HomeMy WebLinkAbout025-07-11 ACHD Miranda Gold,President
Alexis Pickering,Vice-President
IM
ACHDKent Goldthorpe,Commissioner
Dave McKinney,Commissioner
/ Patricia Nilsson,Commissioner
July 11, 2025
To: Shari Stiles
Becky McKay
Engineering Solutions
1029 N Rosario Street
Suite 100
Meridian, ID 83642
Subject: MPP25-0018 / H-2025-0037
1250 E Everest Street
Borough Village Subdivision
The Ada County Highway District has reviewed the submitted application for the preliminary plat
referenced above and has determined that there are no improvements required to the adjacent street(s).
The proposed preliminary plat is approved without conditions, as the site is fully improved.
The applicant will be required to pay all platting and review fees prior to final plat approval.
If you have any questions, please contact me at (208) 387-6384.
Sincerely,
Sam Standal
Assistant Traffic Engineer
Development Services
cc: Sonya Allen and Bill Parsons, City of Meridian
connecting you to more
Ada County Highway District•580a N Meeker Avenue•Boise,ID•83713•PH 2O8-387-6100•FX 345-7650•www.achdidaho.org
Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all
easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way
(including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located within the
ACHD right-of-way.
3. In accordance with District policy, 7203.3, the applicant may be required to update any existing
non-compliant pedestrian improvements abutting the site to meet current Public Right-of-Way
Accessibility Guidelines (PROWAG) requirements. The applicant's engineer should provide
documentation of compliance to District Development Review staff for review.
4. Replace any existing damaged curb, gutter, and sidewalk and any that may be damaged during
the construction of the proposed development. Contact Construction Services at 208-387-6280
(with file number)for details.
5. A license agreement and compliance with the District's Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall be
borne by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to
breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations
387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of
construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing
by the District. Contact the District's Utility Coordinator at 208-387-6258 (with file numbers) for
details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC
Standards and approved supplements, Construction Services procedures and all applicable
ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho
shall prepare and certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in writing
and signed by the applicant or the applicant's authorized representative and an authorized
representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of
any change from ACHD.
12. If the site plan or use should change in the future,ACHD Planning Review will review the site plan
and may require additional improvements to the transportation system at that time. Any change
in the planned use of the property, which is the subject of this application, shall require the
applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time
unless a waiver/variance of the requirements or other legal relief is granted by the ACHD
Commission.
connecting you to more
Ada County Highway District•5800 N Meeker Avenue•Boise,ID•83713•PH 2O8-387-6100•Fx 345-7650•www.achdidaho.org