Loading...
HomeMy WebLinkAboutKing Excavation Bid Award W. 1st Street Washington to Cherry City of Meridian Public Works Dept. Memo RECEIVED MAR 2 9 2(lOl To: Will Berg; Tara Green From: Kyle Radek, P.E., Staff Engineer CC: File, Len Grady Date: March 29, 2007 Re: Proposed Agenda Item for April 3 City Council Meeting City of Meridian City Clerk Office jcfL The Public Works Department respectfully requests the following item be placed on the April 3, 2007 City Council agenda, under Consent Agenda, for Council's consideration: Aooroval of bid for Water and Sewer Imorovements in coniunction with ACHD West First Street. Washington to Cherrv Proiect ACHD received bids for this project. The bid amount for the water and sewer improvements for the overall project low bidder is $18,042.50. The engineer's estimate was $45,500.00. This work will be done as a part of the ACHD contract. Recommended Council Action: The Public Works Department recommends that City Council approves the bid of $18,042.50 for Water and Sewer Improvements in conjunction with ACHD West First Street, Washington to Cherry project and authorizes Engineering to go ahead with the project. Thank you for your consideration. Please contact me if you have any questions regarding this item. . Page 1 ['~;Ji' Contract Number CT207 -11 Contract Name 01st Street W. Washington St I Cherry Lane Bidders 01 Bidder King Excavation 02 BidderlwF Construction m.__~ 03 BidderlAmerican Paving Schedule 1 -1st Street (West) CGSP206.14 806023.001 01st Street W, Washington Ave I Cherry Lane 10201-HC.2 Removal of Obstructions~---' 1 I LS J 01 Bidderf$1 03 Bidder $1 10202.4.3A1 Excavation 3775 I Cy I 01 Bidder _'u 03 Bidderl 150 I CV I 01 Bidderl 03 Bidder .--.-~ 01 Bidder .~... 03 Bidder 52 I LF 1 01 Bidder 03 Bidder 345 1 LF 1 01 Bidder 03 Bidder 22 1 ~ 01 Bidder 03 Bidder 30 I LF J 01 Bidder 03 Bidder I EA I 01 Bidder '$ 03 Bidder $ 2 ~ 01 Bidder $ 03 Bidder $ 4 1 EA 1 01 Bidder 03 Bidder I EA I 01 Bidder $ 03 Bidder $ 2 j EA I 01 Bidder $ 03 Bidder[ $2,2( 3247 I_~ 01 BidderL-----J 03 Bidde'"l 312 ~ 01 Bidder m 03 Bidder 1S03 1 SYJ 01 Bidder 03 Bidder 125 1 SY I 01 Bidder 03 Bidder 2731 1 CY I 01 Bidder 03 Bidder 997 lCYl 01 Bidder 03 Bidder 974 I TN I 01 Bidder 03 Bidder 2S2 I SF 1 01 Bidder 03 Bidder 3 I EA 1 01 Bidder 03 Bidder SO 1 HR I 01 Bidder 03 Bidder I 0202.4.5A 1 Unsuitable Material Excavation 10601.4,1.A.01 12" Dla, RCP ~41.A.016 12" Dla. PVC, C-900 1S- Dia. RCP 10601.4, l.A.01 A 10601.4, t.A.01 8 10601.4,1,0,1 OS" Dia. RCP Construct Open Ditch ~E.2 48" Dia. Standard Catch Manhole 1000 Gallon Sand & Grease Trap ~2,4, 1.H,2 Inlet Catch Basin. Type IV 10602.4, U,1 ~M.1 Concrete Irrigation Box. Size 4'x4' 10602.4. 1.M.1 A Concrete Irrigation Box - Size 3'x3' 10706.4.1,A,2 03" Rolled Curb & Gutter 10706.4.181 Concrete Valley Gutters ~.E2 05' Concrete Sidewalk Concrete Repair 10706.4.1,G,2 06" Minus Uncrushed Aggregate Base 10801.4.1A1 I 0802.4.1.A. 1 Crushed Aggregate for Base, Type 314" ~.tA1 11103.4.1.8.1 Hot Plant MIx Asphalt Pavement. 2.5" Traffic Control Signs Traffic Control Barricades I 1103.HC.1 Traffic Control Maintenance 11103.4.t.J.1 3/2812007 ~,~~ 8,S67.00 $18,867.00 5,000.00 $15,000.00 .. $10.65 $40,203.75 $14.10 $53,227.50 $36.70 $5,505.00 $20.00 $3,000.00 $26.77 $2,462.84 " $55.00 $5,060.00 $46.70 $2,428.40 -- $60,50 $3,146.00 $29.30 $10,108.50 $60.50 $20,872.50 $3S.55 $848.10 $60.50 $1.331.00 $21,66 $849.80 $33.00 $990.00 2,425.00 $2,425.00 3,62500 $3,825.00 2,795.00 $5,590.00 3,740.00 $7,480.00 --- $798.00 $3,192.00 $770.00 $3,080.00 2,234.00 $2,234.00 2.475.00 $2,475.00 1,290.00 $2,580.00 2,200.00 $4,400.00 $9.70 $31.495.90 $9.35 $30,359.45 ..- $10,670.40 $34.20 $33.00 $10.296.00 $30.80 $55,532.40 ~-------'- $29.70 $53,549.10 $45.60 $5,700.00 $64.35 $8,043.75 $12.30 $33,591.30 $15.40 $42,057.40 $15.50 $15,453.50 $49.30 $49,152.10 $78.10 $78,069.40 $51.50 $50,161.00 $6.85 $1,931.70 -- - $6.60 $1,861.20 $S5.50 $256.50 $S2.50 $247.50 -.,,-~ $27.40 $2,192.00 $26.40 $2,112.00 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate CT207-11 01st Streel W, Washington SI/ Cherry Lane $15,20 $16,67 $1 $2 $3 $3 $5 $6 $5 $9 $6 $7 $4 $5 $ $1 $3,72 $4.00 $4,20 $3,00 577 $1.20 $3.10 $1,SO $2,S5 $1,50 $ $2 $3 $4 $3 $5 $4 $4 $2 ..---- $ $3 $2 $5 $7 $ -..--- $ $8 $1 $ $ _,,__J 0.00 $15,200.00 7.00 $16,677.00 2.00 $45,300.00 - 0.00 $75,500.00 1.00 $4,650.00 0.00 $4,500.00 5.00 $5,060.00 0.00 $5,520.00 _. 5.00 $2,860.00 0.00 $4,680.00 5.00 $22,425.00 5.00 $25,875.00 5.00 $990.00 S.OO $1,276.00 7.00 $210.00 5.00 $450.00 0.00 $3,720.00 0.00 $4,000.00 0.00 $8,400.00 0.00 $8,000.00 0.00 $3,080.00 0.00 $4,800.00 0.00 $3,100.00 0.00 $1,800.00 0.00 $5,700.00 0.00 $3,000.00 9.50 $30,848.50 ----. 5.00 $81,175.00 ----.. 3.00 $10,296.00 ---- 5.00 $14,040.00 _. 0.00 $54,090.00 0.00 $90,1 SO.OO 4.00 $5,500.00 0.00 $5,000.00 0.00 .- $54,820.00 17.00 $48,427.00 5.50 $35,393.50 5.00 $24,925.00 7.00 $55,518.00 2.00 $70,128.00 6.50 $1,833.00 9.00 $2,538.00 2.00 $246.00 00.00 $300.00 26.50 ~~~ 25.00 $2,000.00 Page 1 [2OiD.4.1.A.l MObilization 12030.4.1.A.l Manhole, Adjust to Grade 1 SP 02020 Gravel Repair ~~O Asphalt Repair ISp 09007 08" Slide Gate Isp l006.4.1.C.l Inlet Protection ~p 11222 Relocate Roadside Sign ~9 Remove and Re5et Fence ~. 25063 Property Owner Meetings [SP 29065 Sod Repair l!' 29090 Trim Tree [sP 29093 Remove ~xisting Tree ~29101 Remove & Reset Existing Sprinklers m H~ 01 Bidder $2 03 Bidder $4 3 I EA I 01 Bidder 03 Bidder 3~0~ 01 Bidder 03 Bidder 275 J~ 01 Bidder 03 Bidder 1 EAl 01 Bidder 03 Bidder 8 I EA I 01 Bidder $ 03 Bidder ...... _1.1 .J.~~ 01 Bidderl 03 Bidderl _~ 01 Bidderj 03 Bidder(m . . . .~J 01 Bidder!. . 03 Bidder 480 I ~ 01 Bidder m_ 03 Bidder 4 I EA I 01 Bidder 03 Bidder ~ 01 Bidder 03 Bidder 40 I LF 1 01 Bidder 03 Bidder 2,120.00 $22,120.00 02 Bidder $38,800.00 $38,800.00 ---'--. 5,866.50 $45,866.50 Estimate $23,350.00 $23,350.00 ----- ----. $382.00 $1,148.00 02 Bidder $495.00 $1,485.00 $800.00 .--- __.n._. ____ $2,400.00 Estimate $600.00 $1,800.00 $11.00 ------. $3,300.00 02 Bidder $15.00 $4,500.00 $12.00 -. $3,600.00 Estimate $20.00 $8,000.00 $19.10 $5,252.50 02 Bidder $40.00 $11,000.00 $26.80 $7,370.00 Estimate $30.00 $8,250.00 $540.00 $540.00 02 Bidder $385.00 $385.00 $550.00 $550.00 Estimate $150.00 $150.00 $9,944.00 ______u 1,243.00 02 Bidder $175.00 $1,400.00 $15000 ------ "--~ $1,200.00 Estimate $125.00 51,000.00 $177.00 .___u___, $1,947.00 02 Bidder $82.00 $902.00 $200.00 $2,200.00 Estimate $150.00 $1,650.00 $18.70 $4,114.00 02 Bidder $18.00 $3,980.00 $11.00 $2,420.00 Estimate $12.00 $2,640.00 $342.00 --...-----.-. $171.00 02 Bidder $175.00 $350.00 .- --.------ $300.00 $800.00 Estimate $1,000.00 $2,000.00 -- ----.--. $1250 $8,000.00 02 Bidder $11.50 $5,520.00 .- -..------..- $9.90 $4,752.00 Estimate $12.00 $5,780.00 $342.00 $1,368.00 02 Bidder $165.00 $860.00 $55.00 $220.00 Estimate $100.00 $400.00 $570.00 $570.00 02 Bidder $495.00 $495.00 -..-. .. $165.00 $185.00 Estimate $300.00 $300.00 -.- -. $1000 $400.00 02 Bidder $10.00 $400.00 ----. $10.00 $400.00 Estimate $35.00 $1,400.00 1,015.00 I 03 Bidder 5443,270.00 01 Bidder $387'030.991 02 Bidder Estimate $545,461.00 . Schedule 2 . City 01 Meridian Utility Adjustments (W. 1st Street) CGSP206-14 806023.001 01st Street W, Washington Ave/ Cherry Lane ~O Adjust Existing Water Valve Box to ~_@ 01 Bidder $518.70 Grade 03 Bidder $615.00 Remove & Relocate Existing Fire 2 1 EA 1 01 Bidder $1,619.00 ~~~t m__ 03 Bidder $4,500.00 Relocate Existing Water Meter 10 I EA 1 01 Bidder $~O.OO 03 Bidder $1,010.00 21 I EA 1 01 Bidder __~~~.1:~0 03 Bidder $485.00 $18,042.50 02 Bidderl $24,230.00 $45,500.00 1 SP M330 l!' M340 Isp M341 Adjust Existing Water Meter to Grade 01 Bidder Estimate $44 $2,593.50 $3,075.00 $3,238.00 $9,000.00 $8, 100.00 $10,100.00 58, 111.00 $10,185.00 03 Bidder 50.00 $1,250.00 50.00 $3,750.00 15.00 $4,830.00 00.00 $8,000.00 00.00 $11,000.00 00.00 $20,000.00 50.00 $7,350.00 50.00 I 515,750.00 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate 02 Bidder Estimate $2 $7 $2,3 $3.0 $1.1 $2,0 $3 $7 532,380.00 Contract Totals 01 Bidder $405,073.49 I 02 Bidderl Estimate $590,961.00 3/28/2007 $465,245.00 I 03 Bidde~ $475,830.00 CT207-11 01st Street W. Washington St I Cherry Lane Page 2