HomeMy WebLinkAboutSouthridge South MFP-2025-0002 BEFORE THE MERIDIAN CITY COUNCIL
HEARING DATE: AUGUST 12, 2025
ORDER APPROVAL DATE: AUGUST 19, 2025
IN THE MATTER OF THE )
REQUEST FOR MODIFICATION )
TO THE FENCING TYPE ) CASE NO. MFP-2025-0002
APPROVED WITH THE FINAL )
PLAT FOR SOUTHRIDGE SOUTH ) ORDER OF CONDITIONAL
NO. I ALONG THE RIDENBAUGH ) APPROVAL OF FINAL PLAT
CANAL. ) MODIFICATION
BY: THE LAND GROUP )
APPLICANT )
This matter coming before the City Council on September 12, 2025 for final plat
modification approval pursuant to Unified Development Code (UDC) 11-613-3 and the Council
finding that the Administrative Review is complete by the Planning and Development Services
Divisions of the Community Development Department, to the Mayor and Council, and the
Council having considered the requirements of the preliminary plat, the Council takes the
following action:
IT IS HEREBY ORDERED THAT:
1. The Final Plat of"PLAT SHOWING SOUTHRIDGE SOUTH SUBDIVISION
PHASE 1, LOCATED IN THE NORTHWEST 1/4 OF SECTION 23, TOWNSHIP
3 NORTH, RANGE I WEST, BOISE MERIDIAN, CITY OF MERIDIAN, ADA
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR SOUTHRIDGE SOUTH NO. 1 MFP-2025-0002
Page 1 of 3
COUNTY, IDAHO, 2025, HANDWRITTEN DATE: 5/5/2025, by JAMES R.
WASHBURN, PLS, SHEET I OF 6," is conditionally approved subject to those
conditions of Staff as set forth in the staff report to the Mayor and City Council
from the Planning and Development Services divisions of the Community
Development Department dated August 12, 2025, a true and correct copy of
which is attached hereto marked"Exhibit A" and by this reference incorporated
herein.
2. The final plat upon which there is contained the certification and signature of the
City Clerk and the City Engineer verifying that the plat meets the City's
requirements shall be signed only at such time as:
2.1 The plat dimensions are approved by the City Engineer; and
2.2 The City Engineer has verified that all off-site improvements are
completed and/or the appropriate letter of credit or cash surety has been
issued guaranteeing the completion of off-site and required on-site
improvements.
NOTICE OF FINAL ACTION
AND RIGHT TO REGULATORY TAKINGS ANALYSIS
The Applicant is hereby notified that pursuant to Idaho Code § 67-8003, the Owner may
request a regulatory taking analysis. Such request must be in writing, and must be filed with the
City Clerk not more than twenty-eight(28) days after the final decision concerning the matter at
issue. A request for a regulatory takings analysis will toll the time period within which a Petition
for Judicial Review may be filed.
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR SOUTHRIDGE SOUTH NO. 1 MFP-2025-0002
Page 2 of 3
Please take notice that this is a final action of the governing body of the City of
Meridian,pursuant to Idaho Code § 67-6521. An affected person being a person who has an
interest in real property which may be adversely affected by this decision may, within twenty-
eight(28) days after the date of this decision and order, seek a judicial review pursuant to Idaho
Code§ 67-52.
By action of the City Council at its regular meeting held on the day of
2025.
By:
Robert E. Simison
Mayor, City of Meridian
Attest:
Chris Johnson
City Clerk
Copy served upon the Applicant,Planning and Development Services Divisions of the Community
Development Department and City Attorney.
By: Dated:
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR SOUTHRIDGE SOUTH NO. 1 MFP-2025-0002
Page 3 of 3
EXHIBIT A
STAFF REPORT C� E IDIAN --
COMMUNITY DEVELOPMENT DEPARTMENT
HEARING 8/12/2025 INTERSTATE I-84
DATE:
TO: Mayor&City Council
_W.OVERLAND RD
FROM: Sonya Allen,Associate Planner
208-884-5533 TR#,
PROJECT
AREA TB#Z
SUBJECT: Southridge South No. 1
MFP-2025-0002
LOCATION: Generally located on the south side of W. y
Overland Rd., approximately 1/4 mile
east of S. Ten Mile Rd., in the NW 1/4 of
Section 23,T.3N., R.1W.
I. PROJECT DESCRIPTION
Modification to the final plat(FP-2021-0059)approval to change the fencing type along the
Ridenbaugh Canal from black wrought iron as required by City Council,to black open vision vinyl-
coated chain link with posts installed in sleeves for easy removal as required by NMID.
II. APPLICANT INFORMATION
A. Applicant:
Macy Lui, The Land Group—462 E. Shore Dr., Ste. 100, Eagle, ID 83616
B. Owner:
Challenger Development,Inc.— 1977 E. Overland Rd.,Meridian,ID 83642
C. Representative:
Same as applicant
III. STAFF ANALYSIS
The preliminary plat(H-2020-0083) for Southridge South subdivision was approved by City Council
in 2021. At the time,the applicant proposed 6-foot-tall chain link fencing along the Ridenbaugh
Canal to preserve public safety in accord with UDC 11-3A-6C to match existing fencing in
Southridge Subdivision. There was a lengthy discussion by City Council pertaining to the fencing
type and shared opinion that chain link was not a desirable material for aesthetic reasons; therefore,
black wrought iron fencing was specifically required to be constructed adjacent to the City's multi-
use pathway along the Ridenbaugh Canal in this development.
The landscape plans submitted with the final plat(FP-2021-0059) application did not reflect the
Page 1
required fencing type;therefore,a condition of approval was included for the plans to be revised
accordingly. The final plat is now under review for City Engineer signature and cannot be signed
unless the plan is revised to comply with this condition or the condition is modified by City Council.
The proposed chain link fence has already been constructed on the site without approval from the
Planning Division.
The Applicant states in their application narrative that Nampa Meridian Irrigation District(NMID)
required fence posts to be installed in sleeves to allow the fence to be easily removed when/if NMID
needs access to their easement for the canal.A letter from Butte Fence,the Applicant's fence
contractor,was included in the narrative stating they could only meet this"removable"requirement
with chain link fencing.
The Applicant requests City Council's approval to modify final plat condition#5d, as follows:
The fencing type along the Ridenbaugh Canal shall be black wrought iren open vision vinyl-
coated chain link as require approved by City Council with MFP-2025-0002; depict
accordingly.
IV. DECISION
A. Staff:
Staff finds the Applicant's proposal complies with UDC 11-3A-6C,which requires open
irrigation canals to be fenced with an open vision fence at least six(6)feet in height and having
an 11-guage,two-inch mesh or other construction, equivalent in ability to deter access to said
canal. Because City Council was the decision-making body who required wrought iron fencing,
City Council should determine if the proposed change is acceptable.
B. City Council:
City Council approved the Applicant's request as proposed.
Page 2
V. EXHIBITS
A. Final Plat(dated: 515125)
-ACL
e=
4 4 h x
W 2 0
5 �6 � x � � � HIS
5 o® I'll �s � 1 � R- _
R pp
I q q e Nx � ss M npg
III ° W � ' �: a � HIM h41
�
y yi
o = i I f x ��
vztN G I Q,r �1 �Q r1 0 Z 9 g ct,
q1 A�!
dir
_ C-) s��
a CV i rr �I a III�r ■
w 4Y $�
[6 L L] I
CD
L•i y y�,+II y 1 a 11 V 11 1 w
J 1 a3 a tiJ �a an O 0
09rr
J
\ I
� f � 3 9 9 $ $ $ $ $ $ $ h $ $ $ � � R � E 4 9 A � �•''`�� �to i
9 9 3 9 9 h 9 •� /�/ail /�
G3iir�dun
Page 3
B. Proposed Landscape Plan with 6-foot-tall black wrought iron fence alongRidenbaugh Canal
CODLlivawdolanap aaf;ualleq� J 1 dd} 1 = �_ C
L 3SVHd Him 3013WHIMNEI
Sal A a s �, ,ram p J
VIM
j. MIS
RIHIIHIHM Hill
@ e
I ljjlfiljllji�q
IN
r
w. JIM
RP Ell
lip
_ d
,Y� J
Page 4
VI. CITY/AGENCY COMMENTS
A. PLANNING DIVISION
1. Applicant shall comply with all previous conditions of approval associated with this
development [MDA-12-009,Development Agreement Inst. #113077158(Linder 109)—
replaced#111102269; H-2020-0083 (RZ&PP); FP-2021-0059],except as follows:
Final plat condition of approval#5.d, shall be amended as follows:
The fencing type along the Ridenbaugh Canal shall be black open vision vinyl-
coated chain link as require approved by City Council with MFP-2025-0002; depict
accordingly.
Page 5