Loading...
HomeMy WebLinkAbout2025-09-19 Boise Project Board of ControlRICHARD MURGOITIO CHAIRMAN OF THE BOARD DAN SHEIRBON VICE CHAIRMAN OF THE BOARD ROBERT D. CARTER PROJECT MANAGER THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYL GARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER City Clerk's Office 33 E Broadway Avenue Meridian ID, 83642 BOISE PROJECT BOARD OF CONTROL (FORMERLY BOISE U.S. RECLAMATION PROJECT) 2465 OVERLAND ROAD BOISE, IDAHO 83705-3155 17 September 2025 RE: South Ridge South No. 2 South Side of West Overland Rd Nampa -Meridian Irrigation District Givens Latera137+40 Sec. 23, T3N, R1E, BM, Sonya Allen, Planner: FP-2025-0011 NM- 1494 R-1494 OPERATING AGENCY FOR 167,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL: (208) 344-1141 FAX: (208) 344-1437 There are no Boise Project facilities located on the above -mentioned properties; however, they do in fact possess a valid water right. The Ridenbaugh Canal is under the jurisdiction of Nampa -Meridian Irrigation District and must be contacted about any easements on that facility. Storm Drainage and/or Street Runoff must be retained on site. Per Idaho Statutes, Title Al local irrigation/drainage ditches that cross this property, to serve neighboring properties, must remain unobstructed and protected by an appropriate easement by the landowner, developer and contractors. Landowner/developer must do their due diligence to contact all owners of neighboring properties on this matter. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting a copy of the irrigation and drainage plans. Whereas this property lies within the Nampa -Meridian Irrigation District it is important that representatives of this development contact the NMID office as soon as possible to discuss a pressure system prior to any costly design work. If applicable, the irrigation system will have to be built to specific specifications as set by the District /Project. Boise Project Board of Control must receive a written response from the Nampa/Meridian Irrigation District as to who will own and operate the pressure irrigation system prior to review and approval of an irrigation plan by Boise Project Board of Control. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right to require changes when our easements and/or facilities are affected by unknown factors. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Thomas Ritthaler Assistant Project Manager, BPBC for/tr cc: Kevin Reeves Watermaster, Div; 2 BPBC Dave Duvall Water Superintendent, NMID File No aC� LM G NO m L O M N N z O N O N LL U V IO a i- U Q Q� �- _ ( C7 OQO LUz �w QC) M O CD N O� O Ln °�' M LU Q M M mo esteem ¢a U shk9 4 C = Lu N O g� E U)z ° zw ~ O M CD (7 C Lnn — v a) v U E00p �(D v� o zz �� CL Ln O a) O= wW �mLn zz o pz 4, 00 W W O C .. O � U � � Nr 00) T U c1 C Z Q U =