HomeMy WebLinkAboutApplication Request
Council hearing date: 8/12/2025
Planner: Sonya Allen
Request: Modification to the final plat to change the fencing type along the Ridenbaugh
Canal from black wrought iron as required by City Council, to black open vision vinyl-
coated chain link with posts installed in sleeves for easy removal as required by NMID, by
The Land Group, Inc.
Location: Generally located on the south side of W. Overland Rd., approximately 1/4 mile
east of S. Ten Mile Rd., in the NW 1/4 of Section 23, T.3N., R.1W.