HomeMy WebLinkAboutTask Order No. 0666 with Civil Survey Consultants, Inc. for Downtown Meridian Sewer Relocation Study
TASK ORDER NO. 0666
CITY OF MERIDIAN (OWNER)
AND
CIVIL SURVEY CONSULTANTS INC. (ENGINEER)
This Task Order is issued by Owner and accepted by the Engineer pursuant to
the mutual promises, covenants and conditions contained in the Agreement
between the above named parties dated November 8,2006.
CITY OF MERIDIAN
DOWNTOWN MERIDIAN SANITARY SEWER RELOCATION STUDY
PURPOSE
The Engineer's scope of services, time of completion and compensation shall be as set
forth herein. Services shall generally be described as Engineering Consulting Services.
TASK 0666 - Facilities Review and Planning
Per the City's request, the Engineer will provide professional services to evaluate the
feasibility of relocating existing sanitary sewer mains currently located within existing
alleys and across private properties into existing public right-af-way within the study
area. The study area is generally bounded by Cherry Lane I Fairview Avenue on the
north, West 5th Street on the west, Watertower Street on the south, and Baltic Street on
the east.
The Engineer will review existing sanitary sewer facilities, develop a conceptual plan for
the relocated facilities, provide a preliminary opinion of project cost, and provide a list of
possible issues related to the plan. The conceptual plan will be provided electronically
on an AutoCAD drawing that will overlay existing city mapping. The Owner will furnish
the Engineer with GIS information including the location and size of all existing sewer
mains within the study area; location and depth of pipes at all existing manholes; an
orthographic photo; existing ground contours and spot elevations; existing property lines;
and existing right-af-way within the study area boundary. The Owner will also provide
pipe sizes for future over sizing within the study area if applicable.
TIME OF COMPLETION
Within first month of contract, engineering services will be completed to evaluate the
sewer system located between Cherry Lane on the north, Main Street on the east,
Washington on the south and Meridian Road on the west. Engineering services for the
remainder of the study area will be completed on an as needed basis.
COMPENSA TION
The Not-To-Exceed amount for this Task Order No. 0666 is Twenty Five Thousand
dollars ($25,000.00). The hourly rate for services and direct expenses is per the
previously approved Prevailing Fee Schedule Effective October 1, 2006, and by this
reference made a part hereof.
CITY OF MERIDIAN
ENGINEER
BY:
~,~\~ ~~ \ '~~ ' '~;y~;:;;it;'~'>/r~
.~ (f' · -~ -----.. ~ ;4 ~.
,..... ,/" ~~vOf~.'J' .-b"" ~
.:::- 00 .' "<+1 ;~!::'- '/
:::- ..... --.... :."".. -::..
::::..:t v S
Attest:
,
LLIAM G. BERG, JR., CITY CL~R 81E~fi%.L _
~ -y ~~:=
\.~ ~r 1$\ ,,f} j? j
Approved by City Council: 3 - 6 - 0jj1 Cr.. .. . ~"'t ".......'
(Date) '//II/;VVN-rf ' ,\,,,,,,
Illflfln n\\\\'
Glenn K. Bennett, P.L.S.
President
Timothy A Burgess, P.E.
Vice President
Labor:
Civil Survey Consultants, Inc.
1400 E. Watertower St.
Suite 100
Meridian, Idaho 83642-7786
(208)888-4312
Fax 888-0323
CIVIL SURVEY CONSULTANTS
CITY OF MERIDIAN
PREVAILING FEE SCHEDULE
EFFECTIVE OCTOBER 1, 2006
Project Manager
Chief of Surveys
Project Engineer
Land Surveyor
Design Engineer 1
Design Engineer 2
Design/Survey Technician 1
Design/Survey Technician 2
Design/Survey Technician 3
Direct Expenses:
GPS
Vehicle 2- Wheel Drive
Vehicle 4- Wheel Drive
Outside Printing
Long Distance Telephone
Sub-Consultants
- $105.00 perhour
- $ 105.00 per hour
- $ 95.00 per hour
- $ 85.00 per hour
- $ 85.00 per hour
- $ 80.00 per hour
- $ 70.00 per hour
- $ 65.00 per hour
- $ 55.00 per hour
- $ 40.00 per hour
- $ No Charge
- $ No Charge
- $ Cost
- $ Cost