Loading...
HomeMy WebLinkAboutPP2.3 UTILITY PLAN AREA THREE ORIGINAL SURVEY ON FILE AT ACCURATE / NOTES UTILITY LEGEND QQ \ 1. SHOWN EXISTING UTILITIES ARE APPROXIMATE.ORIGINAL j TOPOGRAPHIC SURVEY WAS CONDUCTED BY ACCURATE Q� � SURVEY&MAPPING DATED 03/14/2025 — — PROPERTY LINE �Q'? EASEMENT LINE ° ki�,06/09/25.c) ——————————— BUILDING SETBACK C'OgTF OF ° / o / / O PARCEL NUMBER </N RON�`P 0 z G R R 12"PVC GRAVITY o IRRIGATION PIPE w SV00 IR CONCRETE GRAVITY E W IRRIGATION MANHOLE m w EXISTING POWER POLE ° 0 0 1 o o fj7 z / T P � -D � co ES —OP—OP—OF EXISTING OVERHEAD POWERLINE -s E ° ° a cu c ° w s0--+ O.U N O CJ O Eb ° � � F N a 0 E N C C (D C7 ro _2y�5 EXISTING MAJOR CONTOUR c) co o — _ w J) I O N z , I 76 EXISTING MINOR CONTOUR w CL.0)c 3 cu o co o 6 30 EXISTING 8"WATER LINE W 0 �\ W12" EXISTING 12"WATER LINE - z 8"SS EXISTING 8"SEWER LINE 40 QS EXISTING SEWER MANHOLE \ / / Bliss 8"SEWER LINE SEWER SERVICE O \ \\ �� SEWER MANHOLE M \ 1 WBii 8"WATER LINE ° m 3� \\ W(��� 6"WATER LINE K / v FIRE HYDRANT ° U Nsl % \ \ ��' s \ / �� SINGLE WATER METER&SERVICE IDOUBLE WATER METER&SERVICE � WATER BLOW OFF ASSEMBLY N IR PRESSURE IRRIGATION LINE py g O Co ri ht C 2025 z x PRESSURE IRRIGATION STUB All rights reserved. Reproduction or use in any form or by any means without written permission of S V Breckon Land Design,Inc.is unlawful and subject to 0 SD SD STORM DRAINAGE LINE criminal prosecution. a 0 PROPOSED SEEPAGE BED o / w ® PROPOSED CATCH BASIN Q A 1��� / ® PROPOSED SAND AND GREASE TRAP z 0 LL PROPOSED SWALE i2150� y �V / / v TOP OF BASIN Cf) LU o MIDDLE OF BASIN ^ I � o \ 1/ LLJ ` V C) �A BOTTOM OF BASIN / W Z s e o 0,, 00 a � \ � � � � � � W Cf) W UTILITY CALLOUTS 0 s v ' R LU PRESSURE IRRIGATION PUMP STATION&WET V WELL. Q \ S I PROPOSED IRRIGATION STORAGE POND 0 Q � I I PROPOSED FIRE HYDRANT LOCATION - - z 6 F / v �� vv / CONNECT TO EXISTING SEWER MANHOLE Lu Z / s CONNECT TO EXISTING WATER MAIN 3 s ��• �\ 6 GRAVITY IRRIGATION SUPPLYLU < VPP2.5 \ \ \ V AV / 7 PROPOSED SEEPAGE BED cf- S \ i 0 I \ \ & \ \ -a 11 / g EXISTING CATCHBASIN TO BE RELOCATED CD I c \ ff \ 9 EXISTING OVERHEAD POWER POLE UJ 0 \ vv U 10 CONCRETE IRRIGATION STANDPIPE AND w 1 I1 1 I 1 \\ ` � OVERFLOW PIPE 01 o CONNECT TO EXISTING GRAVITY IRRIGATION c MANHOLE r EXISTING FIRE WELL TO BE ABANDONED i 13 CONCRETE PATHWAY-SEE LANDSCAPE PLANS Q d cp / AREA 3 I 10 6 \ S S / \ yWo"oWA IN 19 �� 1 I I / �QC9QCWW o-- UTURE WATER LOOPING \ 0 ) �� \ / w o Q 2� C ni I y THROUGH MONDT MEADOWS SUB �� ? W / I _ - - - �— — � - - -� - - - � — - - - - - — — - - - - - - - - - — KEY MAP Q REVISIONS � No. Date Description / 0— / 4 / / IPROJECT NO.: o h 25012 DRAWN BY: I BE � 1� I CHEC JBED BY: DATE: J o \ 5/21/2025Lf) w o ��/ / — / I SHEET NUMBER ^^ t T UTILITY PLAN -AREA THREE PP2.3 0 N 30 0 30 60 GO SCALE: I"= 30'-0" 1 2 3 4 5 6 7 8 19 10 1 11 1 12 1 13 1 14 1 15 1 16