August 7, 2025
Nick Napoli
Planning Division
City of Meridian
33 E Broadway Ave. Suite 102
Meridian, ID 83642
RE: Mogul Industrial Park Subdivision Phase 1—Final Plat Application
PN 124186
Dear Nick:
We are pleased to submit the enclosed final plat application for the Mogul Industrial Park Subdivision,
Phase 1. The overall project site has been developing as a modern industrial business complex known as
the Meridian Commerce Park(the "Center") and is generally located west of S. Black Cat Rd. and north of
Interstate 1-84. The Land Group, Inc. is pleased to represent the applicant/developer, Meridian BC 1 and
Meridian BC Holdings for this application.
The final plat, as submitted, is in conformance with and meets all requirements and conditions of the
preliminary plat as approved on July 22, 2025 (file H-2025-0006). The proposed development is also in
conformance with all requirements and provisions of the UDC. Specific Conditions of Approval have been
addressed as described below.
City/Agency Comments & Conditions
A. Meridian Planning Division
1. Future development of this site shall comply with the previous conditions of approval and terms
of H-2021-0064(AZ—DA Instrument#2022-082504) and the conditions contained herein.
Response: Noted as an ongoing and continuing requirement
2. Future development of the proposed lots is required to comply with the dimensional standards
I-L zoning districts in UDC Table 11-213-3, as applicable.The 25-foot-wide arterial street buffer
and the 20-foot wide collector street buffer may be placed in an easement rather than a
common lot in accord with UDC 11-313-7C.2a.
Response: Landscape buffers being 25-ft wide along Black Cat(an arterial),20-ft wide along
Grand Mogul (a collector)and 50-ft wide along Interstate 84 are depicted on the final plat.
3. Prior to submitting the final plat for Phase 3,the applicant shall coordinate with the City and
ACHD to determine the final alignment of the north-south collector along the west boundary.
Response: Understood.This condition will apply to the future Phase 3.
4. The final plat shall be revised as follows:
a. Depict street sections for W. Grand Mogul Drive and the future north/south collector
consistent with Street Section C in the TMISAP with a modification that allows for 8-foot
462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 thelandgroupinc.com
Page 2 of 3
parkways and detached 10-foot wide sidewalks/pathways in lieu of on-street bike lanes
as required TMISAP. Streetlights are required at a pedestrian scale (see pg. 3-20, 3-22, 3-
23).
Response: Construction plans that accompany the final plat depict the W. Grand
Mogul Dr. street section in accordance with ACHD's conditions. It includes 8-ft
parkways and 10-ft multi-use pathways on both sides of the roadway. Streetlights are
provided per City requirements.The overall design is consistent with the existing
segment of Grand Mogul Dr. extending west from Black Cat Rd.
b. Depict required street landscape buffers in common lots or on permanent dedicated
buffer easements, maintained by the property owner, homeowner's association or
businessowners' association, as applicable, as set forth in UDC 11-313-7C.2.
Response: Required street landscape buffers are encompassed in permanent
dedicated buffer easements. In accordance with the project CC&Rs,the landscape
buffers will be maintained by the property owner.
c. Revise the plat and landscape plans to accurately depict the dimensions of the
landscape buffers along W. Grand Mogul Drive and north/south collector road (20-feet
wide), S. Black Cat Road (25-feet wide), and 1-84 (50-feet wide) on the Plans.
Response:The plat and landscape plans depict the landscape buffers accurately, per
the noted dimensions.
d. Add a plat note stating that a blanket cross-access easement applies to all lots within
the subdivision OR include a note referencing the recorded CCR's in effect for the entire
development that establishes the requirement for cross-access.
Response: See Note 11 on the final plat.The CC&R instrument number will be
confirmed and added to the note prior to recording.
5. The landscape plan shall be revised as follows:
a. Revise the plat and landscape plans to accurately depict the dimensions of the
landscape buffers along W. Grand Mogul Drive and the north/south collector road (20-
feet wide), S. Black Cat Road (25-feet wide) and 1-84 (50-feet wide) on the plans;
currently both landscape buffers do not accurately depict the landscaping as required by
UDC Table 11-213-3.
Response:The plat and landscape plans depict the landscape buffers accurately, per
the noted dimensions.
b. Depict landscaping within required street buffers in accord with standards listed in UDC
11-3B-7C; all required landscape buffers along streets shall be designed and planted
with a variety of trees, shrubs, lawn, or other vegetative ground cover. Plant materials in
conjunction with site design shall elicit design principles including rhythm, repetition,
balance, and focal elements.
Response:The landscape design for street buffers is in accord with the UDC and
includes a variety of trees,shrubs and other vegetative ground cover.
c. Revise the plat and landscape plans to include the dimensions of the pathways.
Response:The landscape and roadway construction plans include dimensions of the
r, = THE
4 LAND 462 East Shore Drive, Suite 100, Eagle, Idaho 83616 . 208.939.4041 - thelandgroupino.com
L E GROUP
Page 3 of 3
pathways. All pathways are 10-ft in width and separated from the roadway by 8-ft
(min) landscape planters.
d. Sidewalks,walkways and pathways shall include dedicated crosswalks at the
intersection with all streets of W. Grand Mogul Drive with changes in color, markings,
materials,texture and/or surface to distinguish them from the surrounding pavement as
set forth in the TMISAP (see pg. 3-28, Crosswalks).
Response: Noted.There are no street intersections in this phase.This condition will
apply to future phases.
6. With the submittal of each certificate of zoning compliance application, provide a minimum of 5
feet of landscaping when parking abuts the 2 feet of landscaping on the back side of the 10-foot
multi-use pathway per UDC 11-3E3-8.
Response:Will be addressed with submittal of certificate of zoning compliance applications
for future development on the proposed lots.
7. Comply with all of ACHD's staff report conditions of approval.
Response: Understood.
8. Depict bike racks and pedestrian connections on the plans submitted with the future CZC and
Design Review application in accordance with UDC 11-3C-5C.
Response:Will be addressed with submittal of certificate of zoning compliance applications
for future development on the proposed lots.
9. Upon completion of the landscape installation, a written Certificate of Completion shall be
submitted to the Planning Division verifying all landscape improvements are in substantial
compliance with the approved landscape plan as set forth in UDC 11-313-14.
Response: Understood.
10. The preliminary plat approval shall become null and void if the applicant fails to either: 1) obtain
the City Engineer's signature on a final plat within two years of the date of the approved
findings; or 2) obtain approval of a time extension as set forth in UDC 11-6 E3-7.
Response: Understood.
11. Staff's failure to cite all relevant UDC requirements does not relieve the applicant from
compliance.
Response: Understood.
As you complete your review, please don't hesitate to let me know if we can provide any additional
information to clarify the application. I can be reached via email to iason@thelandgroupinc.com or at 208-
939-4041.
Sincerely,
r90w�-�
nDen.smer, PE, Principal
oup, Inc.
Enclosures- Final Plat Application and specified supporting attachments