HomeMy WebLinkAboutAmenity Details (Pathways) PLANTING SOIL NOTES DRYLAND TURF SEEDING a' U � U E 1. TOPSOIL REQUIREMENTS: ASTM D 5268, PH RANGE OF 5.5 TO 7, FOUR PERCENT ORGANIC MATERIAL REQUIREMENTS ID MINIMUM, FREE OF STONES 1/2 INCH OR LARGER IN ANY DIMENSION, AND OTHER EXTRANEOUS �_ °O cal tvD tuo p FENCE LEGEND OPEN SPACE LEGEND MATERIALS HARMFUL TO PLANT GROWTH. � qj 2. TOPSOIL SOURCE: REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH GENERAL OVERVIEW N U) m �1 IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. VERIFY SUITABILITY AND CONDITION OF CD • 12) t TOPSOIL AS A GROWING MEDIUM. THIS REPORT OUTLINES RECOMMENDED REVEGETATION AND SLOPE STABILIZATION MEASURES FOR m CD 4 SOLID FENCE, 6 SOLID PRIVACY QUALIFIED COMMON NON-QUALIFIED COMMON DISTURBED CUT AND FILL SLOPES WITHIN THE PROJECT LIMITS AS DEFINED ON THE ACCOMPANYING PLAN WHICH Q COLOR: TAN; SEE FENCE, OPEN SPACE AREA = OPEN SPACE AREA = A. STRIP EXISTING TOPSOIL FROM ALL AREAS OF THE SITE TO BE DISTURBED. TOPSOIL SHALL BE v DETAIL 8/L2.01 COLOR: TAN; SEE 93,407 SF 4,738 SF FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, WILL BE SEEDED WITH THE DRYLAND SEED MIX AND NOT IRRIGATED. THESE RECOMMENDATIONS ARE MADE TO = V a DETAIL 7/L2.01 BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, ORGANIC MATTER LARGER PREVENT SHORT TERM AND LONG TERM SOIL EROSION AS WELL AS TO PROVIDE AN AESTHETIC REVEGETATION O v tn % OF PHASE 2 = 17.06% % OF PHASE 2 = .86% THAN 1/2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO WHICH WILL BLEND WITH THE EXISTING NATURAL SURROUNDING AREA. THE MEASURES INCLUDE REVEGETATION I PLANT GROWTH. TOPSOIL SHALL BE SCREENED TO ACHIEVE THIS REQUIREMENT. r.•, * TOTAL COMMON OPEN SPACE AREA= 98,145 SF AND HYDROMULCHING PROCEDURES FOLLOWING TOPSOIL DISTRIBUTION AND FINE GRADING. THE AREA TO BE 3. REPRESENTATIVE SAMPLES OF PLANTING SOILS SHALL BE TESTED FOR ACIDITY, FERTILITY, ORGANIC MATTER AND GENERAL TEXTURE BY A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY. SUBMIT REVEGETATED CONSISTS OF ALL DISTURBED AREAS RELATED TO GRADING FOR CONSTRUCTION AND ANY OTHER AREAS DISTURBED IN THE PROCESS OF CONSTRUCTION. THE SLOPES TO BE AFFECTED VARY WIDELY IN DEGREE Q TOPSOIL ANALYSIS TEST RESULTS FROM TESTING LABORATORY WITH RECOMMENDATIONS FOR IT TO W9tv 8"INV OUT=2691.47(W) L m Al DEPTH=0.00' MEET REQUIREMENTS.TO THE LANDSCAPE ARCHITECT'S REPRESENTATIVE BY THE CONTRACTOR. ALL AND ASPECT. � to ca Q TOPSOIL SHALL BE AMENDED TO ACHIEVE SPECIFIED PH AND ORGANIC REQUIREMENTS. RE-TEST P // // \\ / TOPSOIL PRIOR TO FINAL COMPLETION TO ENSURE REQUIREMENTS HAVE BEEN MET. GENERAL EARTHWORK .rr�■� a v 6' \ 4. AT A MINIMUM, PREPARE SOIL IN ALL AREAS BY SPREADING A 15-15-15 FERTILIZER AT 7.5 POUNDS PER PI v v _ �i '�-B-aALL WORK SHALL BE LIMITED TO THE AREA REQUIRED FOR CONSTRUCTION WITH MINIMAL, IF ANY, m 1000 SQUARE FEET OF SURFACE AREA AND AN MANURE COMPOST (OR APPROVED EQUAL)AT 3 CUBIC YARDS PER 1000 SQUARE FEET OF SURFACE AREA OVER FINISH GRADE AND ROTO-TILL INTO TOP 6" OF DISTURBANCE TO THE SURROUNDING NATURAL SLOPE OR VEGETATION. ALL FINISHED GRADES SHALL BE SMOOTH �� a SOIL. FOLLOW ALL IMPROVEMENT RECOMMENDATIONS OF SOIL TEST RESULTS. TOPSOIL SHALL BE A AND ROUNDED TO ENSURE A NATURAL TRANSITION BETWEEN NEW AND EXISTING GRADES. REFER TO GRADING = p zw- w W 8 12 - z„W- - LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED - 87. W AND DRAINAGE PLANS FOR ADDITIONAL REQUIREMENTS. cn ' - - Ri 6°6 - - SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO 7.0. IF ONSITE p .Q z TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTOR IS RESPONSIBLE TO EITHER: try O O_ _ A. PROVIDE APPROVED IMPORTED TOPSOIL, OR SITE PREPARATION - - -_ _--E - `r = -�1�` B. IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARCHITECT. EARTHWORK PROCESS SHOULD BEGIN WITH CLEARING LARGE SHRUBS FROM THE AREAS TO BE DISTURBED. w NOT A : I 'a III �- 5. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, ENSURE IT IS FERTILE, FRIABLE, WOODY STEMS AND BRANCHES SHALL BE CHIPPED ON SITE TO IMPROVE THE AMOUNT OF ORGANIC MATERIAL IN NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND I THE TOP SOIL. NATURAL TOPSOIL OCCURS AT VARYING DEPTHS ON THE PROJECT SITE. THE TOPSOIL SHOULD BE 21 = OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, EXCAVATED AND STOCKPILED AT DESIGNATED STORAGE AREAS PRIOR TO THE PROPOSED GRADING OPERATIONS. 3: " o I 3 BU _ J AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. oJ PART a c I A. OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS a o V / - - 3:_ I I TO THOSE FOUND ON THE PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED TOPSOIL DISTRIBUTION o SITES WHERE TOPSOIL OCCURS AT A DEPTH OF NOT LESS THAN 4 INCHES. ONCE THE GENERAL EARTHWORK IS COMPLETE AND ROUGH GRADING HAS BEEN ACCOMPLISHED, THE o 0 20 B. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY, TOXICITY, ORGANIC TOPSOIL SHOULD BE REDISTRIBUTED OVER THE AREA TO MINIMUM DEPTHS AS SPECIFIED. WHERE NEEDED, o p z z MATTER, AND GENERAL TEXTURE BY A T NG AGENCY'S FINDINGS GS AND RECOMMENDATIONS DATIONS SHALL RECOGNIZED COMMERCIAL SORL E FURNISHED O GOVERNMENT SLOPES SHOULD BE GRADED WITH SERRATION TO HOLD TOPSOIL ADEQUATELY NOT A COPIES OF THE TES . TOPSOIL SHOULD BE SPREAD z < z THE OWNER'S REPRESENTATIVE BY THE CONTRACTOR. NO TOPSOIL SHALL BE DELIVERED IN A AND LIGHTLY COMPACTED UTILIZING A SMALL CLEATED TRACTOR MOVING PERPENDICULAR TO THE CONTOURS OR w z w FROZEN OR MUDDY CONDITION. ACIDITY/ALKALINITY RANGE - PH. 5.5 TO 7.6. ANOTHER METHOD WITH EQUAL CAPABILITY. IT IS OUR RECOMMENDATION THAT ANY NECESSARY MECHANICAL o z z 8s =flART 6. NO TOPSOIL SHALL BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION. MEANS OF EROSION CONTROL BE IN PLACE PRIOR TO BEGINNING SITE DISTURBANCE. > O 5 I 19T m 7. PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THICKNESS AS SCHEDULED. PLACE TOPSOIL ONCE TOPSOIL HAS BEEN DISTRIBUTED AND GRADED, REVEGETATION SEEDING SHALL FOLLOW o w z 3- _ 26 i I DURING DRY WEATHER. PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED TO BRING SURFACE TO - - !► IMMEDIATELY. IN ORDER TO ELIMINATE SURFACE CRUSTING AND TO FACILITATE BETTER ROOT PENETRATION, THE 'a I - - N PROPOSED FINISH GRADE, AS REQUIRED. o o ° I SURFACE SHOULD BE SCARIFIED PRIOR TO SEEDING. 0 0 8. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE a 3: o OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. � " m c) c o 25 `w B 16 �s 9. TOPSOIL STOCKPILE LOCATIONS TO BE COVERED COORDINATE WITH EROSION AND SEDIMENT SEEDING z z w 8L.2 °i = BL.3 , N��N ` CONTROL PLAN. APPLY SEED TO THE PROJECT SITE BY HYDROSEEDING. z w 10. ALL GRAVEL, SUBBASE, AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE - � STOCKPILED IN PROPOSED IMPERVIOUS AREAS. NO GRAVEL OR ROCK MATERIALS SHALL BE THE FOLLOWING INFORMATION PROVIDES MATERIAL AND EXECUTION FOR SEEDING. CD } w I \ STOCKPILED OR TEMPORARILY PLACED IN PROPOSED LANDSCAPE AREAS TO PREVENT LANDSCAPE y J I i AREAS FROM BEING CONTAMINATED WITH ROCK MATERIALS. CONTRACTOR SHALL SUBMIT A SEED MIXTURE: PURE LIVE SEED % MIX o C) } 17 EARTHWORK OPERATIONSDETAILED STOCKPILE PLAN TO LANDSCAPE ARCHITECT AND OWNER FOR APPROVAL PRIOR TO ANY till zmz \\ HARD FESCUE 25 CD _T 2a / CANADA BLUE FESCUE 25 0 0 2E co SHEEP FESCUE 25 CD GENERAL NOTES •. � m / sq $ � \ 16 WINGLEY CHEWINGS FESCUE 25 � s�°o � TOTAL SEED 40 LBS PURE LIVE SEED �♦♦�P�� OF o� 1. CONTRACTOR TO VERIFY THE LOCATIONS OF ALL UTILITIES WITH OWNER AND UTILITY COMPANIES PRIOR ♦ D, R� O may; ��, TO CONSTRUCTION, TO DETERMINE IN THE FIELD ACTUAL LOCATIONS AND ELEVATIONS OF ALL EXISTING INSTALL @ 25 LBS /ACRE UTILITIES, WHETHER SHOWN ON THE PLANS OR NOT. THE CONTRACTOR SHALL CALL UTILITY PROTECTION \ 23 9 15 SERVICE 72 HOURS PRIOR TO CONSTRUCTION. h / 10 q B / 2. CONTRACTOR SHALL EXAMINE FINISH SURFACE, GRADES, TOPSOIL QUALITY AND DEPTH. DO NOT START FIBER MULCH MATERIAL �.1 ANY WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. VERIFY LIMITS OF WORK GROW NUTRIBASE FROM "QUATTRO ENVIRONMENTAL", A COMPOSTED POULTRY BASED MULCH MATERIAL FREE OF LA- 16827 \ / \ BEFORE STARTING. GROWTH OR GERMINATION INHIBITING INGREDIENTS. APPLY AT THE RATE OF 2000 LBS. PER ACRE. i �� -1/21/25 i 14 3. CONTRACTOR TO REPORT ALL DAMAGES TO EXISTING CONDITIONS AND INCONSISTENCIES WITH PLANS TO / \ 22 0 11 \ e_ I OWNER'S REPRESENTATIVE PRIOR TO BEGINNING OF CONSTRUCTION. ORGANIC SOIL AMENDMENT ����1VDSCA��'♦♦♦ �e°° 4. CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE IN ALL LANDSCAPE BEDS AND ALL LAWN AREAS. GROW NUTRIBOOST FROM "QUATTRO ENVIRONMENTAL" (OR APPROVED EQUAL)APPLIED AT 5 GALLONS PER ACRE. *oA.. ��♦ �o1b 5. CONTRACTOR TO FINE GRADE AND ROCK HOUND ALL PLANTING AREAS PRIOR TO PLANTING, TO PROVIDE A i SMOOTH AND CONTINUOUS SURFACE, FREE OF IRREGULARITIES (BUMPS OR DEPRESSIONS)AND TACKIFIER / \ 12 21 I I I I EXTRANEOUS MATERIAL OR DEBRIS. MULCH TACKIFIER SOIL STABILIZER - ECOLOGY CONTROLS M-BINDER. TACKIFIER APPLIED AT THE RATE OF 80 LBS. c = o 0 / BL•2 / ' I I I 6. COORDINATE LANDSCAPE INSTALLATION WITH INSTALLATION OF UNDERGROUND SPRINKLER AND PER ACRE. y Wco co DRAINAGE SYSTEMS. GRANITE SEED N rn \ I I I 7. CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FOR ALL PLANT MATERIAL SUBSTITUTIONS FROM 1697 WEST 2100 NORTH - o a/ \ OWNER'S REPRESENTATIVE PRIOR TO ORDERING OR INSTALLATION. FAILURE TO COMPLY WILL REQUIRE P.O. BOX 177 O co / i9 l I THE REMOVAL OF MATERIALS AT NO COST TO THE OWNER AND REPLACED WITH APPROVED MATERIALS. LEHI, UTAH 84043 w x i \ / L - J 8. CONTRACTOR SHALL BE RESPONSIBLE TO IMPLEMENT BEST MANAGEMENT PRACTICES TO STABILIZE ALL 1-800-768-4433 J_ / • / 3 SLOPES 3:1 OR GREATER AND PREVENT EROSION OR MOVEMENT OF SOIL FROM SLOPES. (OR APPROVED EQUAL) W < o MH 1.12 / / \ \ / \ 9. ALL ROCK MATERIALS TO BE OBTAINED FROM LOCAL SOURCE OR APPROVED EQUAL. O - co -, / 16 \sue HYDROSEEDING pC z 9 7+36.10 6 Q 00 MIX SPECIFIED SEED AND ORGANIC SOIL AMENDMENT IN WATER PER MANUFACTURER'S RECOMMENDATIONS. cn 0') / 2 WEED ABATEMENT APPLY SEEDED SLURRY EVENLY IN TWO INTERSECTION DIRECTIONS. DO NOT HYDROSEED AREA IN EXCESS OF c O ° w NOT A �- pa., �� 1 . � o 17 Aso°off 1. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED THAT WHICH CAN BE MULCHED ON SAME DAY. KEEP OFF ROADS, WALKS, STRUCTURES AND AREAS NOT TO BE � ON THEM PRIOR TO PLANTING OR HYDROSEEDING. SEEDED. CLEAN UP THESE AREAS. AFTER HYDROSEED, TRACK IN SEED USING A CLEATED CRAWLER WITH TRACK o 0 2. CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH 'ROUND-UP' (CONTACT HERBICIDE) OR APPROVED MARKS PERPENDICULAR TO THE SLOPE. AFTER TRACKED, MULCH SLOPE WITH 2O00 LBS. PER ACRE OF r \ PAR / EQUAL. FERTILE-FIBER MULCH MATERIAL AND 80 LBS. PER ACRE OF TACKIFIER. BL2 3. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. 4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14 \P ) MAINTENANCE Py � DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS. IMMEDIATELY RESEED AREAS WHICH SHOW BARE SPOTS. MINIMUM ACCEPTABLE PLANT COVERAGE IS 80 14 15 0� 5. APPLY SECOND APPLICATION OF 'ROUND-UP' TO ALL EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE PERCENT AFTER ONE GROWING SEASON. PROTECT SEEDED AREAS WITH WANING SIGNS DURING MAINTENANCE U^ 06 WITH MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7) PERIOD. THE SEED WILL REQUIRE APPROXIMATELY NINETY (90) DAYS OF FAVORABLE GROWING CONDITIONS TO vJ DAYS. REMOVE WEEDS FROM THE SITE. GERMINATE AND BECOME ESTABLISHED FOR SUCCESSFUL SURVIVAL WITH NORMAL MINIMAL SUMMER LLJ Z / + I 6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2)APPLICATIONS, CONTRACTOR SHALL BE DIRECTED TO PERFORM A THIRD APPLICATION. PRECIPITATION. '^ \ 25 7. AT THE TIME F PLANTING AND HYDROSEEDING, ALL PLANTIN AREA HALL BE WEED FREE. Z VJ R,o /• �� BL 1 O G G S S m W 8. COORDINATE WITH CIVIL FOR ALL WEED ABATEMENT REQUIREMENTS SEEDING TIME Z Q S G W THE OPTIMAL SEEDING TIME SHALL BE IN FALL, BETWEEN MID SEPTEMBER AND MID OCTOBER. IF SEEDING IS V) O rj / ql 8s -f 2a APPLIED TOO EARLY OR TOO LATE AND PROPER GERMINATION IS NOT REALIZED PRIOR TO FALL DORMANCY, THEN `,I„I Z oC Q z 19 / \ , RIGHT OF WAY LANDSCAPE NOTES RESEEDING SHALL BE APPLIED IN EARLY SPRING, AS SOON AS SOIL IS WORKABLE (NOT MUDDY) BETWEEN MARCH O z W / - 1. COORDINATE ALL DRAINAGE AREAS AND UTILITIES WITH TREE LOCATIONS AND ADJUST PER FIELD AND MID MAY. THIS PLANTING TIME PROVIDES THE OPTIMUM WEATHER CONDITIONS FOR SEED GERMINATION AND W - c� \••: 23 CONDITIONS. SEEDLING SURVIVAL RATE. SEEDING AFTER NOVEMBER 20, 'DORMANT SEEDING' INSURES THAT THE SEED DOES n ULp W U 2. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL STORM DRAIN PIPE STRUCTURES NOT GERMINATE PRIOR TO FREEZING WINTER TEMPERATURES AND SEED SHOULD BE IN PLACE FOR THE EARLY `J c� 20 �/ 0 OR FACILITIES. SPRING RAINS. (� z o l� 21 C\\ 3. ANY PERENNIAL TREES OR PLANTS THAT WILL EXTEND ROOTS DEEPER THAN 18 SHALL BE PROHIBITED Q Q 0 0,6 z 8L.1 OVER UNDERGROUND SEEPAGE BEDS, INFILTRATION FACILITIES OR PIPING SYSTEMS. WATER� � U� 4. SEEPAGE BEDS AND OTHER STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL Z CONTAMINATION DURING THE CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION THE CONTRACTOR WILL PROVIDE SUPPLEMENTAL WATER TO ENSURE PROPER SEED GERMINATION. 6"PI J I SYSTEM. z 11 5. ALL TREES TO BE LOCATED A MINIMUM OF 5 FEET OR GREATER FROM THE BACK OF ANY SIDEWALK. FERTILIZATION L.L \ II 6. TRIM ALL TREES WITHIN VISION TRIANGLES TO 8'ABOVE FINISH GRADE TO MEET LOCAL JURISDICTIONAL FERTILIZATION IS NOT RECOMMENDED FOR RECLAMATION SEEDING DUE TO PROMOTION OF WEED COMPETITION. V J L.L - - Lij NOT A m \ STANDARDS. IF WEEDS ARE APPARENT, CONTACT LANDSCAPE ARCHITECT FOR WEED REMOVAL REQUIREMENTS. PART EROSION CONTROL / UNDER NORMAL CIRCUMSTANCES AND ADHERENCE TO THE CONSTRUCTION PRACTICES DESCRIBED IN THE SCALE AS SHOWN SPECIFICATIONS, THE ABOVE RECOMMENDED EROSION CONTROL MEASURE SHOULD PROVIDE A STABLE SLOPE \ CONDITION. TO AVOID INCIDENTAL EROSION, IT IS IMPERATIVE THAT THE SLOPES, ONCE PREPARED, REMAIN DATE 7/21/2025 \ \ UNDISTURBED UNTIL SEEDING GERMINATES AND IS ESTABLISHED. PROJ. NO. 25-266 AN 80% VEGETATION COVER IS RECOMMENDED TO CONTROL EROSION. SURFACE CONDITIONS SHOULD BE MONITORED DAILY. IF EROSION DETRIMENTAL TO THE SLOPE IS OBSERVED OR ANTICIPATED DUE TO EXCESSIVE SHEET 1 OF -- RAINFALL, REMEDIAL MEASURES SHALL BE IMPLEMENTED AS REQUIRED. REFER TO THE STORM WATER FENCING & OPEN SPACE PLAN O' 80' 160' 240' POLLUTION PREVENTION PLAN FOR ADDITIONAL REQUIREMENTS. L2 , 0 SCALE: I" = bO'-O" xxxxxx-TI.DWG