (no change to cycle
length)
o Year 2035 Total Traffic — additional signal timing split adjustments (no change to
cycle length
o Site traffic percentage of the total 2035 entering volume is approximately 4.6% in
the AM peak hour and 6.8% in the PM peak hour.
o Per District policy 7205.3.1, no mitigation is required at this intersection as a part
of this application as the site traffic percentage is below 10% in the PM peak hour.
• Amity Road / Linder Road Intersection
o Existing — Eastbound left-turn lane.
o Year 2026 Phase 1 Background — addition of a traffic signal assumed to include
left-turn lanes on each approach; however, the following should be considered:
10 Costco at Meridian / MER25-0080 /A-2025-0078
■ Intersection only exceeds V/C threshold in weekday PM peak hour and
operates acceptable in the shoulder peak hour.
■ Intersection is included in CIP for a single lane roundabout
■ Phase 1 site traffic is under 10%.
o Year 2035 Buildout Background — northbound right-turn lane
o Year 2035 Total Traffic—a second eastbound through lane.
o Site traffic percentage of the total 2035 entering volume is approximately 3.5% in
the AM peak hour and 6.6% in the PM peak hour.
o Per District policy 7205.3.1, no mitigation is required at this intersection as a part
of this application the site traffic percentage is below 10% in the PM peak hour.
Additionally, there is an ACHD project programmed as a funded improvement in
the CIP for the intersection to be reconstructed as a single-lane roundabout
between 2036 and 2040.
• Amity Road / Locust Grove Road Intersection
o Existing — prior to ACHD constructing the roundabout, construct an interim traffic
signal.
The above mitigation was recommended as the eastbound and westbound
approaches do not meet ACHD policy in the AM peak hour and the westbound
approach does not meet ACHD policy in the PM peak hour. This intersection has
already been analyzed for an interim signal to be installed by ACHD. However, site
constraints make it infeasible to widen the roadways to include left-turns and
therefore, the interim signal would not meet the need it would be installed for. Due
to this, an interim signal is not recommended by ACHD.
o Year 2026 Phase 1 Background — Intersection only exceeds ACHD's acceptable
level of service planning threshold in the weekday PM peak hour, intersection
included in FYP for multilane roundabout, & site traffic is under 10%.
o Year 2035 Buildout Background — right-turn lanes on each approach
o Year 2035 Total Traffic—site traffic is under 10%.
o Site traffic percentage of the total 2035 entering volume is approximately 2.3% in the
AM peak hour and 4.4% in the PM peak hour.
o Per District policy 7205.3.1, no mitigation is required at this intersection as a part of
this application the site traffic percentage is below 10% in the PM peak hour.
Additionally, there is an ACHD project programmed as a funded improvement in the
CIP for the intersection to be reconstructed as a multi-lane roundabout between
2031 and 2035.
The following has been recommended as per the TIS for site access intersections:
• Lake Hazel Road / Costco Way/Private Street "B" (Site Access A)
o Maintain as proposed with the proposed eastbound right-turn deceleration lane.
• Lake Hazel Road / Prevail Avenue (Site Access B)
11 Costco at Meridian / MER25-0080 /A-2025-0078
o Signalize with the opening of the Phase 1 retail uses as described in the 2026
total traffic recommendations.
o Extend the westbound left-turn lane further into the two-way left-turn lane to
provide 400 feet of queue storage.
o Extend the northbound dual left-turn lanes to provide a minimum of 275 feet up
to 325 feet of queue storage
o Install a northbound right-turn overlap phase at the traffic signal along with
maintaining the 200 feet of queue storage.
• Meridian Road/SH-69/ Costco Way/Private Street "A" (Site Access D) (right-in/right-out)
o Addition of a northbound right-turn lane as part of Phase 1.
• Meridian Road/SH-69/ Spire Street (Site Access E) (right-in/right-out/left-in)
o Addition of a northbound right-turn lane as part of Phase 1.
o Striping a southbound left-turn lane within the existing two-way left-turn lane with
275-feet of queue storage.
o Additional 2035 total traffic recommendation: monitor the operation of the
southbound left-turn movement and westbound right-turn movement. If
operational or safety issues are identified, evaluate the need for a traffic signal
to serve the southbound left-turn and westbound right-turn movements. The
signal spacing does not meet ITD policy.
• Spire Street/ Prevail Avenue (Site Access G)
o Maintain as an unsignalized intersection with the eastbound and westbound
approaches stop-controlled.
• 1/81" Mile Access / Prevail Avenue (Site Access 1)
o Construct a single-lane roundabout. Additionally, southbound and eastbound
right-turn lanes should be considered to reduce queuing and improve operations
during peak periods.
• Retail Driveway/ Prevail Avenue (Site Access J)
o Maintain as an unsignalized intersection with the eastbound approach stop-
controlled.
• Retail Driveway/ Spire Street (Site Access K)
o Maintain as an unsignalized intersection with the eastbound approach stop-
controlled.
The following has been recommended as per the TIS for roadway segments:
• Existing & Year 2026 Phase 1 — All roadway segments meet jurisdictional policy for
segment volumes under the 2023 existing traffic conditions and 2026 background traffic
conditions. Therefore, no mitigation should be required as a part of this application as
this development is included in year 2026 phase 1 of the Apex Zenith development.
• Locust Grove Road (Lake Hazel Road to Amity Road)
12 Costco at Meridian / MER25-0080 /A-2025-0078
o Year 2035 Buildout Background Traffic Conditions—This roadway segment does
not meet ACHD policy for segment volumes. The TIS recommends the widening
of this portion of Locust Grove Road to add a center left turn lane to meet ACHD
segment planning thresholds. However, this may not be required for the following
reasons:
■ Widening to add a center turn lane has already been completed for a
section near Lake Hazel Road and is programmed in the ACHD 2020
CIP as a funded improvement for construction in the 2036-2040 timeline.
■ Widening to add a center left turn lane is planned for a significant portion
of this roadway section as part of an upcoming phase of the Apex
residential development.
o No mitigation is required for Phase 1 of this project as the buildout for Phase 1
as there are no recommended mitigations for Year 2026.
• Amity Road (Linder Road to Meridian Road)
o Year 2035 Buildout Background Traffic Conditions — Widening the roadway to
add a center turn lane is needed to meet ACHD segment planning thresholds
under 2035 background conditions. Widening is not currently included in the
ACHD 2020 CIP. The addition of a center turn lane may not be required due to
the following:
■ There are turn lanes identified at the Linder Road intersection as part of
the intersection mitigations.
■ Turn lanes at Meridian Road already exist.
■ Rural nature of the roadway results in low-volume driveways, such that a
continuous center left turn lane will not provide significant benefit.
Future development will likely construct left-turn lanes or continuous turn lanes
at the future collector and local street intersections in this section.
o Year 2035 Total Traffic — Widening to add a center turn lane is needed to meet
the ACHD segment planning thresholds. Widening is currently not included in
the ACHD 2020 CIP.
o No mitigation was identified or recommended under year 2026 traffic conditions;
therefore no mitigation is required as a part of this application.
c. Staff Comments/Recommendations: Staff comments are provided by District Traffic Services
and Development Review staff.
Staff has determined that the applicant should be required to construct the following mitigation:
• Lake Hazel Road / Prevail Avenue (Site Access B)
Consistent with the TIS, the applicant should be required to signalize and construct the
intersection with 2/3 lanes on the north leg, 5-lanes on the south and east legs, and 6-
lanes on the west leg consistent with the TIS.
As part of the Lake Hazel Road widening project, conduit was installed at the Lake Hazel
Road/Prevail Avenue intersection to accommodate the installation of a future signal. In
order to install a traffic signal at the Lake Hazel Road/Prevail Avenue intersection, the
applicant will need to obtain plan approval for the first phase, purchase the signal
equipment, and enter into a signal agreement with ACHD. The signal should be
13 Costco at Meridian / MER25-0080 /A-2025-0078
constructed, prior to plan approval for the first phase of the development. The signal
agreement should include requirements that the applicant is responsible for all costs
associated with the hardware, design, and installation of the traffic signal, and that this
improvement is not eligible for reimbursement by ACHD. In order to ensure the traffic
signal at the Lake Hazel Road/Prevail Avenue intersection is installed, the following
items must be in place prior to plan approval for the first phase of the development.
o Signal Agreement
o Full design and approved plans for the intersection
• Costco Way (Private Street "A") / Prevail Avenue (Site Access 1)
o Construct a single-lane roundabout with southbound and eastbound right-turn lanes.
The applicant has proposed to construct a single-lane roundabout as a part of this
development with southbound and eastbound right-turn lanes.
14 Costco at Meridian / MER25-0080 /A-2025-0078
E. Findings for Consideration
1. Sales Tax Anticipation Reimbursement Agreement (STAR Agreement)
The applicant has indicated that they are in the process of entering into a Sales Tax Anticipation
Reimbursement Agreement (STAR Agreement) with ITD. The details of the STAR Agreement are
unknown to ACHD at this time. If improvements are proposed on roadways under the jurisdiction
of ACHD or new signalized intersections are planned to be constructed as part of the STAR
Agreement, then plan review and signal agreements will be required. The applicant is responsible
for all costs associated with the design, construction, and signal hardware associated with the
STAR Agreement.
2. State Highway SH-69 /Meridian Road
SH-69/Meridian Road is under the jurisdiction of the Idaho Transportation Department (ITD). The
applicant, City of Meridian, and ITD should work together to determine if additional right-of-way or
improvements are necessary on SH-69/Meridian Road.
3. Lake Hazel Road
a. Existing Conditions: Lake Hazel Road is improved with 5-travel lanes, vertical curb, gutter,
an 8-foot wide planter strip, and a 10-foot wide multi-use pathway abutting the site. There is
145-feet of right-of-way for Lake Hazel Road (50-76 feet from centerline).
b. Applicant Proposal: The applicant is not proposing any improvements to Lake Hazel Road
abutting the site.
c. Staff Comments/Recommendations: Lake Hazel Road is fully improved, therefore no
additional right-of-way dedication or additional improvements are required as part of this
application. Consistent with District Minor Improvements Policy, if any transportation facilities
are damaged during the construction of this development then the applicant should be required
to repair or replace any transportation facilities abutting the site on Lake Hazel Road consistent
with the current version of PROWAG.
4. Spire Street
a. Existing Conditions: Spire Street does not exist internal to or abutting the site.
b. Applicant Proposal: The applicant is proposing to construct Spire Street as a 3-lane collector
roadway with 11-foot wide travel lanes, 5-foot wide bike lanes, vertical curb, gutter, 8-foot wide
planter strip, and 5-foot wide sidewalk on either side of the roadway within 74-feet of right-of-
way.
c. Staff Comments/Recommendations: The applicant's proposal meets District policy.
However, staff recommends the on-street bike lanes on Spire Street be removed and the 5-foot
wide detached sidewalk be replaced with a 10-foot wide multi-use pathway to allow for
consistent bike/pedestrian facilities throughout both phases of the development. This is
preferred by the City of Meridian.
For pathways, the applicant may reduce the right-of-way dedication to 2-feet behind back of
curb and should provide a permanent right-of-way easement from 2-feet behind back of curb to
2-feet behind back of pathway.
5. Prevail Avenue
a. Existing Conditions: Prevail Avenue does not exist internal to or abutting the site.
b. Applicant Proposal: The applicant is proposing to construct Prevail Avenue from Lake Hazel
Road south to the proposed roundabout as a 5-lane collector roadway with 11-foot wide travel
lanes, vertical curb, gutter, 8-foot wide planter strips, and 10-foot wide multi-use pathways on
either side of the roadway within 95-112 feet of right-of-way.
15 Costco at Meridian / MER25-0080 /A-2025-0078
The applicant is proposing to construct Prevail Avenue south of the roundabout at Private Street
"A" as a 3-lane collector roadway with 11-foot wide travel lanes, vertical curb, gutter, 8-foot wide
planter strips, and 10-foot wide multi-use pathways on either side of the roadway within 74-feet
of right-of-way.
c. Staff Comments/Recommendations: The applicant's proposal meets District policy and
should be approved, as proposed. For detached pathways, the applicant may reduce the right-
of-way dedication to 2-feet behind back of curb and should provide a permanent right-of-way
easement from 2-feet behind back of curb to 2-feet behind back of pathway.
6. Prevail Avenue and Private Street "A" Roundabout
a. Applicant's Proposal: The applicant is proposing to construct a single-lane roundabout with
southbound and eastbound right-turn lanes with vertical curb, gutter, 8-foot wide planter strips,
and 10-foot wide multi-use pathways surrounding the roundabout.
b. Staff Comments/Recommendations: The applicant's proposal is consistent with the findings
and recommendations of the TIS and therefore should be approved, as proposed. The
roundabout should be designed and constructed consistent with District policies 5108
Roundabouts and 5188 Roundabout Design Guide.
The applicant shall be responsible for all costs associated with the design and construction of
the roundabout and if required, enter into a signal agreement for the installation of RRFB's
(Rectangular Rapid Flashing Beacon) to be constructed at pedestrian crosswalks at the
intersection.
The applicant should be required to either dedicate right-of-way to 2-feet behind back of
pathways or may reduce the right-of-way dedication to 2-feet behind back of curb and should
provide a permanent right-of-way easement from 2-feet behind back or curb to 2-feet behind
back of pathways.
7. Roadway Offsets
a. Applicant's Proposal: The applicant is proposing to construct Prevail Avenue, a collector
roadway, to intersect Lake Hazel Road located a quarter-mile east of Meridian Road/SH-69.
The applicant is proposing to construct Spire Street, a collector roadway, to intersect Prevail
Avenue located a quarter-mile south of Lake Hazel Road.
b. Staff Comments/Recommendations: The applicant's proposal for Prevail Avenue does not
meet District Collector Offset Policy which requires new signalized collector roadways to
intersect principal arterials at the half-mile. However, the need for the roadway was
demonstrated though the TIS and should be approved, as proposed.
The applicant's proposal for Spire Street meets District policy and should be approved, as
proposed.
8. Stub Streets
a. Existing Conditions: There are no roadways stubbing to the site.
b. Applicant Proposal: The applicant is proposing to construct Spire Street to stub to the east
located a quarter-mile south of Lake Hazel Road (measured centerline to centerline).
The applicant is proposing to construct Prevail Avenue to stub to the south located a quarter-
mile east of Meridian Road (measured centerline to centerline).
Staff Comments/Recommendations: The applicant's proposal meets District policy and
should not be approved, as proposed. For stub streets which extend to a length greater than
150-feet past the nearest public street intersection,the applicant should be required to terminate
the stub street in a temporary cul-de-sac turnaround with a minimum turning radius of 50-feet.
16 Costco at Meridian / MER25-0080 /A-2025-0078
The applicant should be required to install a sign at the terminus of each collector roadway
stating, "THIS IS A DESIGNATED COLLECTOR ROADWAY. THIS STREET WILL BE
EXTENDED AND WIDENDED IN THE FUTURE."
9. Driveways
9.1 Lake Hazel Road
a. Existing Conditions: There are three existing driveway approaches on Lake Hazel Road
located as follows (measured centerline to centerline):
• A 14-foot wide curb-cut type driveway located 400-feet east of Meridian Road for utility
access.
• A 40-foot wide curb-return type driveway located 672-feet east of Meridian Road
restricted to right-in/right-out only by a raised curb median.
b. Applicant's Proposal: The applicant is proposing to maintain the 14-foot wide curb-cut type
driveway for utility access. The applicant is proposing to maintain the 40-foot wide driveway for
the proposed private road Costco Way/Private Street "A".
c. Staff Comments/Recommendations: The applicant's proposal does not meet District policy
7205.4.7, which when allowed requires that driveways on principal arterial roadway align or
offset by 520-feet. However, the need for these driveways was demonstrated though the traffic
impact study and therefore the driveways should be approved, as proposed.
9.2 Spire Street
a. Applicant's Proposal: The applicant is proposing to construct two 31-foot wide paved curb-
return type driveways on Spire Street located 439-feet and 985-feet east of Meridian Road/SH-
69 (measured centerline to centerline).
b. Staff Comments/Recommendations: The applicant's proposal meets District policy and
should be approved, as proposed.
9.3 Prevail Avenue
a. Applicant's Proposal: The applicant is proposing to construct a 42-foot wide curb-return type
driveway on Prevail Avenue located 360-feet south of the proposed Private Street "A"
(measured centerline to centerline).
b. Staff Comments/Recommendations: The applicant's proposal meets District policy with
exception to the width of the driveway and should be approved, as proposed. The applicant
should be required to construct the driveway to a maximum width of 36-feet.
10. Private Roads
a. Applicant Proposal: The applicant is proposing to construct two private streets Costco
Way/Private Street "A" to intersect Prevail Avenue and Costco Way/Private Street "B" to
intersect Lake Hazel Road.
b. Staff Comments/Recommendations: If the City of Meridian approves the private road, the
applicant shall be required to pave the private roadway in its full width and at least 30-feet into
the site beyond the edge of pavement of all public streets and install pavement tapers with 15-
foot curb radii abutting the existing roadway edge. If private roads are not approved by the City
of Meridian, the applicant will be required to revise and resubmit the preliminary plat to provide
public standard local streets in these locations.
Street name and stop signs are required for the private road. The signs may be ordered through
the District. Verification of the correct, approved name of the road is required.
ACHD does not make any assurances that the private road, which is a part of this application,
will be accepted as a public road if such a request is made in the future. Substantial redesign
17 Costco at Meridian / MER25-0080 /A-2025-0078
and reconstruction costs may be necessary in order to qualify this road for public ownership
and maintenance.
The following requirements must be met if the applicant wishes to dedicate the roadway to
ACHD:
• Dedicate a minimum of 50-feet of right-of-way for the road.
• Construct the roadway to the minimum ACHD requirements.
• Construct a stub street to the surrounding parcels.
11. Traffic Calming
a. Staff Comments/Recommendations: Spire Street and Prevail Avenue are proposed to extend
to a length greater than 750-feet. Staff has concerns over the length of these roadways as they
extend as long, straight street sections and believe the design of the roadways will necessitate
future traffic calming implementation by ACHD. Per District policy 7206.3.8, staff recommends
the applicant be required to provide traffic calming to discourage excessive speeds through the
use of passive design elements approved by ACHD Traffic Services.
Speed humps/bumps, valley gutters, stop signs, and cross drains are not an acceptable tool for
traffic calming on new collector streets and will not be accepted as traffic calming.
12. Other Access
Lake Hazel Road is classified as a principal arterial roadway; Spire Street and Prevail Avenue are
classified as collector roadways. Other than the access specifically approved with this application,
direct lot access is prohibited to these roadways.
18 Costco at Meridian / MER25-0080 /A-2025-0078
F. Policy
1. Federal Accessibility Design Guidelines and Standards
District policy 7203.1.1 states that developers shall follow the current version of the U.S. Access
Board's Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way(PROWAG), 36
CFR Part 1190, September 7, 2023; (Also see, https//www.access-board.gov/prowag and
https//www.access-board.gov/files/prowag/planning-and-design-for-alternatives.pdf for additional
information).
2. Minor Improvements
Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing
Highways adjacent to a proposed development may be required. These needed transportation
facilities are to correct deficiencies or replace deteriorated facilities. Included are sidewalk and/or
bike lane construction or replacement (with physical buffers if missing and needed); construction of
transitional sidewalk segments; crosswalk construction or replacement; curb and gutter
construction or replacement; repair, replacement or expansion of curb extensions; replacement of
unused driveways with curb, gutter, sidewalk, repair or addition of traffic calming or speed mitigation
features; installation or reconstruction of pedestrian ramps; pavement repairs; signs, motor vehicle,
pedestrian and bicycle traffic control devices; and other similar items. The current version of
PROWAG will determine the applicable accessibility requirements for alterations and elements
added to existing streets. ACHD staff is responsible for identifying the minor improvements that
would be proportionate to the size and complexity of the development.
3. Livable Street Performance Measures
District policy 7203.8 states that ACHD has adopted performance measures (level of stress) for
evaluating the experience of bicyclists and pedestrians. ACHD seeks to create a transportation
network that serves all ages and abilities. Bike and pedestrian facilities built through development
should achieve a bike and pedestrian level of traffic stress 1 or 2, with no new bike lane below a
minimum of 5-feet.
4. Lake Hazel Road
Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for
improving all street frontages adjacent to the site regardless of whether or not access is taken to all
of the adjacent streets. Improvements shall include transitional segments in accordance with the
current version of PROWAG.
Master Street Map and Typology Policy: District Policy 7205.5 states that the design of
improvements for arterials shall be in accordance with District standards, including the Master
Street Map, Livable Streets Design Guide, and the most current ACHD Livable Streets Performance
Measures Plan as adopted by the ACHD Commission. The developer or engineer should contact
the District before starting any design.
Street Section and Right-of-Way Width Policy: District Policies 7205.2.1 & 7205.5.2 state The
standard 5-lane street section shall be 59-feet (back-of-curb to back-of-curb). This width typically
accommodates two travel lanes in each direction, a continuous center left-turn lane or landscaped
median with intermittent turn lanes, and curbs and gutters. A 5-lane road shall also include a
minimum 10-foot wide multi-use path on both sides with an 8-foot wide buffer from back-of-curb.
Other bike facility treatments as defined in the ACHD Bike Master Plan may be approved at the
discretion of the ACHD Development Review Supervisor. If an interim on-street bike lane is required
in order to connect to existing facilities, the street section shall be 75-feet to allow for a 5-foot wide
bike lane and 3-foot wide painted buffer. The standard right-of-way width for a 5-lane arterial is 100-
feet.
Right-of-Way Dedication: District Policy 7205.2 states that The District will provide compensation
for additional right-of-way dedicated beyond the existing right-of-way along arterials listed as impact
19 Costco at Meridian / MER25-0080 /A-2025-0078
fee eligible in the adopted Capital Improvements Plan using available impact fee revenue in the
Impact Fee Service Area.
No compensation will be provided for right-of-way on an arterial that is not listed as impact fee
eligible in the Capital Improvements Plan.
The District may acquire additional right-of-way beyond the site-related needs to preserve a corridor
for future capacity improvements, as provided in Section 7300.
Pedestrian Facilities: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide are
required on both sides of all arterial streets. A parkway strip at least 8-feet wide between the back-
of-curb and street edge of the sidewalk is required to provide increased safety and protection of
pedestrians. Alternatively, on roadways identified for improvement in the Capital Improvement Plan,
a minimum 10-foot wide multi-use path may be required. The path shall be placed in accordance
with planned buildout in the Master Street Map with a minimum 8-foot wide planter strip as
measured to the closest edge of the path. Street trees are encouraged between the pedestrian
facility and the roadway when irrigation and maintenance will occur by the adjacent property owner
or HOA through an approved license agreement. Consult the District's planter width policy if trees
are to be placed within the parkway strip. In some instances, to match existing conditions, a
minimum 7-foot wide sidewalk may be constructed next to the back-of-curb. ACHD Development
Review staff will be responsible for determining the required facility. Vertical hardscape alternatives
to street trees may be considered in the buffer space when street trees are not practicable.
Detached sidewalks and multi-use paths are encouraged and should be parallel to the adjacent
roadway. Pedestrian facilities will only be allowed to deviate from a straight line parallel to the
roadway when authorized by Development Review staff to accommodate site specific conditions
(i.e., street trees, utilities, etc.).
Appropriate easements shall be provided if public pedestrian facilities are placed out of the right-of-
way. The easement shall encompass the entire area between the right-of-way line and 2-feet behind
the back edge of the pedestrian facility. Pedestrian facilities shall either be located wholly within the
public right-of-way or wholly within an easement.
Curb ramps or blended transitions shall be provided to connect the pedestrian access route at each
pedestrian street crossing in accordance with the current version of PROWAG. Provide detectable
warning surface in accordance with the current version of PROWAG.
Frontage Improvements Policy: District Policy 7205.2.1 states that the developer shall widen the
pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel shoulder adjacent to
the entire site. Curb, gutter and additional pavement widening may be required (See Section
7205.5.5).
ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM)
guide the right-of-way acquisition, arterial street requirements, and specific roadway features
required through development. This segment of Lake Hazel Road is designated in the MSM as a
Residential Mobility Arterial with 5-lanes and on-street bike lanes, a 59-foot street section within
100-feet of right-of-way.
5. Spire Street & Prevail Avenue
Collector Street Policy: District policy 7206.2.1 states that the developer is responsible for
improving all collector frontages adjacent to the site or internal to the development as required
below, regardless of whether access is taken to all of the adjacent streets. Improvements shall
include transitional segments in accordance with ADA and the current version of PROWAG.
Master Street Map and Typologies Policy: District policy 7206.5 states that if the collector street
is designated with a typology on the Master Street Map, that typology shall be considered for the
required street improvements. If there is no typology listed in the Master Street Map, then standard
20 Costco at Meridian / MER25-0080 /A-2025-0078
street sections shall serve as the default. ACHD reserves the right to require bicycle and pedestrian
facilities above those identified in the Livable Streets Design Guide and Master Street Map to
ensure the safest facility possible based on current best practice.
Street Section and Right-of-Way Policy: District policy 7206.5.2 states that the standard right-
of-way width for collector streets shall typically be 50 to 70-feet, depending on the location and
width of the sidewalk or multi-use path and the location and use of the roadway. The right-of-way
width may be reduced, with District approval, if the sidewalk or multi-use path is located within an
easement; in which case the District will require a minimum right-of-way width that extends 2-feet
behind the back-of-curb on each side.
The standard street section shall be 47-feet (back-of-curb to back-of-curb). This width typically
accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike
lanes. If a multi-use path is determined to be the required treatment, the street section shall be
reduced to 37-feet. If it is determined a continuous center left-turn lane is not appropriate and a
path is installed, the street section may be reduced to 26-feet.
Residential Collector Policy: District policy 7206.5.2 states that the standard street section for a
collector in a residential area shall be 36-feet (back-of-curb to back-of-curb). The District will
consider a 33-foot or 29-foot street section with written fire department approval and taking into
consideration the needs of the adjacent land use, the projected volumes, the need for bicycle lanes,
and on-street parking.
At the discretion of Traffic Engineering staff, adjustments may be made to the street section,
including removal of the continuous center turn lanes or modification to lane widths, where no
driveways or intersections are present or to ensure adequate space for pathways and buffers.
Pedestrian Facilities: District policy 7206.5.6 requires a concrete sidewalk at least 5-feet wide to
be constructed on both sides of all collector streets. A parkway strip at least 8-feet wide between
the back-of-curb and street edge of the sidewalk is required to provide increased safety and
protection of pedestrians. Consult the District's planter width policy if trees are to be placed within
the parkway strip. Sidewalk constructed next to the back-of-curb shall be a minimum of 7-feet wide.
Alternatively, on roadways identified as low-stress bikeways in ACHD's Bike Master Plan, a
minimum 10-foot wide multi-use path may be required in lieu of sidewalks. ACHD Development
Review staff will be responsible for determining the required facility. The path shall be built 8-feet
behind the back-of-curb as measured to the closest edge of the path. Street trees are encouraged
between the pedestrian facility and the roadway when irrigation and maintenance will occur by the
adjacent property owner or HOA through an approved license agreement. Vertical hardscape
alternatives to street trees may be considered in the buffer space when street trees are not
practicable.
Pedestrian facilities should be parallel to the adjacent roadway. Pedestrian facilities will only be
allowed to deviate from a straight line when authorized by Development Review staff to meet site
specific conditions (i.e., street trees, utilities, etc.).
Appropriate easements shall be provided if public sidewalks or multi-use paths are placed out of
the right-of-way. The easement shall encompass the entire area between the right-of-way line and
2-feet behind the back edge of the sidewalk or multi-use path. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.
Curb ramps or blended transitions shall be provided to connect the pedestrian access route at each
pedestrian street crossing in accordance with the current version of PROWAG. Provide detectable
warning surface in accordance with the current version of PROWAG.
Spire Street ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street
Map (MSM) guide the right-of-way acquisition, collector street requirements, and specific roadway
features required through development. A new collector roadway was identified on the MSM with
21 Costco at Meridian / MER25-0080 /A-2025-0078
the street typology of Residential Collector. The new collector roadway should be constructed as
a quarter-mile collector intersecting Meridian Road and continue through the property stubbing to
the east. The Residential Collector typology as depicted in the Livable Street Design Guide
recommends a 2-lane roadway with bike lanes, and on street parking, a 36-foot street section within
50-70 feet of right-of-way.
Prevail Avenue ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master
Street Map (MSM) guide the right-of-way acquisition, collector street requirements, and specific
roadway features required through development. A new collector roadway was identified on the
MSM with the street typology of Residential Collector. The new collector roadway should be
constructed as a quarter-mile collector intersecting Lake Hazel Road and continue through the
property to intersect Aristocrat Drive at the site's south property line. The Residential Collector
typology as depicted in the Livable Street Design Guide recommends a 2-lane roadway with bike
lanes, and on street parking, a 36-foot street section within 50-70 feet of right-of-way.
6. Roadway Offsets
Collector Offset Policy: District policy 7205.4.2 states that the optimum spacing for new
signalized collector roadways intersecting principal arterials is one half-mile.
District policy 7206.4.2 states that the preferred spacing for new collectors intersecting existing
collectors is '/4 mile to allow for adequate signal spacing and alignment.
District policy 7206.4.3 states that access is typically prohibited within the influence area of an
existing or future roundabout intersection, which is generally considered the area from the
intersection to the far end of the splitter islands.
District policy 7206.4.5, states that the preferred spacing for a new local street intersecting a
collector roadway to align or offset a minimum of 330-feet from any other street (measured
centerline to centerline).
7. Stub Streets
Stub Street Policy: District policy 7206.2.4.3 (collector) states that stub streets will be required to
provide circulation or to provide access to adjoining properties. Stub streets will conform with the
requirements described in Section 7206.2.4 (collector) except a temporary cul-de-sac will not be
required if the stub street has a length no greater than 150-feet. A sign shall be installed at the
terminus of the stub street stating that, "THIS IS A DESIGNATED COLLECTOR ROADWAY. THIS
STREET WILL BE EXTENDED AND WIDENDED IN THE FUTURE."
In addition, stub streets must meet the following conditions:
• A stub street shall be designed to slope towards the nearest street intersection within the
proposed development and drain surface water towards that intersection; unless an
alternative storm drain system is approved by the District.
• The District may require appropriate covenants guaranteeing that the stub street will remain
free of obstructions.
Temporary Dead End Streets Policy: District policy 7206.2.4.4 (collector)requires that the design
and construction for cul-de-sac streets shall apply to temporary dead end streets. The temporary
cul-de-sac shall be paved and shall be the dimensional requirements of a standard cul-de-sac. The
developer shall grant a temporary turnaround easement to the District for those portions of the cul-
de-sac which extend beyond the dedicated street right-of-way. In the instance where a temporary
easement extends onto a buildable lot, the entire lot shall be encumbered by the easement and
identified on the plat as a non-buildable lot until the street is extended.
8. Driveways
8.1 Lake Hazel Road
22 Costco at Meridian / MER25-0080 /A-2025-0078
Access Points Policy: District Policy 7205.4.1 states that all access points associated with
development applications shall be determined in accordance with the policies in this section and
Section 7202. Access points shall be reviewed only for a development application that is being
considered by the lead land use agency. Approved access points may be relocated and/or
restricted in the future if the land use intensifies, changes, or the property redevelops.
Access Policy: District policy 7205.4.7 states that direct access to principal arterials is typically
prohibited. If a property has frontage on more than one street, access shall be taken from the street
having the lesser functional classification. If it is necessary to take access to the higher classified
street due to a lack of frontage, the minimum allowable spacing shall be based on Table 1 b under
District policy 7205.4.7, unless a waiver for the access point has been approved by the District
Commission. Driveways, when approved on a principal arterial shall operate as a right-in/right-out
only, and the District will require the construction of a raised median to restrict the left turning
movements.
Driveway Location Policy: District policy 7205.4.7 requires driveways located on principal arterial
roadways to be located a minimum of 355-feet from the nearest intersection for a right-in/right-out
only driveway. Full-access driveways are not allowed on principal arterial roadways.
Successive Driveways: District policy 7205.4.7 Table 1 b, requires driveways located on principal
arterial roadways with a speed limit of 50 MPH to align or offset a minimum of 520-feet from any
existing or proposed driveway.
Driveway Width Policy: District policy 7205.4.8 restricts high-volume driveways (100 VTD or
more)to a maximum width of 36-feet and low-volume driveways (less than 100 VTD)to a maximum
width of 30-feet. Curb return type driveways with 30-foot radii will be required for high-volume
driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for
low-volume driveways with less than 100 VTD.
Driveway Paving Policy: Graveled driveways abutting public streets create maintenance
problems due to gravel being tracked onto the roadway. In accordance with District policy,
7205.4.8, the applicant should be required to pave the driveway its full width and at least 30-feet
into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance
with Table 2 under District Policy 7205.4.8.
Temporary Access Policy: District Policy 7202.4.2 identifies a temporary access as that which
"is permitted for use until appropriate alternative access becomes available". Temporary access
may be granted through a development agreement or similar method, and the developer shall be
responsible for providing a financial guarantee for the future closure of the driveway.
Cross Access Easements/Shared Access Policy: District Policy 7202.4.1 states that cross
access utilizes a single vehicular connection that serves two or more adjoining lots or parcels so
that the driver does not need to re-enter the public street system.
8.2 Spire Street & Prevail Avenue
Access Policy: District Policy 7206.4.1 states that all access points associated with development
applications shall be determined in accordance with the policies in this section and Section 7202.
Access points shall be reviewed only for a development application that is being considered by the
lead land use agency. Approved access points may be relocated and/or restricted in the future if
the land use intensifies, changes, or the property redevelops.
District Policy 7206.1 states that the primary function of a collector is to intercept traffic from the
local street system and carry that traffic to the nearest arterial. A secondary function is to service
adjacent property. Access will be limited or controlled. Collectors may also be designated at bicycle
and bus routes.
23 Costco at Meridian / MER25-0080 /A-2025-0078
Driveway Location Policy (Signalized Intersection): District policy 7206.4.3 requires driveways
located on collector roadways near a signalized intersection to be located outside the area of
influence; OR a minimum of 440-feet from the signalized intersection for a full-access driveway and
a minimum of 220-feet from the signalized intersection for a right-in/right-out only driveway.
Dimensions shall be measured from the centerline of the intersection to the centerline of the
driveway.
Driveway Location Policy (Stop Controlled Intersection): District policy 7206.4.4 requires
driveways located on collector roadways near a STOP controlled intersection to be located outside
of the area of influence; OR a minimum of 150-feet from the intersection, whichever is greater.
Dimensions shall be measured from the centerline of the intersection to the centerline of the
driveway.
Successive Driveways: District policy 7206.4.5 Table 1 requires driveways located on collector
roadways with a speed limit of 25 MPH and daily traffic volumes greater than 100 VTD to align or
offset a minimum of 245-feet from any existing or proposed driveway.
Driveway Width Policy: District policy 7206.4.6 restricts high-volume driveways (100 VTD or
more)to a maximum width of 36-feet and low-volume driveways (less than 100 VTD)to a maximum
width of 30-feet. Curb return type driveways with 30-foot radii will be required for high-volume
driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for
low-volume driveways with less than 100 VTD.
Driveway Paving Policy: Graveled driveways abutting public streets create maintenance
problems due to gravel being tracked onto the roadway. In accordance with District policy,
7206.4.6, the applicant should be required to pave the driveway its full width and at least 30-feet
into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance
with Table 2 under District Policy 7206.4.6.
Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing
Highways adjacent to a proposed development may be required. These needed transportation
facilities are to correct deficiencies or replace deteriorated facilities. Included are sidewalk and/or
bike lane construction or replacement (with physical buffers if missing and needed); construction of
transitional sidewalk segments; crosswalk construction or replacement; curb and gutter
construction or replacement; repair, replacement or expansion of curb extensions; replacement of
unused driveways with curb, gutter, sidewalk, repair or addition of traffic calming or speed mitigation
features; installation or reconstruction of pedestrian ramps; pavement repairs; signs, motor vehicle,
pedestrian and bicycle traffic control devices; and other similar items. The current version of
PROWAG will determine the applicable accessibility requirements for alterations and elements
added to existing streets. ACHD staff is responsible for identifying the minor improvements that
would be proportionate to the size and complexity of the development.
9. Private Roads
Private Road Policy: District policy 7212.1 states that the lead land use agencies in Ada County
establish the requirements for private streets. The District retains authority and will review the
proposed intersection of a private and public street for compliance with District intersection policies
and standards. The private road should have the following requirements:
• Designed to discourage through traffic between two public streets,
• Graded to drain away from the public street intersection, and
• If a private road is gated, the gate or keypad (if applicable) shall be located a minimum of
50-feet from the near edge of the intersection and a turnaround shall be provided.
24 Costco at Meridian / MER25-0080 /A-2025-0078
10. Traffic Calming
Speed Control and Traffic Calming Policy (Collectors): District policy 7206.3.8 states that
collector streets should be designed to discourage speeds above 35 MPH and in a residential area,
collector streets should be designed to discourage speeds above 30 MPH. The design of collector
street systems should discourage excessive speeds by using passive design elements. If the
design or layout of a development is anticipated to necessitate future traffic calming implementation
by the District, then the District will require changes to the layout and/or the addition of passive
design elements such as horizontal curves, bulb-outs, chokers, etc. The District will also consider
texture changes to the roadway surface (i.e. stamped concrete) as a passive design element.
These alternative methods may require a maintenance and/or license agreement.
11. Tree Planters
Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in
planters less than 8-feet in width without the installation of root barriers. Class II trees may be
allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed
in planters with a minimum width of 10-feet.
12. Landscaping
Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD
right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm
drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle
at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height
restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop
signs. Landscape plans are required with the submittal of civil plans and must meet all District
requirements prior to signature of the final plat and/or approval of the civil plans.
13. Pathway Crossings
United States Access Board R304.5.1.2 Shared Use Paths. In shared use paths, the width of curb
ramps runs and blended transitions shall be equal to the width of the shared use path.
AASHTO's Guidelines for the Development of Bicycle Facilities 5.3.5 Other Intersection
Treatments: The opening of a shared use path at the roadway should be at least the same width
as the shared use path itself. If a curb ramp is provided, the ramp should be the full width of the
path, not including any flared sides if utilized. . . . Detectable warnings should be placed across the
full width of the ramp.
FHWA's "Designing Sidewalks and Trails for Access" (1999) reflected common ADA-related
concepts: Chapter 6, Page 16-6: The width of the ramp should be at least as wide as the average
width of the trail to improve safety for users who will be traveling at various speeds. In addition, the
overall width of the trail should be increased, so the curb ramp can be slightly offset to the side.
The increased width reduces conflict at the intersection by providing more space for users at the
bottom of the ramp.
25 Costco at Meridian / MER25-0080 /A-2025-0078
G. Attachments
January 202a
Lake Hazel&SH-69 Apex MixedPlse Development Executive Summary
EXECUTIVE SUMMARY
Brighton Development is proposing to develop a 147-acre mixed-use development located an the
southeast corner of the Lake Hazel Road /Meridian Road (SH-69j intersection in Meridian,Idaha.The
proposed site is currently vacant farmland.The proposed development is planned to include a 195,243
square-foot warehouse style big box stare that includes a fuel station (24 fueling positions) and market
delivery operation (MDO),shopping center uses,office uses,single-family housing,and multifamily
apartments.The initial phase of the development will include the warehouse big-box stare, market delivery
operation, ❑nd approximately 60,000 square feet of medical office uses in approximately 2026. BulIdouI of
the development includes the remaining
approximately 250,757 square feet of shopping center
uses, 40,000 square feet of general office,460 multi-
family units, and 320 single family homes expected to TM
be completed by approximately 2035. Figure E1 shows -
•NIfY?6 +
the study area intersections c nd roadway segments.
Figure 1 (see page 29) shows the site vicinity and
Figure 2 (sere page 30) illustrates the preliminary land-
use plan for the development.
A
Access to the development from Lake Hazel Road and = }
s
Meridian Road is proposed via five new private and 2 F
collector streets:
CIDMEH?6
• A new right-in/right-out north-south private
street on Lake Hazel Road located l
approximately 670 feet east of Meridian
Road (Site Access A).
• A new public coilector street connection
on Lake Hazel Road located Figure E1, Study Area Roadways and
approximately 'A mile east of Meridian Intersections
Road (Site Access B).
• A new right-in/right-out east-west private street on Meridian Road located approximately 700
feet south of Lake Hazel Road (Site Access D).
• A new public collector street with right-in/right-out/left-in on Meridian Raad located
approximately 1,440 feet south of Lake Hazel Road (Site Access E).
• Extension of Aristocrat Drive east of Meridian Road as a new Y2 mile East-West C ollec to r f rom
the existing Meridian Road /Aristocrat Drive intersection (study intersection 8).
In the long-term,a future north-south collector (Access C) is proposed at the half-mile location between
Meridian Road and Locust Grave Road and is included in the evaluation of access a Item atives.It is not
possible to build by 2026 and possibly still will not be built by 2035 as it will require a property under different
ownership to develop.
This TIS addresses the development's impacts in the initial Phase 1 buildout year 2026 and full buildout in the
year 2035.
26 Costco at Meridian / MER25-0080 /A-2025-0078
H. Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all
easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way
(including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD
right-of-way.
3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non-
compliant pedestrian improvements abutting the site to meet current Americans with Disabilities
Act (ADA), Public Right-of-Way Accessibility Guidelines (PROWAG), ISPWC, or ACHD
requirements. The applicant's engineer should provide documentation of compliance to District
Development Review staff for review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number)for details.
5. A license agreement and compliance with the District's Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall be borne
by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking
ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190
in the event any ACHD conduits (spare or filled)are compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards
and approved supplements, Construction Services procedures and all applicable ACHD Standards
unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and
certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized
representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of
any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan
and may require additional improvements to the transportation system at that time. Any change in
the planned use of the property, which is the subject of this application, shall require the applicant
to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a
waiver/variance of the requirements or other legal relief is granted by the ACHD Commission.
I. Conclusions of Law
1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval
are satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
27 Costco at Meridian / MER25-0080 /A-2025-0078
Request for Appeal of Staff Decision
To request an appeal of a staff level decision, see District policy 7101.6.7 at
https://www.achdidaho.org/home/showpublisheddocument/452/638243231708370000
Request for Reconsideration of Commission Action
To request reconsideration of a Commission Action, see District policy 1006.11 at
https://www.achdidaho.org/home/showpublisheddocument/452/638243231708370000
28 Costco at Meridian / MER25-0080 /A-2025-0078
Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all
easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way
(including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located within the
ACHD right-of-way.
3. In accordance with District policy, 7203.3, the applicant may be required to update any existing
non-compliant pedestrian improvements abutting the site to meet current Public Right-of-Way
Accessibility Guidelines (PROWAG) requirements. The applicant's engineer should provide
documentation of compliance to District Development Review staff for review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during
the construction of the proposed development. Contact Construction Services at 208-387-6280
(with file number)for details.
5. A license agreement and compliance with the District's Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall be
borne by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to
breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations
387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of
construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing
by the District. Contact the District's Utility Coordinator at 208-387-6258 (with file numbers) for
details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC
Standards and approved supplements, Construction Services procedures and all applicable
ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho
shall prepare and certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in writing
and signed by the applicant or the applicant's authorized representative and an authorized
representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of
any change from ACHD.
12. If the site plan or use should change in the future,ACHD Planning Review will review the site plan
and may require additional improvements to the transportation system at that time. Any change
in the planned use of the property, which is the subject of this application, shall require the
applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time
unless a waiver/variance of the requirements or other legal relief is granted by the ACHD
Commission.