HomeMy WebLinkAboutPP2.3 UTILITY PLAN AREA THREE ORIGINAL SURVEY ON FILE AT ACCURATE
/ NOTES UTILITY LEGEND
QQ \ 1. SHOWN EXISTING UTILITIES ARE APPROXIMATE.ORIGINAL
j TOPOGRAPHIC SURVEY WAS CONDUCTED BY ACCURATE Q�
� SURVEY&MAPPING DATED 03/14/2025 — — PROPERTY LINE
�Q'? EASEMENT LINE °
ki�,06/09/25.c)
——————————— BUILDING SETBACK C'OgTF OF
° / o
/ / O PARCEL NUMBER </N RON�`P
0
z
G R R 12"PVC GRAVITY o
IRRIGATION PIPE w
SV00 IR CONCRETE GRAVITY E W
IRRIGATION MANHOLE m w
EXISTING POWER POLE °
0 0
1 o o fj7 z
/ T P � -D � co
ES —OP—OP—OF EXISTING OVERHEAD POWERLINE -s E ° ° a cu c ° w
s0--+ O.U N O CJ O
Eb
° � � F
N a 0 E N C C (D C7 ro
_2y�5 EXISTING MAJOR CONTOUR c) co o
— _ w J) I O N z , I
76 EXISTING MINOR CONTOUR w CL.0)c 3 cu o co o
6 30
EXISTING 8"WATER LINE W
0
�\ W12" EXISTING 12"WATER LINE - z
8"SS EXISTING 8"SEWER LINE
40 QS EXISTING SEWER MANHOLE
\ / / Bliss 8"SEWER LINE
SEWER SERVICE
O
\ \\ �� SEWER MANHOLE
M \ 1 WBii 8"WATER LINE °
m 3� \\ W(��� 6"WATER LINE
K / v FIRE HYDRANT °
U
Nsl
% \ \ ��' s \ / �� SINGLE WATER METER&SERVICE
IDOUBLE WATER METER&SERVICE �
WATER BLOW OFF ASSEMBLY N
IR PRESSURE IRRIGATION LINE py g O
Co ri ht C 2025 z
x PRESSURE IRRIGATION STUB All rights reserved. Reproduction or use in any form
or by any means without written permission of
S V Breckon Land Design,Inc.is unlawful and subject to 0
SD SD STORM DRAINAGE LINE criminal prosecution.
a
0
PROPOSED SEEPAGE BED o
/ w
® PROPOSED CATCH BASIN
Q
A 1��� / ® PROPOSED SAND AND GREASE TRAP z
0
LL
PROPOSED SWALE
i2150� y �V / / v TOP OF BASIN Cf) LU o
MIDDLE OF BASIN ^ I � o
\ 1/ LLJ ` V C)
�A BOTTOM OF BASIN
/ W
Z
s e o
0,,
00
a
� \ � � � � � � W
Cf) W
UTILITY CALLOUTS 0
s v ' R
LU
PRESSURE IRRIGATION PUMP STATION&WET V
WELL. Q
\ S
I
PROPOSED IRRIGATION STORAGE POND 0
Q
� I I
PROPOSED FIRE HYDRANT LOCATION
- - z
6
F / v �� vv / CONNECT TO EXISTING SEWER MANHOLE Lu Z
/ s
CONNECT TO EXISTING WATER MAIN
3 s ��• �\ 6 GRAVITY IRRIGATION SUPPLYLU <
VPP2.5 \ \
\ V AV / 7 PROPOSED SEEPAGE BED
cf-
S \ i
0 I \ \ & \ \ -a 11 / g EXISTING CATCHBASIN TO BE RELOCATED CD I
c \ ff \ 9 EXISTING OVERHEAD POWER POLE UJ
0 \
vv
U 10 CONCRETE IRRIGATION STANDPIPE AND w 1 I1 1 I 1
\\ ` � OVERFLOW PIPE
01 o
CONNECT TO EXISTING GRAVITY IRRIGATION
c MANHOLE
r
EXISTING FIRE WELL TO BE ABANDONED
i 13 CONCRETE PATHWAY-SEE LANDSCAPE PLANS
Q
d
cp / AREA 3
I 10 6 \ S S / \ yWo"oWA IN 19
��
1 I I / �QC9QCWW
o-- UTURE WATER LOOPING \ 0 ) �� \ / w o Q 2�
C ni I y THROUGH MONDT MEADOWS SUB �� ? W
/ I _
- - - �— — � - - -� - - - � — - - - - - — — - - - - - - - - - — KEY MAP Q
REVISIONS
� No. Date Description
/ 0—
/ 4 / /
IPROJECT NO.:
o h
25012
DRAWN BY:
I
BE
� 1� I CHEC JBED BY:
DATE: J
o \ 5/21/2025Lf) w
o
��/ / — / I SHEET NUMBER ^^
t
T UTILITY PLAN -AREA THREE
PP2.3
0 N 30 0 30 60 GO
SCALE: I"= 30'-0"
1 2 3 4 5 6 7 8 19 10 1 11 1 12 1 13 1 14 1 15 1 16