Loading...
HomeMy WebLinkAboutC4.01 Roadway Utilities Plan & Profile Sheet Notes: �� 1. CONTRACTOR SHALL COMPLY WITH ALL NOTES ON SHEET C1.00. hN '�' T H E 1 1 L A N D 1 3 1 Sewer Keynotes: # - G RO UP 1 PROPOSED DOMESTIC AND FIRE SERVICE STUBS TO PROPOSED 1 1. CONNECT TO EXISTING SSMH AND INSTALL KOR-N-SEAL BOOT. ADJUST "BUILDING C". SEE BUILDING C PLANS FOR CONTINUATION, BY OTHERS. SSMH CHANNEL AS REQUIRED. TlrL­ 8 1 2. POTABLE WATER MAIN CROSSING-SEE SEWER NOTE NO. 2/C1.01. 1 5 41-LF 4-IN C900 1 e a 3. INSTALL SEWER SERVICE PER ISPWC SD-511. CAP AND MARK STUB PER 6'PIRR 611PIRR 6"PIRR 6"PIRR 6"PIRR 6"PIRR 6"PIRR 6"PIRR 6"PIRR 6"PIRR 6"PIRR "PIRR 6"PIF CITY OF MERIDIAN SD-SW3. 47-LF 10-IN C900 ® j j 7 II 7 II Water Keynotes: �8-LF 6-IN C900 d 8-LF 6-IN C900 R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W 1. LOCATE EXISTING WATER LINE IN THIS APPROXIMATE AREA. REMOVE BLOW-OFF(EXISTING BLOW-OFF INSTALLED PER CITY OF MERIDIAN 12"W 2"W 12"W 12"W 12"W 12"W 12"W 12"W 12" 12"W 12"W o il 235-LF 12-IN C900 5 2 4 197-LF 12-IN C900 5 1 1 SD-W13)AND EXTEND WATER MAIN. I W. Grand M og u I D r. I 2. INSTALL 1-12"CROSS (FLG), 1-12"ADAPTER (FLGxMJ), 1-12"GATE VALVE 1 16-LF 12-IN C900 O1 EX SSMH 18 1 z (FLGxMJ), 1-1 2 x10 REDUCER (FLG)AND 1-10 GATE VALVE (FLGxMJ), LU �— y AND 1-12"x8" REDUCER (FLG)AND 1-8"GATE VALVE (FLGxMJ). TEE 77 400-LF OF 8-IN PVC AT 0.40% e=d'6 00 25+00 SSMH 19 224+00 8"SS 23+00 8"SS 8"SS W 8"SS 8"SS 8"SS 8"SS 8'SS 8"SS 8 SS W 3. INSTALL 2"BLOW-OFF ASSEMBLY PER CITY OF MERIDIAN SUPPLEMENTAL y i SAN ti 213-LF OF 8-IN PVC AT 0.40% 900 � ,� I 1 0� 5 2 0 11 DRAWING SD-W13.THRUST BLOCK AS REQUIRED. `�Oo o I 4. INSTALL 1-12"x4"TEE (MJxFLG), 1-4"GATE VALVE (FLGxMJ),THRUST o o � a O I Q I O a U) 5. POTABLE WATER MAIN CROSSING-SEE WATER NOTE NO. 2/C0.00. — 18"S 18"SD 18"SD 8"SD O I I I N Cn i C I 18"SD 18"SD 8"Sp O i i z`D sao LL I z � 1 6. INSTALL 1-12"x12"TEE (FLG), 2-12"GATE VALVES (FLGxMJ), 1-12" CD ADAPTER (FLGxMJ),THRUST BLOCK AS REQUIRED. °O JCD ■ Qy LL_ J I I I 00 7. INSTALL FIRE HYDRANT ASSEMBLY PER CITY OF MERIDIAN SD-W8. 'IRR 6"PIRR 6"PIRR 6"PIRR 6"PIRR x N 6"PIRR r 6"PIRR 6"PIRR 6"PIRR 6"PIRR - 6"PIRR 6"PIRR ■� PI LO P� 1 8. CAP AND MARK WATER SERVICE STUB PER CITY OF MERIDAN SD-SW3 OFOR FUTURE CONTINUATION BY OTHERS. ■ 1 I 12.i5 I SERVICE 01 1 "T'TYPE CLEAN-OUT PO 3 I o I 13 STA: 22+13.78, 52.00'L No 1 RIM: 2554.02 CITY OF MERDIAN SO S1 L_ — — _ — _ J 1 1 STA: 24+33.71, 58.00'L 30' PROPOSED CITY IE OUT: 2544.80, 6 IN PVC (N)) 1 RIM: 2553.61± UTILITY EASEMENT 1 IE OUT: 2544.91, 8-IN PVC (N) i 1 1 1 c ■ Roadway Utilities Plan & Profile 20' 40' _ Horizontal Scale: 1" = 20' Roo cr) 400 O CO) NO 2564 2564 = NO W. Grand o ul Dr. : Sta. 21 +80 - 26+00 HORIZONTA SCALE: 1" := 20' . o VERTICAL SCALE: 1" = 4' Rom o 2560 0 2560 CD C z N O Q rn ■ 0 N W W C j N m J CD W 2556 2556 Revisions 1. ---- - ---- — ---- ————— ———— ----040°1---- — -- ---- ------ --- ---- ---- �`_— --�.70% 2552 �——— 2552 12-IN PVC CROSSING PROPOSED GROUND AT CENTERLINE STORM DRAIN 8-IN PVC CROSSING 12-IN PVC CROSSIN WATER MAIN G STORM DRAIN 2548 2548 z 0 3 400-LF OF 8-IN PVC AT 0.40% O 213-LF OF 8-IN PVC AT 0.40% 2544 2544 SSMH 19 48-IN MH PER ISPWC SD-501 L STA: 24+33.71, 6.00'L EX SSMH 18 ��$ZONA ENS 48-IN MH PER ISPWC SD-501 2540 2540 RIM: 2552.77±IE IN: 2544.70, 8-IN PVC (W) STA: 22+20.28,3.67'L 10961 IE IN: 2544.70, 8-IN PVC (S) RIM: 2552.24± IE OUT: 2544.60, 8-IN PVC (E) IE IN: 2543.75, 8-IN PVC (W) E IN PVC 8 ( )65 2543. , - \OP EXISTING GROUND ELEVATION PROPOSED GROUND ELEVATION IE OUT: COO" 9TE OF 2536 AT CENTERLINE F AT CENTERLINE 2536 4`ONDES _ _ _ _ _ _ 22 r CT CT M LC) O (` CS) _ M N Lf') N N co M co Ln � Lf) m Lf) co CD r CD 1- co LIM O� �J 2�25 -_ co N C) CS) c0 ti f• co Lf) � co M N O CA C3) CD N �vj N C7 M co M CO c7 co CO C� M N M N M N M N M N M N M N M N M N M N co N co N N N N N Project No.: 124186 LO Lo Lf) L, lf) Lf) Ln LC) LC) LO LS") lf) Ln lf) Ln LO LO lf) Ln lf) LS") LO LO LO LO LO LO X) LO LS") Ln Ln Ln LO L() U_" 3 LO LO LO LC) l!") LO LO LC) LO LC) U') Lf) U') LC) U') Lf) U') Lf) U') Lf) LO LO LO LO LO LO LO LO LO LO LO LO Lf) Lf) Lf7 Lf) Lf7 Lf) Lf) Lf) LO LO LO N N N N N N N N N CV N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Date of Issuance: 07-23-2025 Project Milestone: FINAL PLAT SUBMITTAL 26+00 25+00 24+00 23+00 22+00 21+80 Roadway Utilities Plan & Profile N E a C4m01