Loading...
HomeMy WebLinkAboutC2.02 Roadway Plan & Profile Sheet Notes: gTHE h� 1. CONTRACTOR SHALL COMPLY WITH ALL NOTES ON SHEET C1.00. i%:' NORTH SIDE INTERSECTION LAND - 2. REFER TO SHEET C2.51 FOR TYPICAL ROADWAY SECTIONS AND ASPHALT . SEE SHEET DETAIL 2/C3.00 FOR ' MIX DESIGN. - GROUP = 30'ACHD TEMP ' TURNAROUND DETAILS ' 3. REFER TO SHEET C5.01 FOR STRIPING AND STREET SIGN PLANS. EASEM ENT 4. STATIONING REPRESENTS ROADWAY CENTERLINE ALIGNMENT, OR AS ' - - - - - - - ' INDICATED ON THE PLANS. I I 40'FC-FC I ' I _ P - - - - ' 5. ABANDONED BUILDINGS,TEST PITS OR WATERWAYS LOCATED WITHIN Id 6 PI I PI \ d - _ CURRENT OR FUTURE RIGHT-OF-WAY SHALL BE RE-EXCAVATED TO - - - - ;; I RR I - - - -6"PI�R 'PIRR 6"PIRR NATIVE SOIL AND BACKFILLED WITH STRUCTURAL FILL PER ISPWC ' � - - - - aaee aaee I - - -- - - - - -- - - - - - - - - - - - SPECIFICATIONS. I 5v I I Pedestrian Surface Construction Notes:ow 14 00 � I I I 1. ALL PEDESTRIAN FACILITIES, SIDEWALKS, PATHWAYS AND RAMPS SHALL ' n/W R/W R/W R/W R/W- R/VII R BE CONSTRUCTED AT 1.75%-2.00% MAXIMUM CROSS SLOPE PER ADA X STANDARDS. CONTRACTOR SHALL ENSURE THAT THIS REQUIREMENT IS z ' X 12 W 1211 x 100' 12 W 12" ' 2 W 12"W MET DURING CONSTRUCTION. a 10 13 _ 0 2. PEDESTRIAN RAMPS LOCATED WITHIN A CURB RETURN,THE GRADE 04 N m W. Grand Mogul Dr. MUST MAINTAIN ADA COMPLIANCE FOR SLOPE AT THE THROAT OF THE CO) - - � - m - - - - - - - W PEDESTRIAN RAMP (2%MAX.). r x 28+00 0 27+00 26 h W ' 8" S 8"SS 8"SS - 8 SS 8 SS 8 SS W 8 SS Keynotes. NOTE: NOT ALL KEYNOTES # CO) - u n n h u ■ ' ' SHOWN ON THIS SHEET 2553,� tltt� t 1. REMOVE AND SALVAGE EXISTING TYPE II SIDEWALK BARRICADE WITH KICK PLATE FOR REINSTALLATION RAAJ PAL R2. REMOVE AND SALVAGE EXISTING TYPE III BARRICADE FOR j j 18"SD 1 "SD 18" D r 18"S 18"SD 18"SD REINSTALLATION 0 279-LF OF 18-IN HOPE AT 0.00% 279 LF OF 18-IN HOPE AT 0.00% 3. CONSTRUCT INLET CATCH BASIN TYPE I FOR 6"VERTICAL CURB AND ■ GUTTER PER CURRENT ACHD SUPPLEMENT DRAWING NO. SD-601. y - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - z_ ' X 611PIRR o 6"PIRR 12 6"PIRR 6"PIRR 6"PIRR ' R 4. INSTALL ASTM D 3034 SDR 35 PVC STORM DRAIN PIPE; SIZE, LENGTH, ■ ' - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -' - - - - --,- - - - AND SLOPE PER PLAN. ` 1' 8 `-U 8 ' 5. GROUND WATER OBSERVATION WELL. SEE DETAIL 2/C2.50. 12 C3 00 6. SAW-CUT 2'MINIMUM FROM EXISTING EDGE OF PAVEMENT OR AS NEEDED. SEE ACHD ROADWAY NOTE 1/C1.00 CONCERNING REQUIREMENTS FOR ALL STREET CUTS AND REPAIRS.ADDITIONAL STREET CUTTING MAY BE REQUIRED BEYOND WHAT IS SHOWN ON THESE PLANS. COORDINATE WITH THE ACHD INSPECTOR. 7. INSTALL CITY OF MERIDIAN STREETLIGHT. SEE SHEET C4.50 FOR STREETLIGHT PLAN. cc cc ■ 8. PROPOSED ACHD DRAINAGE EASEMENT 0 20' 40' 9. RE-INSTALL TYPE II SIDEWALK BARRICADE WITH KICK PLATE PER ISPWC Roadway Plan & Profile SD-1132A. BARRICADES SHALL HAVE THICKENED EDGE ALUMINUM WITH 6-INCH WIDE REFLECTIVE RED/WHITE DIAGONAL DECALS. NO PAINT. cc Horizontal Scale: 1" = 20' 10. RE-INSTALL TYPE III BARRICADE PER ISPWC SD-1132B BARRICADES ANN SHALL HAVE THICKENED EDGE ALUMINUM WITH 6-INCH WIDE O REFLECTIVE RED/WHITE DIAGONAL DECALS. NO PAINT. INCLUDE SIGN THAT STATES, "THIS ROADWAY TO BE EXTENDED IN THE FUTURE". 2560 GRAND MOGUL: Sta. 26+00 - 29+00 2560 11. CONSTRUCT SEEPAGE BED NO 1 15'W x 115'L x 3.4' D SEE SHEET C2.50 „ _ FUTURE PHASE 1 FOR DETAIL. HORIZONTAL SCALE. 1 20 = VERTICAL SCALE: 1 rr PHASE 2- 2r 12. CONSTRUCT SEEPAGE BED NO 215'W x 289'L x 2.5' D SEE SHEET C2.50 FOR DETAIL. 2558 2558 cc CD13. CONSTRUCT 4'CONCRETE VALLEY GUTTER PER CURRENT ACHD = SUPPLEMENT SD-708. 0 C z 14. CONSTRUCT 4-FT WIDE ASPHALT PATHWAY TO CURB. O Q ■ p 2556 2556 w END PHASE 1 STA: 28+00 FINISH GRADE AT CENTERLINE EL: 2554.54 Revisions 2554 0.45% 2554 1 EXISTING GROUND AT CENTERLINE _/- ------------- 2 2552 552 12 2550 I 2550 279-LF OF 18-IN PERFORATED AT 0.00% - - 2548 2548 AL O� �65 10961 2546 2546 sT �0 J 9TE OF 9s0N DEN EXISTING GROUND ELEVATION FINISH GROUND ELEVATION 07/23/2025 AT CENTERLINE I FAT CENTERLINE Project No.: 124186 2544 2544 Date of Issuance: 07-23-2025 m O CV M Ln co r` W m CDN CYJ N m clJ CDC,J ao �`' r_ v co � Ln v LIDrJ CO N Co ti CDti o °° of °° oo °° r- of co Project Milestone: FINAL PLAT SUBMITTAL N N N N C\J N N N N N CV CV N N C\J N V V � LO � � � LO M M C'J LfJ LfJ LID LfJ LfJ LfJ LCJ LCJ LfJ LfJ LfJ LfJ LID LfJ LfJ LfJ LO LC) L[") LC') LCJ LC) LCJ LC) LC) LC) LC) LC) Ln LCJ LCJ L, LCJ LC) LCJ LC) LCJ Ln LCJ C\J LCJ lf7 LCJ LC) LCJ l!7 LCJ LC) LCJ LC) LCJ LC) LCJ LC) LCJ LC) LCJ C\J LCJ C\J LCJ C\J LCJ LC) a N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N E 29+00 28+00 27+00 26+00 Roadway Plan & Profile v E 2mO2C