Loading...
HomeMy WebLinkAboutC4.02_Sanitary Sewer Line B y 131 L37 / r �rIRq 6p,� �p� �� � � � Sheet Notes: ��_„ STA:41+51.07 �� F-� -4 THE OFF:44'L O Fp\ Fp �Q 1. CONTRACTOR TO FIELD VERIFY ALL EXISTING CURB &GUTTER, STORM DRAIN, /��� IE:2659.1 LD ` / CHANNEL CROSSINGS, &SEWER ELEVATIONS OR INVERTS PRIOR TO LAND / 6'%°qq�� EP EP EP EQ / CONSTRUCTION AND NOTIFY ENGINEER WHEN ELEVATIONS OR INVERTS DO NOT . qr 8'(,�j\ N o / B1 L38 / Ep`` EP % d MATCH PLANS. °o CO '' EPA GROUP N / O SS 2. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN 8 S\ "' o w 6"PIRR APPROPRIATE LOCATIONS. THE CONTRACTOR SHALL DETERMINE THE EXACT T LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. HE AGREES TO rSO.ZF`1 2 �V + J �, / BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT OCCUR BY HIS �FB,/ CD /� N M O°, / B1 L39 / / k�� FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND p�6gT°4° g sS SSMH 27 P_ o w / / // OpO°�° UTILITIES. 42� P°0 W 2 r' / ` // �Q� / -13. PROFILE ALIGNMENT REPRESENTS PIPE CENTERLINE. STATIONING IS GIVEN TO /\ � �F�' // CENTER OF STRUCTURES UNLESS NOTED OTHERWISE. Q 8 CO CO / B1 L40 ` 3 1?90 Q N ` / / 4. ALL PIPE INSTALLATION AND TRENCHING SHALL CONFORM TO THE LATEST EDITION c~ LL o w / O ` / / OF ISPWC DIVISION 300 AND SD-301. BEDDING AND BACKFILL SHALL BE Lam-• 8" d CONSTRUCTED PER SECTION 305 AND 306 OF THE ISPWC. S'S � o �/ h O � r� o , nch d 43� S S q 0 0 ,� + r / / // 5. NO PERMANENT STRUCTURES CAN BE WITHIN AN EASEMENT OR OVER A V 8 a N // ���� / SEWER/WATER MAIN.THIS INCLUDES BUILDINGS, CARPORTS,TRASH ENCLOSURES, g\ 2 ,l w // TREES, OR DEEP ROOTING BUSHES S cn o Fg/vpVC B8 L1 T 040/ 8'SS \44�UU� 2 // Keynotes: // 10 ,��► 1. POTABLE WATER MAIN CROSSING-SEE SEWER NOTE NO. 2 ON SHEET C1.00. 41 (9 \ 1250 // ���,i0 2. POTABLE/NON-POTABLE SERVICE CROSSING-SEE SEWER NOTE NO. 3 ON SHEET O C1.00. X b ` 3. NOT USED. / SSMH 28 F2]92 4. INSTALL 4-IN SEWER SERVICE AT A MIMIMUM 2/°GRADE TO LENGTH SHOWN PER Line B ISPWC SD-511. CAP AND MARK PER MERIDIAN SD SW3. 0 30' 60' Horizontal Scale: 1" = 30' UJ - y amime 2676 2676 Sewer Line B.: Sta. 41 +40 - 46+20 HORIZONTAL SCALE: 1" = 30' VERTICAL SCALE: 1" = 3' C 2673 2673 CD C 2670 2670 W 0 C C 2667 2667 _ o o PROPOSED GROUND AT CENTERLINE PIPE 2664 2664 = c z Q SEEPAGE BED. SEE ROADWAY EXISTING GROUND AT y PLANS FOR DETAILS. CENTERLINE PIPE 2661 — _ 2661 Revisions 1� OWATER MAIN 1. AGENCY COMMENTS 07-28-25 STORM DRAIN 8-IN PVC CROSSING-�O CROSSING 2658 2658 OWATER SERVICE CROSSING I I II I 2655 2655 II I 396-LF OF 8-IN PVC AT 0.40% 267-LF OF 8-IN PVC AT 0.40% 2652 150-LF OF 8-IN PVC AT 0.40% 2652 SSMH 28 48-IN DIA. PER ISPWC SD-503 SSMH 27 STA:44+88.06, 0.00' ZON T EN 48-IN DIA. PER ISPWC SD-503 RIM: 2663.98± 2649 -STA:42+21.37, 1.101L IE IN: 2652.95, 8-IN PVC (SE) 2649 RIM: 2663.47± IE OUT: 2652.85, 8-IN PVC (N) 10961 IE IN: 2651.78, 8-IN PVC (S) ���T£OF \oP�o IE OUT: 2651.68, 8-IN PVC (N) �4sON DEN 2646 2646 0-712a12025 Project No.: 121172 Date of Issuance: 07-28-2025 EXISTING GROUND ELEVATION PROPOSED GROUND ELEVATION Project Milestone: PERMIT SUBMITTAL AT CENTERLINE PIPE AT CENTERLINE PIPE 2643 2643 Sanitary Sewer 0 0 V O M V O co V O coO 00 O O N c.4 O m M ~ (D M O � co O � � Line B ti GD O N N co O co I— M O N co V co M co M co GV T O O O O O T 00 00 00 O M O M O M O M co M O M O co co M co M O M co M CO M co Cm LCJ M LCJ N LCJ ICJ O GD co co O GD O O CO co O O co O co O co co co GD O co O CO CO co O co O co O co O co co GV co N co GV O N CO N O N O N O N O N O GV O N co N CO N co N O N O N O N co N E N N N N N N GV N N N N N N N N N N 41+40 41+70 42+00 42+30 42+60 42+90 43+20 43+50 43+80 44+10 44+40 44+70 45+00 45+30 45+60 45+90 46+20 iq C4mO2