Loading...
HomeMy WebLinkAboutPP2.2 UTILITY PLAN AREA TWO ORIGINAL SURVEY ON FILE AT ACCURATE NOTES UTILITY LEGEND 1. SHOWN EXISTING UTILITIES ARE APPROXIMATE.ORIGINAL Q� TOPOGRAPHIC SURVEY WAS CONDUCTED BY ACCURATE SURVEY&MAPPING DATED 03/14/2025 — — PROPERTY LINE U EASEMENT LINE ki�,06/09/250 ——————————— BUILDING SETBACK C� F OF z �N R(03 O3 PARCEL NUMBER 0 z_ z G R R 12"PVC GRAVITY IRRIGATION PIPE IR CONCRETE GRAVITY ° E m IRRIGATION MANHOLE 0- 0 o ---- CoJ° E CO a EXISTING POWER POLE � c o � M 0 n \ vao o0 o EXISTING OVERHEAD POWERLINE E ?�' \ L E O McD ^ Co(o W ` ma m E a ccoc'3 v' -° m ¢ o O c o n L z }G,� \ \ Zyly EXISTING MAJOR CONTOUR w ') v N z oo EXISTING MINOR CONTOUR w ° c L o o z Q W8" EXISTING 8"WATER LINE LL a (0 CD W 40 _ o W12" EXISTING 12"WATER LINE • Z z L / �� / 8"SS EXISTING 8"SEWER LINE W / � / O EXISTING SEWER MANHOLE m Cd / 8��SS 8"SEWER LINE , SEWER SERVICE z / o SEWER MANHOLE o W811 8"WATER LINE a U Wil 6"WATER LINE I o K / FIRE HYDRANT o / Z SINGLE WATER METER&SERVICE DOUBLE WATER METER&SERVICE �J o �8 WATER BLOW OFF ASSEMBLY z IR PRESSURE IRRIGATION LINE Copyright CO 2025 z All rights reserved. Reproduction or use In any form o x PRESSURE IRRIGATION STUB orbyany means without written permission of / V Breckon Land Design,Inc.is unlawful and subject to 0 SD SD STORM DRAINAGE LINE criminal prosecution. 1111 W ` \ a PROPOSED SEEPAGE BED W Y SNPF ER SO �'pN S 13 PROPOSED CATCH BASIN w/ �� < Q PROPOSED SAND AND GREASE TRAP o O 0 H / / / PROPOSED SWALE z CDTOP OF BASIN0 W MIDDLE OF BASIN > N o LU / W \� BOTTOM OF BASIN 0 W 0 / W a 00 W ter/ F G LU / O o� m tiQ' / m UTILITY CALLOUTS L1J UJ = Q m W8ii W8ii W8„ W8„ W ii 8ii / / r I� �-/ Q I - _ E SHAFER VIEW DRIVE i WELL. 1 PRESSURE IRRIGATION PUMP STATION&WET Q N —SS„8 (EXISTING) S,� — S,� — — — — s / 1 i / O PROPOSED IRRIGATION STORAGE POND F Ln r i ~ / 3 PROPOSED FIRE HYDRANT LOCATION 0 , O Lu z J O 4 CONNECT TO EXISTING SEWER MANHOLE 3: LL w Q Q 0 CONNECT TO EXISTING WATER MAIN GRAVITY IRRIGATION SUPPLY 0 c 7 PROPOSED SEEPAGE BED r n V, 1 I cr EXISTING CATCHBASIN TO BE RELOCATED w o _ E U I N.5 EXISTING OVERHEAD POWER POLE W UJ c \ I 10 CONCRETE IRRIGATION STANDPIPE AND o I OVERFLOW PIPE CONNECT TO EXISTING GRAVITY IRRIGATION U \ I ' 11 MANHOLE T I i EXISTING FIRE WELL TO BE ABANDONED r n I 13 CONCRETE PATHWAY-SEE LANDSCAPE PLANS '0 v o� AREA2 aUJQ:W °y�ui�WzLU \ I y 114U. i 1 r �� C1C9W,Z►jCC \ \ I \ m Z F• e / QOOWO c-ul C o cl� KEY MAP REVISIONS \ \ i i D Da te ate Description LU J 0- Q \ C� — 27,50 \ \ I / PROJECT NO.: 25012 B 3 — 21I HI di DRAWN BY: HI 21I 21I SI di di al 21 21 2R al 211 BE z _ CHECKED BY: 13 I JB DATE: J o — — — — — 5/21/2025 w o \ \ SHEET NUMBER ^ A T UTILITY PLAN -AREA TWO PP2.2 0 N 30 0 30 60 q0 I SCALE: I"= 30'-0" 1 2 1 3 14 5 6 7 8 9 10 1 11 1 12 1 13 1 14 1 15 1 16