June 4, 2025
Project No. 24-288
City of Meridian
33 E Broadway Ave., Ste. 210
Meridian, Idaho 83642
RE: Pollard North Subdivision No. 1
Meridian, Idaho
To Whom It May Concern:
Please accept this letter as certification that the centerline elevations of the proposed streets within Pollard
North Subdivision No. 1 are designed a minimum of three (3) feet above the seasonal high ground water
elevation. The geotechnical engineering report, "Pollard Lane Realignment", prepared by Materials Testing &
Inspection and dated August 31, 2016, was used to determine the approximate groundwater elevations relative
to the street centerline elevations.
Please feel free to contact me at 208.639.6939 should you have questions or require any additional information.
Sincerely,
KM Engineering, LLP
cS\ON A L FNc
E N SF� ��L
Q, Digitally signed by
8 O Lachlin Kinsella, P.E.
Date: 2025.06.04
09:35:25-06'00'
OF \�P
C . K�N�
Lachlin Kinsella, P.E.
Project Manger