Loading...
HomeMy WebLinkAboutCC - Engineer Statement 01 THE �� ``� - LAND GROUP February 18, 2025 Mr.Warren Stewart,PE City of Meridian 33 E. Broadway Ave. Meridian, ID 83642 RE: Southridge South Subdivision Phase 2 Street Centerline Elevation Certification PN 121172 Dear Mr. Stewart: As required by the City's final plat application requirements, please accept this statement certifying that all street finish centerline elevations are set a minimum of three (3)feet above the highest established normal groundwater elevation. According to the initial test pit investigations and recent construction activities,the groundwater within this project was not encountered in investigations of 25-ft or more in depth. Based on the above information, I certify that groundwater would be greater than three(3)feet below the designed finished street centerline elevations throughout the project. Sincerely, �NoN AL EN O� �F G1S T Jason Densmer, PE, Principal 109 1 The Land Group, Inc. ATE OF 1�P f4suN DEN 02/1S/2025 462 East Shore Drive, Suite 100, Eagle, Idaho 83616 - 208.939.4041 thelandgroupinc.corn