Loading...
HomeMy WebLinkAbout2025-07-17 PLANNING AND ZONING COMMISSION MEETING City Council Chambers, 33 East Broadway Avenue Meridian, Idaho Thursday, July 17, 2025 at 6:00 PM MINUTES ROLL-CALL ATTENDANCE PRESENT Commissioner Brian Garrett Commissioner Jessica Perreault Commissioner Sam Rust Commissioner Matthew Stoll Commissioner Jared Smith Chairperson Maria Lorcher ABSENT Commissioner Matthew Sandoval ADOPTION OF AGENDA Adopted CONSENT AGENDA \[Action Item\] Approved Motion to approve made by Commissioner Rust, Seconded by Commissioner Smith. Voting Yea: Commissioner Garrett, Commissioner Perreault, Commissioner Rust, Commissioner Stoll, Commissioner Smith, Chairperson Lorcher 1. Approve Minutes of the June 26, 2025 Planning and Zoning Commission Meeting 2. Approve Minutes of the July 10, 2025 Planning and Zoning Commission Meeting 3. Findings of Fact, Conclusions of Law for Uplift Gym by Erik Hagen, located at at 3410 W. Nelis Dr. ITEMS MOVED FROM THE CONSENT AGENDA \[Action Item\] ACTION ITEMS 4. Public Hearing for Touchmark (H-2025-0012) by The Land Group, generally located on the south side of E. Franklin Rd. and the north side of I-84, midway between S. Eagle Rd. and S. Cloverdale Rd. Recommend Approval to City Council Application Materials: https://bit.ly/H-2025-0012 A. Request: Modified Development Agreement to update the conceptual development plan for the overall site, which consists of approximately 121.50 acres of land to consolidate the existing agreements (AZ-99-021 Touchmark (recorded in 2001, Inst. #101048096); April 2001 Addendum (Inst. # 101048097); May 2003 Addendum (Inst. #103137119); AZ-02-018 (Bair Property AZ-02-018, Inst. #102143308); MI-07-006 (Meadowlake Village North 3rd Addendum, Inst. #108022885) into one new agreement that replaces all previous agreements. B. Request: Rezone of 63.34 acres of land from the L-O to the C-C (55.17 acres) and C-G (8.17 acres) zoning districts. C. Planned Unit Development Modification (Meadowlake Village CUP-03-005) to update the concept/use plan and include 4.6 acres of additional land, a deviation to the maximum building height allowed in the C-C district from 50ft. to 64ft. for the hotel and inclusion of 2 and 3 story townhome dwellings. Motion to recommend approval to City Council made by Chairperson Lorcher, Seconded by Commissioner Rust. Voting Yea: Commissioner Garrett, Commissioner Perreault, Commissioner Rust, Commissioner Stoll, Commissioner Smith, Chairperson Lorcher 5. Public Hearing for Gramercy Townhomes (H-2025-0019) by Elton Development Company, located at 1873, 1925 and 2069 Wells Ave. Recommend Approval to City Council Application Materials: https://bit.ly/H-2025-0019 A. Request: Rezone of 6.98 acres of land from the C-G zone to the TN-R zone. B. Request: Preliminary Plat for 82 buildable lots and 8 common lots. C. Request: Development Agreement Modification to establish a new concept plan and remove the age restriction on the property. Motion to recommend approval to City Council made by Commissioner Rust, Seconded by Commissioner Stoll. Voting Yea: Commissioner Garrett, Commissioner Perreault, Commissioner Rust, Commissioner Stoll, Commissioner Smith, Chairperson Lorcher ADJOURNMENT 8:02 PM --------------------------------------------------------------------------------------------------------------------- To view upcoming Public Hearing Notices, visit https://apps.meridiancity.org/phnotices --------------------------------------------------------------------------------------------------------------------- Meridian Planning and Zoning Meeting July 10, 2025. Meeting of the Meridian Planning and Zoning Commission of July 17, 2025, was called to order at 6:00 p.m. by Chairman Maria Lorcher. Members Present: Commissioner Maria Lorcher, Commissioner Jared Smith, Commissioner Brian Garrett, Commissioner Jessica Perreault, Commissioner Sam Rust and Commissioner Matthew Stoll. Members Absent: Commissioner Matthew Sandoval. Others Present: Tina Lomeli, Kurt Starman, Sonya Allen, Garrett White, Jamie Leslie, Steve Taulbee and Dean Willis. ROLL-CALL ATTENDANCE _X Brian Garrett X Matthew Stoll Matthew Sandoval X Jessica Perrault _X Sam Rust X Jared Smith X Maria Lorcher - Chairman Lorcher: Good evening. Welcome to Planning and Zoning Commission meeting for July 17th, 2025. At this time I would like to call the meeting to order. The Commissioners who are present for this evening are here at City Hall and currently we do not have any commissioners on Zoom. We also have staff from the city attorney and the city clerk's office, as well as the city's planning department. If you are joining us on Zoom this evening we can see that you are here. You may observe the meeting, however, the ability to be seen on screen and talk will be muted. During the public testimony portion of the meeting you will be unmuted and, then, be able to comment. Please note that we cannot take questions until the public testimony portion of the meeting. If you have a process question during the meeting please e-mail cityclerk@meridiancity.org and they will reply as quickly as possible. If you simply want to watch the meeting we encourage you to watch the streaming on the city's YouTube channel. You can access it at meridiancity.org/live. With that let us begin with roll call. Madam Clerk. ADOPTION OF AGENDA Lorcher: The first item on the agenda is the adoption of the agenda. There are no changes tonight to tonight's agenda. May I get a motion to adopt tonight's agenda? Smith: So moved. Perreault: Second. F Meridian Planning&Zoning Commission July 17,2025 Page 2 of 36 Lorcher: It's been moved and seconded to adopt tonight's agenda. All those in favor say aye. Any opposed? Motion carries. MOTION CARRIED: SIX AYES. ONE ABSENT. CONSENT AGENDA [Action Item] 1. Approve Minutes of the June 26, 2025 Planning and Zoning Commission Meeting 2. Approve Minutes of the July 10, 2025 Planning and Zoning Commission Meeting 3. Findings of Fact, Conclusions of Law for Uplift Gym by Erik Hagen, located at at 3410 W. Nelis Dr. Lorcher: The next item on the agenda is the Consent Agenda, which include to approve the minutes of the June 26th Planning and Zoning meeting, approve the meeting minutes of the July 10th Planning and Zoning meeting and Findings of Facts, Conclusions of Law for Uplift Gym. Could I get a motion to accept the Consent Agenda as presented? Rust: So moved. Smith: Second. Lorcher: It's been moved and seconded to approve the Consent Agenda. All those in favor say aye. Any opposed? Motion carries. MOTION CARRIED: SIX AYES. ONE ABSENT. ITEMS MOVED FROM THE CONSENT AGENDA [Action Item] Lorcher: At this time I would briefly like to explain the public hearing process. We will open each item individually and begin with the staff report. Staff will report their findings on how the item adheres to our Comprehensive Plan and our Unified Development Code. After staff has made their presentation the applicant will come forward to present their case and respond to staff's comments and they will have 15 minutes to do so. After the applicant is finished we will open the floor to public testimony. Each person will be called only once during the public testimony portion. The clerk will call the names individually of those who have signed up in advance or if you are in Chambers you may come to the microphone or be unmuted on Zoom. Please state your name and address for the record. You will have three minutes to address the Commission. If you have previously sent pictures or a presentation for the meeting it will be displayed on the screen and our clerk will help you with the presentation. If you have established you are speaking on behalf of like a larger group, like an HOA, where others from the Meridian Planning&Zoning Commission July 17,2025 Page 3 of 36 group will allow you to speak on their behalf, you will have up to ten minutes. After all those who have signed up in advance have spoken we will invite any others who wish to testify. If you wish to speak on a topic you may come forward in Chambers or if on Zoom you may hit the raised hand button or if you are only listening on the telephone please press star nine and wait for your name to be called. If you are listening on multiple devices, such as a computer and a phone, please -- please be sure to mute those extra devices, so we don't experience feedback and we can hear you clearly. When you are finished if the Commission doesn't have questions for you you will return to your seat in chambers or be muted on Zoom and no longer have the ability to speak and, please, remember we will not call on you a second time. After all the testimony has been heard the applicant will be given another ten minutes to come back and respond. When the applicant has finished responding to the questions and concerns we will close the public hearing and the Commissioners will have an opportunity to discuss and hopefully make either final decisions or recommendations to City Council as needed. ACTION ITEMS 4. Public Hearing for Touchmark (H-2025-0012) by The Land Group, generally located on the south side of E. Franklin Rd. and the north side of 1-84, midway between S. Eagle Rd. and S. Cloverdale Rd. A. Request: Modified Development Agreement to update the conceptual development plan for the overall site, which consists of approximately 121.50 acres of land to consolidate the existing agreements (AZ-99-021 Touchmark (recorded in 2001, Inst. #101048096); April 2001 Addendum (Inst. # 101048097); May 2003 Addendum (Inst. #103137119); AZ-02-018 (Bair Property AZ-02- 018, Inst. #102143308); MI-07-006 (Meadowlake Village North 3rd Addendum, Inst. #108022885) into one new agreement that replaces all previous agreements. B. Request: Rezone of 63.34 acres of land from the L-O to the C-C (55.17 acres) and C-G (8.17 acres) zoning districts. C. Planned Unit Development Modification (Meadowlake Village CUP- 03-005) to update the concept/use plan and include 4.6 acres of additional land, a deviation to the maximum building height allowed in the C-C district from 50ft. to 64ft. for the hotel and inclusion of 2 and 3 story townhome dwellings. Lorcher: With that we will start with item -- Item No. 3 on the agenda for H-2025-0012 for a modified development agreement, rezone and a planned unit development modification for Touchmark and Meadow Lake Village and we will begin with the staff report. F Meridian Planning&Zoning Commission July 17,2025 Page 4 of 36 Allen: Thank you, Madam Chair, Members of the Commission. The development agreement modification does not require action from the Commission tonight. That is only a City Council decision on that. Modification of the existing planned unit development and rezone. This site consists of 121.5 acres of land. It's zoned L-O, limited office. It's generally located on the south side of East Franklin Road on the -- and the north side of 1-84, midway between South Eagle Road and South Cloverdale Road. I will go through a little history on this property and the approvals. The majority of this property was annexed back in 2000 with a development agreement and a conditional use permit for a conceptual planned unit development. A smaller 4.6 acre portion of property was later annexed and included in an amended development agreement and conceptual development plan. The original conceptual PUD was approved for a continuing care retirement community comprised of 250 to 300 units of independent and assisted living, 450 units of residential, including single family, duplex townhomes and multi-family. A community senior health and fitness center. Medical office parks. Commercial and retail businesses. Since that time approximately 428 residential units have been built in the retirement community, along with the senior health and fitness center and many amenities, including open green space and walking trails, a community garden, coffee shop and bistro, salon and barber shop, a library, theater, dining venues, pickleball courts and other on-site amenities. In 2003 the development agreement and planned unit development were amended to allow the development of 318 residential units and approximately 600,000 square feet of commercial and office space on a larger 138 acre area with reduced building setbacks in the L-O zoning district. The Comprehensive Plan future land use map designation is mixed use community. A modification to the development agreement is proposed to update the conceptual development plan for the overall site, which consists of approximately 121.5 acres of land and consolidate the existing development agreements into one new agreement that replaces all previous versions. A rezone of 55.17 acres of land to the C-C zoning district and 8.17 acres to the C-G district is proposed from the L-O zoning district to the undeveloped -- excuse me -- for the undeveloped portion of the site, included in the master plan to accommodate the proposed uses. So, everything that they are proposing is C-C and, then, just that parcel in their piece up in the upper northeast corner is C-G. The proposed project consists of -- let me back up for just a minute. I didn't have my slide on when I was talking about the original existing concept plan that's approved for this property and that is in your staff report as well if you want to look at it a little closer. This plan is proposed to be replaced with a new plan and that's this plan right here. The proposed project consists of 121.5 acres of land within a larger mixed use community designated area, totaling approximately 164 acres and includes a mix of uses consisting of commercial, office, light industry and a variety of residential housing types as shown on this bubble plan here before you and that is consistent with the Comprehensive Plan for mixed use community designation. A couple of areas on the concept plan. The ones -- the two with the star symbols are shown with two possible uses, the medical office and townhomes along the southwest boundary of the site and the community -- commercial and multi-family along the north side of the site along Franklin Road. If the demand for office space doesn't come to fruition the applicant proposes an alternate use of townhomes, 50 to 55 units in that area. Commercial uses similar to the commercial Meridian Planning&Zoning Commission July 17,2025 Page 5 of 36 proposed to the west along Franklin Road is proposed on the other area with the flexibility for multi-family residential. The number of units and density is not specified on the plan, but the applicant states the area could support 115 to 140 units, using the same density as the other multi-family area. The multi-family use would be at a larger scale than the townhomes and an increase in density. Staff does not recommend approval of the optional residential uses, because residential uses, as the comp plan allows for up to 65 percent of the development area to be comprised of residential uses with the provision of transit, which the applicant is providing, which does exist and the applicant is proposing approximately 68 percent, not including the optional multi-family and townhome style units. Additionally, the commercial uses are desired in the mixed use community diagram and the comp plan along arterial streets transitioning to lesser intense uses. Therefore, staff recommends the concept plan is revised to only reflect commercial uses on those portions of the property prior to the City Council hearing. A modification to the existing planned unit development for Meadow Lake Village, CUP- 03-005, is proposed to update the concept plan and includes a request for deviation to the maximum building height allowed in the C-C district from 50 feet to 64 feet for the hotel measured to the highest point of the structure and inclusion of the townhome dwellings as a permitted use in the C-C district. Staff is amenable to the building height increase as proposed. However, is not in support of the request for townhomes to develop in the C-C district, because townhomes, where each unit is on its own property, are a prohibited use in the C-C district and, therefore, aren't allowed through the planned unit development. This would require rezone to a residential or a traditional neighborhood zoning district in which the use is allowed. Because the applicant isn't proposing to subdivide the property, the use is considered multi-family residential, as all of the units are on one property and is allowed in the C-C district. The new development plan includes approximately 114,000 square feet of medical office space, approximately 300 to 400 non-age restricted market rate multi-family units, both apartments and townhomes, with the possibility of 165 to 195 additional units through the alternate uses proposed. Twenty to 25 single family attached units, also known as villas, three single family detached units, also known as cottages on the plan; 75,546 square feet of self-storage, i.e., light industry; 45,000 square feet of general office space; 45,000 square feet of commercial retail space and an approximate 126 room hotel. Conceptual building elevations for the proposed structure as -- are as shown there on the sides of that plan. A pedestrian pathway plan was submitted as shown there. The green lines represent ten foot wide pathways. The blue five foot proposed sidewalks and the pink five foot wide existing sidewalks. A phasing plan is proposed as shown, which depicts four phases of development. It's anticipated to be completed between 2030 and 2040. Phase one is the villas and cottages, which is two to five years. Phase two is the apartments and townhomes, which is three to ten years. Phase three is the commercial, self-storage, additional multi-family and hotel along Franklin Road, which is three to 15 years. And phase four is the medical office and daycare, post-acute care and townhomes, four to 15 years. Staff recommends a subdivision application is submitted for each phase of development and recorded in order to have a legal parcel for development purposes. The existing community is proposed to remain unchanged, except for the small golf course and that is this pink area right here around their water feature here, which at some point in the future may Meridian Planning&Zoning Commission July 17,2025 Page 6 of 36 redevelop with villas and that's the single family attached units. The open space amenities are also evolving and as the golf course is redeveloped the required open space amenities will be reprogrammed in other areas of the project. Before changes can be approved to this area the applicant must demonstrate compliance with the terms of the previously approved PUD in regard to site amenities with removal of the golf course. Per the city code in effect at that time at least ten percent of the gross area of the PUD was required as open space, exclusive of required street buffers and buffers between incompatible land uses. The development area consists of 61.5 acres of land. Therefore, a minimum of 6.15 acres of qualified open space is required to be provided. An exhibit should be submitted showing the existing qualified open space without the golf course area prior to the City Council hearing. No written testimony has been received from the public. The applicant did submit a response to the staff report and they will go through that in their presentation. Staff is recommending approval per the recommendation in the staff report and I would just like to make a note that with development agreements and planned unit developments, the decision making body is able to place additional conditions on development applications that may not typically be required in the UDC in an effort to provide exemplary site development in accord with the purpose statement of the planned unit development. Staff will stand for any questions. The applicant is here to present. Lorcher: Would the applicant like to come forward? Hi. Thompson: Hi, Madam Chair, Members of the Commission. My name is Tamara Thompson. I'm with The Land Group. Our offices are at 462 East Shore Drive in Eagle. With me tonight I have Kendra Lackey and Ryan Benson from Touchmark and Gary Sorensen from Pivot North. So, we have our full team here to answer any of your questions and I do have a presentation. I will try not to be redundant with -- with Sonya's presentation. She was -- she was very thorough. But just to give you a brief overview, the development site is located on the south side of Franklin and east of Touchmark. The -- the west side is the Ridenbaugh Canal and we are just north of Interstate 84. North of Franklin Road are industrial uses that are zoned I-L and west is medical office, which includes St. Luke's. Those are all zoned L-O. Currently the site is zoned L-O and in order to align better with what the uses are the staff has recommended that we do that rezone, although the -- the proposal that we have before you is not much different than -- than what is currently approved in our PUD. Again we are in the MUC future land use map designation. Here is that zone -- or zoomed in and the reason I wanted to show this is just to show how close we are to the city of Boise. City of Boise is just right on the other side of the Ridenbaugh Canal. That is that dashed line there. With industrial across on the north side of Franklin. Just to give -- I'm sure you have all driven this area, but just to give a little overview of what it looks like, the -- the top photo is looking west along Franklin that has the industrial properties there to the right and the bottom is looking east along Franklin Road. The properties were developed in 2003 and at that time Touchmark did all of the public roads to their facility to and through the facility, and did all of the beautiful fountains and water features, all the landscaping and I just have some pictures of-- of all of that and you can tell on this bottom left one all of the sidewalks, even back in 2003, were the detached Meridian Planning&Zoning Commission July 17,2025 Page 7 of 36 sidewalks, which weren't -- weren't common back then. And, then, I will point out also that all of the utilities were stubbed at that time as well. As Sonya mentioned, this was the -- the concept plan with the development agreement. So, Touchmark has owned this property since the late 1990s and it opened its first phase of the retirement community, which was Touchmark at Meadow Lake Village in 2003. Touchmark has been a member of the Meridian community for over 20 years, collaborating with local businesses, nonprofits, schools and government organizations to provide employment and volunteer opportunities, as well as provide much needed service for elderly residents of the Boise and Meridian areas who moved to the Touchmark at Meadow Lake Village. The properties were annexed and zoned L-O with a PUD and a development agreement in 2001 and, then, there were multiple development agreement modifications after that. The development agreement states the construction and development of a continuing care retirement community comprised of 250 to 300 units of independent and assisted living, 450 units of residential, including single family duplexes, multi-family, townhomes, medical office parks, commercial and retail businesses and community and senior health and fitness center. Our proposal today is not much different than that. We are just going to define it a little bit better, since what was defined back then it -- it lists all those, but it doesn't really define well the exact acreage or the exact square footage of those types of -- of -- of uses. Again, there is the development agreement and three subsequent addendums to that development agreement. The most recent development agreement was recorded in 2008. As you can see on this aerial, approximately 62.8 acres of the 121.5 total acres or 52 percent of the original master plan has been constructed and is operating as Meadow Lake Village, a Touchmark community. Since that time approximately 428 residential units have been built and much of the -- all of the public roads have been built and the utility infrastructure and landscaping along those public roads. Sonya mentioned all of the amenities that have been -- that go along with it as far as the green space and walking trails. You can see there is a pond and numerous water features for the residents. The pond and center community area is planned to be part of the entire community, not just for the senior housing. Currently there are over 12 acres of qualified open space and part of that then -- which is over 20 percent of the existing community that part of that will be for -- for everybody and, then, we will be adding even more for -- for -- for the new development. Here is some photos of just some of the existing. All right. Now, to the Touchmark mixed use development. This includes approximately 114,000 square feet of medical office, 500 non-age restricted market rate multi-family units. These will be both in the form of apartments and townhomes. As Sonya mentioned, they won't be fee simple townhomes, they will be townhome style, but they will be designated multi- family, because they will all be on one lot, but they will look like townhomes. There will be age restricted villas and cottages. So, there is 24 of those, which will be -- I don't know if I can point on this thing. Don't know how to do that. So, it's -- it's -- if I just point to it does it do it? Yeah. Right in that area around -- around the -- the pond area. Forty- five thousand square feet of general office and 45,000 square feet of commercial retail space. A hundred and twenty-six room hotel. And the development is planned to be phased over the next five to 15 years. We -- we have included concept plans and concept elevations and with those we have -- we have added that the city's design standards are what are to be met. So, those will be -- will go through the city's CZC and 10 1 Meridian Planning&Zoning Commission July 17,2025 Page 8 of 36 design review process. Throughout the project additional pedestrian sidewalks and multi-use pathways will be utilized to create a better network to ensure safety and efficient mobility through the site and as intended with the original master plan a multi- generational project where residents of the existing Touchmark retirement community can maintain a sense of security, while benefiting from the adjacent diverse uses is intentional. Future occupants of the multi-family and townhomes, as well as users of the future commercial and retail, will benefit from generous new connectivity and green space throughout the interior of the master plan, as well as from the existing pedestrian infrastructure along Franklin Road and Touchmark Way. Extensive pathways will be accompanied by recreational areas for children and adults to enjoy daytime leisure activities, such as playgrounds, open spaces, dog park areas and functional spaces, that promote general health and wellness. The existing monument sign and fountain at the entrance, that fountain amenity will -- that exists will be maintained and remain and, then, at least one amenity per amenity category within the Meridian City Code is proposed. So, that will continue through the CZC process and that's something that we provided in our application with -- with the PUD. And, then, the -- with each of the areas -- or each of the zones we provided a sub area with dimensional standards for that -- for each of that sub area. Accesses to the project -- most of those are already existing. There is only one new access to Franklin here that aligns with Truckee Avenue to the north. An updated traffic study was required and it was conducted by Kittelson and Associates and both -- both ITD and ACHD have comment on -- commented on that and the -- there are no new conditions that are required. The Touchmark development can be development -- developed with minimal impacts to the surrounding roadway system. We do have a couple of requested revisions. We have reviewed the staff report and agree with staffs recommended conditions with the following revisions. There is a reference to wrought iron fence. We would like to replace that with metal picket fence to make that just a little -- instead of wrought iron, a lot of times those are metal picket or full privacy to match the existing. What we are showing here is what the existing fence is around the perimeter of the existing development. So, we are asking to stay consistent with that. And I'm sorry if you want that number I can give that to you. That is condition A.1.ii. And, then, condition -- conditional use permit and the planned unit development modification I, the drive private street from Truckee, there is a condition to have an internal drive that connects to the east to that existing drive and let me go back here. That would be to -- from that Truckee one here to this existing drive at that location and there -- that may not be possible and let me just give you a few items here. So, what I have here on the right-hand side is the topography of that area and there -- there is an existing ditch that runs at the top of the grade. So, on the bottom there is a 27 foot grade difference from that approach to the top of that hill and, then, there is a ditch that runs across there, which is a gravity irrigation ditch and -- and, then, the -- the top left is an aerial of that. So, all the engineering hasn't been done for this area yet, but in maintaining flows for that ditch and having to address 27 feet of fall from the top of that down to that existing access, it may not be possible to have a street access at that location, which is why we didn't put one initially and, then, I just wanted to show -- so, this is that access and you can see that for this one -- can I -- can I finish, please? Okay. Just coming in initially they had to put retaining walls immediately once -- at this one. So, this -- what we would like to do is be mindful of that request and work 11 Meridian Planning&Zoning Commission July 17,2025 Page 9 of 36 with staff during the CZC process and that if it's possible we will -- we will make that connection, but -- but not have that as -- as a requirement. And, then, lastly, our plan as proposed is consistent with the Comprehensive Plan and we respectfully request the ability for up to 65 percent of the land to be allowed as residential uses. When I did the math at that -- what -- what Sonya mentioned as the 68 percent, I incorrectly did that with the rezone, which those go to the center line of the roads, but if I just use the land area -- so, the way that that goes is right now with the -- with the layout the commercial uses are 41 percent of the -- of the master plan. The residential is 36 percent and the areas that we have laid out as the flex areas comprise 21 percent. So, if a hundred percent of that flex area were to go to the commercial side, then, that would be 62 percent to the -- to the commercial. If a hundred percent of that flex area were to go residential, it would be 58 percent. We are not asking for more units, we are -- we are sticking at that -- at the 524 units, we are just asking for more flexibility on that land area. It's been 20 plus years that they have had that frontage as -- as commercial and should they need it they -- they just want that flexibility to extend in those two areas. Lorcher: Thank you very much. Commissioners, do we have questions for Tamara? Perreault: Madam Chair? Lorcher: Commissioner Perreault. Perreault: Good to see you. Thompson: Good to see you. Perreault: Yes, I do have some questions for you. So, am I to understand correctly that the only age restricted residential units will be the cottages and, then, some of the townhomes? Thompson: Madam Chair and Chair -- or Council -- Commissioner -- Perreault: Commissioner. Thompson: Commissioner Perreault, the -- a hundred percent of the current community is age restricted, 55 and older, and 24 of the new units that's adjacent to that would be age restricted. The -- the new ones will not be. That is correct. Because it has always been the plan for it to be multi-generational. Perreault: Madam Chair? Lorcher: Commissioner Perreault. Perreault: Is there a market need for the additional age restricted or are you not seeing that often? F12 Meridian Planning&Zoning Commission July 17,2025 Page 10 of 36 Thompson: I would need my -- my client to answer that question, but I'm guessing if-- if they are not going that direction, then, there wouldn't be. Perreault: Okay. And, then, I just want to get clarification. So, the way I read the staff report is that the limitation on the 65 percent residential for the development area I was under the impression that was for the entire original project, like the master plan, and you have calculated it as just this area that is being rezoned. So, did I misunderstand that? Would you like to answer that? Thompson: That's true. I am calculating on the -- on the new area and I can give a little bit more history on that, too. Is that -- and -- and a few years ago we did this on other projects in the -- in the vicinity and in the mixed use community area most of those developments, especially south of 1-84, do not get developed with 20 percent or even 50 percent residential uses and so if you blend the entire mixed use community area it doesn't -- it doesn't even get to ten percent in the audit that we did a couple years ago for -- for a different project south of the freeway. But on this one we were just looking at the new development area. Perreault: So, if I'm understanding you correctly, you are saying that the 164 acres within the full MUC designated area has much smaller percentage of residential? If you looked at the entire picture that MUC designation, you are saying that it doesn't come close to the 65 percent? Thompson: And -- and if we looked at the MUC area within just this quadrant even south of the freeway we wouldn't even come close to that. Perreault: Okay. I think that's all the questions I have for you for now. Thank you. Thompson: Thank you. Lorcher: Commissioners, any other questions before we take public testimony? I did have a question in regard to some of the last slides where the city asked you to have some connectivity and you said that there were some topical restrictions based on the way the topography works. The drainage ditch that goes, you know, south to north that draining down, is that run by Nampa-Meridian -- or the irrigation district or is that just part of that parcel, because it used to be a farm? Thompson: Madam Chair, it does -- it is run by the irrigation district. It -- its headgate is on the Ridenbaugh and it -- it goes through the property, but it does serve downstream as well. It's not just for this property. So, we do need to maintain it and so, you know, we can't drop it too much, maybe we can drop it a little bit. Like I said, the -- the -- the engineering and all that for this -- for it hasn't happened, but one -- when you are looking at 27 feet of grade change and needing to maintain flows, it -- it -- it's going to be difficult at best. So, I would like to have it as a please look at, but not a hard and fast requirement. 13 Meridian Planning&Zoning Commission July 17,2025 Page 11 of 36 Lorcher: And did they say they wanted it tiled once it gets development or that -- or did they want it open? Thompson: They haven't said, but typically we can tile that size. Lorcher: So, if you tiled that size would it be a challenge to, then, put a road on top of it, at least the portion that it cuts across, because you are a diagonal and the cross-street would go in perpendicular? Thompson: I don't think it would be as much of a problem with putting a road on top of it, it's just however those flows are going to be. Lorcher: Right. Thompson: Yeah. Lorcher: And, then, finally, cross-access to the eastern property, which is the city of Boise. So, is the city of Boise requiring connectivity, like typically Meridian asks for connectivity between, you know, parcels and subdivisions, so that there is always an escape route? Thompson: So, I looked at the plat for that property. That's an industrial plat that's in the city of Boise and I -- ACHD constructed those access points prior to that development when they did the improvements along Franklin years ago and -- but the -- the plat for that industrial property does look like it has a -- an easement around it that goes back at least a little bit. So, it doesn't go all the way back, but it goes back enough for just a little bit of -- for the shared access, so that we can at least get to the access point and it does split the property line, so half of that access is already on our property, but it does have a little bit of an easement around it on both sides, so they are using it on our property currently and we can get to it to get to theirs. But it doesn't go like all the way back to have like a big road coming in if-- if that's what you are asking. Yeah. Lorcher: Okay. Any other questions before we open public testimony? Okay. Thank you very much. Thompson: Thank you. Lorcher: Oh. Wait. Commissioner Perreault. Perreault: I found a few more. So, if we are understanding the phasing plan correctly, you could -- you could have all four phases going at the same time. I mean the first three years you could potentially have all different types of construction going on. Have you -- do you have or have you thought through how that will work with -- just with that entrance -- or with the entrance that comes off of Franklin Road and the entrance to Touchmark, how will that flow if you have construction going on in all different areas? 14 Meridian Planning&Zoning Commission July 17,2025 Page 12 of 36 Thompson: We will need to -- we will definitely need to work through that with -- with what becomes fruition first. I don't know that all four would happen at the same time. We just kept that flexibility that -- that any one of those could go first. Perreault: Okay. And are the calculate -- the square footage calculations that you used for the office and retail, does that include those areas that you want to keep flexible or does it not? Thompson: Let me find it. So, in my calculation I have the commercial, hotel, light industry and medical office the ones that are solid colors on the concept plan. Those come out to 41 percent and, then, if I take the villas, cottages, townhomes and multi- families, the ones that are solid colors, those come out to 36 percent and, then, if I take the medical office slash townhomes, the one that has the striped color and the commercial, multi-family striped color, that's 21 percent. Perreault: Okay. So, where it says there is potentially 45,000 square foot of commercial retail space, this -- is that counting that area as commercial or is it counting that area as multi-family -- I mean is it included or not? Thompson: I was -- I did my calculation off of the land area on the concept plan. Perreault: To calculate square footage of the commercial. Thompson: To calculate the -- the -- because that's what the 65 percent is is land area. So, I was doing land area. Perreault: Okay. I'm just referring to what was in our presentation tonight, so -- Thompson: Yeah. I -- we may be talking apples and oranges, because I was looking at the land area, because -- because that's what the -- the comp plan talks about, land area of up to 65 percent if you are in proximity of a transit -- of transit. Perreault: Thank you. Lorcher: Okay. Thank you very much. Thompson: Thank you. Lorcher: Madam Clerk, do we have anybody that signed up to testify? Lomeli: Thank you, Madam Chair. No one has signed up. You can come forward. Lorcher: Yeah, you can come forward. If you can state your name and address for the record that would be great. Cruise: Okay. Thank you. I apologize, I did not know I needed to sign up. F15] Meridian Planning&Zoning Commission July 17,2025 Page 13 of 36 Lorcher: No. That's fine. That's why we have big Chambers here, so there is plenty of room for people to come. Cruise: My name is Sandra Cruise. C-r-u-i-s-e. My address is 210 South Winthrop Place, Boise. 83709. 1 live in Edgeview Estates, which is the subdivision on the east side of the Ridenbaugh Canal and my house is -- my property is adjacent to the development. We live right on the canal and so I have several questions or issues that I wanted to make sure were in your -- under your consideration and I don't even know if I have a voice in this, because I don't live in Meridian, but, first of all, there is a tree -- I live right where -- where the Ridenbaugh wraps around my subdivision. I would be most adjacent to commercial light industry there where you were just talking about how there is a 27 percent gradient. There is a very large very old black locust tree. I believe it's black locust tree that's home to many raptors and other birds and many animals. It's habitat for red tails, kestrels -- we have got Coopers now in the neighborhood -- Cooper hawks also. I would hate to see -- see us lose that tree. I would hate to see the birds lose that tree. They are losing their feeding grounds with this development, but they -- they have managed to hang on all of these years -- for 25 years as their -- their land, their opportunity for hunting has decreased they have managed to stay in the area and I would hate to lose them and see them go. At the very very least I would be -- if you -- if that tree is taken down that it be taken down not in a nesting season. Oh. And there is owls, too, there sometimes. So, just be -- be mindful that raptors live in that tree and other trees. Number two, the development to the east, the light industrial development to the south side of Franklin Road, when that went in the Ridenbaugh Canal was paved, because it's up above all of that, and I wonder if the Ridenbaugh will need to be paved for that -- I would call it the yellow commercial slash light industry piece that -- that eastern most piece will it need to be paved also. So, that is a question I do not have -- do not expect you all to have an answer for that, but that's a Nampa-Meridian Irrigation question that I would hope would be addressed. Lorcher: Is it your preference to have it open or closed? Cruise: It's my preference that the Nampa Irrigation District is mindful of it and that -- the reason they paved it is -- they paved the part that was getting developed below is because what if the -- what if the canal is breached -- Lorcher: Right. Cruise: -- everything below it would be flooded. Lorcher: Okay. Cruise: So, that's -- you know, of course I would rather the Ridenbaugh Canal -- it's not paved over, it's just the sides are paved. Lorcher: Got you. F16] Meridian Planning&Zoning Commission July 17,2025 Page 14 of 36 Cruise: Yeah. It's -- so it's reinforced. Lorcher: Got you. Cruise: And, then, of course, we are -- we are used to our unrestricted view and I know progress happens and people lose their views, but we would hate to have three story housing just staring into our backyard, even though it is across the canal and I would hope that there would be some consideration for easements from one story to two story to three story, because there is a residential area around us. We are -- I know that there is not many houses that would be affected by this multi-family three story development, but there are some of us and we were expecting over the years that Touchmark would continue to develop one story housing, which is what we were told 20 some years ago, that it would be senior development one story. Well, the central part -- the central buildings are tall, but that we could expect one story building. Lorcher: Okay. Cruise: That's what we were told. Lorcher: All right. Cruise: Whether that's what they thought I can't speak to that. Lorcher: All right. Well -- Cruise: Those are my issues. Lorcher: Okay. Cruise: Thank you very much. Lorcher: Thank you for your time. Anybody else in Chambers that would like to speak as part of the public testimony? And is there anybody online? Lomeli: Madam Chair, there is one person attending online. They have not raised their hand. Lorcher: Okay. Tamara, would you like to come back and respond? Thompson: Madam Chair, Members of the Commission, Tamara Thompson again. So, I wrote down three items. If you will let me know if there was something that I -- that I missed here. So, the questions are the black locust tree. I think I know which one that is. I believe it to be the one where the headgate is for that canal -- or that ditch that we were just talking about. So, I do not know on that one currently, but if we can retain it we always like to retain trees. We are -- first and foremost The Land Group is landscape architects, so we retrain -- retain trees where -- where we can. So -- so we F17] Meridian Planning&Zoning Commission July 17,2025 Page 15 of 36 would like to do that. It is on the perimeter of the project. So, we are hoping that we can. As far as the Ridenbaugh and paving the sides and those types of things, we will not have anything to do with -- with the Ridenbaugh. The Ridenbaugh -- we will go up to right at their easement line and, then, we won't have anything to do with it past that. So, I don't have an answer for that. That will be the irrigation district. And, then, as far as the two story, three story housing, we can definitely take a look at that. We have -- we were doing that stair step with the -- with the townhouses and, then, to the multi- family and so there is just a small little area right in -- right in this -- right there that we can -- we can look at that, too. It's probably going to be frankly parking garages there first and then -- and, then, get to the -- get to the units. So, the -- the apartments will probably be back a little ways. Lorcher: Okay. Thompson: So, did I answer everything? I think I got it. Lorcher: I believe so. I believe so. I mean, you know, it's impossible to guarantee any unrestricted view, but being conscious of the people who always live there is always a nice consideration. Thompson: It is. Lorcher: I do have a few questions for you in regard to the golf course. So, you are suggesting of eliminating the golf course and turning those into villas. Thompson: So, the way that it's colored in it looks like all of it goes. It's just going to be reprogrammed. There will be some open space around that. There is -- there is -- there is a small number of villas that go in there. There is 20 villas that go in there. So, there will be a considerable amount of open space that -- that retains. What's -- what's left there is going to be around six acres with the current pond and what's over on the -- on the west side as well and, then, there -- they will -- typically their -- their programming and what they have has some sort of putting green or pitching green -- you know, pitching area, those types of things. So, it's -- it likely won't a hundred percent go away, but it's just going to be reprogrammed. Lorcher: And does that satisfy -- because I don't know the exact wording, so, Sonya, you might have to help me with this, but does that satisfy the original PUD of open space that was required if the golf course is amended? Allen: Madam Chair, I don't have those calcs from the applicant. She said she did some preliminary calcs and it appears to comply with those standards, but I would like to see an exhibit showing exactly what areas are being counted in order to determine that. Lorcher: Okay. So, before Council you will have to have -- 18 Meridian Planning&Zoning Commission July 17,2025 Page 16 of 36 Thompson: Yeah. So -- and I'm sorry I did not -- I didn't bring that, but we do -- we did do some calculations and there is 12 acres. So, there is pickleball courts as part of this -- of what's -- so, what's constructed currently is around 12 acres of qualified open space. So, there is pickleball courts. There is pathways that go to benches and gazebos. There is -- there is little waterfall areas with seating areas. There is the pond. There is -- there is all kinds of different areas. There is a dog park area and, then, that -- there is the golf course area. So, with eliminating the golf course area we are still well over what was required for the original PUD. Like almost double what was required. Lorcher: Okay. One final question from me. When you had your neighborhood meeting with the community people bought in this community based on senior living and the amenities, possibly even the golf course, you know, being part of it. What has been the response from the community for your adjustments to the open space and, then, the flex space of turning some of that into villas and that type of thing, what kind of response -- I mean the fact that nobody is here complaining leads me to believe that it -- it's not a huge concern, but it is a difference to what they were committed to when they purchased in that community. Thompson: I would like my client to answer that question, because they have been working more closely with their tenants, if-- if that's fine. Lorcher: Hi. If you could just state your name and address for the record that would be great. Benson: Sure. Ryan Benson. Touchmark. Our address is 5150 Southwest Griffith Drive in Beaverton, Oregon. 97005. Lorcher: Okay. Benson: Thank you all for your time this evening. I personally hosted a town hall with our residents a few months ago. It was very well attended. We had 50, 60 people there. We went through this entire master plan and we received plenty of comments. We have incorporated all that into our programming. Our executive director at this community, who couldn't be here tonight, we have -- we have registered all of their -- their questions and, to be honest, the golf course is pretty lightly used as is. So, our intent is to reprogram into a more activated space that's going to be used on a day-to- day basis and benefit everybody in the community. So, we are actively engaged with all the residents on this project. Lorcher: Okay. So, nobody feels like you are taking away anything in particular, especially because if -- with the golf course, if it is being limited attended, but you put something else in there so the community can use it more on a daily basis that could be a benefit to your group. Benson: Right. Our -- our operations team will probably go through a really thorough process with them to kind of talk through, you know, what -- what more can we do as we 19 1 Meridian Planning&Zoning Commission July 17,2025 Page 17 of 36 start to program out the villas and what that looks like, so I don't have an answer as to like what it will become -- Lorcher: Right. Benson: -- but we will be factoring in all of their -- their comments and their thoughts into that. Lorcher: And what did the community say when you were going to invite families that are not age restricted into your community? Benson: I think it was -- it was mixed. I think some people were excited. They liked the idea of having more activity around, you know, a mix of uses is fun and engaging and there were some concerns with safety and security. So, we received mixed reviews and we intend to be very thoughtful in addressing their concerns. But overall I would say it was mixed. Lorcher: Okay. All right. Any questions for Touchmark? Garrett: Yeah. I'm sorry, what is the demographics of the hotel? What are you looking for -- I mean it seems to be off the beaten track. Benson: You know, we haven't programmed what exactly that hotel will look like, but I do think that users might be visitors of family members. They could be people using the hospital services nearby. We haven't exactly programmed what the hotel will look like. Garrett: Well, that's what I assumed. Benson: Yeah. Maybe those two would be primary users. Garrett: Yeah. Okay. Just a question. Benson: Thank you. Lorcher: Any other questions for Touchmark while he is up? Okay. Thank you very much. Benson: Thank you, everyone. Allen: Madam Chair, may I clarify an item that was discussed? Lorcher: Yes. Allen: So, the percentage of residential versus commercial uses in the Comprehensive Plan for mixed use designated areas, that is based on the overall larger designated area. It's not on a project specific area. So, that's where staff got our calculations and F20] Meridian Planning&Zoning Commission July 17,2025 Page 18 of 36 what the original calcs were based on. So, anyway, just wanted to clarify and explain that. Thank you. Lorcher: Okay. Thank you. Tamara, did you have any other final thoughts before we close the public hearing? Thompson: Madam Chair, Members of the Commission, I think I got through everything. The Touchmark mixed use, I think they have been an excellent neighbor in -- in Meridian. They have -- they have shown -- you know, what they currently have constructed is very very high quality and that's what they want to bring to the community and -- and providing an additional service to -- and -- and something that complements the adjacent residential commercial and office uses and this project will provide a vibrant, livable development with a variety of housing options. This fits every single -- checks every box on the mixed use community with all the multiple uses that are being provided for and the commercial component will provide easily accessible and convenient services for residents in the general vicinity. The development agreement modification, the PUD modification and the rezone request comply with the applicable provisions of the Comprehensive Plan and tonight we request your recommendation for approval with those three modifications that I walked you through. We thank you for your time. Lorcher: All right. Thank you very much. Perreault: Madam Chair, may I ask a couple more questions? Lorcher: Commissioner Perreault. Perreault: Thank you. I wanted clarification on the townhouse areas. We had discussion about there being townhome style units, but they are not actually townhomes. Is that just in the multi-family section or would that be in the section that's labeled townhomes? Thompson: Madam Chair, Commissioner Perreault, that is the areas that are called townhomes. So, those will look like townhomes, they just won't be platted where they can be sold fee simple. Perreault: So -- so, that's the area where there is the request to raise the height to 64 feet? Thompson: No. The height request is just for the hotel. Perreault: Oh. Okay. That's not -- that's not what it stated I believe in the staff report. So -- okay. So, the areas that are light blue that are townhomes -- Thompson: Let me make sure I have that correct. I have -- I have that. So, the townhomes -- the -- the asterisk for the townhomes is -- so, we were trying -- we just F21 Meridian Planning&Zoning Commission July 17,2025 Page 19 of 36 wanted to make sure that townhomes were approved and -- and they are, but they -- they are designated as multi-family, but they are going to look like townhomes, so -- but -- because they are all on one lot. So, that's what that asterisk is for. But the height -- the building height is just for the hotel, just for the salmon pink -- dark pink color. Perreault: Okay. Thank you for clarifying that. The staff report says that there is a request for a deviation to the maximum building height allowed in the C-C district from 50 to 64 feet for the hotel and inclusion of townhome dwellings as permitted use in the C-C district. Thompson: Yeah. Perreault: And inclusion of the townhomes -- Thompson: That's separate. We are not talking about -- those are separate. What we have for the height of the townhomes is -- 35 feet is proposed, which fits within the height of that zone. Perreault: Okay. One more question. So, with the -- when you come in for -- I don't know what the requirement will be in the PUD when you do the multi-family, if you have to come in and have a hearing like you do with a CUP. I don't think you have to. It sounds like it can just go straight to the zoning compliance process; is that right? So, can you chat with us a little bit about -- and so say that the villas come in and we take some of the open space away from that central area, what is -- what is that multi-family open space going to look like? Is it going to be another smaller version of -- of that where you have got the -- you know, a dog park or you have got seating areas, plaza areas? And it sounds like we are not going to have a whole lot of say in that right now and that's okay, but I just want to make sure that, you know, those open areas are being replaced. Thompson: They are. So, you -- through the CZC and the DR process -- so, there is a -- I want to say it's a pretty rigorous checklist of -- through the design review where we have a point system for open space and we have -- we have outlined where we are going to have points in every single category for the multi-family and so we are going to have clubhouses and we are going to have a pool and we are -- you know. So, we have outlined what -- what those are going to be and we have given an example in our application of what all those points could be -- will likely be, but we have also committed to having points in each category that will meet or exceed the minimum requirements. Lorcher: My only other comment is the use of the word townhomes during this entire conversation has been very confusing -- Thompson: It has been. Lorcher: -- because the city has a very solid definition of what a townhome is and what that looks like on being a single unit, whether it's for purchase or rent, whereas multi- 22 Meridian Planning&Zoning Commission July 17,2025 Page 20 of 36 family is one big parcel divided up into other things. So, I don't know if you and the planning department can come up with another word other than townhomes, because I have been trying to wrap my head around it during this meeting and you are going to have the same challenges when you go to Council. Thompson: Yeah. I agree. Lorcher: So, between now and then where it says townhomes that should be labeled something else. Villas. Cottages. Whatever comes up to be multi-family, but not under the definition of townhomes. Because every time you talked about townhomes I'm like, okay, this is not where it's supposed to be and it's not working, but you are telling me, well, it's like a townhome, but it's not a townhome. So, if you can adjust that for Council that would be great. Thompson: Yeah. That's -- that's -- that's fabulous feedback. Thank you. We will -- we will try to make up a word. Lorcher: Yes. Come up with something clever. I'm sure we will find something. All right. With that thank you very much. I appreciate your patience. May I have a motion to close the public hearing? Smith: So moved. Rust: Second. Garrett: Second. Lorcher: It's been moved and seconded to close the public hearing for Touchmark and Meadow Lake Village. All those in favor say aye. Any opposed? Motion carries. MOTION CARRIED: SIX AYES. ONE ABSENT. Perreault: Madam Chair? Lorcher: Commissioner Perreault. Perreault: Would it be possible for staff to maybe address any of the things that came up during the hearing that -- it seemed like what I was reading was maybe a little different than what they were presenting and if there is anything that you want to clarify with us? Allen: Madam Chair, Commissioner Perreault, I can't think of anything other than the percentage of residential that I already clarified in the MUC designated area in the -- you know, the -- in response to the -- Madam Chair's comment, I think townhome style multi-family would be appropriate on the concept plan, as well as -- you know, villas and cottages are something that the city code doesn't recognize either, so -- and as long as F23] Meridian Planning&Zoning Commission July 17,2025 Page 21 of 36 those units aren't being platted on individual lots, which I understand they aren't, then, that would also be multi-family and like the villas would be single family attached style multi-family and the cottages single family detached style multi-family. Other than that if -- unless -- unless you are thinking of something I'm not thinking of that needs clarified, Commissioner Perreault. I can't think of anything else. Perreault: Well, the only other question I had was in the presentation this evening about the 45,000 square foot of office and 45,000 square foot of retail space, it sounded like the applicant didn't provide those numbers and I'm trying to understand if that's the total proposed -- I realize that might not be what it ends up to be, but if that's kind of the total proposed idea with the concept -- Allen: I believe there was a total of 114,000 square feet of medical office. Perreault: That was for medical office. Allen: And, then, 75,546 square feet of self-storage, 45,000 office space and 45,000 commercial retail space. Is there -- Perreault: Yes. The question I was trying to have answered is are the -- the bubbles that show a commercial there in the northwest and potentially commercial light industry in the northeast, is that enough space to build 45,000 square feet or would the applicant need to use the commercial multi-family flex space? I guess that's what I'm trying to understand is when they came up with this calculation of 45,000 square feet commercial retail, is that just supposed to fit in that northeast corner that's purple? Is that spread out over the whole -- Allen: The purple -- Perreault: -- development? Allen: Each of those colors in each of those areas on the concept plan -- you can't see it, because the prints too small on the screen, but there are notes on each color coded thing saying how many square feet, approximately, is proposed. Perreault: Okay. Allen: And I assume that's a multi-family -- or a multi-story, excuse me, square footage. But it is a concept at this time, but that's what they have guesstimated to fit on those areas. Lorcher: Any comments about this development? Rust: Madam Chair? F24] Meridian Planning&Zoning Commission July 17,2025 Page 22 of 36 Lorcher: Commissioner Rust. Rust: Yeah. I appreciate the effort that's gone into this. I think Touchmark has been aware of them as the business for a number of years. This has been a long-term development. I mean the history -- it's not often we get a history that starts in the '90s and I think there is, obviously, a lot of thought and care that has gone into the development of the existing development. The fact that they had a really well attended town hall as part of their community and we didn't see anybody from that town hall here tonight, I think just speaks to the overall level of care that's gone into this. This is not a development that they are looking to slam things together in the next three or four years. This is going to be phased. This is going to be thoughtful. I'm inclined to give deference to Touchmark and give them wide latitude to fill this out as they see fit. This is they have been good stewards of this property for 25 years now and so I would be inclined to recommend approval to the Council and grant them the three conditions that they are asking for. The wrought iron fence. Let's look at that side connection, but not necessarily require that and, then, give them the flexibility that they are asking for on the commercial slash multi-family piece. I think that they have, again, been good stewards. They are the kind of people that we want to partner with as the city and I want to give them as much latitude as we can. Lorcher: Okay. Thank you. Any other comments? I like the idea that there is a hotel. My -- my -- my mom lives in an adult -- or a senior community back in Illinois and she doesn't let me stay with her, so -- but, then, she is like but I want you close by, but there is nothing there. So having a hotel close by is -- would be a benefit to your community I would think and, plus, the proximity of the hotel -- you know -- excuse me. The hospital would also benefit from that as well. The only thing that kind of threw me off today was the labeling and I'm sure we will come up with some good terms before Council. You know, the market has changed quite a bit since 1995 or '3 or whenever you kind of started this and my only concern is that, though, the people who already live there -- I would hate to see them purchase a property and committed to one thing and it turns into something else with the understanding that things do evolve. So, like if the golf course isn't working and maybe only ten percent of your community uses it, but, then, you change it to something else and, then, now 80 percent of your community can use it. So, I totally get that part as well. Because this is over the next 15 years and it's not going to be all done tomorrow, I'm inclined to approve it as well, with those conditions, so that as -- over the next 15 years as things change and as the market deems necessary they have the flexibility to be able to serve our community. Smith: Madam Chair? Lorcher: Commissioner Smith. Smith: I think I generally direction on -- on that direction -- or that's where I'm heading. There are two kind of things that I'm a little bit not -- you know, not the biggest fan of. I think there is -- we are leaving a bit of an open question on that connection -- on that -- that eastern side that I don't love kind of leaving unanswered. I'm okay granting F25] Meridian Planning&Zoning Commission July 17,2025 Page 23 of 36 deference. It seems like this is, again, a longer term period -- you know, longer term development, but there is just some unease that gives me. The only other thing is -- that I recall from -- kind of -- is that -- a question for staff I guess, just having seen the image of the proposed fencing. Along the canal there needs -- does there not need to be like an open view for that fencing or is that -- is -- would you say that that -- what's pictured is adequate in this open view, since there are kind of slats? It doesn't -- it seems kind of obstructed to me. Allen: Madam Chair, if I could respond. So, our code requires either open vision or -- typically open vision along waterways and that's for -- so, that the irrigation district can maintain their -- their ditches and their easement areas and burn -- burn weeds if necessary and vinyl fences are kind of frowned on along there. I wasn't aware that there was existing vinyl fence along there and I'm not sure that the city ever approved that fencing. Anyway, that's the reason for the requirement for wrought iron. I'm not sure what the metal picket fencing is that the applicant is possibly -- one of the two options they proposed to me that would be the same, but I haven't seen a picture of that, so I'm unsure. Smith: So, Madam Chair, I guess what I would say is an addendum to maybe that is that just ensuring that whatever goes there along the canal might be -- is open vision in compliance with code is my only maybe sticking point. But beyond that I think I'm -- I'm in agreement with everything. Yeah. Allen: Madam Chair. And just to add a little bit to that, if-- if that's the motion you make that would allow the possibility of chain link fencing along there. So, typically we don't allow that. More for esthetic reasons than anything, but, anyway, just wanted to clarify. Thank you. Lorcher: Does the irrigation allow -- district. Thank you. Allow chain link fence? Allen: As far as I know, yes. Lorcher: Okay. So, maybe where it ensures that the fencing complies with city code, whatever that happens to be? Smith: Yeah. Madam Chair, I would be supportive of that. Lorcher: Okay. Any other comments from Commissioners in regard to this or I will take a motion. Perreault: Madam Chair? Lorcher: Commissioner Perreault. Perreault: So, I agree with -- with the open -- or that the fencing that city code and keeping that wrought iron. With the townhomes versus the multi-family, I kind of got the F26] Meridian Planning&Zoning Commission July 17,2025 Page 24 of 36 feeling -- and I apologize if this is incorrect -- that the townhomes were just kind of apartments, but the outside looked different and so I don't know if that actually is the case or really is a home that has multiple levels and it's just attached. I -- if -- if it is apartment style, but just has an exterior that looks different, I would encourage the applicant to maybe reconsider that, because I'm pretty sure that Council will -- will want to have that conversation. I just -- I think it would be good for the applicant to be really specific and distinct about the difference between the townhomes and the multi-family, how they are going to look, how that -- how they are going to be lived in and how they really are going to be distinctive from each other and, then, act as that buffer. For me that wasn't as clear maybe as it could have been. I realize we are just doing a concept plan here, but, you know, it is important, because you -- we are defining specific things that are going in those bubbles. I'm also sad to hear the golf course may -- or part of the golf course may go away, but I understand, as the chairwoman said, that if that's not an efficient use of that space for the residents, then, I understand wanting to make the change. What I would like to see is whatever acreage that is turned into villas, that that -- an equivalent amount of that be created in the new -- the new areas and I don't mean whether it meets the 15 percent qualified open space, I mean an actual acre-for-acre replacement. I would like to really see that. I think that that would be honoring to the existing residents that had that expectation of a certain amount of space to use, so I assume that is a condition we can request and, then, I would like to say -- I would like to see a follow up on the concern over the old tree. I would recommend that the applicant have some sort of response for City Council on that. Hesitant to put a condition on it, but never -- never try to put a condition on the -- had a few applications that have requested a tree to remain, but I agree with -- with the neighbor that that's a really important piece of nature for our -- for our ecosystem really. So, yeah, those are all the things I wanted to mention. Thank you. Lorcher: Okay. Any other comments? Stoll: Madam Chair, if I may? Lorcher: Commissioner Stoll. Stoll: I have watched this development sadly for many years and I remember thinking that I was way too young and now I'm -- Lorcher: Right there, uh? Stoll: I'm at that age and looking at my own mother in law's place down in Arizona, we are seeing a transition where it is getting young -- it's no longer 55 plus, they are going down to 40 plus with the market and in some cases it's causing a reinvigoration of the communities and a greater dynamic with the folks that are living there. Following up on your comment regarding the hotel, my mother in law probably would not be appreciative of the hotel. I would have been appreciative of the hotel -- Lorcher: Right. 27 Meridian Planning&Zoning Commission July 17,2025 Page 25 of 36 Stoll: -- many times, but overall I support what the applicant has submitted and I think there is some aspects of it that I really do like. I caution them to make sure that they preserve the open space and maximize that and the opportunities for the residents. The one that I was surprised was the comments from ACHD and ITD regarding the traffic impact. Franklin and Eagle Road are congested roadways in that area and that they felt that there was -- in one case with ITD there was no comments provided and with ACHD they said it was added level of service E and that -- that was acceptable and that there would be negligible impacts regarding the development. We have a lot of units that are going to be going in here. It's going to have an impact and something that our community is going to need the leadership from the transportation agencies on providing input to the land use agencies on the traffic impacts. But based on the comments that we have today I'm inclined to recommend to Council approval with the conditions that staff have laid out. I -- I'm okay with saying -- allowing the condition that they can work out the 27 foot drop on potential connection. I have concerns regarding wrought iron fence versus not wrought iron fence. I think we need to make sure that -- we only have this opportunity to put in the type of treatments that we want and what was put in or -- and approved or not approved 27 some odd years ago doesn't necessarily have to dictate what we have now. Lorcher: Right. Stoll: So, that -- Lorcher: Okay. Any comments? Are you good? Oh, you already commented. Okay. All right. Let me give this a go. After considering all staff, applicant and public testimony, I move to recommend approval to City Council for File No. H-2025-0012 as presented in the staff report to include ensuring the fence complies with city code. The flex space to be -- or the -- yeah. The flex space for commercial and residential be fluid. Define the word townhome as multi-family residential and include an exhibit for open space without the golf course. Did I forget anything? Perreault: Madam Chair? Lorcher: The road connection? Pearreault: Could you just clarify -- staff have recommended that the flex space not be flex space. Are you saying that we are recommending that it's -- that it is? Lorcher: Because this is, in my opinion, a five to 15 year build out, that the market may deem that residential ten years from now might be more advantageous to our community than the commercial. So, I'm recommending that -- that the flex space be open to either. But that's my motion. And, then, we wanted to add work with the irrigation district for a connective -- was it a connective street? Do you remember? Smith: Madam Chair, regarding the -- like that cross-connection -- F28] Meridian Planning&Zoning Commission July 17,2025 Page 26 of 36 Lorcher: Yeah. Smith: -- I mean I think the applicant was asking for just the ability to continue working with staff. I guess I think what I would like to -- what I would like to have more in terms of what we can require is maybe something more fleshed out before it gets to Council specifically. I'm not trying to lock them into anything, but I would like maybe Council to be able to discuss the different possibilities more specifically than kicking it down the road. Lorcher: Okay. One second. Okay. I'm going to try this again, because I have my notes. All right. The modifications include the -- ensure the fence complies with city code. That the commercial space be recommended, but be flexible to residential for long-term future growth. Define townhomes as multi-family residential. Include an exhibit for open space without the golf course and work with the irrigation district and the city for connectivity to the east boundary. Allen: Madam Chair, may I clarify if your motion included any changes to the applicant's request for the office use in the southwest corner of the site to be allowed to possibly develop with townhome uses? Lorcher: I did say the commercial to be flexible for commercial or residential. Allen: Okay. Lorcher: Does that -- does that cover that? Allen: There is commercial, as well as the office. There is commercial along Franklin -- Lorcher: Right. Allen: -- and, then, the office was along the west boundary of the site. So, you meant for both -- both of those areas? Lorcher: I did. Allen: Thank you. Lorcher: Okay. Do I have a second? Rust: Second. Lorcher: It's been moved and seconded to approve File No. H-2025-0012 with the modifications listed. All those in favor say aye. Any opposed? Motion carries. Thank you very much. MOTION CARRIED: SIX AYES. ONE ABSENT. F29] Meridian Planning&Zoning Commission July 17,2025 Page 27 of 36 Lorcher: Took us a minute to get there, but we got there. Okay. There was a lot going on. All right. We have another one this evening for H-2025-0019 for Gramercy Townhomes for a rezone, preliminary plat, and DA modification and, Bill, if you can give us less than five minutes for a little break we will go ahead and get -- and that way you can get it loaded up. Parsons: That would be fine. Thank you. (Recess: 7:28 p.m. to 7:34 p.m.) 5. Public Hearing for Gramercy Townhomes (H-2025-0019) by Elton Development Company, located at 1873, 1925 and 2069 Wells Ave. A. Request: Rezone of 6.98 acres of land from the C-G zone to the TN-R zone. B. Request: Preliminary Plat for 82 buildable lots and 8 common lots. C. Request: Development Agreement Modification to establish a new concept plan and remove the age restriction on the property. Lorcher: Okay. Let's carry on for Gramercy and we will begin with the staff report. Thanks, Bill. Parsons: Thank you, Madam Chair, Members of the Commission. So, last project before you this evening is the Gramercy Townhome project. The site consists of 6.98 acres of land, currently zoned C-G in the city. This -- this project has a lot of history as well. This started in 2006 and, then, with this particular property that we are discussing this evening was actually approved by this body in 2021 for an age restricted 164 multi- family development. So, the applicant is here this evening to discuss modifying the development agreement, rezoning the property and platting it to build a townhome development. So, not going to confuse you with this presentation, this is a true townhome development. Lorcher: Okay. Thank you. Parsons: What they say that -- what we are calling townhomes are actually townhomes. It meets -- Lorcher: All right. Very good. Parsons: -- the definition. So, you can see on the future land map that's before you this evening this area is also part of a larger mixed use regional area. I think Nick did a good job putting some analysis in there. So, typically, when we are looking at mixed use developments, as Sonya mentioned in her last presentation, we are looking for a mix of uses. Well, you can see here everything around Eagle Road and Overland is F30] Meridian Planning&Zoning Commission July 17,2025 Page 28 of 36 mixed use regional. So, we took a broader lens in looking at this and we said, okay, let's do some comparison here. So, we know there is a mix of employment, mix of retail, mix of residential units in the area. So, essentially, although this project is coming in with a townhome -- as a townhome project, when you look at the greater good -- the greater area it has all of those things that are envisioned with the -- by the Comprehensive Plan, so, therefore, this development in itself is consistent with the Comprehensive Plan. The other items that we look at in mixed use regional areas is density. So, in a mixed use regional designated area we are looking between 60 and 40 dwelling units to the acre. What's unique about this project this evening is the applicant is actually rezoning from a commercial district to a Traditional Neighborhood Residential district, which is called TN-R is the acronym and, then, in that particular zoning district we want two different residential types -- product types in there. So, either a townhome, single family attached, single family detached. But, again, in our staff report we made it clear to both the Commission and Council that there is other residential happening in the area and as part of the Gramercy project, so although this may have one style of residential, overall the rezone and what's developed in the area and the mixed use regional area is still consistent and, therefore, we are recommending the TN-R zone with the one residential use that's proposed before you this evening. See if this thing will advance for me here. Here we go. Here is the property highlighted as well. You can see it's adjacent to Mountain View High School on the west and, then, also to the south what makes this a great amenity or neighborhood for the city is the fact that it's in close proximity to a city park directly to the south and, then, the applicant will be tying the development into the existing ten foot multi-use pathway that you see. That red dashed line is the multi-use pathway that's built within that development, allowing residents who live here to walk to that -- that amenity that's currently constructed. Here, again, is the rezone boundary. Again, rezoning from C-G to TN-R. This is the proposed site plan slash plat and we are looking at 82 residential lots and eight common lots on -- on approximately seven acres. The other unique thing about TN-R residential zoning standards is we like to have alley-loaded product is the primary push in that particular zoning district. It's a dimension -- part of the dimensional standards, where it's -- the preference is alley loaded, which this is. The applicant's also providing parkways in front of the units, which is also consistent with that requested zoning district and they are also providing traffic calming through bulb outs in front of the units along some of the commercial drive aisles and that will also allow for additional guest parking or parking for the development and, then, you can see here in the central MEW, that's within the middle of the development, there is also overflow parking. So, the applicant is providing additional 46 parking spaces on this site to allow -- account for guest parking or overflow parking. It's not required by code, but the applicant's done that based on staff's recommendation. As the applicant moves through the final platting process they will have to -- currently everything that provides access to these lots is a commercial drive aisle or will be, but as part of the final plat process staff has recommended that they plat these -- or apply for a private street application, so that we can name them so we can address the units appropriately. The applicant will also have to work with the adjacent property owners to the east, because there are existing drive aisles that are stubbed to this property. The recorded Gramercy plat does grant cross- access to this development. However, it's an easement and not a public -- a private F31 Meridian Planning&Zoning Commission July 17,2025 Page 29 of 36 street. So, the applicant will have to work with those potential business owners on naming one of those commercial drive aisles, so that they have -- the private street does touch a public street. So, that's something that will -- again, we will be looking for at the time of final -- final platting. Because the applicant is rezoning to a commercial district and it is -- townhomes are considered single family, they are required to provide open space -- 15 percent open space and to be exact in the plat before you is 18.8 percent. So, they are actually providing more than what the code requires. They are also providing the required amenities with the central parkway -- walkways that you see through the central part of the development and there is also a dog area. So, waste stations, which counts as amenities for the subdivision. So, they are meeting the point requirements for amenities and they are also meeting the -- exceeding the open space requirements of the code. Here is the landscape plan, just kind of highlighting what's qualified and being counted towards that required 18 percent per city code. One thing that the applicant will be working with the city on is typically when we have these micro path lots or these walkways between units we typically see those in common lots. In this particular case the applicant does have some site constraints that they need some flexibility on how to make their units fit on some of the lots and, therefore, they are -- some of the micro path areas will be basically easements on the plat -- on the lots versus a common lot, which is allowed by city code. So, just something different that we don't see, but they have been conditioned to provide those easements on the plat, so that anyone reviewing plans for this development will know that the units cannot encroach within those pedestrian easements that they will be depicting on the plat. So, the plat may not show the 15 foot wide -- it will show the easement, but the landscape plan does show the 15 foot landscape buffer and landscaping required per code. And, then, because this development is part of the Gramercy development a lot of the architectural style in that development does have brick on it and so the applicant's -- when we have met with the applicant during our pre-application meetings and working on their design of the townhome units, we have encouraged them to incorporate some brick on the dwelling unit, so it does blend in with the rest of the Gramercy development and you can see they have added that wainscoting on the ground -- ground floor here. So, again, I -- overall staff is supportive of the rezone of the plat and the MDA, the development agreement modification. Before I came to the hearing I had a chance to look at the public record. It looks like we did get public comment from one of the adjacent neighbors and she had concerns with the traffic. A little misunderstanding on the density. Just wanted to provide some clarification on the record. This particular development is actually less dense than the previous one. So, we are actually 164 going down to 82, so we are actually providing less dwelling units. Where it could get confusing for residents and for maybe even you and Council as we go forward, is typically in a TN-R zone there is -- the density is based off a net density and not gross density and really the difference there is we take out the open space in the roads and that's how we are left with net. So, this particular development, if you look at it on paper, is it at 19 dwelling units net density, but it's approximately 12 dwelling units to the acre if you were looking at the gross. So, again, meets the TN-R zone that they are requesting, complies with the comp plan and it's less dense than what was previously approved. So, anyways, the resident also brought up concerns with utilities, parks, schools, police -- all the typical conversations you have had in the past with other 32 Meridian Planning&Zoning Commission July 17,2025 Page 30 of 36 residents. So, again, this is what was originally envisioned for Gramercy. It was a mixed use development. They are just contributing and reducing the density. So, again, staff is recommend -- recommending approval of this project and I will stand for any questions you may have. Lorcher: Okay. Would the applicant like to come forward? Hi. Chidester: Hi. Mike Chidester. 2541 East Gala Street here in Meridian. 83642. Good to be with you tonight. Do you have the presentation? Thank you. Appreciate the chance to be with you. I'm with -- Mike Chidester with Elton Development. We are a local -- local development company. We specialize in -- in senior living. There is a lot of our work, which explains a previous application for this -- this site. Also do townhomes, some large lot subdivisions, multi-family. I will try and be brief tonight. I do want to give just a brief history of this site to give you an idea of kind of what's happened on -- on this site over the years. Principals of our property -- or our company have been working on this since 2014. Initially -- and in that time in 2014 and '15 this is actually a potential site for the new south Meridian YMCA and having senior housing be one of the things that our principals work on, we were looking at potentially with the YMCA and St. Luke's partnering for a facility here, we were looking at doing potentially a facility where we could mix generations and have a senior housing facility adjacent to the Y. As you know in 2018 the Y opened at -- at the current location and so between 2016 and '19 there really wasn't much development there. One parcel was owned by Luke's, one by the Y and one by a charter school. In 2020 we started looking at this as a potential location for a 55 plus apartment complex. We went through the work to do it. We hit -- but, unfortunately, a number of things made it so that project just wasn't feasible. A lot of the difficulties of cost inflation, et cetera, and, then, just some market dynamics and so we -- we worked on that, but -- but really pulled back from that project. But over the years I just want to say that since then we have -- we have looked at concepts of -- the images here you have of 55 plus apartments, we have looked at flex industrial, we have looked at office, we have looked at destination resident. A lot of retail. A lot of different things at this site and it's just been -- the biggest challenge for these parcels in particular is shown here. That red line is a principal arterial, Overland Road, good for traffic and visibility. The blue line is Wells, which, again, is a collector. And these parcels are just off the beaten path enough that with every concept we talk to visibility is the first thing that comes up and, you know, access is okay, but visibility is very difficult and it just doesn't work for a number of things. That doesn't look too far on that image, but the closest point between Wells and our property is 220 feet. So, it's just a challenge that way. So, that's why we have -- you know, the concern always when I come before this board is -- these are commercial. We are changing it to residential. Is that -- is that an issue. That just gives -- I wanted to give you a little context of the efforts that have been made to look at this in the C-G zoning. High level view. You seem to get into the site plan a little bit more, Bill's done a good job of naming it, but I -- one of the challenges of developing this was we have all these access points -- existing roads that we had to tie into and so it took a little bit of work around and I credit staff, actually, for helping us get this to the best place we can. We had a meeting with Bill and Nick and they made some recommendations and, ultimately, what F33] Meridian Planning&Zoning Commission July 17,2025 Page 31 of 36 we came to was we were trying to do what's -- what's wanted in the TN-R zone, which is the alley load. With the exception of that center area we -- we realized we had room to do something larger and so, really, the -- the soul of this project I think is that large common area there. To give you an idea it's -- it's about 300 feet long. It's essentially the exact -- within a few feet the same length as the -- the plaza out in front of this building. A little bit -- not quite as wide, but -- so, it will be a great thing. Dog park. Great amenity. It's the perfect size for the neighborhood Thanksgiving Day turkey bowl. So, we think that's a -- that's a great amenity that we worked hard to have. On-street parking was another thing that we made an effort to have, simply because we all know when places are under parked. We meet the code of four -- four stalls per unit, but that additional on-street parking we think will be good. The red line you see in here, as Bill mentioned, is the connection to the multi-use pathway. And, again, we have some -- knowing we all love our animals, we have some amenities there and I would simply say at the bottom right corner you will see a connection to Gordon Harris Park. That's -- you don't notice it, but if you pull back a little bit it's about a five minute walk to an 11 acre park, which I think will be a huge amenity and even the ball fields being adjacent to this property gave a really nice open feel for this. So, we felt it was -- there is some things that will be nice for residents who want to live here. These are for sale townhomes as we said. These are the real thing. Three and four bedroom units. Three story designed. Bill had mentioned this -- we have worked hard to get this design to fit Gramercy with the exception -- I will say we have not gone to the minutia of dialing the colors perfectly. This doesn't -- this green doesn't work perfectly within -- within Gramercy. We will be working to do that. We work closely with Greg Johnson and Taylor Merrill, who are the folks who would have to approve the design within Gramercy and if -- if you want an idea of really what we are trying to do, this is a project that our principals completed in Garden City called Parkway Station. The design is -- is not exactly the same, but about probably 90 percent on the exterior. So, that will give you an idea of the type of project that we are -- that we are trying to do and with that I will stand for questions. Well, actually, I do want to -- I should mention I -- Hethe Clark, sorry, with Clark Wardle here and I think he wants to -- I'm going to have him -- I'm going to ask him to come up and speak to some of the technicalities. Clark: Hi, everybody. Hethe Clark. 251 East Front Street. Commissioner Garrett looked bored, so I thought I would come tap dance for a second. I did want to just emphasize one of the points that Bill made there and just because -- again, because I know how concerned folks can be about pulling back from a C-G zone. So, I just wanted to emphasize the -- a couple of things. First on the comp plan, Bill knows that one of my favorite parts of the comp plan is that we only look at these mixed use regional areas between the lines of the arterials. I think that's not the greatest policy, but in this case that's what it is and so looking at that what you can see on the left side here is the area that we are talking about. I decided to pull out a little bit, so you can see both sides of Eagle Road and you can see that there is a really nice mix of uses that's already there and the staff did the calculation for the area that's bounded on the north by Overland and on the east by Eagle and with this project in the residential it gets to about 25 percent. So, you are very much within that ten to 30 percent that the -- the mixed use regional area calls for. And, then, just on the TN-R -- and I'm not sure where F34] Meridian Planning&Zoning Commission July 17,2025 Page 32 of 36 the red stuff is. It's -- I'm just I guess trying to have a party up here throwing -- throwing confetti. We did do the TN-R after conversations with staff. We felt like that was the most appropriate thing. The things that I would add to what Bill said is that there is existing TN-R in that location and so this adds a little bit more buffer, so you go from C-G to TN-R to R-15, so we thought that that was great. And, then, again, the emphasis on the alley load. They have done the alley load on them -- on the -- those two blocks. Alley load, as you guys know and as you have heard me talk about before, is complicated and a little bit hard and -- and so I think the effort that went into putting the alley load in here should be commended, because it really is an effort to try to make sure that we are doing it the way that the city would like to with the planning. And so with that I just would emphasize, as we wrap up, that we are in agreement with all the conditions of the staff report. I think it's a -- it's a good thing that, you know, we had these initial conversations with staff, we reoriented one of the blocks and when we got to the right design, the conditions just kind of fell into place and so we are happy about all that. So, we are happy to answer any other questions and not prolong the matter, so -- Lorcher: Commissioners, do we have any questions for Hethe at this time? Perreault: Madam Chair? Lorcher: Commissioner Perreault. Perreault: True to form I have several. I don't love the statistic that shows that 52 percent of the site is paved area. Don't love that. But I understand what -- I understand why it's happening with the private streets. But when I saw that I was like, oh, wow. Okay. So, my questions -- maybe more suggestions -- are one of the things we consistently see with the narrow private streets and, then, you have the narrow alley, are challenges with trash cans on trash day and then -- and, then, parking larger vehicles, like a furniture delivery truck, Norco trucks and so I think that the extra parking that you have put is fantastic. Love seeing that -- all that guest parking. Would it be possible to put a space on -- on each private street that's like a bigger parking space for like a larger truck or a cargo truck where some of those delivery trucks can drop off at there? I mean I live in a small neighborhood and every day there is, you know, Amazon and, you know, big delivery trucks and so I see them constantly and that's one of the challenges we see with these type of developments. So, would really like to see that happen and, then, the other question I have is about market demand. So, I can see how this would be a really good development in Garden City, but there is -- I don't know if you are familiar with another three story unit -- or three story unit development off of Ten Mile and Franklin called the Entrada Farms. That's a rental community. It's not -- it's not for sale, but they had a real struggle getting those rented because of the three stories. So, can you tell us how -- what you have run into and whether you see that this will be a successful project in terms of-- Clark: Well, maybe I will take the first two and, then, I will -- F35] Meridian Planning&Zoning Commission July 17,2025 Page 33 of 36 Perreault: -- getting that sold. Clark: -- Mike take the third one. So, the first one on the paved area that is inherent with the idea of the TN-R's promotion of alley load. So, alley loads do include more paved area. One of your challenges with alley load is you get the heat areas in the back. So, one of the things that we have done is we have worked with staff and we are going to do some alternative compliance on this, is to add some -- some space that we are going to shrink a couple of those parking spaces -- or the drive aisle spaces back there and add a little more landscaping to try to break that up a little bit. Second item on the parking -- I think you will find that with alley load on the front most of those deliveries come in through the front and so that issue is not quite as big of a concern as you might in some other traditional -- see in some traditional product, but we are more than happy to look at that through the -- with the direction of the Council and, then, I will turn it over to Mike on the market. Chidester: Yeah. It's -- it's a good -- it's a good question. When we looked at doing townhomes here one of the challenges, here again as I mentioned, was the existing streets and so we had to look at what we could fit within -- within those parameters. A two story townhome requires usually a deeper, you know, a deeper lot and so that was one of the things that challenged -- that challenged us. There will be buyers who are not interested. It's probably someone who wants to be more central valley, maybe younger families, maybe more single. So, we -- we have looked hard at who our target market is and there will be some folks that I think will say, yeah, that's -- that's not for us, because -- because of that. We have done some things like modifying the plan that you saw there in -- in Garden City to allow three bedrooms on the top unit, as opposed to two, so you could have a family with parents and a couple of kids in there. So, we have tried to do some things to adapt for folks who might, you know, be more concerned about that or having that first floor bedroom that isn't really as usable. So, we have tried to do some things to adapt to that. You are not -- you are not wrong, there will be people that won't like that as much. You have -- in Pine you have some two story things, but we feel comfortable in the long-term success; right? So, it's a good question. Perreault: Madam Chair? Lorcher: Commissioner Perreault. Perreault: In that regard I just want to say I really appreciate seeing the three and four bedroom options, because they are very hard to find with attached housing and there is a big need for it, so -- Chidester: Good. That's good to hear. Lorcher: Any other questions for the applicant? Thank you. Madam Clerk, do we have anybody signed up to testify? F36] Meridian Planning&Zoning Commission July 17,2025 Page 34 of 36 Lomeli: Thank you, Madam Chair. No one has signed up. Lorcher: Anybody in Chambers? Mike or Hethe, do you have anything else you would like to add before we close the public hearing? Okay. May I get a motion to close the public hearing, please? Smith: So moved. Garrett: Second. Lorcher: It's been moved and seconded to close the public hearing for Gramercy. All those in favor say aye. Any opposed? Motion carries. MOTION CARRIED: SIX AYES. ONE ABSENT. Lorcher: I know that the city has expressed before that we don't necessarily like to go from commercial back to residential, but your comments of the lack of visibility where this is kind of tucked into both residential and a commercial little neighborhood, it does make sense in this particular case, which is why we do each application individually. So, I appreciate that. I have gotten lost back here quite a bit on the weekends and it's actually a nice little spot, because it's a little bit hidden off, it's -- it's near Overland, but it's not quite on Overland. As long as you disclose to your -- your buyers that there will be baseball and band practice over at Rocky Mountain High School and that they should not complain about it, because they are moving in there we will be fine. I -- there was this one article about some family wanting to sue the city of Boise because the pickleball courts were too loud. But you kind of should have known that before you moved in. But I digress. Anyway, I think this is good. Since you are in a New York state of mind here, a couple suggestions for your private streets. You can do Central Park Drive. You can do Manhattan Drive or -- so get a whole New York vibe thing going over there, too. But this looks great. It's a great little in-fill. It's a nice little spot in -- in this kind of area and even though it's three stories I think they will be -- there will be a good market for it. Any other comments as far as this application is concerned? Smith: Madam Chair? Lorcher: Commissioner Smith. Smith: The only thing I have to say -- and I understand why TN-R and why kind of this density was aimed for is -- one thing as -- I guess as a generality is when I look at how close this is to points of interest and to the freeway, thinking of transit-oriented development, part of me almost wishes this were a little bit more dense, which might not be something that -- you know, that might be an evil sentence to utter in some circles, but I understand this. I think it's -- anytime I hear Hethe Clark say we are in condition -- or in agreement with all the conditions of the staff report it's a good day. So, I fully support this. You know, I think these kinds of areas -- I mean I would like to see a conversation start to be for how can we increase density in these strategic areas that F37] Meridian Planning&Zoning Commission July 17,2025 Page 35 of 36 are closer to the really high volume corridors, but as far as the constraints they are dealing with here I think this is a great development. Lorcher: Any other comments? A motion? Perreault: Madam Chair? Lorcher: Commissioner Perreault. Perreault: I think this is also a very fitting development for this location. A lot of the acreage in this whole Gramercy area has sat surprisingly -- I remember when it was originally developed and I worked in private finance, so yes -- and I appreciate -- I wanted to say I appreciate the large open space. It's not a requirement. But if there were more -- more opportunities for activity -- I know there is a dog park, maybe there could be something added that is a little more active feature, but, again, can't require that, so -- but thank you for putting so much thought into this and trying to answer our questions before we have them. Hethe has come to attempt to do that every time and I appreciate it. Rust: Madam Chair? Lorcher: Commissioner Rust, yes. Rust: After considering all staff, applicant and public testimony, I move to recommend approval of File No. H-2025-0019 as presented in the staff report for the hearing date of July 17th, 2025. Garrett: Second. Lorcher: It's been moved and seconded to approve Gramercy Townhomes. All those in favor say aye. Any opposed? Motion carries. MOTION CARRIED: SIX AYES. ONE ABSENT. Lorcher: I will take one more motion. Stoll: Move to adjourn. Rust: Second. Lorcher: It's been moved and seconded to adjourn. All those in favor say aye. Any opposed? Motion carries. Thank you, gentlemen, very much. Have a good night. MOTION CARRIED: SIX AYES. ONE ABSENT. MEETING ADJOURNED AT P.M. F38] Meridian Planning&Zoning Commission July 17,2025 Page 36 of 36 (AUDIO RECORDING ON FILE OF THESE PROCEEDINGS. ) APPROVED 8 7 25 MARIA LORCHER - CHAIRMAN DATE APPROVED ATTEST: CHRIS JOHNSON - CITY CLERK F39 E IDIAN 'aAHO AGENDA ITEM ITEM TOPIC: Approve Minutes of the June 26, 2025 Planning and Zoning Commission Meeting 3 Meridian Planning&Zoning Commission June 26,2025 Page 68 of 68 Lorcher: It's been moved and seconded to adjourn. All those in favor say aye. Any opposed? Motion carries. Thank you very much. MOTION CARRIED: FOUR AYES. THREE ABSENT. MEETING ADJOURNED AT 10:13 P.M. (AUDIO RECORDING ON FILE OF THESE PROCEEDINGS. ) APPROVED 7 I 17 125 MARIA LORCHER - CHAIRMAN DATE APPROVED ATTEST: CHRIS JOHNSON - CITY CLERK F71 E IDIAN 'aAHO AGENDA ITEM ITEM TOPIC: Approve Minutes of the July 10, 2025 Planning and Zoning Commission Meeting F72 Meridian Planning&Zoning Commission July 10,2025 Page 7 of 7 Rust: Second. Lorcher: It's been moved and seconded to approve the facts findings, conclusions of law for The Habit Burger with these Commissioner modifications. All those in favor say aye. Any opposed? Motion carries. MOTION CARRIED: SIX AYES. ONE ABSENT. Lorcher: I will take one more motion. Rust: Madam Chair, I -- Lorcher: Commissioner Rust. Rust: I move that we adjourn. Garrett: Second. Stoll: Second. Lorcher: It's been moved and seconded that we adjourn. All those in favor say aye. Any opposed? Motion carries. Thank you very much. MOTION CARRIED: SIX AYES. ONE ABSENT. MEETING ADJOURNED AT 6:18 P.M. (AUDIO RECORDING ON FILE OF THESE PROCEEDINGS.) APPROVED 7 I 17 I25 MARIA LORCHER - CHAIRMAN DATE APPROVED ATTEST: CHRIS JOHNSON - CITY CLERK 79 E IDIAN 'aAHO AGENDA ITEM ITEM TOPIC: Findings of Fact, Conclusions of Law for Uplift Gym by Erik Hagen, located at at 3410 W. Nelis Dr. F80 CITY OF MERIDIAN wl IDIAN;=-- FINDINGS OF FACT, CONCLUSIONS OF LAW AND � DAHO DECISION& ORDER In the Matter of the Request for a conditional use permit is requested to operate an indoor recreation facility(indoor gym)for Suite 100(13,043 square foot space)in an existing 37,020 square foot industrial building,and extend the hours of operation to 24 hours a day,7 days a week on 2.49 acres of land for Uplifted Gym,Located at 3410 W.Nelis Drive in the I-L Zoning District,by Erik Hagen. Case No(s).H-2025-0023 For the Planning& Zoning Commission Hearing Date of: July loth, 2025 (Findings on July 17th, 2025) A. Findings of Fact 1. Hearing Facts(see attached Staff Report for the hearing date of July 10',2025,incorporated by reference) 2. Process Facts(see attached Staff Report for the hearing date of July 10', 2025,incorporated by reference) 3. Application and Property Facts (see attached Staff Report for the hearing date of July 10', 2025, incorporated by reference) 4. Required Findings per the Unified Development Code(see attached Staff Report for the hearing date of July 17t'',2025, incorporated by reference) B. Conclusions of Law 1. The City of Meridian shall exercise the powers conferred upon it by the"Local Land Use Planning Act of 1975,"codified at Chapter 65, Title 67,Idaho Code(I.C. §67-6503). 2. The Meridian Planning&Zoning Commission takes judicial notice of its Unified Development Code codified at Title 11 Meridian City Code, and all current zoning maps thereof. The City of Meridian has,by ordinance, established the Impact Area and the Amended Comprehensive Plan of the City of Meridian,which was adopted April 19,2011,Resolution No. 11-784 and Maps. 3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § 11-5A. 4. Due consideration has been given to the comment(s)received from the governmental subdivisions providing services in the City of Meridian planning jurisdiction. 5. It is found public facilities and services required by the proposed development will not impose expense upon the public if the attached conditions of approval are imposed. CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 1 F81 6. That the City has granted an order of approval in accordance with this decision,which shall be signed by the Chairman of the Commission and City Clerk and then a copy served by the Clerk upon the applicant,the Planning Department,the Public Works Department and any affected party requesting notice. 7. That this approval is subject to the conditions of approval in the attached staff report for the hearing date of July 1 Ott', 2025, incorporated by reference. The conditions are concluded to be reasonable and the applicant shall meet such requirements as a condition of approval of the application. C. Decision and Order Pursuant to the Planning &Zoning Commission's authority as provided in Meridian City Code § 11- 5A and based upon the above and foregoing Findings of Fact which are herein adopted, it is hereby ordered that: 1. The applicant's request for a conditional use permit is hereby approved in accord with the conditions of approval in the staff report for the hearing date of July 10', 2025, attached as Exhibit A. D. Notice of Applicable Time Limits Notice of Two(2)Year Conditional Use Permit Duration Please take notice that the conditional use permit,when granted, shall be valid for a maximum period of two(2)years unless otherwise approved by the City in accord with UDC 11-5B-6F.1. During this time,the applicant shall commence the use as permitted in accord with the conditions of approval, satisfy the requirements set forth in the conditions of approval,and acquire building permits and commence construction of permanent footings or structures on or in the ground. For conditional use permits that also require platting,the final plat must be signed by the City Engineer within this two(2)year period in accord with UDC 11-5B-6F.2. Upon written request and filed by the applicant prior to the termination of the period in accord with 11-513-6.F.1,the Director may authorize a single extension of the time to commence the use not to exceed one(1)two (2)year period.Additional time extensions up to two (2)years as determined and approved by the Commission may be granted. With all extensions,the Director or Commission may require the conditional use comply with the current provisions of Meridian City Code Title 11. E. Judicial Review Pursuant to Idaho Code § 67-652 1(1)(d),if this final decision concerns a matter enumerated in Idaho Code § 67-6521(1)(a), an affected person aggrieved by this final decision may,within twenty-eight (28)days after all remedies have been exhausted,including requesting reconsideration of this final decision as provided by Meridian City Code § 1-7-10, seek judicial review of this final decision as provided by chapter 52,title 67, Idaho Code. This notice is provided as a courtesy; the City of Meridian does not admit by this notice that this decision is subject to judicial review under LLUPA. F. Notice of Right to Regulatory Takings Analysis CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 2 82 Pursuant to Idaho Code §§ 67-6521(1)(d) and 67-8003, an owner of private property that is the subject of a final decision may submit a written request with the Meridian City Clerk for a regulatory takings analysis. G. Attached: Staff Report for the hearing date of July 10', 2025. CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 3 83 By action of the Planning&Zoning Commission at its regular meeting held on the 17th day of July ,2025. COMMISSIONER MARIA LORCHER, CHAIRMAN VOTED COMMISSIONER JARED SMITH,VICE CHAIRMAN VOTED COMMISSIONER BRIAN GARRETT VOTED COMMISSIONER JESSICA PERREAULT VOTED COMMISSIONER MATHEW STOLL VOTED COMMISSIONER MATTHEW SANDOVAL VOTED COMMISSIONER SAM RUST VOTED Maria Lorcher, Chairman 7-17-2025 Attest: Chris Johnson, City Clerk 7-17-2025 Copy served upon the Applicant, the Planning and Development Services divisions of the Community Development Department,the Public Works Department and the City Attorney. By: Dated: 7-17-2025 City Clerk's Office CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 4 84 Exhibit A COMMUNITY DEVELOPMENT C��fEPIDIAN;,�-,-` DEPARTMENT REPORT I D A H O HEARING 7/10/2025 Legend DATE: Project location TO: Planning&Zoning Commission Area of impact 'A �= City Limits FROM: Nick Napoli,Associate Planner O Analysis 208-884-5533 -- nnapoli@meridiancity.org117 APPLICANT: Erik Hagen SUBJECT: H-2025-0023 Uplifted Gym a LOCATION: Located at 3410 W.Nelis Drive in Section 34,TAN.,R.1W. irJo jog ,SRI I. PROJECT OVERVIEW A. Summary Conditional Use Permit(CUP)is requested to operate an indoor recreation facility(indoor gym) for Suite 100(13,043 square foot space) in an existing 37,020 square foot industrial building, and extend the hours of operation to 24 hours a day, 7 days a week on 2.49 acres of land in the I-L zoning district. B. Issues/Waivers The Planning and Zoning Commission should carefully consider whether the continued expansion of commercial businesses into industrial-zoned areas is appropriate. C. Recommendation Staff: Approval with conditions. Decision Commission: Approved as presented in the staff report. CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 5 85 COMMUNITY METRICS Table 1: Land Use Description Details Map Ref. Existing Land Use(s) Industrial - Proposed Land Use(s) Commercial - Existing Zoning I-L(Light Industrial) Adopted FLUM Designation Mixed Use Non-Residential Table 2: Process Facts Description Details Preapplication Meeting date 3A/2025 Neighborhood Meeting 3/26/2025 Site posting date 6/27/2025 Table 3: Community Metrics Agency/Element Description/Issue Reference Ada County Highway District Comments Received No - Commission Action Required No - Access W.Nelis Drive: Local Street - Meridian Public Works Wastewater Distance to Mainline Existing on Site Impacts or Concerns No Meridian Public Works Water Distance to Mainline Existing on Site Impacts or Concerns No Note: See section 0. CITY/AGENCY COMMENTS& CONDITIONS for comments received, or see the public record. CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 6 86 STAFF ANALYSIS Comprehensive Plan and Unified Development Code(UDC) General Overview/History The purpose of the MU-NR designation is to designate areas where new residential dwellings will not be permitted, as residential uses are not compatible with the planned and/or existing uses in these areas. For example,MU-NR areas are used near the City's Wastewater Resource Recovery Facility and where there are heavy industrial or other hazardous operations that need to be buffered from residential. The Applicant proposes to develop the site with an indoor recreation facility(i.e. an indoor gym) within a portion of an existing industrial building. The building was approved under an administrative application(A-2021-0083). This property is part of the larger McNelis Subdivision that was annexed in 2004 with a Development Agreement(DA) and a preliminary plat; a final plat was later approved and recorded that included this property as Lot 4,Block 2,McNelis Subdivision. The DA was later amended in 2011. Although indoor recreation facilities are not standard uses within industrial zones,they may be considered through a Conditional Use Permit. As such,the Planning and Zoning Commission should evaluate whether continued expansion of commercial uses within industrial areas remains appropriate. In the surrounding area,there is a church, flex space,other warehousing uses, employment, and vehicle repair uses. With the addition of the proposed indoor gym next to existing industrial and commercial users, Staff believes the proposed indoor recreation facility should complement other uses in the surrounding area and provide opportunities for residents to recreate. However, staff have concerns that the continued expansion of commercial businesses into industrial spaces could lead to impacts on employment in the city. In addition,the applicant has indicated that the proposed hours of operation are intended to be twenty-four(24)hours a day, seven(7) days a week. The development agreement requires the hours of operation to be restricted to seven(7)am to ten(10)pm unless otherwise approved with a conditional use permit. Due to this,the applicant is also requesting that the hours of operation be extended to allow for operation twenty-four(24)hours a day, seven(7) days a week. It is also important to note that this building was constructed to Industrial parking standards. The applicant has indicated his gym has about 220 members with roughly fifteen(15) members at any one time. This has raised some concerns with staff, as parking may be an issue if not addressed. To address this,the applicant has received approval from the neighboring church to use up to twenty-five(25)parking spaces. While this helps provide parking, it does not provide a clear path for residents to get to the business. Staff is recommending a pedestrian connection be installed to allow gym users to get from the church site to the gym. Additionally, after conversations with the applicant,revisions were made to add an additional thirteen(13)parking stalls on the west and southwest portions of the site to better accommodate the use that is proposed. The combination of this parking on site and off site (Church Parking)will provide adequate parking in the event that the gym grows. Therefore, Staff finds the proposed use should be an appropriate use in the MU-NR FLUM designation for the reasons noted above. "Plan for an appropriate mix of land uses that ensures connectivity,livability, and economic vitality."(3.06.02) The proposed use will contribute to the mix of uses in this area and should add to the livability and economic vitality of the community. CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 ■ Page 7 Monitor and adjust the amount and mix of industrial, commercial, and office areas needed to meet the employment needs of the City."(3.06.0113) The proposed use will contribute to the mix of uses in this area; however, the desire for industrial and employment uses is diminished. "Encourage and support mixed-use areas that provide the benefits of being able to live, shop, dine,play, and work in close proximity,thereby reducing vehicle trips, and enhancing overall livability and sustainability."(3.06.02B) The subject mixed-use area currently contains office, church,flex space, warehousing, and vehicle repair. The proposed use will provide another recreational opportunity in close proximity to residential neighbors to the south and east, thereby reducing vehicle trips and enhancing the livability of the area. "Preserve the industrial base within designated industrial land use areas by discouraging non-industrial uses and focusing on light manufacturing, distribution, flex-space, and base- employment."(3.07.01 D) The proposed use is a non-industrial use requesting a CUP to occupy an industrial land use area approved for industrial space. Staff have some concerns about approving another commercial use for an indoor recreation facility(indoor gym) within the vicinity proposed for industrial uses. If approved, this would be the first such use in this building but one of many in the city. "Provide,partner, and preserve public and private indoor and outdoor recreation amenities for a diverse range of physical activities."(5.01.01C) The proposed indoor recreation facility offers opportunities for recreation through a personal training gym to the public and will contribute to the range of physical activities offered in the City. Table 4: Proiect Overview Description Details History AZ-04-004,PP-04-004(McNelis Subdivision Ord.#04-1090,DA Inst. #104093293);FP-05-047;TE-05-003 (I-yeartime extension on the PP); CPAM-10-002;MDA-11-002(Addendum to McNelis Subdivision DA, Inst.#112054621);A-2021-0083. Acreage 2.49 acres Site Development and Use Analysis Proposed Use Analysis (UDC 11-2): The proposed use of an indoor recreation facility(indoor gym)is a conditional use in the I-L zoning. The I-L zoning and FLUM designation is meant to provide opportunities for low- impact business areas which typically includes professional offices,research and development, etc. This use adheres to Policy 3.07.02B,which promotes a mix of land uses that ensures connectivity, livability, and economic vitality. While industrial uses are intended in the area, an indoor recreation facility can be approved through a conditional use permit. The applicant has indicated that the gym has approximately 220 members,with about fifteen (15)members in the gym at any given time. This raises some concerns for staff as a gym with this many members may create parking issues. However,with the shared parking and additional onsite parking being installed, staff believe the proposed use can work effectively on the site. There will also be no outdoor activity from the gym. In addition,the applicant has CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 8 F881 indicated that the proposed hours of operation are intended to be twenty-four(24)hours a day, seven(7)days a week. The development agreement requires the hours of operation to be restricted to seven(7)am to ten(10)pm unless otherwise approved with a conditional use permit. Due to this,the applicant is also requesting the hours of operation be extended to allow for operation twenty-four(24)hours a day, seven(7)days a week. Dimensional Standards (UDC 11-2): The proposal meets the dimensional standards for setbacks, landscape buffers,landscape requirements and maximum building height. Specific Use Standards (UDC 11-4-3): A. General standards. 1.All outdoor recreation areas and structures that are not fully enclosed shall maintain a minimum setback of one hundred(100)feet from any abutting residential districts. The playing areas of golf courses, including golf tees, fairways, and greens, are an exception to this standard.No outdoor recreation areas are proposed; all activities will take place within the building. 2.No outdoor event or activity center shall be located within fifty(50)feet of any property line and shall operate only between the hours of 6:00 a.m. and 11:00 p.m.No outdoor events or activities are proposed. 3.Accessory uses including,but not limited to,retail, equipment rental,restaurant and drinking establishments,may be allowed if designed to serve patrons of the use only.Noted. 4.Outdoor speaker systems shall comply with section 11-3A-13, "outdoor speaker systems", of this title.No outdoor speakers are proposed. B.Additional standards for swimming pools.Any outdoor swimming pool shall be completely enclosed within a six-foot nonscalable fence that meets the requirements of the building code in accord with title 10,chapter 1, of this Code.Not applicable. C.Additional standards for outdoor stage or musical venue. Any use with a capacity of one hundred(100) seats or more or within one thousand(1,000)feet of a residence or a residential district shall be subject to approval of a conditional use permit.No outdoor stage or musical venue is proposed. D.[Outdoor lighting.] Outdoor lighting, including lighted fields, designed for the site shall comply with Section 11-3A-11, "outdoor lighting," of this title. These standards may be modified through the approval of a conditional use permit.Noted. Design Standards Analysis Landscaping (UDC 11-3B): Landscape buffers along streets The site has already been approved under permit A-2021-0083 and no additional landscaping improvements will be required. Parking lot landscaping CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 9 89 The site was previously approved under Permit A-2021-0083. However,with the proposed addition of thirteen(13)parking spaces,the applicant is required to submit a Certificate of Zoning Compliance application. Staff has reviewed the site and notes that, should the gym vacate the premises in the future,the space could potentially be converted back to industrial use. In such a scenario, parking lot landscaping on the western portion of the site may hinder truck access and circulation. As a result, staff recommends that the applicant seek alternative compliance for the parking lot landscaping requirement and relocate the required trees to other suitable areas on the site. Landscape buffers to adjoining uses The site has already been approved under permit A-2021-0083 and no additional landscape buffer improvements will be required. Tree preservation The site has already been approved under permit A-2021-0083 and no additional tree preservation improvements will be required. Parking (UDC 11-3C): Nonresidential parking analysis A minimum of one(1) off-street parking space is required per 2,000 square feet of gross floor area for industrial buildings.Based on the 37,057-square-foot multi-tenant building, 19 parking spaces are required. The site currently provides 25 spaces,exceeding the UDC requirements for the I-L zoning district. However,the proposed use,an indoor recreation facility, is considered a commercial use, which requires one (1)off-street parking space per 500 square feet of gross floor area. In response to staff s request,the applicant has proposed thirteen(13) additional on-site parking stalls, increasing the total to thirty-eight(38).Additionally,the applicant has secured an agreement with the adjacent church to utilize up to twenty-five(25)of their parking spaces. This results in a total of sixty-three(63)available parking spaces. While the entire building is 37,057 square feet,the proposed tenant space is 13,043 square feet. Staff believes that the combination of on-site parking and the shared parking agreement will provide sufficient parking for the proposed gym use while continuing to accommodate the existing industrial tenants. The applicant shall provide a recorded copy of the shared parking agreement and depict the additional parking spaces with the certificate of zoning compliance. Bicycle parking analysis A minimum of one(1)bicycle parking space must be provided for every 25 vehicle spaces or portion thereof per UDC 11-3C-6G;bicycle parking facilities are required to comply with the location and design standards listed in UDC 11-3C-5C. Bicycle parking is depicted on the plans submitted with this application that meet the requirements. Building Elevations (Comp Plan, Architectural Standards Manual): The approved building elevations and perspectives were submitted for the industrial building as shown in Section IX.D.As stated throughout this report, these elevations have already CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page10 Fol been approved through the administrative process and the building is already existing. The submitted elevations are for supplementary purposes only. Transportation Analysis Access (Comp Plan, UDC 11-3A-3, UDC 11-3H-4): One(1)driveway access is depicted and approved on the overall site plan via W.Nelis Drive (local street).ACHD and the City has approved the location of the access driveway with administrative approval for the overall industrial building(A-2021-0083). Multiuse Pathways (UDC 11-3A-5): The multi-use pathway along Five Mile Creek has already been constructed with the administrative approval for the overall site(A-2021-0083) Sidewalks (UDC 11-3A-17): There are existing 5-foot wide attached sidewalks along W.Nelis Drive that meet UDC standards. Any damaged curb, gutter, or sidewalk is required to be replaced. In addition,due to the cross-parking agreement with the church, staff is recommending a pedestrian connection from the church parking lot to the gym entrance to promote pedestrian connectivity. Services Analysis Pressurized Irrigation(UDC 11-3A-15): Underground pressurized irrigation water is required to be provided as set forth in UDC 11- 3A-15. Storm Drainage (UDC 11-3A-18): Storm drainage is required to comply with the standards listed in UDC 11-3A-18. Utilities (Comp Plan, UDC 11-3A-21): Both the Plan and the UDC establish policy and regulations for extending and connecting to City utilities. Goal 3.03.03G of the Plan mandates urban infrastructure be provided for all new developments,including curb and gutter, sidewalks,water and sewer utilities.All utilities for the proposed development are required to be installed in accord with the standards listed in UDC 11-3A-21. CITY/AGENCY COMMENTS & CONDITIONS Meridian Planning Division The applicant shall comply with the site plan,landscape plan, and building elevations approved with A-2021-0083,including the modifications listed below. The applicant shall submit a certificate of zoning compliance application with the following revisions: - Provide an additional thirteen(13)parking spaces on the west portion of the site as indicated on the concept plan. - Apply for alternative compliance to the parking lot landscaping standards with the submittal of the certificate of zoning compliance application. - Submit a copy of the recorded shared parking agreement with the church. - Provide a pedestrian connection for the members who park in the church parking lot to the gym entrance. CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 11 F91 The proposed project shall comply with the standards listed in UDC 11-4-3-2 for Art, Entertainment, or Indoor Recreation Facility. • Accessory uses including,but not limited to,retail,equipment rental,restaurant, and drinking establishments may be allowed if designed to serve patrons of the use only, and not the general public. • All outdoor recreation areas and structures that are not fully enclosed shall maintain a minimum setback of one hundred feet(100')from any abutting residential districts. The playing areas of golf courses,including golf tees, fairways, and greens,are an exception to this standard. (Ord. 07-1325,7-10- 2007). • No outdoor event or activity center shall be located within fifty feet(50') of any property line and shall operate only between the hours of six o'clock(6:00)A.M. and eleven o'clock(11:00)P.M. • Accessory uses including,but not limited to,retail,equipment rental,restaurant, and drinking establishments may be allowed if designed to serve patrons of the use only. • Outdoor speaker systems shall comply with section 11-3A-13, "Outdoor Speaker Systems",of this title. The conditional use permit is valid for a maximum period of two (2)years unless otherwise approved by the City. During this time,the Applicant shall commence the use as permitted in accord with the conditions of approval, satisfy the requirements set forth in the conditions of approval,and acquire building permits and commence construction of permanent footings or structures on or in the ground as set forth in UDC 11-513-6 A time extension may be requested asset forth in UDC 11-513-6F. CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 12 92 Meridian Public Works wmto ater - Di!;urlxtoSml!r Avoib61ewtSne si , + Sarer Shed CstinTated Propel Sreappli ofim wirer ERlrs * WF(FLF Declining flalanac * PTopctConsistcnt Yes with WW Master FlaryrFaulity Pda . Impod�frnrlQms + See FuNK%VoFksSim Specffir Canciiibms 11fa�r + ffitanl toMratu %WaterArablrkatSite SeVira * Pregrezvle Estimated Pmpd Seeapplkz6m WatcrLRLrs waterClualily Ilonc * PraprtConsistcnt Yes with Water iAmAer Plan lK- N ON-PLAT CONDI 1014E F11sur..Vhwu I1QnRTmFNT Site 9pai6c Carld6mii.■F Apprartl 1. Acy cbmgc%Lo Public wsler inirssmcLum mast be appm%ad by Pulllk works,Lbis ind Ldes hydranic ar Ox aha Wiecii leaL of waler mains. 2. No pcmiwkcnL Arudj L".�Uccx,13mhcy,bui 1clur i,cullwirix.Um l Tu LL74arli."5Yd1I ronL7m. mfilb-An4m irLnhLa,hgbL pupa,LLL-)Lif be haulLwrthm the rt11131.y xLz L C�ralCrr&br rfA"MFKL I. hppliraniAallrnxdingewawrandsrwer main simmdmltiggwiLhLbePublicWnrlts FkpatrrrmL 2. Per Mrridim City Cade{MCC.1.3112 appik"L shall be respansibk Lo ioslall.sewer and wa vivnsinamdHrmughLhisdavelapmrrLt. Applkart way beel.iphtcfar3M[mbiimmant agnsmrnt fire infra&tiu �cnhaoomlool pQ MC['S&5- 3. The applbmrd shall prayide as cinmt[s]for all.public waicr's war mains ns We ofprblie riglLL of way{includc all wabirwvkxswilbydinenu7. Scvkvcr.-watcrCWznKmL varies&rANAingansewer d�th.fcwcr 0 2U D deep Tequilc a SO ft�smLco4 20 25 iL s d0 ft�smlcoi~amd 25.18 n s 45 ft CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 13 93 casement. Rnsumno-permanent slrtrrturs(veer,bushes,biIdirkps,cwpau.cashrrceplade walls,fences,iafiLtra Linn Lenches,Ligbl.poles,ew.)are huiRwiLluin Ibe uLiLiLy ease L. SulimiI an cooeuled o nnenL{car Lbe Frim available hmn Public WD&M,a Iogal desagrioo paepwc3 by an Idaho L.kcnscd PmFosinoal].vrdSurvcycw,wbichmwc irxludc the mmaafthe cwmrcrr (m rked l iXI[MIT A)and an ItIa's 1 I—nW with bearbigs mid tlis larioa(marked V f I ILRIT I1) forrcriew.lAN3i cxhibiLs musLbeaeald sigmad.ard dwodby a 14ofesskmal L mdSuveym.❑Q NOT RL.`ORd. 4. The Cily of Meridim rcquires that prarA rcted irijALioa sysbcros he suplibod by a ycar rnuod source oFcrabw(I rDC.I.1311 4)_The aplAicam dould tie required to use any existing surname ar well water for the primary source IFa sraiaoe or well sconce is mot availalik a single pnimL camrieclinn Lo Lhe cdiruary water system shall he inquired.If a single poioL conncctim is ulilia&t the dei+cloper wLIL he respnwLble for Ihcpayment ofassessmcnrs for Lhecnmmo-n arcasprirx Ln prkw to rccciving dcvcloprnenL Ttlam apprewal. 5. Amy suv ures IFW arc alinw+ed La ro aim shall be subject Lo evalua&m and posslile rm Snmerrt oFsneeL addressing to he im complianoewilh MCC. 16. All irrigation ditches,caair41aoerak,ardiains,exchuive of narural waLerways,inibmuKliig, crmssimg nr laying adjp=L and rn Ligv m dw area being subdivided shall be addressed per 11TIC I L 3A 6. In perFnrmiog such wod,Lhc applbc L shall comply with Idxl a Code 42 12N and any nrher applicable law or regida"n. ?. Amy wells Lhal will dil cnmioue Ln be used must be Twoperly ahandnned aDmrdmg to Idaho Well CsraslrurLinn Stwh3aads Rules admioiskred by Lhe IdaboDopaitmernr of Wader �- The lkvclogo's lrmgfte rstloll per kka sstaLrmtent zddreKsimg whctbeT there me my existing wells in laic dct+clopnK:nL,and it sn,bnw Lhey will onetime m he used,or provide nomrd of l3rcir abandatirrtenL. $. Amy cxislingseplic s}somas wiLbin this project shall he remmnd fr=m rvicepc�r{'iry fkd'mance Soc nn9 1 4wJ9 4 K Csxtiars Cemml 6istria Ilealth for abacdmrnent pmuda and isspa7Lnns(2M)375 521L. 9. All impravemmis related to public Life,safety amd b miLli du1L be completed puitr to oongma y Drthe mr+ounces. 10.Appl icmr shall he rmp irod to pay Poo is Works develjmrmaril plan review,and earninwLian osspo.ctiw fees,as ddcrmimad diving Hic plan inview prnccss,prior to the ismar►m of a plan appmval tidier. I I.It.shall lie Lbe respnnsihiGLy ofthe applicant tD eseum Lhal all desrleganerut fearures asmpLy wiLb the Americus with ImabiLiLim Act and Lhe Fair J Imrsimg Aa. 12.Applicant sbmlL he respnceible foaapplicaLion andenmplianoewi0n any SaAino 4W Permihlhng that=y he required by Lhc Army Corps nF Imeinoers. 11.fki+ leper shall.cacrdinare maiLhnx Iccatinns with the Mcridiam Preset Office. J 4.C,ntnpaction rcsL resuhs shall he submitted Lo We Meridian Building Dcpartoioit Fr all buildoig psis mceivine crkgirom,-,d baclLFRI,where FnMimgwraldsit alopfill.material. 15.Thedcsigncrggin shall be required Ln=tiFy dial the streetcernLedinecl�valiorrsaresala minimum of 3 fceL abav Lbe KEhcst established peak gFnundwator clevuticn. ThiskhD�me tlnaL the bnLlom cicvelinn afncc crawl spras ofhrimcs is Akarst I Fiat above. I I$.The alnplicanic des ipp engineer shall be mKroonslde finr impoclirm of all irrigaikm m dW drdhL gle facilLtywirhim this pmjeeLthx do-WLfall under the juriidi kannf m irrigation district w ACLII).The design erngincer shall provide oertificaiinn that Lhe faciLiLies have been iristalkd m amnrdanoe with the apprDved dmLgn plane.This rertifrcalirm wHL be re4tired beFre a certificalr oFoccuparuy is issued For my sbsrrlrsret wilhio Ibeprojocl 17.At the onmuplvLkm oflhe projecL,Lhe applicant shall be resporcalile Lo submit reonrd drxwioV per the City of Me idran AutoVAa s6-mimAx. Thew record drawings must he received and appmved prior W The knmce of a cartifwa ian ofnccupancy fnr any strurbnm widlio Lbe projocL J9.Astiml light plan will mend Ln be included in 0w civilcnridnxlim planes.Stre Ligkplan r glmiry muLs arc Liswd in section 6 5 of Lbe Lrrapmsr mein Slamdards for Strad Ligbliug_A copy Dl`dr sLamdar,kr be Fnurdar help:ri�w.rneridianciLy.nrgrpuhLic Ax rks.aspc?id 272. J 9.The Cily of Meridim requires that We fmmcr post Lo Ihrc CiLy a parrorsmum-smay in Lhe amonml or 125%oFthc total cons ruction rosL far all iornmpkv sewer,watts and rassc Lriftwutrltre puiwm final.pLik signaLrc_This surety will be verifucdhya Line iLam cmLextinu eTp idodby the owner Ln dye Cky.The x Ly can lie pnsmd im the torn ofan irtetncable LQLcr of credi,cash d{rrnsiLnrbnrd.Applicant ny=file anapplicatioo frsrsurcLy,whicbcm be frxrdon Lhe Community DomlopmmL L3epaLi31e13Lwchsile. Please comae Imadl}evcicpmrnL Sen-ice fin more infomatiom at$47 221 I_ 20.The Cily of Meridim requires tl a Lbe owner posL Lo Lbc CiLy a warrurdy surcry in duc amnrmrL of M%of ik toud croslnwtion cast for all enm*Led sewer,wafer and reuse iofr anxtnrc for duration n f twn yeas.This mmLy will.he verified by a line ieem ansL estimal.e prnsidod by Lhe ownerw the City.The sureLy can lie posood in the form oFan irrevocable Lawrofcredk,cash d pmiL or bnrd.Applicant must file an applicatirm Fir mrvLy,which cm be found on Lhe Cmmmunily DeveleTmmL L7cparbwal.welbsite_ Please comet ImmdDcvclgnmmt Sarin for inns information 2037 221 I_ FINDINGS Conditional Use(UDC 11-513-6E) The commission shall base its determination on the conditional use permit request upon the following: CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 14 94 That the site is large enough to accommodate the proposed use and meet all the dimensional and development regulations in the district in which the use is located. The Commission finds the design, construction, operation and maintenance of the proposed use with the conditions imposed, should be compatible with other uses in the general vicinity but may moderately change the character of the area due to the limited I-L zoning within the City. That the proposed use will be harmonious with the Meridian comprehensive plan and in accord with the requirements of this title. The Commission finds the proposed use will be harmonious with the Comprehensive Plan in that it will provide an indoor recreation use which will contribute to the mix of uses desired in the MU-NR Comprehensive designation as desired. That the design, construction, operation and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area. The Commission finds the design, construction, operation and maintenance of the proposed use with the conditions imposed, should be compatible with other uses in the general vicinity but may moderately change the character of the area due to the limited I-L zoning within the City. That the proposed use,if it complies with all conditions of the approval imposed,will not adversely affect other property in the vicinity. The Commission finds that if the applicant complies with the conditions outlined in this report, the proposed use will not adversely affect other property in the area. That the proposed use will be served adequately by essential public facilities and services such as highways, streets, schools,parks,police and fire protection, drainage structures,refuse disposal,water, and sewer. The Commission finds the proposed use will be served by essential public facilities and services as required. That the proposed use will not create excessive additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. The Commission finds the proposed use will not create additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. That the proposed use will not involve activities or processes,materials, equipment and conditions of operation that will be detrimental to any persons,property or the general welfare by reason of excessive production of traffic,noise, smoke, fumes, glare or odors. The Commission finds the proposed use will not be detrimental to any persons,property or the general welfare by the reasons noted above. That the proposed use will not result in the destruction,loss or damage of a natural, scenic or historic feature considered to be of major importance. The Commission finds the proposed use will not result in the destruction, loss or damage of any such features. Additional findings for the alteration or extension of a nonconfonning use: Not Applicable. CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 15 F951 That the proposed nonconforming use does not encourage or set a precedent for additional nonconforming uses within the area; and, Not Applicable. That the proposed nonconforming use is developed to a similar or greater level of conformity with the development standards as set forth in this title as compared to the level of development of the surrounding properties. Not Applicable. ACTION A. Staff: Staff recommends approval of the proposed Conditional Use Permit per the provisions included in Section IV in accord with the Findings in Section V. Commission: The Meridian Planning&Zoning Commission heard this item on July 10',2025. At the public hearing.the Commission moved to approve the subject conditional use permit request. 1. Summary of the Commission public hearin& a. In favor: Trevor Summers b. In opposition:None c. Commenting:None d. Written testimony:None e. Staff presenting application:Nick Napoli f. Other Staff commenting on application:None 2. Key issue(s)of public testimony: a. None 3. Key issue(s)of discussion by Commission. a. None:No discussion on this application. 4. Commission change(s)to Staff recommendation: a. None CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 16 96 EXHIBITS Project Area Maps (link to Project Overview) Aerial Legend � Project Locationx ,.: Area of Impact OAnalysis ,��•� 111-i � .� low qr jai V"T AIR is e'i•��a 7a � i Aw -go Vl � y � CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page17 97 =rll# IfAffA► - - --=�Irk..� �if u ■��■ii■� • - ► � rr for �� r■ G [ g♦ !iil_,o Sri 1IEA �■tl#Irnryt So lon� � � irn� mlrry�+�y /j�liii jt�� ■. I/� ••n vl► •ii ■Itt►� ■ 1rf � 1# . lllfq, y��•w V • • �FiH4 ■ �eql n .rat . ■ r:wli'I' a Z mil► � ?� �� y / "it J 11.1 lrrrrlrrM� ♦r y � �■ ru`t:■ e� � uu r �, � r� ��� � <�1�1�11� l■■ �In,,..���-�I ■■■■■■■r.-......■ ■�r rr �■ ■r11� IIpIOJ•■■■l■rlr■arrr r[ ee• n a■�rrrati :I am■ ■l► ■��■ l .ia nri, i:::::11� ■■ � }�r[ .�essro`.� 1�■r r � �C 1 r■r�\��l•* .' i f_ loll iw 11 � �■■o. �■ r ■[llq ,rrr,, �■l■ i�■■■ \�'n■ _� lIr}��■■... ■■■ ■l a ll l[• • ♦ ` r rr �ll •1■f\ \�1[■ r.�#!j 111 i■ r. ,i asr .. ♦ rr - Nrr■n■iff �r. Q'w:r I•♦tir■■:■nu■■■ :: r■■■■ r.�► ■[ ■k. .alrr■.�it/� ■ �■■ 1�� rrrrr■ r..■ ..... ♦ jr i 1 ,. ♦ a1r arrr■■■■a■ ■.. ■■■■. � ■ _► ■ rrt�►1MINI rr■rrrrrlw►i■l!�■r ,AI/ ♦ �� ■ ■■.■� w -, alnn■lk._ n1 pl srru�- ■n 1i■r�r■■■aal■�.■ .■.:: �{ r r ■lrlrirllll■r_ �►■rrr$'= A[ r![[O w *� ♦, QT[1 r ��r�: �♦� *•� � � r ' ' a loin anu� �y� � yrs� ♦r r ♦ r s■■[r- ,"■r�► ' ■■-. t i.Ra♦♦ w,■■lsnsrsrsrs■l1l■fr ♦w ■i�w:r i�ie:R as o■■■rrr_urrur■: -♦♦♦ �♦am[ ���..I.f.r.am�+s♦a Moo �► S- 1 —INN e - f1#� pinmorass t■/ - - 11 ■- IIII 1111''�I r1A 1 r_' 01 mom rt � r�' Z ■ii ■- � s 1 Its :riiii ■ i L�f111t �f Ills �ac Y ♦alr � ♦ rr �, us ■ J l ilrrrr#rrls /1♦� 111 (� � i lr;��R;;■i �\ , �1 � • - 1.1[[1■ L qta r ..= USTICK s e unD [ r- i /E� .■� wlr nr� ,I[■rRl. ■■r■.. ■lf rrirrl ■ urrruul ■■ rrla ■■ ' ■rrr■■■ ■l•1 a1 nnrr a ■■■■■��■ a■ ■■ ■ 111� ■ a nrr■ra an ■ .�.-, . :r .� 7■l► ■ ■■:�::■ is as■ •■■.�r�♦ ■a■ ■ NINE 1 1..r 1■■■r�\� its N. ■■ri w ■1 ...w■. r }r■ l[a1�1 irr '= �rrrE ' r •■r 1f�lrrr _r 1 lllr■.....� ii■ ll • ♦ rrr` ■; Irr■ I�i l � � r[r i.-•♦ .■ .r ir■■ rah 1!f■R ♦ 4 avrio. No !lw ll■•■. �::�R tiiiii=:rr■■■■a ■■ r■l ii �� ,hu r1 'CIr i i��i:i�i�� LL �� ���ai■ !i iw ♦ w C■nr■nr► r::i i:::: fir•`� r��w� lr■ Ark■.a■.■s■.� ►r*w. r>R ■■■■Itbask.■look., doA�r���♦f ♦ - • ■i■■■■■a■■■■�r/■•■ p _ ■■nruih■ • ia� row fir ors}lsirllllr4 --.--- :��j♦�♦ - ♦ ♦i • 1 11 m Planned Development Map +�w1�1Li�17 W1J11y Legend �l Project Location � t � Area of Impact City Limits Planned Parcels — OAnalysis LEO i HEM - O i r ' CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page19 F991 Service Accessibility Report Overall Score: 24 1 5th Percentile Description ■ ■ Location In City Limits GREEN Extension Sewer Trunkshed mains -< 500 ft.from parcel GREEN Floodplain Either not within the 100 yr flaodplain or > 2 acres GREEN Emergency Services Fire Response time > 9 min. RED Emergency Services Police Meets response time goals some of the time YELLOW Pathways Within 1/4 mile of current pathways GREEN Transit Not within 1/4 of current or future transit route RED Ultimate configuration (#of lanes in masle� =t-'e,t. Arterial Road Buildout Status GREEN plan) matches existing (# of lanes) School Walking Proximity Within 1/2 mile walking GREEN Either a High School ❑r College within 2 miles OR a Schaal Drivability Middle or Elementary School within 1 mile driving GREEN (existing or future) Either a Regional Park within 1 mile OR a Camirun u.- Parklalkability Park within 1/2 mile OR a Neighborhood Park with' GREEN 114 mile walking CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 20 11001 Site Plan (date: 5/l/2025) -� A U" 0 Nelis Gym TI r ---_- -- -- --1 -- -_ Trevor Summers 34 V)W Ner Dc Meridian.ID 0698 ' [ £ g fiayevjpilrevl�gmail.vom,206.877_I341 Conditlonal Use App 5/1/2025 .__._______________ten Yor1v"_ /v •�•• •� �� •� \�,, e✓N �� ' - - — wYdBmahelW 6uBd.0 G.J.5unmary xi ~,•`•. 4 _ 4 2.��,�:. / �9•j 1 dr.^ ����v.:.":.�.'..' Js y Gt0 cover.Si[a Plan. Busting Sila Plan 8 Code Da� CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 21 11011 Landscape Plan(date: 5/21/2025) 7-- f.—M trknurieyd.fue _ Nelis Gym TI Trevor Summers --�--�-�--� G f aamwN�na, ,,ma�aae i o-�..anur.i�y,�,.tizaa.an.7ssa :-----T� — Conditional Use App 512112025 v..,tr pa. h P-j-Au-- 79:9 Cad.nwmaq ; I JJ _ —'G1-0 E-1—sile amn RN � &Ccdr 6ax CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 22 [102] Building Elevations (date: 2/10/2021) WFST ELEVATRYN f TT T T T eeq CL NORTH ELFVA770N CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 23 [103] ............ ............... r Nil L EAST El"ATMN z SOUTH ELEVATION • h-3-I CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2025-0023 Page 24 [104] E K IDIAN:--- iuAn Planning and Zoning Presentations and outline Changes to Agenda: None Item #4: Touchmark – MDA, PUD, RZ (H-2025-0012) Application(s):  Development Agreement Modification (doesn’t require Commission action, only Council)  Modification to the existing Planned Unit Development  Rezone Size of property, existing zoning, and location: This site consists of 121.5 acres of land, zoned L-O, generally located on the south side of E. Franklin Rd. and the north side of I-84, midway between S. Eagle Rd. & S. Cloverdale Rd. History: The majority of this property was annexed in 2000 with a DA and a CUP for a conceptual PUD – a smaller 4.6 acre portion of property was later annexed and included in an amended DA and concept development plan. The original conceptual PUD was approved for a continuing care retirement community comprised of 250-300 units of independent and assisted living, 450 units of residential, including single-family, duplex, townhomes and multi-family, a community senior health and fitness center, medical office parks, commercial and retail businesses. Since that time, approximately 428 residential units have been built in the retirement community along with a senior health and fitness center and many amenities including open green space and walking trails, a community garden, coffee shop and bistro, salon and barbershop, a library, theatre, dining venues, pickleball courts and other on-site amenities. In 2003, the DA & PUD were amended to allow the development of 318 residential units and approximately 600,000 s.f. of commercial/office space on 138 acres of land with reduced building setbacks in the L-O district. Comprehensive Plan FLUM Designation: MU-C Summary of Request: A modification to the DA is proposed to update the conceptual development plan for the overall site, which consists of approximately 121.5-acres of land, and consolidate the existing agreements into one (1) new agreement that replaces all previous agreements. A rezone of 55.17 acres to the C-C district and 8.17 acres to the C-G district is proposed from the L-O district for the undeveloped portion of the site included in the master plan to accommodate the proposed uses. The reason for the rezone is that because the concept plan is proposed to be revised, it must comply with current UDC provisions, which prohibit retail, hotel, self-service storage, light industry & multi-family residential uses in the L-O district. The previously developed areas of the site will remain L-O as allowed with the previous PUD through City Code in effect at that time. The proposed project consists of 121.5 acres of land within a larger MU-C designated area totaling approximately 164 acres and includes a mix of uses consisting of commercial, office, light industry and a variety of residential housing types as shown on the “bubble” plan consistent with the Plan. A couple areas on the concept plan (w/star symbol) are shown with two (2) possible uses – the medical office/townhomes along the southwest boundary of the site and the commercial/multi-family along the north side of the site along Franklin Rd. If the demand for office space doesn’t come to fruition, the Applicant proposes an alternate use of townhomes (50- 55 units) in that area. Commercial use similar to the commercial proposed to the west along Franklin is proposed on the other area with the flexibility for MFR (number of units/density is not specified but the Applicant states the area could support 115-140 units using the same density as the other multi-family area) – the multi-family use would be at a larger scale than the townhomes and an increase in density. Staff does not recommend approval of the optional residential uses because residential uses as the Comp Plan allows for up to 65% of the development area to be comprised of residential uses with the provision of transit and the Applicant is proposing approximately 68%, not including the optional multi-family & townhome style units. Additionally, commercial uses are desired in the MU-C diagram in the Comp Plan along arterial streets transitioning to lesser intense uses. Therefore, Staff recommends the concept plan is revised to only reflect commercial uses on those portions of the property. A modification to the existing PUD (Meadowlake Village CUP-03-005) is proposed to update the conceptual development plan and includes a request for deviation to the maximum building height allowed in the C-C district from 50-feet to 64-feet for the hotel (measured to the highest point of the structure), and inclusion of townhome dwellings as a permitted use in the C-C district. Staff is amenable to the building height increase as proposed; however, is not in support of the request for townhomes to develop in the C-C district because townhomes (where each unit is on its own property) are a prohibited use in the C-C district and therefore, aren’t allowed through the PUD. This would require a rezone to a residential or traditional neighborhood zoning district in which the use is allowed. Because the Applicant isn’t proposing to subdivide the property, the use is considered MFR and is allowed in the C-C district. The new development plan includes approximately 114,000 sq. ft. of medical office space, approximately 300-400 non-age restricted market rate multi-family units (both apartments and townhouses) with a possibility of 165-195 additional units through the alternate uses proposed, 20-25 single-family attached units (aka villas), three (3) single-family detached units (aka cottages), 75,546 sq. ft. of self-storage (i.e. light industry), 45,000 sq. ft. of general office space, 45,000 sq. ft. of commercial retail space and an approximate 126- room hotel. Conceptual building elevations for the proposed structures are as shown. A pedestrian pathway plan was submitted as shown – the green lines represent 10’ wide pathways, the blue 5’ proposed sidewalks and the pink 5’ wide existing sidewalks. A phasing plan is proposed as shown, which depicts (4) phases of development, is anticipated to be completed between 2030 and 2040. Phase 1 is the villas and cottages (2-5 years), Phase 2 is the apartments and townhomes (3-10 years), Phase 3 is the commercial, self-storage, additional multi-family and hotel along Franklin Rd. (3-15 years), and Phase 4 is medical office, daycare, post-acute care and townhomes (4-15 years). Staff recommends a subdivision application is submitted for each phase of development and recorded in order to have a legal parcel for development purposes. The existing community is proposed to remain unchanged except for the small golf course, which at some point in the future may redevelop with villas (i.e. duplexes). The open space amenities are also evolving and as the golf course is redeveloped, the required open space amenities will be reprogrammed in other areas of the project. Before changes can be approved to this area, the Applicant must demonstrate compliance with the terms of the previously approved PUD in regard to site amenities with removal of the golf course. Per the City code in effect at that time, at least 10% of the gross area of the PUD was required as open space, exclusive of required street buffers and buffers between incompatible land uses. The developed area consists of 61.50 acres of land, therefore, a minimum of 6.15 acres of qualified open space is required to be provided. An exhibit should be submitted showing the existing qualified open space without the golf course area prior to the City Council hearing. Written Testimony: No public comments were received. The Applicant submitted a response to the staff report. Staff Recommendation: Approval per the recommendation in the staff report (Note: With DA’s and PUD’s, the decision-making body is able to place additional conditions on development applications that may not typically be required in the UDC in an effort to provide exemplary site development in accord with the purpose statement of the PUD.) Possible Motions: Approval After considering all staff, applicant and public testimony, I move to recommend approval to the City Council of File Number H- 2025-0012, as presented in the staff report for the hearing date of July 17, 2025, with the following modifications: (Add any proposed modifications to conditions) Denial After considering all staff, applicant and public testimony, I move to recommend denial to the City Council of File Number H-2025- 0012, as presented during the hearing on July 17, 2025, for the following reasons: (You should state specific reasons for denial) Continuance I move to continue File Number H-2025-0012 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance) ______________________________________________________________________________________________________ Item #5: Gramercy Townhomes (H-2025-0019) Application(s):  Rezone  Preliminary Plat  Development Agreement Modification Size of property, existing zoning, and location: This site consists of 6.98 acres of land, zoned C-G, located at 1873, 1925, and 2069 Wells Avenue. History: In 2021, the subject properties were approved for a multi-family development consisting of 164 age-restricted units on 5.24 acres of land. Comprehensive Plan FLUM Designation: Mixed Use Regional Summary of Request: Rezone of 6.98 acres of land from the C-G zone to the TN-R zone, a preliminary plat for 82 buildable lots and 8 common lots, and a development agreement modification to establish a new concept plan and remove the age restriction on the property. The subject properties fall within the Mixed-Use Regional (MU-R) Future Land Use Map (FLUM) designation. The intent of the MU-R designation is to provide a mix of employment, retail, and residential dwellings and public uses near major arterial intersections. The MU-R designation should make up between 10% and 30% of the total development area, with gross residential densities ranging from 6 to 40 units per acre. The MU-R area, located at the southwest corner of Eagle Road and Overland Road, encompasses approximately 165.2 acres. Of that total, roughly 41.5 acres are designated for residential use, including the proposed development, accounting for 25.1% of the MU-R area in this quadrant, which aligns with the Comprehensive Plan's vision and density targets. The proposed development plan depicts eighty-two (82) townhomes with the Traditional Neighborhood Zoning (TN-R) as the single use for the subject properties. While the TN-R zoning requires two different types of housing, staff finds that the surrounding garden-style apartments, single-family detached, and townhomes provide the mix of units desired in the area. The proposed townhomes range in size from 1,650 s.f. and 1,750 s.f. with three (3) and four (4) bedroom units. Net density for the development exceeds the minimum net density of 6 dwelling units per the Tn-R standards. In addition to the townhomes, the development plan depicts a 0.60-acre common open space with parkways, on-street parking, and alleys. The applicant has provided an internal pathway to connect with the ten (10) foot multi-use pathway on the southern boundary to help residents connect with Mountain View High School and Gordon Harris Park to the south. The project exceeds open space requirements, providing 1.31 acres (18.8% of the site) against a 15% minimum. Amenities include a large central open space and a dog waste station, totaling 3.5 amenity points, well above the required 1. Each townhome includes four parking spaces, and 46 guest spaces are also provided throughout the community. Access is proposed via three (3) drive aisle connections: one to the north connecting to an existing drive aisle and commercial property, and two to the east to connect to S. Wells Avenue. These drive aisles are currently not named and are considered commercial drive aisles. However, the applicant is proposing to add six private streets in the development that require a minimum of one connection to a public street. Staff has discussed this with the applicant and determined the southern connection on the eastern boundary would be best as it aligns with Blue Horizon on the east side of S. Wells Avenue. This will take coordination with the neighboring property owners to name the existing private drive aisle. The applicant has indicated that the buildout timeline for the development depends on demand; however, they anticipate developing the project in five (5) phases, with the first phase consisting of the large open space, amenities, and roads. Staff Recommendation: Approval with a development agreement and conditions. Written Testimony: Emily Prumers – Concerns regarding traffic and congestion becoming worse, specifically at the Overland and Eagle intersection and being in close proximity to the Goddard School (daycare center); incompatible density in area (gross density of 11.74 units/acre); deviation from the previously approved concept plan for 164 age-restricted apartments; Strain on public services ie. Utilities, parks, schools, fire/police; No transition from commercial uses. Possible Motions: Approval After considering all staff, applicant and public testimony, I move to recommend approval of File Number H-2025-0019, as presented in the staff report for the hearing date of July 17, 2025: (Add any proposed modifications to conditions) Denial After considering all staff, applicant and public testimony, I move to deny File Number H-2025-0019, as presented during the hearing on July 17, 2025, for the following reasons: (You should state specific reasons for denial) Continuance I move to continue File Number H-2025-0019 to the hearing date of ____ for the following reason(s): (You should state specific reason(s) for continuance.) h2 Planning and Zoning July 17, 2025Commission Meeting Slide 1 h2 Agenda Item Numbers/Order: hoodc, 12/19/2006 Zoning MapAerialFLUM Zoning MapAerialFLUM W IDIAN� AGENDA ITEM ITEM TOPIC: Public Hearing for Touchmark (H-2025-0012) by The Land Group, generally located on the south side of E. Franklin Rd. and the north side of 1-84, midway between S. Eagle Rd. and S. Cloverdale Rd. Application Materials: https://bit.ly/H-2025-0012 A. Request: Modified Development Agreement to update the conceptual development plan for the overall site, which consists of approximately 121.50 acres of land to consolidate the existing agreements (AZ-99-021 Touchmark (recorded in 2001, Inst. #101048096); April 2001 Addendum (Inst. # 101048097); May 2003 Addendum (Inst. #103137119); AZ-02-018 (Bair Property AZ-02- 018, Inst. #102143308); MI-07-006 (Meadowlake Village North 3rd Addendum, Inst. #108022885) into one new agreement that replaces all previous agreements. B. Request: Rezone of 63.34 acres of land from the L-0 to the C-C (55.17 acres) and C-G (8.17 acres) zoning districts. C. Planned Unit Development Modification (Meadowlake Village CUP-03-005) to update the concept/use plan and include 4.6 acres of additional land, a deviation to the maximum building height allowed in the C-C district from 50ft. to 64ft. for the hotel and inclusion of 2 and 3 story townhome dwellings. 105 PUBLIC HEARING SIGN IN SHEET DATE: July 17, 2025 ITEM PROJECT NAME: Touchmark H-2025-0012 wish to testify Your Full Name Your Full Address Representing (marl(x (Please Print) HOA? if yes) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 COMMUNITY DEVELOPMENT C��fEPIDIAN*,,--, DEPARTMENT REPORT HEARING 7/17/2025 Legend DATE: Project Location TO: Planning&Zoning Commission Area of Impact �= City Limits FROM: Sonya Allen,Associate Planner m , 1 208-884-5533 sallen@meridiancity.org _ -" p APPLICANT: The Land Group SUBJECT: H-2025-0012 _ Touchmark—MDA,PUD,RZ01 LEMUR � LOCATION: Generally located on the south side of E.Franklin Rd. and the north side of I-84, I 0., , ® ® midway between S. Eagle Rd. and S. @ , Cloverdale Rd.,in the north 1/2 of Section 16,T.3N.,R.IE. (Parcels: S1116120662, S1116121055, S1116131260, S1116131400, S1116212561, S1116244261, R8509130020, S1116244270, S1116244710). I. PROJECT OVERVIEW A. Summary The Applicant has submitted the following development applications for the subject property: • Development agreement modification(MDA)to update the conceptual development plan for the overall site,which consists of approximately 121.5-acres of land, and consolidate the existing agreements [AZ-99-021 Touchmark(recorded in 2001 Inst.#101048096); April 2001 Addendum(Inst. #101048097);May 2003 Addendum(Inst. #103137119); AZ-02-018 (Bair property AZ-02-018 Inst. 102143308);MI-07-006 (Meadowlake Village North 3rd Addendum Inst.#108022885)] into one (1)new agreement that replaces all previous agreements; • Rezone(RZ) of 63.34-acres of land from the L-O to the C-C(55.17-acres)and C-G (8.17-acres)zoning districts; and • Modification to the existing Planned Unit Development(PUD) (Meadowlake Village CUP-03-005)to update the concept/use plan and include 4.6-acres of additional land, a deviation to the maximum building height allowed in the C-C district from 50-feet to 64- feet for the hotel, and inclusion of townhome dwellings as a permitted use in the C-C district. City of Meridian I Department Report 1. Project Overview 106 B. Issues/Waivers As part of the PUD,the Applicant requests a deviation to the maximum building height allowed in the C-C district from 50-feet to 64-feet for the hotel(measured to the highest point of the structure); and allowance for townhome dwellings to develop in the C-C district. In regard to the request for townhouse dwellings to develop in the C-C district,townhouse dwellings are defined in UDC 11-1A-1 as, "A structure containing three(3)or more dwelling units attached by common walls where each dwelling unit is located on a separate property." Townhouse dwellings are a prohibited use in the C-C district and therefore, aren't allowed through the PUD per UDC 11-7-4A.2. If the property is proposed to be subdivided in the future so that each unit is on a separate property, a rezone would be required to a residential or traditional neighborhood zoning district in which the use is allowed. The proposed townhouse style units are considered multi-family residential because there are multiple units on a single property and therefore, are allowed in the C-C district. C. Recommendation Staff. Approval Commission: Pending D. Decision City Council: Pending I1. COMMUNITY METRICS Table 1:Land Use Description Details Map Ref. Existing Land Use(s) Residential(single-family detached, - Proposed Land Use(s) Commercial,multi-family residential[apartments and - townhome,single-family detached(aka cottages)and attached(aka villas)style units all on one property], commercial/light industry,hotel,medical office Existing Zoning L-O(Limited Office) VII.A.2 Proposed Zoning C-C(Community Business)(55.17 acres)&C-G(General Retail&Service Commercial)(8.17 acres) Adopted FLUM Designation MU-C(Mixed Use—Community) VII.A.3 Table 2: Process Facts Description Details Preapplication Meeting date 2/18/2025 (PREAPP-2024-0119) Neighborhood Meeting 2/26/2025 Site posting date 7/2/2025 Table 3: Community Metrics Agency/Element Description/Issue Reference Ada County Highway District Error! Reference source not found. • Comments Received Yes - • Commission Action Required No - • Access E.Franklin Rd.,an arterial street and S.Touchmark Way,a - collector street.No access is proposed via Louise Dr.,a collector street City of Meridian I Department Report 11. Community Metrics 107 • Traffic Level of Service(LOS) The SH-55/Eagle intersection and other lane groups don't - meet ACHD's LOS planning thresholds per the TIS but area roadways do(no improvements are planned in the future) ITD Comments Received ITD reviewed the TIS and has no comments or Error! requirements for this development Reference source not found. Meridian Fire No comments were received Error! Reference source not ME MI found. • Distance to Station Fire Station#1 —less than 2 miles away • Response Time The service accessibility report states response time is more than 9 minutes(due to traffic delays,not the proximity of the station),which isn't acceptable Meridian Police No comments were received Error! Reference source not found. • Response time The service accessibility report states it meets response time goals most of the time Meridian Public Works Wastewater See Agency Comments folder in the public record Error! Reference source not found. • Distance to Mainline Available Meridian Public Works Water Error! Reference source not found. • Distance to Mainline On-site ' School District(s) No comments were submitted Error! Reference source not found. Note: See section IV. City/Agency Comments&Conditions for comments received. City of Meridian I Department Report 11. Community Metrics 108 Figure 1: One-Mile Radius Existing Condition Metrics Reference Parcel:S1116120662 Uate Retrieved:2025 1 718 Parcel Count Parcel Acreage I nfill Indicator: 412 Surrounding Area _ 255 21% Not city 655 ® City Limits 974,2 ❑ Not city Household Change Household&Population Growth r Households C3 2020 Population Change:25.69a Population ■Growth (Household and Population Change since 2010 Decennial) 3,000 10,000 Use Types Residential Addresses All Addresses ■ Single-family 53% rl Multi-family ¢7% 33% ® Commercial Preliminary Plats(last S-years) Conditional Use Permit(last S-years) Pro posed Proposed Pending Pending Approved Approved W. 0 500 1000 15W 0 200 400 N ■ Single-family ® Multr-family >> For Projects with Residential Units << 2.00 500 Single-family -jr Residential c 150 Parcel Diversity a 0.77 0 Parcel Count ;n 0.50 ' «. a 0.21 is a ■Average Acres ° 0.00 0 R-2 R-4 RIB R-15 Average Single-family Density by Zoning Average 15.00 ` 12.66 Residential Net Density 10.00 c 5.00 — 4.a1 0s.s3 i 5■0i 1.29 0.00 Dwelling Units 1 Acre R-2 R-4 R-8 R-15 Notes: See VIII.Additional Notes&Details for Staff Report Maps,Tables,and Charts. City of Meridian I Department Report II. Community Metrics 1 09 Figure 2: ACHD Summary Metrics ACHD Planned Improvements 1. Capital Improvements Plan (CIP)l Five Year Plan (FYP): There are no roadways, bridges or intersections in the general vicinity of the project that are in the Five Year Plan(FYP)or the District's Capital Improvement Plan (CIP). Level of Service Planning Thresholds 1. Condition of Area Roadways Traffic Count is based on Vehicles per hour(VPH) Roadway Frontage Functional PM Peak Hour PM Peak Hour Classification Traffic Count Level of Service Franklin Road 2,250-feet Principal Arterial 774 Better than "E° Touchmark Way (Louise Drive to 651-feet Collector 233 Better than °D" Franklin Road *Acceptable level of service for a five-lane principal arterial is"E"(1,780 VPH). x Acceptable level of service for a two-lane collector is"D"(425 VPH). *Acceptable level of service for a three-lane collector is"D"(530 VPH). Notes: See VIII.Additional Notes&Details for Staff Report Maps,Tables,and Charts. Figure 3: Service Impact Summary pact Too Ready Marginal Caution ,NA- Notes: See VIII.Additional Notes&Details for Staff Report Maps,Tables,and Charts. III. STAFF ANALYSIS Comprehensive Plan and Unified Development Code(UDC) A. General Overview The subject property is designated Mixed Use—Community(MU-C) on the Future Land Use Map in the Comprehensive Plan. The purpose of this designation is to allocate areas where community-serving uses and dwellings are seamlessly integrated into the urban fabric. The intent is to integrate a variety of uses, including residential,and to avoid mainly single-use and strip commercial type buildings. Non-residential buildings in these areas tend to be larger than in Mixed Use Neighborhood(MU- N) areas,but not as large as in Mixed Use Regional(MU-R)areas. Goods and services in these areas tend to be of the variety that people will mainly travel by car to but also walk or bike to(up City of Meridian I Department Report III. Staff Analysis 1 10 to three or four miles). Employment opportunities for those living in and around the neighborhood are encouraged. Developments are encouraged to be designed according to the conceptual MU-C plan depicted in Figure 3E in the Plan. In reviewing development applications,the City will consider the following items in MU-C areas: (staffs analysis in italics) • Development must comply with the Functional Integration principles for development in all Mixed-Use areas.A variety of residential and non-residential uses are proposed with pedestrian connectivity throughout the development, which should reduce vehicle trips for nearby residents and/or visitors. At least three different land uses (i.e. commercial, office, residential) are proposed on the master plan in the MU-C designated area as required. Because high-density residential apartments are proposed in the multi family area on the concept plan, commensurate levels of employment or other non-residential elements supporting residents and reducing local vehicle trips should be provided in areas planned for commercial and office uses. Neighborhood activity areas are provided in the existing retirement community. Community-serving facilities such as medical offices are planned within the development and St. Luke's hospital and other medical offices and clinics are located nearby to the west, which should reduce extraordinary service and transportation network impacts. Supportive and proportional outdoor public and/or quasi public spaces and places including,but not limited to,parks,plazas, outdoor gathering areas and linear open space are expected and should be provided in accord with the MU-C guidelines as noted below. These areas may be located in spaces between residential and non-residential uses to provide both integration and transition between uses. Outdoor seating areas at restaurants are not considered supportive public spaces unless integrated into shared open space, natural amenities, and interconnected with cohesive pathway elements. These areas should be designed in accord with the Holistic Design principles included in the Comprehensive Plan (see pg. 3-18 and 3-19 for more information). Staff recommends a provision of the DA that requires future development applications to demonstrate consistency with the Functional integration principles described in the Integration of Uses and Holistic Design sub-sections of the Comprehensive Plan (pp. 3- 16 thru 3-19). • Residential uses are expected to comprise between 20% and 50%of the development area, with gross densities ranging from 6 to 15 units/acre(of the residential area). The Applicant states residential uses are proposed to comprise approximately 68%of the overall site, including the built-out area, with a density of 11.5 units/acre, which exceeds the maximum development area desired for residential uses, even with the additional 15%allowed with the provision of transit. This calculation does not include the two (2) areas where the Applicant would like the flexibility to develop residential instead of medical office and commercial uses. For this reason,Staff recommends those areas develop with commercial and medical office uses and that the residential option be removed from the concept plan. • Supportive and proportional public and/or quasi-public spaces and places should comprise a minimum of 5% of the development area are required. The Applicant states public and/or public spaces and places will comprise a minimum of 5%of the development area and will consist of pedestrian walkways, recreational areas for children and adults to enjoy daytime leisure activities such as playgrounds, open green space, dog areas and functional spaces that promote general health and wellness. Future development City of Meridian I Department Report III. Staff Analysis ■ applications shall demonstrate compliance with this requirement by providing spaces and places consistent with the Functional Integration principles in the Comprehensive Plan. • Where the development site has transit available or stops are planned, an additional 15% of the site may be dedicated to residential uses.Alternatively,this bonus may be applied where the development an identified employment area, and where last-mile transportation features are incorporated into the site including thoughtfully located and integrated ride share parking, commensurate with potential trip capture. Other innovations to reduce traffic and/or parking impacts and capture local trips may be considered. Transit is available to this site and is within one(1) mile of a future identified transit facility. Therefore, an additional 15%of the site may be dedicated to residential uses. • Sample uses appropriate in MU-C areas include: All MU-N categories, community scale grocers,clothing stores, garden centers,hardware stores,restaurants,banks, drive-thru facilities,auto service station,retail shops, and other appropriate community-serving uses. Sample zoning includes: R-15,R-40, TN-R,TN-C, C-C, and L-O. The proposed project consists of 121.5 acres of land within a larger MU-C designated area totaling approximately 164 acres and includes a mix of uses consisting of commercial,office, light industry and a variety of residential housing types as shown on the"bubble"plan below in Section VILE consistent with the Plan. A couple areas on the concept plan are shown with two (2)possible uses—the medical office/townhomes along the southwest boundary of the site and the commercial/multi-family along the north side of the site along Franklin Rd. If the demand for office space doesn't come to fruition,the Applicant proposes an alternate use of townhomes (50- 55 units)in that area. Commercial use similar to the commercial proposed to the west along Franklin is proposed on the other area with the flexibility for multi-family residential(number of units/density is not specified but the Applicant states the area could support 115-140 units using the same density as the other multi-family area)—the multi-family use would be at a larger scale than the townhomes and an increase in density. Because more intense commercial uses are desired along arterial streets in the MU-C diagram in the Comprehensive Plan transitioning to lesser intense uses and because the percentage of residential uses exceeds that desired in the Plan for MU-C designated areas, Staff recommends the concept plan is revised to only reflect commercial use on that portion of the property. A rezone of 55.17 acres to the C-C district and 8.17 acres to the C-G district from the L-O district is proposed for the undeveloped portion of the site included in the master plan to accommodate the proposed uses. Because the concept plan is proposed to be revised, it must comply with current UDC provisions,which prohibit retail,hotel, self-service storage,light industry or multi- family residential uses in the L-O district. The previously developed areas of the site will remain L-O. A modification to the existing Planned Unit Development(Meadowlake Village CUP-03-005)is also proposed to update the concept/use plan and include 4.6-acres of additional land, a deviation to the maximum building height allowed in the C-C district from 50-feet to 64-feet for the hotel (measured to the highest point of the structure), and inclusion of townhome dwellings as a permitted use in the C-C district. In regard to the request for townhouse dwellings to develop in the C-C district,townhouse dwellings are a prohibited use in the C-C district and therefore, aren't allowed through the PUD. This would require a rezone to a residential or traditional neighborhood zoning district in which the use is allowed as set forth in UDC 11-7-4A.2,which states, "Allowed uses.Applicant may request that specific conditional or accessory use(s) allowed in the district be allowed as principal permitted use(s)."Note: Townhouse style units may develop in the C-C district where individual units are not on individual lots as they are then considered a multi-family residential use. City of Meridian I Department Report III. Staff Analysis 112 The existing community is proposed to remain unchanged except for the small golf course,which at some point in the future may redevelop with villas(i.e. duplexes). The open space amenities are also evolving and as the golf course is redeveloped,the required open space amenities will be reprogrammed in other areas of the project. Before changes can be approved to this area,the Applicant must demonstrate compliance with the terms of the previously approved PUD in regard to site amenities with removal of the golf course.Per the code in effect at that time (12-6-7E.5), at least 10% of the gross area of the PUD was required as open space,exclusive of required street buffers and buffers between incompatible land uses. The developed area consists of 61.50 acres of land,therefore,a minimum of 6.15 acres of qualified open space is required to be provided.An exhibit should be submitted showing the existing qualified open space without the golf course area. The new development plan includes approximately 114,000 sq. ft. of medical office space, approximately 300-400 non-age restricted market rate multi-family units(both apartments and townhouses)with a possibility of 165-195 additional units through the alternate uses proposed, 20-25 single-family attached units(aka villas),three(3) single-family detached units(aka cottages), 75,546 sq. ft. of self-storage(i.e. light industry),45,000 sq. ft. of general office space, 45,000 sq. ft. of commercial retail space and an approximate 126-room hotel. A phasing plan, included below in Section VII.H,which depicts four(4)phases of development, is anticipated to be completed between 2030 and 2040.Phase 1 is the villas and cottages(2-5 years),Phase 2 is the apartments and townhomes(3-10 years),Phase 3 is the commercial, self- storage,additional multi-family and hotel along Franklin Rd. (3-15 years), and Phase 4 is medical office, daycare,post-acute care and townhomes (4-15 years). Staff recommends a subdivision application is submitted for each phase of development and recorded in order to have a legal parcel for development purposes. Table 4: Proiect Overview Description Details History CPA-99-004/AZ-99-021/CUP-99/039(Touchmark,Ord.#01-917,DA Inst.#101048096,April 2001 Addendum(Inst.#101048097); "May 2003 Addendum"(Inst.#103137119);AZ-02-018(Bair property,Ord.#02-983, DA Inst. 102143308); CUP-03-005 (Meadowlake Village PUD);AZ-05- 022;PP-07-009/CUP-07-008/MI-07-006(Meadowlake Village North 3rd Addendum Inst.#108022885);H-2016-0058(modified CUP-99-039 to remove the alley depicted for access to 7 of the SFR homes);FP-04-025 Phasing Plan 4 phases from 4-15 years Residential Units 524 units(as stated by Applicant;however,concept plan depicts 300-400 with a possibility of an additional 165-195 through alternate plan) Open Space 486,842 sq.ft. (or 11.18 acres)(see open space exhibit for more info) Amenities Clubhouse,water feature(fountain),existing dog park,playground,multi- use pathways(3,700 ft.),bicycle storage Physical Features The Ridenbaugh Canal runs along the east boundary of the site Acreage 121.5 acres(DA boundary) Density 13.5 units/acre based on 524 units on 38.7 acres of land B. History In 1999, an amendment to the Future Land Use Map(FLUM) in the Comprehensive Plan was approved from single-family residential to Mixed/Planned Use Development(CPA-99-004). This property was also included in two(2)different annexation and zoning applications,the first in 2000 (AZ-99-021 Touchmark) and the second in 2002(A7--02-018 Bair property)with L-O (Limited Office)zoning—Development agreements(DA's)were required as a provision of annexation with both applications(Touchmark Inst. #101048096;April 2001 Addendum-Inst. #101048097; May 2003 Addendum Inst.#103137119 and Bair property Inst. 102143308). A City of Meridian I Department Report III. Staff Analysis 113 third Addendum to the Touchmark DA was approved in 2008,which included a new conceptual development plan(MI-07-006 Meadowlake Village North Inst. #108022885)]. A conditional use permit(CUP-99-039)for a conceptual planned unit development(PUD)in the L-O zoning district was approved with annexation of the property in 2001. It included Phase 1 but required future phases to obtain separate CUP approval for each phase. The PUD was for a continuing care retirement community comprised of 250-300 units of independent and assisted living,450 units of residential including single-family, duplex,townhomes and multi-family, a community senior health and fitness center,medical office parks, commercial and retail businesses. Since that time,approximately 428 residential units have been built in the retirement community along with a senior health and fitness center and many amenities including open green space and walking trails,a community garden, coffee shop and bistro, salon and barbershop, a library,theatre, dining venues,pickleball courts and other on-site amenities. This plan didn't include the 4.6-acre Bair property located at 3975 E.Franklin Rd. that was later annexed in 2002. In 2003, a conditional use permit(CUP-03-005)was approved for revisions to the previously approved conceptual planned unit development(i.e. CUP-99-039)to include the Bair property, consisting of 318 residential units and approximately 600,000 sq. ft. of commercial/office buildings on 138 acres of land with reduced building setbacks in the L-O district. The approved conceptual development plan is included below in Section VII.E. In 2007, a preliminary plat(PP-07-009)was approved for 52 single-family residential lots,two (2)office/commercial lots and 10 common lots. A CUP(CUP-07-008)was also approved to modify the conceptual planned development for the Touchmark Living Centers/Meadowlake Village development and an amendment to the DA(MI-07-006)was approved to amend the construction requirements for Phase III of the development. C. Site Development and Use Analysis 1. Existing Structures/Site Improvements (UDC 11-1): Approximately half of the site has already been developed as part of the Touchmark at Meadow Lake Village development. There is an existing driveway from the site onto Franklin Rd. east of Touchmark Way before the proposed access in alignment with Truckee Ave. on the north side of Franklin that is required to be removed with development. 2. Proposed Use Analysis (UDC 11-2): The proposed development,which will provide of mix of residential housing types (i.e. apartments, attached and detached units, and townhome units), commercial,office and light industry uses,provides a mix of uses as desired in Mixed Use designations. Further,the mix of uses is consistent with those desired in MU-C designated areas. 3. Dimensional Standards (UDC 11-2): Compliance with the minimum dimensional standards listed in UDC Table 11-2B-3 for the C-C and C-G zoning districts is required, as applicable,unless otherwise approved with the PUD(see below). 4. Planned Unit Developments (UDC 11-7): A modification to the existing Planned Unit Development(Meadowlake Village CUP-03- 005)is proposed to update the concept/use plan and include 4.6-acres of additional land area. and inclusion of 2 and 3 story townhome dwellings.Note: The Applicant is not proposing to subdivide the property, therefore, townhomes are not proposed or allowed—townhome style units, which are considered multi family, are allowed through the PUD. City of Meridian I Department Report 111. Staff Analysis ■ The purpose of the PUD requirements is to provide an opportunity for exemplary site development that meets the following objectives: • Preserves natural, scenic and historic features of major importance; Staff is unaware of any natural, scenic and historic features that need to be preserved. • Allows for innovative design that creates visually pleasing and cohesive patterns of development(including,but not limited to,residential development at densities greater than eight(8)units per acre where design guidelines are in place for development and where garage doors are generally not fronting the street); and The 6.56 acres proposed to develop with 50-100 townhome style units would result in a gross density between 8 and 15 units/acre. The 9.45 acres proposed to develop with 250 to 300 multi-family apartments would result in a gross density between 26 and 32 units per acre. The 0.63 acres proposed to develop with three(3) single-family detached style units(aka cottages)would result in a gross density of 5 units per acre. The 4.78 acres proposed to develop with 20 to 25 single-family-attached style units(aka villas)would result in a gross density of 4 to 5 units per acre. Overall,the 21.42 acres proposed to develop with 323 to 428 residential units would result in a gross density of 15 to 20 units per acre.Density calc's are rounded to the nearest whole number. If the 8.16 acres planned to develop with medical offices develops instead with 50 to 55 townhome units, it would result in a gross density of 6 to 7 units per acre. There is no unit count listed if the 4.32 acre commercial property develops instead with multi-family apartments. The multi-family apartment and townhome-style residential portions of the development will exceed 8 units per acre. Rather than proposing design guidelines for the development,the Applicant states future structures will comply with the design standards in the City's Architectural Standards Manual and that garage doors will generally not front a street. • Creates functionally integrated development that allows for a more efficient and cost- effective provision of public services. The proposed pedestrian pathway plan and vehicular connectivity shown on the concept plan should assist in creating functionally integrated development as required. It is not the intent that the PUD process be used solely for the purposes of deviation from the dimensional standards in the district. Per UDC 11-7-4,the Council may approved planned unit developments,upon recommendation by the Commission, in accord with the following standards: ➢ General Use Standards: i. Deviations from underlying district requirements—Deviations from the development standards and/or area requirements of the district may be approved through a PUD. The Applicant requests approval of a deviation to the maximum building height allowed of 50 feet in the C-C district to allow a maximum height of 64 feet for the hotel,measured to the highest point of the structure. ii. Allowed uses—Applicant may request that specific conditional or accessory use(s) allowed in the district be allowed as principal permitted use(s). The Applicant requests the following uses be allowed in C-C and/or C-G districts, as applicable,as principal permitted use(s) so long as the use is located generally on the City of Meridian Department Report III. Staff Analysis 115 project where shown on the concept plan and complies with the specific use standards in the UDC: • Multi-family development [includes single-family detached(aka cottages) and attached units(aka villas), and townhome style units]—compliance with the specific use standards listed in UDC 11-4-3-27—Multi family development is required. • Townhouse dwellings (i.e. 3 or more attached units)—these are considered multi family as they're on one property—such dwellings on individual properties are not allowed. • Single-family detached dwellings(aka cottages)—these are considered multi- family as they're on one property—such dwellings on individual properties are not allowed. • Single-family attached dwellings(i.e. 2-attached units—aka villas)—these are considered multi family as they're on one property—such dwellings on individual properties are not allowed. • Hotel—compliance with the specific use standards listed in UDC 11-4-3-23— Hotel or motel is required. • Daycare center—compliance with the specific use standards listed in UDC 11-4- 3-9—Daycare facility is required. • Live/work residential project—compliance with the specific use standards listed in UDC 11-4-3-50—Live/work residential project is required. • Light industry(only allowed in C-G zone)—compliance with the specific use standards listed in UDC 11-4-3-34—Industry, light and heavy is required. • Self-service storage facility(only allowed in C-G zone)—compliance with the specific use standards listed in UDC 11-4-3-34—Storage facility, self-service is required. • Warehouse(only allowed in C-G zone)—compliance with the specific use standards listed in UDC 11-4-3-42— Warehouse is required. iii. Interconnected uses—The uses within the planned unit development are interconnected through a system of roadways and/or pathways as appropriate. Private streets and service driveways may be permitted,if designed and constructed to the transportation authority standards and in accord with UDC 11-3F Private Street Requirements. A pathway plan is proposed, included below in Section VII.G,that depicts 10' wide multi-use pathways through the site, existing sidewalks and 5' wide proposed sidewalks along streets and drives for pedestrian connectivity within the site and to adjacent properties. Private drives are proposed internally within the site for vehicular access and interconnectivity. iv. Building clusters—Buildings shall be clustered to preserve scenic or environmentally sensitive areas in the natural state, or to consolidate small open spaces into larger, more usable areas for common use and enjoyment. A"bubble"plan was submitted for the concept plan,which doesn't depict building locations. Staff recommends buildings are arranged to comply with this standard as a condition of the PUD. ➢ Private Open Space: In addition to the common open space and site amenity requirements set forth in Chapter 3, a minimum of 80 square feet of private,usable open space shall be provided for each residential unit. This requirement can be satisfied through porches, patios, decks, and enclosed yards. Landscaping entryway and other accessways do not count toward this requirement.A site amenity plan is proposed, included below in Section VII.I, which includes amenity information for the multi family development City of Meridian I Department Report 111. Staff Analysis 116 but not for the townhome, cottage or villa portions of the development—site amenities and open space will be required with development of those areas based on the total area(i.e. 4.02+Z54+0.63+4.78=11.97 acres) at a minimum of 15% open space and one(1)site amenity point for each 5 acres of gross land area being developed. Future residential development should comply with this standard as a condition of the PUD. ➢ Residential Use Standards: i. Multi-family—Notwithstanding the provisions of UDC 11-2,multi-family dwellings may be an allowed use when approved through a planned unit development. As noted above,the Applicant requests multi-family development be a principal permitted use in the C-C district with the PUD. ii. Housing types—A variety of housing types shall be included within a single planned development, including attached units(townhouses,duplexes),detached units(patio homes), single-family and multi-family units,regardless of the district classification of the stie,provided that the overall density limit of the district is maintained. A variety of housing types is proposed consisting of single-family detached and attached,townhomes and multi-family apartments. iii. Density bonus—A residential density bonus may be given for dedications of land for public use such as school,park,fire station or recreational facility provided to the public entity by donation or at a cost less than, or equal to,the applicant's predevelopment cost for that land. No such dedications of land are proposed. ➢ Infill Planned Developments -Properties of five(5) acres or less within the City of Meridian,that are located in areas already substantially developed(at least eighty(80) percent of the land area within three hundred(300) feet of the boundaries of the parcel). Upon recommendation of the commission,the council may approve exceptions to other sections of this chapter as an incentive for infill development as follows: • The decision-making body may allow up to a twenty-five(25)percent increase in the density permitted for the district in which the site is located. • The decision-making body may also waive one(1)or more of the amenity requirements set forth in this section depending on the size and scale of the planned development. The subject property is over 5 acres in size;thus,this is not applicable. ➢ Approval: Conditions—In approving the planned development,the Council may prescribe appropriate conditions, additional conditions,bonds, and safeguards in conformity with this title that: 1. Minimize adverse impact of the use on other property. 2. Control the sequence and timing of the use. 3. Control the duration of the use. 4. Assure that the use and the property in which the use is located is maintained properly. 5. Designate the exact location and nature of the use and the property development. 6. Require the provision for on-site or off-site public facilities or services. 7. Require more restrictive standards than those generally required in this title. City of Meridian I Department Report III. Staff Analysis ■ 8. Require mitigation of adverse impacts of the proposed development upon service delivery by any political subdivision, including school districts,which provides services within the city. 5. Specific Use Standards (UDC 11-4-3): Compliance with the specific use standards for the following uses is required: • Multi-family development(UDC 11-4-3-27) • Light industry(UDC 11-4-3-25) • Hotel(UDC 11-4-3-23) • Live/work residential project(UDC 11-4-3-50) • Self-service storage facility(UDC 11-4-3-34) • Daycare center(UDC 11-4-3-9) • Warehouse(UDC 11-4-3-42) D. Design Standards Analysis In accord with the Comprehensive Plan,non-residential buildings should transition to and compliment adjacent residential buildings in mass and form; and transitions between different land uses should include highly connected open space. 1. Structure and Site Design Standards (Comp Plan, UDC 11-3A-19): Compliance with the structure and site design standards in UDC 11-3A-19 is required for the non-residential portion of the development. 2. Qualified Open Space &Amenities (Comp Plan, UDC 11-3G): Compliance with the qualified open space and site amenity standards listed in UDC 11-4-3- 27C,D is required for the multi-family portion(s)of the development. 3. Landscaping (UDC 11-3B): ➢ Landscape buffers along streets A minimum 35' wide street buffer is required to be provided with development along E. Franklin Rd., an arterial street and entryway corridor; a 20-foot wide street buffer is required along S. Touchmark Way and E. Louise Dr.,both collector streets,landscaped in accord with the standards listed in UDC 11-313-7C. ➢ Parking lot landscaping Parking lot landscaping is required to be provided with development per the standards listed in UDC 11-313-8C. ➢ Landscape buffers to adjoining uses A 25' wide landscape buffer is required to be provided on C-C and C-G zoned property with development adjacent to residential uses per UDC Table 11-2B-3 with landscaping in accord with the standards listed in UDC 11-3B-9C. ➢ Tree preservation Tree mitigation is required for all existing trees 4"caliper or greater that are removed from the site with equal replacement of the total calipers lost on site up to an amount of 100%replacement as set forth in UDC 11-313-1OC.5. ➢ Storm integration Stormwater integration is required in accord with the standards listed in UDC 11-313- 11 C. City of Meridian I Department Report 111. Staff Analysis 118 ➢ Pathway landscaping Landscaping is required along all pathways with development in accord with the standards listed in UDC 11-3B-12C. 4. Parking (UDC 11-3C): Off-street parking is required to be provided for each dwelling unit based on the number of bedrooms per unit in accord with the standards for single-family detached, single-family attached,townhouse and multi-family dwellings in UDC Table 11-3C-6. Off-street vehicle parking is required to be provided for non-residential uses in accord with the standards in UDC 11-3C-6B.1. Bicycle parking is required per the standards in UDC 1I- 3C-6G. 5. Building Elevations (Comp Plan,Architectural Standards Manual): Conceptual building elevations were submitted for the commercial,light industry,hotel, medical offices,multi-family and townhome, single-family detached(aka cottages)and single-family detached(aka villas) style multi-family, included below in Section VII.F. The Applicant's narrative states commercial buildings are proposed to generally front Franklin Rd. and be at a scale compatible with adjacent development;the commercial/light industry will be at a scale and height sensitive to the existing residential homes to the south. Modulation and variation in materials will help define different tenant spaces. Glazing will be provided at grade to activate the street front and high-quality materials will be utilized. The building's massing and materials will be designed to comply with the UDC and Architectural Standards Manual(ASM). The townhomes are proposed to be 2-and 3-stories in height with 3-stories along Touchmark Way,while the cottages and villas will be 1-story in height. The multi-family structures will transition from the townhomes to 3-stories in height. Final design of all structures is required to comply with the design standards in the ASM. 6. Fencing (UDC 11-3A-6, 11-3A-7): Any fencing constructed within this development should comply with the standards listed in DUC 11-3A-6C and 11-3A-7, as applicable. 7. Parkways (Comp Plan, UDC 11-3A-17): Parkways should comply with the standards for such in UDC 11-3A-17E. The minimum width of parkways planted with Class 11 trees is 8'; class 11 trees are preferred parkway trees (see UDC 11-3A-17E for more information). 79,932.6 E. Transportation Analysis The proposed development is located in close proximity to the Eagle Rd. interchange and I-84, St. Luke's hospital and medical offices,and The Village at Meridian shopping center, and is consistent with Comprehensive Plan Policy#2.02.01E,Encourage the development of high quality, dense residential and mixed-use areas near in and around Downtown, near employment, large shopping centers,public open spaces and parks, and along major transportation corridors, as shown on the Future Land Use Map. Public transit is available to this site and is within one(1)mile of an identified future transit facility.Area roadways meet ACHD's Level of Service (LOS)planning thresholds; there are no planned improvements for this area—Franklin Rd. is fully improved with 5-travel lanes, curb, gutter and 7' wide attached sidewalk abutting the site; Touchmark Way is fully improved with 2- travel lanes(3-lanes at the intersection with Franklin Rd. with a 9' wide parkway), curb,gutter, a 7' wide parkway and detached 5' wide sidewalk; and Louise Dr. is fully improved with 2-travel City of Meridian I Department Report III. Staff Analysis 119 1 lanes, curb, gutter and 7' wide attached sidewalk.No new public streets are proposed. A new access to Franklin Rd. is proposed in alignment with N. Truckee Ave.to the north,which has been approved by ACHD. An updated Traffic Impact Study(TIS)was submitted for the updated concept development plan. Based on ACHD's review of the TIS,the following is required at the Franklin Rd/Truckee Ave. intersection: construct a curb return type private road/drive aisle onto Franklin Rd. located in alignment with Truckee Ave. on the north side of Franklin Rd. across from the site;restrict the driveway to right-in/right-out only while continuing to allow full movements to and from Truckee Ave.; and construct a dedicated eastbound right-turn lane on Franklin Rd. at the intersection with the proposed private road/drive aisle. The drive access nearest Franklin Rd. on Touchmark Way is required to be restricted to right-in/right-out only due to the existing center median;the other two (2)accesses via Touchmark at the roundabouts are allowed as proposed. Other than the accesses specifically approved with this application, direct lot access is prohibited via Franklin Rd., Touchmark Way and Louise Dr. 1. Access (Comp Plan, UDC 11-3A-3, UDC 11-3H-4): The concept plan depicts one(1)new driveway access via E. Franklin Rd.,which ACHD is requiring be a right-in/right-out, and driveway access via S. Touchmark Way, a collector street. Either public or private named streets should be provided within the development for addressing purposes.The Applicant should coordinate with an addressing technician and the Fire Dept. on which streets should be constructed as private streets and named if public streets aren't provided. Staff recommends a drive/private street is provided from the north/south drive in alignment with Truckee Ave. on the north side of Franklin to the Commercial/Light Industry designated property at the northeast corner of the site for a functional integration of uses as desired in mixed use designated areas.A cross-access ingress/egress easement should be granted to the abutting property to the east(Parcel #R5262140050)for egress from the site to Franklin Rd. If an easement doesn't already exist to this property from the abutting parcel to the subject property,a reciprocal agreement should be recorded if possible. 2. Multiuse Pathways (UDC 11-3A-5): A pathway plan was submitted that depicts 10' wide multi-use pathways for pedestrian and bicycle access and connectivity within the development, included below in Section VII.G. 3. Pathways (Comp Plan, UDC 11-3A-8): A pathway plan was submitted that depicts a 5' wide existing and proposed sidewalks for pedestrian access and connectivity within the development, included below in Section VII.G. 4. Sidewalks (UDC 11-3A-17): A 7' wide attached sidewalk exists along Franklin Rd., an arterial street; a 5' wide detached sidewalk exists along S. Touchmark Way, a collector street; and a 5' wide attached sidewalk exists along E. Louise Dr., a collector street. Minimum 5' wide detached sidewalks are required to be constructed along collector and arterial streets per UDC 11-3A-17;however, because the existing sidewalks are in good condition and there is a significant grade difference along Franklin, Staff does not recommend those sidewalks are reconstructed as detached walkways. Five-foot wide attached(or detached) sidewalks are required along local and private streets as set forth in UDC 11-3A-17 and 11-3F-4B as proposed on the concept plan. City of Meridian I Department Report III. Staff Analysis 120 5. Private Streets (UDC 11-3F-4): If public streets are not provided internally within the site,private streets should be provided for addressing purposes and should be constructed in accord with the standards listed in UDC 11-3F-4.The developer should coordinate with an addressing technician to determine which drives should be named and constructed as private streets and submit an application for private street approval. F. Services Analysis The subject property was annexed into the City many years ago but has only partially developed and demonstrates consistency with Comprehensive Plan Policy#2.02.02,Maximize public services by prioritizing infill development of vacant and underdeveloped parcels within the City over parcels on the fringe. 1. Waterways (Comp Plan, UDC 11-3A-6): The Ridenbaugh Canal, a large open waterway,runs along the eastern boundary of the development. A maintenance road exists along the west side of the canal. A wrought iron fence exists between the existing residential development and the maintenance road and canal. A minimum 6-foot tall wrought iron fence should be constructed with development on the undeveloped portion adjacent to the canal for public safety. This site is not within the floodplain. 2. Pressurized Irrigation(UDC 11-3A-15): Underground pressurized irrigation water is required to be provided in each development as set forth in UDC 11-3A-15. 3. Storm Drainage (UDC 11-3A-18): An adequate storm drainage system is required in accord with the adopted standards, specifications and ordinances; design and construction shall follow Best Management Practice as adopted by the City per UDC 11-3A-18. 4. Utilities (Comp Plan, UDC 11-3A-21): All utilities for the proposed development are required to be installed in accord with the standards listed in UDC 11-3A-21. Public utilities are available and immediately adjacent with capacity to serve the project. Water service and sanitary sewer service will be provided via extensions of main lines in Touchmark and Franklin Rd. IV. CITY/AGENCY COMMENTS & CONDITIONS A. Meridian Planning Division Development Agreement Modification/Rezone 1. A new DA shall be entered into between the City of Meridian,the property owner(s), and the developer. The subject property identified in the legal description in Section VII.0 shall no longer be subject to any previous agreements. The DA shall be signed by the property owner and returned to the Planning Division within six(6)months of the date of City Council approval of the Findings of Fact, Conclusions of Law and Decision&Order for the subject application. The DA shall,at minimum, incorporate the following provisions: i. Future development of this site shall be generally consistent with the conceptual development plan and building elevations,pedestrian plan,phasing plan and amenity plan submitted with this application and the provisions contained herein. City of Meridian I Department Report IV. City/Agency Comments &Conditions 121 ii. A minimum 6-foot tall wrought iron fence shall be constructed with development on the undeveloped portion of the site along the eastern boundary of the site adjacent to the Ridenbaugh Canal for public safety in accord with UDC 11-3A-6C. iii. Pedestrian pathways and walkways are required to be provided with development in accord with the Pedestrian Pathway Plan included in Section VII.G. iv. All future structures constructed on this site shall comply with the design standards in the Architectural Standards Manual and the holistic design principles included in the Comprehensive Plan for Mixed Use designated areas(see pp. 3-18 and 3-19). Garage doors for single-family detached and townhome style units shall generally not front the street in accord with UDC 11-7-1A.2. v. Other than the accesses specifically approved with this application by the City and Ada County Highway District(ACHD), direct lot is prohibited to Franklin Rd.,Touchmark Way and Louise Dr. vi. Supportive and proportional public and/or quasi-public spaces and places shall be provided that comprise a minimum of 5%of the development area and shall be integrated within the residential and commercial/office portions of the development in accord with the Comprehensive Plan principles for Functional Integration in Mixed Use designated areas. Future development applications shall demonstrate compliance with this requirement. vii. Future development applications shall demonstrate consistency with the Functional Integration principles described in the Integration of Uses and Holistic Design sub- sections of the Comprehensive Plan(pp. 3-16 thru 3-19). viii.A subdivision application shall submitted for each phase of development and recorded prior to submittal of a Certificate of Zoning Compliance for development within that phase. Conditional Use Permit/Planned Unit Development Modification The concept plan shall be revised prior to the Council hearing as follows: i. Depict a drive/private street from the north/south drive in alignment with Truckee Ave. on the north side of Franklin to the Commercial/Light Industry designated property at the northeast corner of the site. ii. In the two (2) areas where residential(i.e.multi-family and townhomes)is depicted as an alternate development option,remove residential and only depict commercial and medical office in those areas. iii. Before villas can be approved to replace the small golf course in the existing development area,the Applicant must demonstrate compliance with the terms of the previously approved PUD in regard to open space with removal of the golf course. The original PUD required a minimum of 10%of the gross land area of the PUD to be qualified open space, exclusive of required street buffers and incompatible land uses. City of Meridian I Department Report IV. City/Agency Comments &Conditions 122 2. A deviation to the maximum building height allowed in the C-C district is allowed for the hotel use from 50-feet to 64-feet,measured to the highest point of the structure. 3. The following uses shall be deemed principal permitted uses through the PUD so long as the use is located generally on the project where shown on the concept plan and complies with the specific use standards for such in the UDC, as applicable: • Multi-family development(includes apartments and single-family detached, single- family attached and townhome style units)—comply with the specific use standards listed in UDC 11-4-3-27.Note:If the land where single-family detached/attached and/or townhome units is subdivided in the future so that units are on individual lots, a rezone is required to a zone in which the use is allowed. • Hotel—comply with the specific use standards listed in UDC 11-4-3-23 • Daycare center—comply with the specific use standards listed in UDC 11-4-3-9 • Live/work residential project—comply with the specific use standards listed in UDC 11-4-3-50 • Light industry(in C-G zone only)—comply with the specific use standards listed in UDC 11-4-3-25 • Self-service storage facility(in C-G zone only)—comply with the specific use standards listed in UDC 11-4-3-34 • Warehouse(in C-G zone only)—comply with the specific use standards listed in UDC 11-4-3-42 4. Either public or private named streets shall be provided within the development for addressing purposes. The developer shall coordinate with an addressing technician and the Fire Dept.to determine which streets should be named if public streets are not proposed.All private streets require a separate private street application to be submitted that demonstrates compliance with the standards listed in UDC 11-3F-4. 5. Buildings shall be clustered to preserve scenic or environmentally sensitive areas in the natural state, or to consolidate small open spaces into larger,more usable areas for common use and enjoyment as set forth in UDC 11-7-4A.4. 6. In addition to the common open space and site amenity requirements set forth in UDC 11-3, a minimum of 80 square feet of private,usable open space shall be provided for each residential unit as set forth in UDC 11-7-413. This requirement can be satisfied through porches,patios, decks, and enclosed yards. Landscaping entryway and other accessways do not count toward this requirement. 7. Submit a recorded cross-access ingress/egress easement to the abutting property to the east (Parcel#R5262140050) for egress from the site via the existing driveway to Franklin Rd. If an easement doesn't already exist to this property from the abutting parcel, a reciprocal agreement should be recorded if possible. 8. Open space and site amenities shall be provided for the townhome,cottage and villa portions of the development in accord with the standards listed in UDC 11-3G-3 and 11-3G-4 based on the total gross land area of those uses(i.e. 11.97 acres). A minimum 15%common open space shall be provided along with a minimum of one(1)point of site amenity for each five (5) acres of gross land area being developed. 9. The conditional use permit for the planned unit development is valid for a maximum period of two(2)years unless otherwise approved by the City.During this time,the Applicant shall commence the use as permitted in accord with the conditions of approval, satisfy the requirements set forth in the conditions of approval, and acquire building permits and City of Meridian I Department Report IV. City/Agency Comments &Conditions 123 commence construction of permanent footings or structures on or in the ground as set forth in UDC 11-5B-6.A time extension may be requested as set forth in UDC 11-5B-6F. Other Agency comments may be accessed in the project file in the public record. Copy and paste the following link into your browser: hggs://weblink.meridianciU.org/WebLink/Browse.aspx?id=398918&dbid=0&repo=Meridian Cit X V. FINDINGS A. Rezone(UDC 11-5B-3E) Upon recommendation from the commission,the council shall make a full investigation and shall, at the public hearing,review the application. In order to grant an annexation and/or rezone,the council shall make the following findings: 1. The map amendment complies with the applicable provisions of the comprehensive plan; Stafffinds the proposed map amendment to the C-C and C-G zoning districts and conceptual development plan complies with the applicable provisions of the Comprehensive Plan. 2. The map amendment complies with the regulations outlined for the proposed district, specifically the purpose statement; Stafffinds the proposed map amendment and development plan complies with the regulations outlined for the proposed districts as the C-C district allows a larger scale and broader mix of retail, office and service uses with access to arterials or non-residential collectors; and the C-G district is the largest scale and broadest mix of retail, office, service and light industrial uses in close proximity to interstate(i.e. I-84) and arterial intersections (i.e. Eagle/Franklin Rd.), which supports the proposed development plan. Further, Stafffinds the proposed map amendment and development plan complies with the purpose of the commercial districts in that it provides for the retail and service needs of the community in accord with the Comprehensive Plan. 3. The map amendment shall not be materially detrimental to the public health, safety, and welfare; Stafffinds the proposed map amendment shall not be materially detrimental to the public health, safety and welfare. 4. The map amendment shall not result in an adverse impact upon the delivery of services by any political subdivision providing public services within the city including,but not limited to, school districts; and Stafffinds the proposed map amendment shall not result in an adverse impact upon the delivery of services by any political subdivision providing public services within the City including but not limited to school districts. 5. The annexation(as applicable)is in the best interest of city. Stafffinds the proposed rezone is in the best interest of the City as it will result in the development of more commercial services, office and residential opportunities in close proximity to I-84, the hospital and entryway corridors (Eagle&Franklin Rd.) into the City. B. Planned Unit Development(UDC 11-7-5) Upon recommendation from the Commission,the Council shall make a full investigation and shall, at the public hearing,review the application. In order to grant a planned development request,the Council shall make the following findings: City of Meridian I Department Report V. Findings 124 1. The planned unit development demonstrates exceptional high quality in site design through the provision of cohesive, continuous,visually related and functionally linked patterns of development, street and pathway layout,and building design. Stafffinds the proposed planned unit development demonstrates high quality in site design through the provision of continuous pedestrian pathways and streets and drives for pedestrian and vehicular connectivity throughout the development. Future development and building design should demonstrate an exceptional high quality of architectural design. 2. The planned unit development preserves the significant natural, scenic and/or historic features. Staff is unaware of any significant natural, scenic and/or historic features that need to be preserved with development. 3. The arrangement of uses and/or structures in the development does not cause damage,hazard, or nuisance to persons or property in the vicinity. Staff is of the opinion the proposed conceptual development plan and uses proposed will not cause damage, hazard, or nuisance to persons or property in the vicinity. The proposed concept plan, with Staffs recommended changes, demonstrates a good transition in uses from lower density residential uses to higher density residential uses, office and commercial uses. 4. The internal street,bike and pedestrian circulation system is designed for the efficient and safe flow of vehicles,bicyclists and pedestrians without having a disruptive influence upon the activities and functions contained within the development,nor place an undue burden upon existing transportation and other public services in the surrounding area. Stafffinds the internal street and pedestrian circulation system, which includes a 10'wide multi-use pathway, which can be used for bikes, is designed for the efficient and safe flow of vehicles, bicyclists and pedestrians without having a disruptive influence upon the activities and functions within the development, nor place an undue burden upon existing transportation and other public services in the surrounding area. 5. Community facilities, such as a park,recreational, and dedicated open space areas are functionally related and accessible to all dwelling units via pedestrian and/or bicycle pathways. Stafffinds the central common open space area with a pond provides a dedicated open space area that's accessible to all residents via pedestrian and/or bicycle pathways. 6. The proposal complies with the density and use standards requirements in accord with chapter 2, "District Regulations", of this title. Stafffinds the proposed residential portion of the development will comply with the density and use standards requirements in UDC 11-7-4. 7. The amenities provided are appropriate in number and scale to the proposed development. Stafffinds the proposed amenity plan for the multi family development(i.e. apartment units), included in Section VII.I, in addition to the amenities required to be provided in the other multi family portions of the development(i.e. single-family detached, single-family attached and townhome style units)per the standards listed in UDC 11-3G-3 and 11-3G-4 will be appropriate for the proposed development. 8. The planned unit development is in conformance with the comprehensive plan. Stafffinds the proposed planned unit development will be in conformance with the comprehensive Plan with the provisions included in Section IV above. City of Meridian I Department Report V. Findings 125 VI. ACTION A. Staff: Staff recommends approval of the proposed MDA,PUD and RZ applications with the provisions noted above in Section IV. B. Commission: Pending C. City Council: Pending City of Meridian I Department Report VI. Action 126 ' � r - • . . L•'� i ,�.. ®:J' � -, �A... a ,�}:' 1 ��. ' `L,J. ill - �� _-_- 1� � w,ws 4 _ • II - - - - FRANKLIN ;. 84 ^r m. Or 1•- pOVERLA v rr f_ - PRANKL-IN 7 rl ■ MEN in �"I' ,IltL1111/Illl.un�i+��nu►r►l■ ■rri uu� ��a+a �-..Giir�1,�+�r� ■+rr++++y � • I �era �� ►�y��iiiiiiue.w�:1=7a=r::::,�L♦♦♦♦Q+R r++�� Ilnr■ ��%/1111111111►�'�r���imu■■ar.a►+�IY�►I�♦1.. ■ 84 -" �- ► ter. 1 i�■■�IIIIIIIIIIIIIIIIIIII •� """- "' 'Illlilll s r���■�'���� ■Illllinlllul�■111lllllll�rlir'\������� � '�`ti,! Wool �����►� �� ��'p�.�y{] � � ��ullni ��Illl■ III �Illiiil�r���r����!. �� IIiL1Li,��• ��■ � III�I��1 IFrnrr�Ij��I� OVERLAND ■ll♦ .■II■ 1�1�1�.-� �iy ��t��■iiu�i� _Y_ Y � �fl■1_ ■,I���,�111 FRANKL-INN Now- War �rrir��� ,,,,;� rrin�l.■■■■ � Illm.lul■ � r�ri/ Gli��+uu,.■�pia++ PRoil iiirNl4i �-11ti� l�,,rf•,ur►/i�:�I■I�IJ . - • �i�r•■■■►t►i bpi�i� �-r�'�+qi i _ +����*►�+ aa�,� i%��■■aria,::� ■■■�+�+r1♦�► ��. :='-� ■=1 '���' w►+r � ��i�♦iiiiii�'::C `."r►+�i♦� aye �r qnu nrr.�■w ■m► :-a ly r. unr► .,■ .�:r■-��� V♦ip•�� � � I ii�■■I�� ►�s♦G■�Il��,�i+i�::....i. ♦♦♦♦♦ ♦If�11r r1 rn' l�llrlr■ �►%IIIIIIf1111►■r■a�!��r/1,■■ani�a�Iar�ath, 84 '� ��qP�"��„ �IIIIIIIIII:.�� RI�I■IIIIIIIIIIIIII ti r•r■rr� ,11� .■■■■■ r " ■■_� ......♦ ....... ■_III.:.: Illlilll +a♦ir• 1//m+ ■���■f'��r�� Jlrlli illlliii►■III�IIIIIIPi���■■■■rl■ ■,�111 :1��rry r ■►t■rr�� i■�■r:1n1, r Qli■�111 Illl�r/rn...+rs m 7:r OYERL-AND i■ ���•����r•��■�ti■■iuri� �Ilr■M■r :�� �■�■MEN ■! so- oil FRANKL-IN -1 10 7 rl ■ � � � ` �. � rII11�1--::++IIP1��1�•+�giiii�iiin ■■■� IM I j ■ ■■ r 4 �n�' d`�+�ri w•�%ism+s�l�hl ■■■■■■■■Ali��f1 r` ■ ■■■ar�i `�, will gill , , +.+ ♦. a�e�771.�r•_ -\+ �.*i����:i Iliir�l,�ra'� ■"�•�i�++ � arr ,•��-� � p+ � I �� q urn••■ �■■��+b♦• �__ *agar+l+�� ►♦♦i ♦f,ur�.'C ■.i '♦♦i♦ a�� ram:-r niris�' 1■ L� I ■ ■ =..rrnnrZ+rna■ :■ar +•���+ tr �i G unr► .,■Cam.':�� G:r'r� gfiff�� rli`� ,,.�-■■ °.y.w , i�'j'i♦4rrrr ae.�: -• _ .. 111�♦Ilrfff r� �.. ■rlr■ ►%IIIIIIIIIII►■n,�i�nur.■■rl��'�I11�i�tl�. ■ 84 ... 1 i�r■+IIIIIIIIIIIII■f1111 ■ it=, . ■1,y�I��it■ rn �l�II���I� ••� ......� 'IIIIIIIIIII:=I���°IIIIIIII au�IHm/y*� rrn111�11111111J■Illlllllll � r — ����/� ■■■■■�fll ■I 111111111111►■Illlllllll�r■�\�■■���� rnmi ■ �`�ry �i�t1+r►� � r�■ um,� r1 tfll■ 11 1�Ip�il u�=■raj+rr�� - ��� -i I,��1�1,�'�.■■■ 1��'—�.F'ir��i���rt���■eft it OEM 0■ .■■■ ■ ` OYERL--AND '- �' �■■fl■ UNION;.■I ������ �! 5. Map Notes Recent Area Preliminary Plats: H-2018-0126 H-2021-0075 H-2016-0112 H-2017-0104 H- 2021-0103 Recent Area Conditional Use Permits: H-2020-0123 H-2021-0012 H-2021-0033 H-2021- 0075 H-2023-0002 H-2017-0011 H-2024-0013 H-2024-0045 H-2024-0046 H-2025-0001 City of Meridian I Department Report VII. Exhibits 129 B. Service Accessibility Report PARCEL SIIIG131260 SERVICE ACCESSIBILITY Overall Score: 27 122nd Percentile Location In City Limits REEK Extension Sewer Trunkshed mains < 500 ft.from par-cel GREEN Floodplain Either not within the 100 yr floodplain or > , :r-es GREEN Emergency Servi-ces Fire Response time > g rein, FLED Emergency Servi-ces Police Meets response time goals most of the time GREEN Pathways Not within 114 mile of current or future pathways khRED Transit ffithin 1/4 mile of future transit route YE_L0W Arterial Road Buildout Status Ultimate configuration(#of lanes in master streets GREEN plan) matches existing #of lanes) School Walking Proximity Within 112 mile walking GREEN Either-a High School or College within 2 miles G=, School Drivability Middle or Elementary School within 1 mile driuinc GREEN (existing or future) Park lhlalkability No park within walking distance by park type I FLED Report gerera Ed on 07-03-2025 hyMEFdD Msalkn City of Meridian I Department Report VII. Exhibits 130 C. Development Agreement Legal Description&Exhibit Map LEGAL DESCRIPTION TH E LAND Page 1 OF 3 GROUP February 13, 2025 Project Nn._121001 DEVE LOPM ENT AG RE EM ENT MODIFICATION TOUCKMARK of the TREASURE VALLEY,LLC An area of land located in the North One Half of Section 16,Township 3 North,Range 1 Eask,Raise Meridian,City of Meridian,Ada County,Idaho,being more particularly described as follows! COMMENCING at the Nnrth One Quarter came rof said Section 16, (from which point the Northeast corner of said Section 16 bears South 89`21'00"East,2702.67 feet distant);thence on narth-south mid- sertian line of said Section 15,South 00'04'42" Eastr 40.00 feetr to a paint on the southern right of way line of East Franklin Road AND the POINT OF BEGINNING: Thence on said southern right of way liner South 89'21'00'East,1351..22 feet; Thence leaving said southern right of way line, South00'01'49"Wesl;,519.08 feet; Thence on the hnundary line of Edgeview Estates Nn_1 and No.2 Subdivisions,as shown in Book 63,Page 6399 AND Raak 65,Page 6702, respectively,records of Ada County, North 82'09'19' West,7.63 feet; Thence North 79'24'56'West,445.48 feet; Thence South 80`51.'07"West,116.19 feet; Thence South 25'43'56"West,195.09 feet; Thence South 22'31'19"East;, 150.00 feet; Thence South 33'09'18"Easl;, 620.00 feet; Thence South 30'42'44"Easy,493_DO feet; Thence South 00'01'44"West,451.50 feet; Thence South 14°00'20"West,426.52 feet; Thence Narth 89'15'24'West,34.37 feet, Thence South 13°54'17"West,21.40 feet,to a point on the northern right of way line Interstate 1-84; Thence on said northern right of way line, North 89'34'54'r W est,530.52 feet; Thence leaving said northern right of way line,North 00'11'26"West,23.85 feet Thence North 89'15'24'West,673.14 feet,to the CenterOne Quarter turner of said Sertiun 16; Thence Narth 89'15'16'West,625.38 feet; Thence Nnrth 85'36'11'West,25.58 feet,to the southeasterly corner of St. Luke's Regianat Medical Center property, Thence cantinuirg on said St.Luke's property,North 00 0S'113"East, 102435 feet; Thence Narth 44'45'45"West,4M.37feet, Thence Nnrth 99'17'59'West,152.37feet; Thence Narth 00'09'19' East,377.27 feet; Thence North 89°51'41"West,214.00 feet; Thence Nnrth 00'09'19' East,14D_55 feet; 482 East Shore Drive. Sulle 100,Eagle, Idaho UN16 209.934.4041 Ihrlandgroupinc.00m City of Meridian Department Report VII. Exhibits 131 February 13, 2025 Page 2 Thence North 5V 07' 05"Westr 70.50 feet,to a paint on the southerly right of way line of East Louise drive; Thence on said southerly right of way line and the right of ways for 5auth Touchmark Way, North 38'52' 55' East,69.44 feet to a point of curvature, Thence 95,89 feet an the arc of a curve to the right, having a radius of 96.00 feet;,a central angle of 51'15'33%and whose chard bears North 64'34'37" East,83.05 feet; Thence South 89`51'41,r East, a distance of 22.84 feet to a point of curvature; Thence 150.77 feet on the arc of a curvetathe rightr having a radius of 165.00 feet,a central angle of 5"06'56"r and whose chard bears South 51'48'47"Eastr 145.82 feet to a point of non-tangent compound curvature; Thence 365.24 feet on the arc of a curve to the left,having a radius of-129.00 feet,a central angle of 63'36'24"r and whose chard bears 5auth 58'03'30"Eastr 346.77 feet; Thence South 89'51'41" East, 141.15 feet to a point of curvature; Thence 176.51 feet on the arc of a curve tathe rightr having a radius of 271.00 feet,a central angle of 37°19'09"rand whose chard bears 5auth 71'12'08"Eastr 173.41 feet; Thence South 52'32'34" East 20.37 feet to a paint of curvature; Thence 87.83 feet an the arc of a curve to the rightr having a radius of 79.00 feet a central angle of 63'42'12",and whose chord bears South 20'41'30" East,83.38 feet; Thence South 52'32'34" East, a distance of 51.1-1feet to a point of curvature; Thence 61.41 feet an the arc of a curve to the rightr having a radius of 64.00 feed,a central angle of 54'58'33",and whose chard bears South 88'96'46" Eastr 59.08 feet; Thence North 37°27'43" East,29.16 feet; Thence North 52°-12' 34"Westr 3.00 feet to a point of curvature; Thence 29,85 feet on the arc of a curve to the rightr having a radius of 5.50 feet, a central angle of 179° 59'59",and whose chord bears North 37`27'26" Eastr 19.'00 feet; Thence South 52'32'AV Easy, 1.00 feet; Thence North 37°27' 26' East,a distance of 2S.76 feet to a point of curvature; Thence 61.70 feet an the arc of a curve to the rightr having a radius of 57.50 feed,a central angle of 61'28'42",and whose chard bears North 16'1.8'59" West,58.78 feet; Thence North 52°-12' 14"Westr a distance of 50.96 feet to a paint of curvature; Thence 92.29 feet an the arc of a curve to the rightr having a radius of 68.00 feed,a central angle of 69'20'11'r,and whose chard bears North 97'12'SY West,77.36 feet; Thence North 52°-12' 34"Westr 28.37 feet to a point of curvature; Thence 214.29 feet on the arc of a curve to the left,having a radius of 329,00 feet, a central angle of 37'19'07'rr and whose chard bears North 71'12'07"West,210.52 feet; Thence North 89°51'41'Westr 141.19 feet to a point of curvature; Thence 313.93 feet on the arc of a curvetathe right,hawing a radius of 271_00 feet,a central angle of 66'2 2'21"r and whose chard bears North 56'40'31"West,296.67 feet to a paint of non-tangent rompnund curvature; Thence 6235 feet an the arc of a curve to the rightr having a radius of 37.50 feet;,a central angle of 95'15'31'r,and whose chord bears North 24,Dg'08'r East,55.41 feet; Thence North 00°09' 15" East,a distance of 2 5.3 1 feet to a point of curvature; Thence 7.46 feet on the arc of a curve to the left,having a radius of M.16 feet, a central angle of 04'44'32"r and whose chard bears 5auth 90'04'09"West,7.46 feet to a poi nt of non-tangent cDmpound curvature; Or Site Planning•Landscape ArdAtetture.Civil EnginmMng.Surveying 462 E.Shore Drive,Suite 100.Eagle,Idaho 83616.P 208.939_AC41+wwwAfielandgmupirlt.com City of Meridian Department Report VII. Exhibits 132 February 13,2025 Page 3 Thence 4.20 feet on the arc of a curve to the right,having a radius of 2.50 feet, a central angle of 96'08'48", and whose chord bears North 54' 12'08" West, 3.72 feet; Thence North 03'53'11"West, 14.26 feet; Thence South 74'42'50"East, 11.78 feet; Thence North 00'09'19" East,a distance of 29.11 feet to a point of curvature; Thence 69.50 feet on the arc of a curve to the right, having a radius of 50.00 feet, a central angle of 79'38' 35",and whose chord bears North 24'58' 17" West,54.04 feet to a point of non- tangent compound curvature; Thence 118.34 feet on the arc of a curve to the right, having a radius of 261.50 feet,a central angle of 25'55'41",and whose chord bears North 27'48'57"East,117.33 feet to a point of non-tangent compound curvature; Thence 311.04 feet on the arc of a curve to the left, having a radius of 438.50 feet,a central angle of 40'38' 29",and whose chord bears North 20' 27 32"East,304.56 feet,- Thence North 00'08'19" East,68.71 feet; Thence North 45'23'55" East,46.14 feet,to a point on the southern right of way line of East Franklin Road; Thence on said southern right of way line,South 89'20'28" East,875.35 feet,to a point on the north-south mid-section line of said Section 16; Thence on said mid-section line, North 00'04'42"West,20.00 feet to the POINT OF BEGINNING. The above-described area of land contains 121.40 Acres,more or less. PREPARED BY: $4 y�G1ENS The Land Group, Inc. r Michael Femenia,PL5 0 a 1a E'afko f.s. City of Meridian I Department Report VII. Exhibits 133 o� A9E8 WPP1'�PW4 � W Z� Gw:V � ~�� all AOFA aanseaal 04110 IIaeaayanol uoileail!PoW VU iof a � I ie � I • Q` � I 1 ` I I I F fw 1 III` 6g I \ �a 9 L ,a d y9 = y CL � Naaa � � a392a � � a � � a � 2 aD F� 3 � � 9 ° 9Raa9eag3 : o v � � � � m : meQeae � ee ee 0 City of Meridian Department Report VII. Exhibits Fl 34 D. Rezone Legal Descriptions & Exhibit Maps LEGAL DESCRIFMON M OF -m 0=1f . LAND Pagel❑F2 = GROUP April4,2025 Project No.:123003 RE-ZONE"CC" TOUCKMARK of the TREASURE VALLEY,LLC An area of land located in the North One Half of Section 16,Township 3 North,Range 1 East Boise Meridian,City of Meridian,Ada County,Idaho,being more particularly described as follows: COMMENCING at the Northwest corner of said Section 16,thence on the north section line of said Section 16,South 89'20'28"East,1759.97 feet,to the POINT OF BEGINNING: Thence continuing on said north section line,South 89'20'28"East,946.40 feet,to the North one quarter corner of said Section 16; Thence South 89'21'OC'East,629.91 feet,(from which point the Northeast corner of said Section 16 bears south 89'21'00'East 2C72.75 feet drstant); Thence leaving said north section line,South 00°38'34"West,333.28 feet, Thence south 43°44'39'East,232.38 feet,to a point on the boundary Irne of Parcel"B"as same is shown on Record of Survey No_10611,Recorded in Instrument No_2015-079903,Ada County Records, Thence continuing on said Parcel"B"boundary,South 25'43'56'West,195.C9 feet Thence South 22'31'18'East,350.00 feet; Thence North 89'51'46"West,331.54 feet, Thence South 00°08'36"West,13.49 feet, Thence South 77'29'43'West,432.91 feet, Thence South 00'04'42'East,6.42 feet, Thence South 88'27'15'West,36.75 feet,to a point of curvature; Thence leaving said Parcel"B"boundary line,296.36 fleet on the arc of a curve to the left,having a radius of 495.35 feet,a central angle of 33'C7'23',and whose chord b ea rs South 50'18'42" West 28239 feet, Thence south 37"27'26'West,32.50 feet; Thence south 52"32'34"East,138.37 feet, Thence 291.49 feet on the arc of curve to the left,having a radius of 200.00 feet,a central angle of 83'30'24",and whose chard bears South W 17'53"East,266.37 feet; Thence South 45'08'19"West,183.25 feet to a point of curvature on the boundary line of Parcel "D"as same is shown on Record of Survey No.9213,Recorded in Instrument No.112048170,Ada County Records, Thence continuing on said Parcel"D"boundary line,175.54 feet on the arc of a curve to the left, having a radius of 223.50 feet,a central angle of 45'00'01",and whose chord bears South 22'39' 19"West,171.06 feet, Thence South 00'08'19"West,198.89 feet to a point of curvature; Thence 135.47 feet on the arc of a curve to the left,having a radius of 203.54 feet.a central angle of W 08'27",and whose chord bears South 18'55'53"East,132.98 feet,to a point common with 4t2 El%t Sn4r4❑nv$.SU114 100,Eagle,IdMnO 53516 2Qa.93g.4U41 Inal and groUpinC.Com City of Meridian I Department Report VII. Exhibits 135 April 4,2025 Page 2 the Northwesterly corner of Parcel shown on Record of Survey No_10690,Recorded in Instrument No_2016-103452,Ada County Records; Thence on the west boundary line of said Parcel,South 23' 18'42"West,222.57 feet; Thence South 41'59' 14"West,86.19 feet,to a paint common with the Northeast comer of Parcel shown on Record of Survey No_10257,Recorded in Instrument No_2015-089469,Ada County Records, Thence on the north boundary line of said Parcel, North 89*50'45"West;,209.10 feet,to a paint on aforementioned westerly boundary line of said Parcel"O"; Thence on said westerly boundary line, North 00*08'19"East,749.70 feet,to the southeasterly corner of Lot 2, Block 1 of Touchmark Living Center Subdivision No_1,Recorded in Instrument No_ 104093301,Ada County Records; Thence on the boundary line of said Lot 2, North 44'45'45"West,430.37 feet,- Th e nce North 890 17'59"West, 152.37 feet; Thence North 000 08' 19" East,377.27 feet; Th a nce N o rth,890 51'41"West;,214.00 fe et; Thence North 00'08'19" East,140.55 feet, Thence North 510 07'05"West;,99.50 feet,to a point on the centerline of East Louise drive; Thence on said centerline,North 39'52'55" Easl;,69.44 feet to a point of curvature; Thence 111.83 feet on the arc of a curve to the right,having radius of 125.00 feet,a central angle of 51'15'33",and whose chord bears North 640 30'38"East, 108.14 feet; Thence South 89'51'41" East,133.66 feet,to a point of curvature in the centerline of South Touchmark Way; Thence on said centerline,240.24 feet on the arc of a curve to the right,having a radius of 300.00 feet,a central angle of45'52'54",and whose chord bears North 17'50'20' Fast 233.87 feet to a point of non-tangent compound curvature; Thence 283.73 feet on the arc of a curve to the left,having a radius of 400.00 feetr a central angle of 40'38'27",and whose chord bears North 20'27'33"East,277.92 feet; Th a nce N orth 00'08'19" East,161.84 feet,to the POINT OF BEGINNING- The above-described area of land contains 55.17 Acres, more or less- Ni.LAN PREPARED BY: The Land Group,Inc. Michael Femenia,PLS cr�,��rl2oz5 Site Planning a Landscape Architecture■Civil Engineering■Surveying 462 E.Shore Driver Su ite'Do■Eagle,Idaho 93616+P 208.939.4441+www.thelandgroupinr.com City of Meridian Department Report VII. Exhibits 136 d d9E8 eyEyl'uerMN �S ee vm„�ru�i a a S 311 Raper ainseaq ayl jo)Iaewyanol S auozaU ,° {I{ J J T 61 r � i f s i 47 m_ L 9 I I H t = -:9 hi �owrwx , C1 3 1 $jl ,1 p1 i — — a$ ! a,. . — II I � s o o a e a e o M N City of Meridian Department Report VII. Exhibits Fl 37 LEGAL DESCRIPTION TH E LAND Page 10F2 GROUP November 11,2024 Project Nm: 123003 RE-ZONE"`CG" TO U C KM ARK of the TREASU RE VALLEY, LLC An area of land located in the Northwest quarter of the Northeast quarter of Section 16,township 3 North, Range 1 East, Boise Meridian, City of Mleridian,Ada County, Idahor being more particularly desc ribed a s faI I aws; COMMENCING at the North One Quarter carver of said Section 16,thence an the north section line of said Section 15, South 89'21' 00" East,629,91 feet,to the POINT OF BEGINNING: Thence continuing on said north section line, South 89'21'00" East,72138 feet,to the East One Sixteenth comer of said Section 16, (from which point the Northeast corner of said Section 16 bears South 99'21'00"East, 1351.37 feet; thence leaving said north section line,South 00°01'49"West,558.09 feet,on the easterly boundary line of Parcel"B"as same is shown on Record of Survey No_ 10611,Recorded in Instrument No.2016-079903,Ada County Records; Thence continuing on said boundary of Rerord of Survey#10611,North 82'09 19"West,7.63 feet; thence North 79'24'56"West 449.48 feet; Thence South 80'51'07"West, 116.19 feet; Thence leaving said Parcel "8,boundary, North 43'44'39"',Vest, 212.39 fEet; thence North 00'38'34" East,131.29 fEet,to the POINT OF REGINNINIG. the above-described area of land contains S.17 Acres,more or less, I'L LA PREPARED BY-. +S' The Land Group,Inc. L Michael Femenia,PLS C2 L y OE 10 4tL$ 11I111202+ 492 Law Shore Onwr, Suns 100. Eagle, Idaho 43619 H5.839.4o41i chrlandgroupinc.dam City of Meridian I Department Report VII. Exhibits 138 Rezone rrCGrr ��. Touchmark of the Treasure Valley LLCM Situate in N 1.2 of Section 16 per. Township 3 North,Range 1 East,Boise Meridian City Of Meridian.Ada CauntY,Idaho qp� � 2024 4S 11/11 2QM+ —889.2i'00'E Eotat Fra-nklln Road 169°21^00I� 629.91' a, 889'2f'00'E 721.m. 1351.37' cv -- -- -- —,—� F'O6 ru w><— SEC 16 NE SEC COR 4 SEC 16 92 IQ REZONE AREA TG" I 1 B.17 Acres± m N42'44'39'W 232.W' QP SSO°51'07�5' 116.19' NAMPA�ME0014N� N °24 449.4 fR+1"r+ON f �157fi�G'7� f ` E➢GEVIE44 ESTATES ` } � No-1 SUE QIVISION L1 Line Table LINE BEARING LEPJSTH L1 NB2"091W -�:7 8 8 0 200' 400' t Exhibbit "B" s a Horizontal Scale:1'=20D PNed No.:1230M y Data OF Imam:Nm embl 1,2024 THE Re-zone "CG" f LAND Touchmark of the Treasure Valley, LLC r �H -GRQUP City of Il�lerdian Ail City of Meridian I Department Report VII. Exhibits F139] 1 r 1J �'.`",' ,,�y -v• 1�-,''fir �n '�j���• -�''�G ., Wilt�It1 � !1 Ix Ar Y r r Y . �•�. �� 1 J � -w' ram• � - JvJ •� fie., � ��Y fir' '�.��t v` � R :d � ' r +► - K 1 . xm, +, L op �l.i���'+KCy i� ?A + �Lll� �� ■ r ■ i F. Proposed Conceptual Development Plan& Conceptual Building Elevations to Replace Existing Plan(dated: 10/23/2024) Ak a ernM•••APRsA AR eae nNN ii� ••n H s�3� 2Y ...e PH s��Q 3 ....N N iM ■ f 4 i h •re! i•"• s T a • b O H ag p • i5 x y` aa pp {4 j gqYppp gFyi �'J{yK f ag 8 .2] y yp pS q •A"�4, �u aeeN�H.•HAR�•- �i eaaN u•N''sP- `� aee•4•A t��- � a ^^-HA �q- aaa ^^-HA P- hip 5 a 9 4 � a9s City of Meridian Department Report VII. Exhibits 141 � e ANN e , a «. . . _ . ---�- . § � ■ � . ' ZOO \ eg - ; , $ f§§ . l. # 2) �§ < §® �2 &f f In 10 -E - : ­3. M. : � \ . . � . \� , . IN - - ju 02 City of Meridian Department Reprt V t Exhibits Fl 42 G. Proposed Pedestrian Pathway Plan r r u � �l l ' - C l r.- IL 41 r . . �•- ■• i ■ ■■ "`� ■ N ,Y k_�• J W yyii a� III( i �g z rr... ■ City of Meridian Department Report VII. Exhibits 143 H. Proposed Phasing Pa (dated: 7/10/202 q � _ \� � �■ � \ ~. \. � e � $ 2 ---- ---- - _ / � n E / ^ Q ®^ f ® 2E on 2 w = o E @ '0 E - ]v 9 m « 0) x \ 0 -0 3 ~ ± \ IL n U o § 2 q _ o CD \ \ « 2 \ - \ 2 \ �! _ N / LU 2 § z u Q ® ,� 0- m 0� 06 03 � � `- - - - - - - - - � � 6 0 \ / 2 )) « / G g e ± < � 2 � � Av4 . - y City of Meridian Department Reprt V t Exhibits F144] I. Proposed Site Amenity Plan (dated: 4/17/2025) OHdlM Haeiugan�l i HI asp-paxiw r�aewgan0l 1 1� a f ! M IN, iii d4 :� H ` . ' tF --- - -- - --- - -- - - -- -r I i _ _ _ - 0 I City of Meridian Department Report VII. Exhibits 145 dllQa9�� .N®��� M ONVI lae11manpl 3Hi asp-Paxiw pomg3n01 1 Ai . � i l. l�Y! ! k i y!. o � t I � �• � I�i � � !a I€ .� .� € �yi 1 all; ll �i 1 I �Itl•d��l ii ii1 'a I € i . gl E• i 3 i$ : • � = t A N jila i lil !g t��� liii1pF1 � $ €g13i E e4ys 1 1 I t yyyq a ge ! _ !! ei fq �p�p1e� �• y # �Se��e9 2i 1s114.1111PI .y: 1 1 111+ 1 r� 011 c +j R � k V dl City of Meridian Department Report VII. Exhibits 146 VIII. ADDITIONAL NOTES & DETAILS FOR STAFF REPORT MAPS,TABLES,AND CHARTS (link to Community Metrics) A. One-Mile Radius Existing Condition Notes This data is automatically derived from enterprise application and GIS databases, and exported dynamically. Date retrieved notes generally reflect data acquired or processed within the last 30- days.Analysis is based on a one-mile radius from the centroid of the identified parcel. Parcel based data excludes certain properties and represents land as it exists now. Properties considered are only those with a total assessed value greater than 0(i.e. excludes most HOA area,transitional development, government, and quasi government facilities). The following values also constrain included property acreage to reduce outliers and non-conforming instances from distorting averages: R-2<5.0; R-4<2.0; R-8< 1.0; R-15 <0.5; R-40<0.25. Conditional Use Permits and Preliminary plat data likely include duplicate project submittals as they may be for the same project, approved at different times through multiple application types. Consider each independently or review prior application approvals. Some approved entitlements, and particularly older ones,may be constructed. Decennial population counts and household counts are based on the most recent Decennial Census. Current population and current household values are COMPASS estimates,usually for the year previous, and are based on traffic analysis zone boundaries(TAZ's). B. Mixed Use Analysis Notes This data is derived from enterprise application and GIS databases, and exported dynamically. Data considered for analysis are only those areas overlapping the overall Mixed Use boundary area. Mixed Use areas across arterial roadways are distinct, separate, and not considered as they do not meet the mixed use principles in the Comprehensive Plan(e.g.pedestrian safety, transportation efficiency, etc.). Mixed Use parcel areas may be greater or smaller than the future land use area designation boundary due parcel size,configuration,right-of-way, and other factors. Conditional Use Permits and Preliminary plat data likely include duplicate project submittals as they may be for the same project, approved at different times through multiple application types. Consider each independently or review prior application approvals. C. Service Assessment Notes This data represents existing conditions derived from our enterprise application and GIS database, exported through dynamic reporting. The system references the most recent available data from various sources, including sewer main lines, sewer trunksheds, floodplain, fire service areas and response times,police crime reporting,pathway information,existing and planned transit, roadway improvements, school and park proximity, and other resources. The tool provides context for project review,using multiple indicators consistently. Data from similar topics may vary based on different levels of review. The overall score is based on weighted criteria(not a ranked order), and the percentile score compares the parcel to others in the city(higher is better). This tool was developed as a City Council priority and outcome of the 2019 Comprehensive Plan. Scores,whether high or low, are just one data point and should not be the sole basis for decisions. D. ACHD Roadway Infographic Notes The Ada County Highway District utilizes a number of planning and analysis tools to understand existing and future roadway conditions. • Existing Level of service(LOS).LOS indicator is a common metric to consider a driver's experience with a letter ranking from A to F.Letter A represents free flow conditions, and on the other end Level F represents forced flow with stop and go City of Meridian I Department Report VIII. Additional Notes&Details for Staff Report Maps, Tables, and Charts 147 conditions. These conditions usually represent peak hour driver experience. ACHD considers Level D, stable flow,to be acceptable. The LOS does not represent conditions for bikes or pedestrians, nor indicate whether improvements: are possible; if there are acceptable tradeoffs; or if there is a reasonable cost-benefit. • Integrated Five Year Work Plan (IFYWP).The IFYWP marker(yes/no) indicates whether the specified roadway is listed in the next 5-years. This work may vary, from concept design to construction. • Capital Improvement Plan(CIP).The CIP marker(yes/no)indicates whether the specified roadway is programmed for improvement in the next 20-years. City of Meridian I Department Report VIII. Additional Notes&Details for Staff Report Maps, Tables, and Charts 148 E IDIAN;--- Applicant Presentation TOUCHMARK PLANNING & ZONING COMMISSION Requested Revisions: full privacy to match existing fence”. A.1.ii. request wrought iron fence reference be replaced with “metal picket fence or Requested Revisions: but should not be a requirement as this may be engineeringly infeasible. and a severe grade difference of approximately 27’. Internal drives will be provided if possible and likely not achievable as there is an existing gravity ditch where flows will need to be maintainedA drive/private street from Truckee Ave to the light industry designated property is difficult i.Conditional Use Permit/ Planned Unit Development Modification Requested Revisions: We are not requesting more units over 524. Just the flexibility to address market conditions. equest the flexibility of up to 65% of the land area to be allowed as residential uses. rii. Our plan, as proposed, is consistent with the comprehensive plan; we respectfully o Conditional Use Permit/ Planned Unit Development Modification THANK YOU V IDIAN� AGENDA ITEM ITEM TOPIC: Public Hearing for Gramercy Townhomes (H-2025-0019) by Elton Development Company, located at 1873, 1925 and 2069 Wells Ave. Application Materials: https://bit.ly/H-2025-0019 A. Request: Rezone of 6.98 acres of land from the C-G zone to the TN-R zone. B. Request: Preliminary Plat for 82 buildable lots and 8 common lots. C. Request: Development Agreement Modification to establish a new concept plan and remove the age restriction on the property. 149 PUBLIC HEARING SIGN IN SHEET DATE: July 17, 2025 ITEM PROJECT NAME: Gramercy Townhomes H-2025-0019 wish to testify Your Full Name Your Full Address Representing (f yes) (Please Print) HOA. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 COMMUNITY DEVELOPMENT C��fEPIDIAN*,,--, DEPARTMENT REPORT HEARING 7/17/2025 Legends® DATE: - Project Location �'•J'� �' TO: Planning&Zoning Commission Area of Impact �= City Limits FROM: Nick Napoli,Associate Planner O Analysis @. ; s 208-884-5533 --r T m nnapoli@meridiancity.org APPLICANT: Mike Chidester SUBJECT: H-2025-0019 , Gramercy TownhomesvT � i - LOCATION: Located at 1873, 1925, and 2069 Wells � '��. Avenue in the NE '/4 of Section 20, - T.3N.,R1E. I. PROJECT OVERVIEW A. Summary Rezone of 6.98 acres of land from the C-G zone to the TN-R zone, a preliminary plat for 82 buildable lots and 8 common lots, and a development agreement modification to establish a new concept plan and remove the age restriction on the property. B. Recommendation Staff. Approval with a development agreement and conditions. Commission: Pending C. Decision Council: Pending City of Meridian I Department Report I. Project Overview 150 I1. COMMUNITY METRICS Table 1: Land Use Description Details Map Ref. Existing Land Use(s) Vacant - Proposed Land Use(s) Residential - Existing Zoning C-G(General Retail and Service Commercial District) VII.A.2 Proposed Zoning TN-R(Traditional Neighborhood District) Adopted FLUM Designation MU-R(Mixed Use Regional) VII.A.3 Table 2: Process Facts Description Details Preapplication Meeting date 11/19/2024 Neighborhood Meeting 2/18/2025 Site posting date 7/7/2025 Table 3: Community Metrics Agency/Element Description/Issue Reference Ada County Highway District IV.D • Comments Received Yes - • Commission Action Required No - • Access Private streets are proposed for the development. - ITD Comments Received Yes;No comment Meridian Public Works Wastewater IV.B • Distance to Mainline Available at Site • Impacts or Concerns Yes, See Public Works Site Specific Conditions Meridian Public Works Water IV.B • Distance to Mainline Available at Site • Impacts or Concerns Yes, See Public Works Site Specific Conditions School District(s) West Ada School District IV.0 • Capacity of Schools Pepper Ridge Elementary:Architectural 675,Program 575 - Lewis and Clark Middle: 1000 Mountain View High: 2175 • Number of Students Enrolled Pepper Ridge Elementary:471 - Lewis and Clark Middle: 899 Mountain View High: 2479 Note: See section IV. City/Agency Comments&Conditions for comments received, or see the public record. City of Meridian I Department Report II. Community Metrics 151 Figure l: One-Mile Radius Existing Condition Metrics Reference Parcel:R3238520110 Date Retrieved:2025/5/5 Parcel Count Parcel Acreage Infiii Indicator: 441 Surrounding Area 313 0 '� 7 �p Notcty ® City Limits 2,894 1,512. ■ Not City Household Household& Population Growth ■ Households 02020 Population Change:15.2°I° Population ■Growth (Household and Population Change since 2010 Decennial) 5,000 10,000 15,000 20,000 Use Types Residential Addresses All Addresses ■ Single-family 31% 25% 0% ® Multi-family 69 55 ® Commercial Notes: See Error! Reference source not found..Error! Reference source not found.. Figure 2: Service Impact Summary ImpactService . . Ready Marginal Caution 2q, e��t �o°a Fite o��L2 s�aAy a�y\� ���°� 0 fro" Q-° Notes: See Error! Reference source not found..Error!Reference source not found.. City of Meridian I Department Report II. Community Metrics 152 III. STAFF ANALYSIS Comprehensive Plan and Unified Development Code(UDC) A. General Overview The subject properties fall within the Mixed-Use Regional(MU-R)Future Land Use Map (FLUM) designation. The intent of the MU-R designation is to provide a mix of employment, retail,and residential dwellings and public uses near major arterial intersections. By integrating a variety of uses together,the goal is to avoid predominantly single-use developments such as a regional retail center with only restaurants and other commercial uses. Development should be anchored by uses that have a regional draw with appropriate supporting uses. This designation supports a diverse and integrated community where residents can live,work,and shop without needing to travel far. According to the Comprehensive Plan,the MU-R designation should make up between 10%and 30%of the total development area,with gross residential densities ranging from 6 to 40 units per acre. The MU-R area, located at the southwest corner of Eagle Road and Overland Road, encompasses approximately 165.2 acres. Of that total,roughly 41.5 acres are designated for residential use,including the proposed development, accounting for 25.1%of the MU-R area in this quadrant,which aligns with the Comprehensive Plan's vision and density targets. The proposed development plan depicts eighty-two (82)townhomes with the Traditional Neighborhood Zoning(TN-R)as the single use for the subject properties. While the TN-R zoning requires two different types of housing, staff finds that the surrounding garden-style apartments, single-family detached, and townhomes provide the mix of units desired in the area. The proposed townhomes range in size from 1,650 s.£ and 1,750 s.£with three (3)and four(4) bedroom units. In addition,TN-R zoning requires detached sidewalks with parkways. While the applicant has provided detached sidewalks along the front of each unit,the sidewalks running north—south are attached. Staff has determined that the combination of detached sidewalks with parkways and on-street parking in front of the units meets the intent of the TN-R zoning. Furthermore,the attached north—south sidewalks are appropriate due to site constraints and are expected to enhance pedestrian connectivity within the development. The private streets provide accurate and easy to find address points that will be beneficial for Fire,EMS,and Police. In addition to the townhomes,the development plan depicts a 0.60-acre common open space with parkways, on-street parking,and alleys. The applicant has provided an internal pathway to connect with the ten(10)foot multi-use pathway on the southern boundary to help residents connect with Mountain View High School and Gordon Harris Park to the south. The applicant has indicated that the buildout timeline for the development depends on demand; however,they anticipate developing the project in five(5)phases,with the first phase consisting of the large open space, amenities, and roads. West Ada School District has indicated that the development is expected to generate approximately nineteen(19) school-aged children across all grade levels. Pepper Ridge Elementary and Lewis and Clark Middle School both have adequate capacity to account for the addition of school-aged children from the development. However,Mountain View High School is over capacity with 2479 students enrolled and a capacity of 2175 students. Overall,the proposed townhome development is an allowed use within the MU-R designation and contributes to the area's intended mix of residential and commercial activity.Beyond the project boundaries, staff also considered surrounding uses and finds that the site's proximity to commercial/employment areas, a child care facility/charter school, and regional pedestrian infrastructure supports the MU-R designation's broader land use goals. • "Encourage a variety of housing types that meet the needs, preferences, and financial capabilities of Meridian's present and future residents."(2.01.02D) City of Meridian I Department Report III. Staff Analysis 153 The proposed for-sale townhomes will provide additional housing options in the area that will blend in with the surrounding developments. This will provide a townhome product to the area which is in close proximity to Mountain View High School and Gordon Harris Park. • "Permit new development only where it can be adequately served by critical public facilities and urban services at the time of final approval, and in accord with any adopted levels of service for public facilities and services."(3.03.03F) City water and sewer services are available and can be extended by the developer with development in accord with UDC 11-3A-21. • "Maximize public services by prioritizing infill development of vacant and underdeveloped parcels within the City over parcels on the fringe."(2.02.02) The subject site is already annexed and in a widely developed area. However, the subject sites are undeveloped and have been vacant for more than a decade as commercial only properties. It is one of the last areas of the Gramercy development to be developed and the Applicant believes constructing high-end townhomes will provide needed housing and stimulate the neighboring commercial businesses. • "Avoid the concentration of any one housing type or lot size in any geographical area; provide for diverse housing types throughout the City."(2.01.01 G) Traditional three-story, garden-style apartments are currently under construction throughout the City, which makes the proposed three-story townhome concept desired in this area.. Table 4: Proiect Overview Description Details History H-2021-0023;H-2021-0022;A-2019-0200;A-2021-0238;TED-2023- 0006 Phasing Plan 5 Phases(Depending on Demand) Residential Units 82 Single Family Attached Units Open Space 1.31 Acres; 18.8% Amenities Dog Waste Station(.05)and Open Space Commons(3) Acreage 6.98 acres Lots 82 Building Lots and 8 Common Lots Density Gross Density: 11.74 units/acre Net Density: 19.04 units/acre B. History/Development Agreement Modification In 2021,the subject properties were approved for a multi-family development consisting of 164 age-restricted units on 5.24 acres of land. The applicant then filed for a time extension in 2023 to extend the CUP,however,the applicant did not move forward with the project as the market changed, and demand was no longer there for age restricted units. Currently,the development agreement from this application governs the site. The existing development agreement restricts the site to the previous concept plan and age restricted units. The applicant is requesting an addendum to the existing DA to remove the age restriction and amend the concept plan in favor of the proposed townhome development. The new development proposes 82 townhomes,which is approximately half of the units proposed in the previous application. The applicant is not proposing an age restriction for the new development and will be constructing it in five(5)phases.Additionally,the applicant has proposed open space exceeding the 15%required by the UDC and amenities meeting the UDC City of Meridian I Department Report III. Staff Analysis 154 requirements. Staff is supportive of this change to the concept plan and development agreement as it provides another housing type to the area. C. Site Development and Use Analysis 1. Existing Structures/Site Improvements (UDC 11-1): The subject properties are annexed into the city with the C-G zoning and have utilities stubbed to the site. The site currently sits vacant. 2. Proposed Use Analysis (UDC 11-2): The applicant is seeking a rezone and proposing eighty-two(82)townhomes,which are listed as a principally permitted use in the UDC Table 11-2D-2 for the TN-R zoning district.As mentioned above,the TN-R zoning requires a minimum of two(2)housing types. Since the subject development lies within the MU-R FLUM designation, staff finds that the surrounding mix of housing types(multifamily, single-family detached,townhomes)provides the mix of housing the city envisioned for this area. In addition to this,the design of the development varies from those of the neighboring uses as the development is anchored by a 0.60-acre common open space with on-street parking and parkways. Staff finds the proposed subdivision to be in compliance with the TN-R zoning district and FLUM. Comprehensive Plan policy 2.01.01 C encourages the applicants to maintain a range of residential land use designations that allow diverse lot sizes, housing types, and densities. The larger MU-R area provides different housing types, lot sizes, and densities in close proximity to commercial, employment, schools, and parks. Comprehensive Plan policy 2.01.01 G states development should avoid the concentration of any one housing type or lot size in any geographical area;provide for diverse housing types throughout the City. The larger MU-R area has a mix of different housing types in the form of single-family detached, single-family attached, and garden-style apartments(multifamily). Comprehensive Plan policy 2.06.02D encourages a diversity of housing, recreation, and mobility options to attract and sustain the local workforce. The proposed subdivision provides a unique design that provides the traditional neighborhood feel that the TN-R zoning district calls for. With the neighboring commercial, schools,and regional parks in close proximity, it will allow future residents to live,work, and play in the immediate area. 3. Dimensional Standards (UDC 11-2): The preliminary plat and future development are required to comply with the dimensional standards listed in UDC Table 11-2D-6 for the TN-R zoning district. All proposed lots and public streets appear to meet UDC dimensional standards per the submitted preliminary plat. This includes lot sizes ranging from approximately 1,461 to 1935 square feet. The subdivision is proposed to develop in five (5)phases with the central open space being developed with phase one (1) as depicted in Exhibit VII. Development of the subdivision is required to comply with the subdivision design and improvement standards listed in UDC 11-6C-3. D. Design Standards Analysis 1. Qualified Open Space &Amenities (Comp Plan, UDC 11-3G): Based on the standards in UDC Table 11-3G-3, a minimum of 15% (or 1.05 acres)of qualified open space is required to be provided within the development.An open space City of Meridian I Department Report III. Staff Analysis 155 exhibit was submitted as shown in Section VII.G,which depicts 18.8% (or 1.31 acres)of open space that meets the required quality and qualified open space standards. In addition to the open space provided in the development,the subject development is within approximately 850 feet of Gordon Harris Park and directly abuts Mountain View High School's ball fields. All common open space areas are required to be landscaped with one deciduous shade tree for every 5,000 square feet of area and include a variety of trees, shrubs, lawn or other vegetative groundcover per UDC 11-3G-5B.3. Based on the standards in UDC 11-3G-4A, a minimum of one(1)amenity point is required to be provided. The amenities proposed are a dog waste station and open space commons as the central open space exceeds 20,000 square feet. The applicant's amenity points total is 3.5 exceeding the UDC requirements. In addition to the amenities proposed,the subject development abuts Mountain View High School's ball fields and is approximately 850 feet from Gordon Harris Park. 2. Landscaping (UDC 11-3B): i. Landscape buffers along streets UDC Table 11-2D-6 requires eight(8) foot parkways with class II trees along local streets for the TN-R zoning district. The applicant is proposing private streets built to local street standards with eight(8)-foot parkways and class II trees in compliance with the UDC standards. ii. Parking lot landscaping The landscaping for parking on Lot 2,Block 1, abutting the central open space shall meet the standards listed in UDC 11-313-8. This includes a planter island with a minimum square footage of fifty(50)and a minimum of five (5)feet wide. In addition, a tree is required at each end of the parking rows inside a planter island.Alternative Compliance can be applied for to relocate these trees. The applicant shall either revise the plan to incorporate planter islands with trees or apply for alternative compliance to relocate these trees, this shall be done with the final plat application. iii. Tree preservation Mitigation shall be required for all existing trees four-inch caliper or greater that are removed from the site with equal replacement of the total calipers lost on site up to an amount of one hundred(100)percent replacement(Example: Two(2)ten-inch caliper trees removed may be mitigated with four 5-inch caliper trees, five(5)four-inch caliper trees, or seven(7)three-inch caliper trees). Deciduous specimen trees four-inch caliper or greater may count double towards total calipers lost,when planted at entryways,within common open space, and when used as focal elements in landscape design. The applicant shall provide mitigation calculations with submittal of the final plat if any trees are being removed from the property. iv. Storm integration Per UDC 11-313-11,the applicant shall meet the intent to improve water quality and provide a natural, effective form of flood and water pollution control through the integration of vegetated,well designed stormwater filtration swales and other green stormwater facilities into required landscape areas,where topography and hydrologic features allow if part of the development. v. Pathway landscaping Pathway landscaping shall comply with the requirements outlined in UDC 11-313-12. The applicant must provide a landscape strip at least five(5) feet wide along both sides of the City of Meridian I Department Report III. Staff Analysis 156 pathway. To enhance design flexibility,variations in the strip's width are encouraged to allow trees to be planted farther from the pathway,reducing the risk of root damage. However,the landscape strip must maintain a minimum width of two(2)feet to ensure proper pathway maintenance. The strips shall be landscaped with a combination of trees, shrubs, lawn, and/or other vegetative ground cover. The applicant is not proposing a multi-use pathway; however, they are proposing a central micro pathway to connect with the existing multi-use pathway on the south boundary of the site. It appears the applicant has provided five (5)feet of landscaping on both sides of the pathway. 3. Parking (UDC 11-3C): i. Residential parking analysis Off-street parking is required to be provided for each home based on the total number of bedrooms per unit as set forth in UDC Table 11-3C-6. On-street parking is also available on portions of the proposed streets. The townhomes consist of three(3)and four(4)bedroom units that require four(4) parking spaces to be incompliance with UDC Table 11-3C-6. The applicant has indicated each townhome has four(4)parking spaces,two(2)inside a garage and two(2) on the parking pad. In addition to the 328 parking spaces for the townhomes,the applicant has provided forty-six(46)parking spaces along the streets and near the common space for guests. The applicant is requesting to reduce the parking pad width to eighteen(18)feet for all parking spaces outside of the garage for the townhomes. The reason for the reduction is to provide a break in the concrete plane in the form of planters as depicted on the site plan. Additional overflow parking is being provided throughout the development to offset the width of the parking pad. This was at the request of city staff. The applicant shall apply for an alternative compliance application to request this reduction with the submittal of the design review application. ii. Bicycle parking analysis The UDC does not require bicycle parking in single-family attached, detached, and townhomes developments.However,the applicant is proposing five(5)bicycle parking spaces at the eastern end of the central common open space. 4. Building Elevations (Comp Plan,Architectural Standards Manual): Goal 5.01.02D of the Comprehensive Plan highlights the need for effective building design and landscaping to buffer, screen,beautify,and integrate commercial,multifamily,and parking areas with existing neighborhoods. In response,the applicant has submitted a conceptual elevation package. The materials included in the elevations are brick,board and batten, fiber cement,vinyl windows, standing seam metal roofs,and asphalt shingles. The applicant has provided varied setbacks to provide different unit profiles on the attached units and has incorporated architectural elements such as gable roofs,pedestrian-scale lighting, and awnings. The buildings are proposed to be approximately thirty-nine(39) feet in height with variations in unit counts, such as a five-plex, six-plex, seven-plex, and eight-plex. The townhomes require design review approval and are subject to the traditional neighborhood design standards in the Architectural Standards Manual. This shall be submitted prior to submitting for a building permit. City of Meridian I Department Report 111. Staff Analysis 157 5. Fencing (UDC 11-3A-6, 11-3A-7): All fencing constructed on the site is required to comply with the standards listed in UDC 11- 3A-7. No fencing appears to be proposed; any future fencing shall comply with UDC 11-3A-7. Alternative compliance shall be submitted for the standards listed in 11-3A-7 for fencing along pathways and common open space. These standards require fencing to distinguish common space from private property. The applicant shall submit this prior to approval of the final plat. 6. Parkways (Comp Plan, UDC 11-3A-17): Per Comp Plan policy 3.07.01C appropriate landscaping,buffers, and noise mitigation with new development along transportation corridors(setback,vegetation,low walls,berms, etc.) is required. Per the UDC the minimum width of parkways planted with Class II trees shall be eight(8) feet. The width can be measured from the back of curb where there is no likely expansion of the street section within the right-of-way;the parkway width shall exclude the width of the sidewalk. Class 11 trees are the preferred parkway trees. The applicant is proposing parkways along Traverse Lane, Ainsley Lane, Blazer Lane, and Foresight Lane that appears to be in compliance with this standard. The applicant shall comply with the standards for UDC 11-3A-17 with submittal of the final plat. E. Transportation Analysis 1. Access (Comp Plan, UDC 11-3A-3, UDC 11-311--4): Access is proposed via three (3) drive aisle connections: one to the north connecting to an existing drive aisle and commercial property, and two to the east to connect to S.Wells Avenue. These drive aisles are currently not named and are considered commercial drive aisles. However,the applicant is proposing to add six private streets in the development that require a minimum of one connection to a public street. Staff has discussed this with the applicant and determined the southern connection on the eastern boundary would be best as it aligns with Blue Horizon on the east side of S.Wells Avenue. This will take coordination with the neighboring property owners to name the existing private drive aisle. The intersection of Blazer Lane and the planned extension of E. Blue Horizon Drive is offset due to site constraints. However,after discussions with the applicant and ACHD, it was determined that the offset is not a concern, as the general alignment remains consistent and the intersection is expected to experience low traffic volumes. In addition,the applicant shall provide traffic calming along Stadia Lane and Starfish Lane in the form of bulb-outs, speed bumps, or other approved methods to reduce vehicle speeds and enhance pedestrian safety(see private street analysis below). 2. Multiuse Pathways and Pathways (Comp Plan, UDC 11-3A-8, UDC 11-3A-5): Comprehensive Plan policy 4.04.01A ensures that new development and subdivisions connect to the pathway system. The subject site does not have a multi-use pathway that runs on the property,however,there is an existing ten(10)foot multi-use pathway on the southern boundary that connects to Mountain View High School and Gordon Harris Park. The applicant has proposed an internal pathway system that connects to the 10-foot multi-use pathway and to the property to the north. 3. Sidewalks (UDC 11-3A-17): All sidewalks constructed as part of this proposal are required to comply with the standards listed in UDC 11-3A-17. The TN-R zoning requires detached sidewalks with parkways. While City of Meridian I Department Report III. Staff Analysis 158 the applicant has provided detached sidewalks along the front of each unit, the sidewalks running north south are attached. Staff has determined that the combination of detached sidewalks with parkways and on-street parking in front of the units meets the intent of the TN- R zoning. Furthermore, the attached north—south sidewalks are appropriate due to site constraints and are expected to enhance pedestrian connectivity within the development. 4. Private Streets (UDC I1-3F-4): Six(6)private streets are depicted on the plat as Stadia Lane, Traverse Lane,Ainsley Lane, Starfish Lane,Foresight Lane,Blazer Lane. The purpose statement for private streets in UDC 11-3F-1, states it's not the intent to approve private streets for single-family developments other than those that create a common mew through the site design or that propose a limited gated residential development. A mew is proposed on the central portion of the development; the development is not proposed to be gated. A private street application must be submitted for approval of the proposed private street that complies with the standards listed in UDC 11-3F-4 and may be submitted with the final plat application.Approval from the transportation authority(i.e.ACHD) and the Fire Dept.is required.Approval of the street name is also required from the Ada County Street Name Committee. 5. Subdivision Regulations (UDC 11-6): i. Block face UDC 11-6C-3-regulates block lengths for residential subdivisions. The intent of this section of code is to ensure block lengths do not exceed 750 ft, although there is the allowance of an increase in block length to 1,000 feet if a pedestrian connection is provided. In no case shall a block face exceed one thousand two hundred(1,200)feet, unless waived by the City Council. The applicant is compliance with the block length requirements in the UDC. F. Services Analysis 1. Pressurized Irrigation(UDC 11-3A-I S): An underground pressurized irrigation system is required to be installed to provide irrigation to each lot in the subdivision in accord with the standards listed in UDC 11-3A-15. 2. Storm Drainage (UDC 11-3A-18): An adequate storm drainage system is required in all developments by the City's adopted standards, specifications, and ordinances. Design and construction shall follow best management practices as adopted by the City as outlined in UDC 11-3A-18. 3. Utilities (Comp Plan, UDC 11-3A-21): Ensure development is connected to City of Meridian water and sanitary sewer systems and the extension to and through said developments are constructed in conformance with the City of Meridian Water and Sewer System Master Plans in effect at the time of development. All utilities are available to the site. Water main, fire hydrant and water service require a twenty- foot(20)wide easement that extends ten(10)feet past the end of main,hydrant, or water meter.No permanent structures,including trees are allowed inside the easement. Comprehensive Plan policy 3.03.03G require urban infrastructure be provided for all new developments,including curb and gutter, sidewalks,water and sewer utilities. City of Meridian I Department Report I1I. Staff Analysis 159 IV. CITY/AGENCY COMMENTS & CONDITIONS A. Meridian Planning Division 1. The amended DA shall be signed by the property owner and returned to the Planning Division within six(6)months of the City Council granting the modification. The addendum shall, at a minimum, incorporate the following provisions: The applicant shall comply with the provisions in the existing development agreement (Instrument#2022-001214)with the addition/modification of the following provisions. a. Modify provision#13 to state: "Future development of this site shall be generally consistent with the preliminaryplat,landscape plan,phasing plan, open space and amenities, and the conceptual building elevations for the single- family attached dwellings included in Section VII and the provisions contained herein." b. Add a provision stating: "Any future development of the site must comply with the City of Meridian ordinances in effect at the time of the development." c. Modify Provision#15: "Applicant shall connect to the regional pathway system along the southern property boundary and the business on the northern property boundary by constructing at least one(1)pedestrian crosswalk across the drive aisle with either stamped concrete,brick pavers, or similar material to clearly delineate the pedestrian connection to the pathway system and businesses. d. Remove provision#14: "The multi family units• it-hi, this eet shall be " r-eso years r-the ApplieavA's proposal." e. Remove provision#16: " paf4iing areas a-ad utility installa4ions by the subjeet property and Par-eel R323851 l 240 A,.,,,p do e d ,,,,,.eept plan f f Pa-eel R32395111240 may be r-equir-ed when it develops if stieh proposal is ineensistei#with the existing £ Remove provision#17: "Prior to Cei4 fie to of Zoning ComNlianee " "' Property T2,,,,,.,,da-y A djusrm epA shall be obtained by the A,.plie=t to r-eeentipr-e the lots eonsistent with the proposed site pla-, " 2. The final plat/landscape plan shall include the following revisions: a. Depict the required street buffers on a common lot or on a permanent dedicated buffer easement,maintained by the property owner or homeowner's association as set forth in UDC 11-313-7C.2a. b. Provide parking lot landscaping in accordance with UDC 11-313-8 or apply for alternative compliance to relocate the trees to a different location. c. Add a plat note and graphically depict the easements encumbering the buildable lots along the alleys and private street frontage. City of Meridian I Department Report IV. City/Agency Comments &Conditions 160 d. Add a plat note stating"This plat is subject to the terms and conditions of the development agreement recorded on(add date)as instrument number (add instrument number). e. Depict any proposed fencing and provide a fencing exhibit. f. Provide a landscape strip at least five(5) feet wide along both sides of the internal micro-pathways in compliance with UDC 11-3A-8 and 11-313-12. g. Implement traffic calming measures along Stadia Lane and Starfish Lane, such as bulb-outs, speed bumps, or other approved methods,to reduce vehicle speeds and enhance pedestrian safety. h. The applicant shall connect to the regional pathway system along the southern property boundary and the business on the northern property boundary by constructing at least one(1)pedestrian crosswalk across the drive aisle with either stamped concrete,brick pavers, or similar material to clearly delineate the pedestrian connection to the pathway system and businesses. 3. Stormwater integration shall comply with the standards listed in UDC 11-313-11C. 4. All townhome units shall comply with the design standards in the Architectural Standards Manual.A design review application shall be submitted for approval of the proposed structures prior to submittal of building permit applications. 5. Submit an alternative compliance application for the reduced parking pad width from twenty (20)feet to eighteen(18) feet concurrent with a design review application. 6. Submit an alternative compliance application to allow for no fencing around the common lots and micro-paths concurrent with the design review application. 7. Depict the fifteen(15)foot easements required along the micro-pathways running through the site on the final plat. 8. The proposed plat and subsequent development are required to comply with the dimensional standards listed in UDC Table 11-2D-6 for the TN-R zoning district. 9. The applicant shall comply with the open space exhibit approved as part of this plat application that depicts 18.8%(or 1.3 acres) of qualified open space and the required amenity points as proposed(3.5 points). 10. Comply with all subdivision design and improvement standards as set forth in UDC 11-6C-3, including but not limited to cul-de-sacs, alleys,driveways,common driveways, easements, blocks, street buffers, and mailbox placement. 11. The final plat shall substantially comply with the approved preliminary plat as set forth in UDC 11-613-3C. City of Meridian I Department Report IV. City/Agency Comments &Conditions 161 12. The preliminary plat shall become null and void if the Applicant fails to obtain the City Engineer's signature on the final plat within two(2)years of the approval of the preliminary plat as set forth in UDC 11-6B-7A; or obtain approval of a time extension as set forth in UDC 11-6B-7C. 13. The Applicant shall comply with all ACHD's conditions of approval. 14. The Applicant shall record the plat prior to submitting a building permit. 15. The Applicant shall have a maximum of two(2)years to obtain City Engineer's signature on a final plat in accord with UDC 11-613-7. 16. Staff s failure to cite all relevant UDC requirements does not relieve the applicant from compliance. 17. A private street application shall be submitted concurrently with the final plat application for approval of the private street. Compliance with the standards listed in UDC 11-317-4 is required. B. Meridian Public Works PRE-PLAT CONDITIONS �'a�Se+are' • VW;I xr to*wrr Awa"ble at eite 5rv-'m'-f-4 • y-r�{r3hrd EsUmmed Prom Sd�e bpplwaun 5Wwq FRU'% • 1YRftFf]e[bn:ryl IW4ntr • f'MjM C stefrt Yts with ww M•stw Pian FXJl Plan Imp�ttsfabllmrnx Florr�6arfurvtteai 5Aq Pol7i9t 11W+'ks �#07Gfic[I�i#ipfq water . • thi"rice to Water A4arahle at&*site. 5eraxes • Presslrr�die • rvi ruled FNOjff We appl"On Water ERU,% • Wite+rtllutlay I Nq. cbr*mmt • Najw{omweni Yes *th wilder Mesta+ Rldrq • Lvwct%Xw"rr4 $to Pm 1eWwksSlntSpedFirCOW%ns Pu iur W ons DEPAxn41 L%r KWlfiW['011"O f ad hpryrasall I F wA Fha*or 6g dekrlopmon will and m 64 nwdekd la o-r fy mi nhk-n fl rc flaw q mainninod, 2. ► utr unduwa-P to pmlLel hWim t.'W awff—mi%NAt Irye ulfMtiep cenkwrd. 3. Wacu ma s.tm hr'dramis.nn$was r wnwu"ime i Nr eawmgnl with the Ills MMCTed.Cohr rat wig 4arxInmi nsmdb lit'paw ilk dead and muon hydmhl.of wwaf a rm.W oaf}Nis ftquind. d_ toemm o4 iro skown on Lhe C'Y411 artd faltdw-I P4 plafls d6 fldl nt11[h.tinswt 11W tllaj e7alth on foal plat an41hatillm area cmffi 6s wifhtrco and wqumd sasamem. City of Meridian I Department Report IV. City/Agency Comments &Conditions 162 5- Ensure no permanent structures(trees,bushes,buildings,carports,trash receptacle walls,icnccs, inrltraticm tmnchcs,light poles,etc-)are built within the utility easetent.Applicant sillI reypOn:5ible fqr raining all lsrtdvsping rt4uiremenLs and should a xmlinalc with their plannor if there ale any questions. 6- Ensure no sewer services pass dhrough infttiration trr11C11es- 7- SLrectlighis will be required for the devvlopmem of Lhis property, - Teoos an not allowed withim the required easement-Ensure that no irees will be widh tk hydrawL or water meter easeme rLq- 9- Wstor meter;LhaL must be in drivew4y6 need to have Lraf tic raW]ids and meter lx5xes.Provide conerrtc joints 2'from the m,Cleron all sides similar to the Tolled edges ofsidcwalk panels to make it easier to nrnove and repair concrete in the future. 10- if a well is located on the si to it must be abandoned per Tegulawry rcyuiremenis and proof of abandonmoni must be provided to the City- 1 1- If Liam arc any exi-aint-hlrnv-off uatvrs that will hr removrd,callous xmc)val- C:cacral Canditiuns o1 Apprnwat I. Applicant shall coordmaie water and wweT main size and routing with the Public Work s a,panineni,and execute standard farms of easements for any mains that are requited is provide service outside of a public right-of-way. Minimum cover over sewer mains is three feet. i f cover from top of pipe to Sub-pidr is Ins shun three kL i than ultorrate materials gall be used in con forntaaccofCity ofh+lcridian Public Works DcpartmmtsStand"Specifications. 2, Per Meridian City Code(MCC).the applicant shall be responsible to install sewer and waigr mains to and through this developmcnL. Applicant may be eligible for a reimbursemein agreement for infrasiructure eahancemeni per MCC 9.6-5. 3. The appl ieant shall provide eAsement(s)for ftl l public wftWrlsewer mains oumid,e of pu0t:Tight of way(include all wrist-r services t5nd hydrants)- The ca_n=ent widths shal l b.,20-Feick wide fw a singlc utility,or Wfcct wide for two. The casxmcnLs shall not be dedicated via the plat,but rather dedicated outside the plat process using the City of Meridian`s standard forms-The casement shall be graphically depicted on the plat for reference purpascs. Submit an executed easement(on like form available From Public Works),a legal description prepared by atti Idaho Lico!t tic professional Lt]nd Surveyor,which must include the area of dte rasememt(marked E HiDIT A)and an 1 i"reap with bearings and distances(marked E 141BIT a)for review,both cxhibils must be sealed,signed and dated by a Professional Land Surveyor.DO NOT RECORD- Add a note to the plat referencing this domimcni. All ememenis must be submitted,feviewed,and approved prior to developmeni pram approval. 4- The City of Meridian requires that pressurized irrigation,systems be supplied by a year-round yourre of water(TJDC 1 1-313-6).ne npptieant sbould be rnquired to use o-my exiSiing Surface or well water for the primary source. If a surfaec or well souTxc is not available,a singlc-point connection to the culinary water system shall be required. If u singlespoint oonncction is utilir.ed. the developer will be responsible for the payment ofaswssinenis for the cotntnon areas prior Lo prior to receiving development plan approval. S- A]l rxisting wulcrures LhaL arc required to bu mmoved shatl be prior to 6gdftture em the Final plul by the City Engingmm Any 4iruciuwN'that are slluwe4 tQ remain shall be sukject to Cvaluution and possible reassignment ofslrcet addressing to be in compliance with MCC. 6- Al I irrigation ditches-curial s,laterals,or drains,exclusive of natural waterways,intersecting, craassing or laying adjacent and contiguous to the area being subdivided slfall be addresstkd par UDC 11-3A-6- In performing such work,the applicant shall comply with Idalko Code 42-]207 and rosy 011kCr applicable law Of regutAtion- City of Meridian I Department Report IV. City/Agency Comments &Conditions F163] 7_ Any weals that wiI I not continue to be used must be properly abandoned according ho Idaho Well C'onsirtnetion Standards Rules administered by the Idaho Department of Wawr Resouroas, Tht Do-eloprr's Engintvr sbull provide 4 St$Lemt-ni addrmLging whether there are any existing wells in the dc"kgmcnt,and if so,how they will continue to be used.OF prMide record of their abandonment- 8- Any existing septic systems within this project shall be removed from service per City Ordinan Section 9-1-4 and 9 4 S. Contact Central District Health for abandonment procedures and insp-�ctions(208)375-5211. 9_ StWt Signs art to be in plate,sanitary 5ewcr fund water System shall br approved and artiv=d. matt base appmYcd by the Ada Cotmty Highway District and the Final Plat for this subdivision steal l be recorded,prior to applying far building permits_ 10_ A letter of credit or cash surety in the amount of I IOy will be rctluired for all uncomplelod fencin-,]andscapin$,amen€ties,etc_,prior io signattree on the final plat. 11_ A]1 impMvrererntS related to public lifr,sazfrty and health shell he completed prior to oar r—cy of the strur'lwm%Anccw approved by the City Digioccr,an owner m ay post a pCrfWManec surety for such improvemcuts in order to obtain City Engineer signature on the final plat as Sel forth in UDC I1-5C-313_ 12_ Applicant shall be required to pay Public Works development plan review,and construction inspection fees,as determ€ned durEn the plan review process,prior to the issttamee of a plan approval letter. D, It shall be the responsibility ofthc applicant to ensure that all development fcatum wpnply with the Arncricans with Disabilities Act xnd the Fair Housing Act. 14_ Applicant shall be responsible for application and comp)iance with any Section"herhniWnit that may be required by the Army Corps of Engineers_ 15_ Devoloprr shall coordinaw mailtwx lormtit ms with the Meridian Pcxst Office_ 16_ Compactirm lest rrsults shall be submi"to thr Meridian Building Drpmiment For all building pads rcr'civing cngiuccrcd b,'tcicfil1,whe c footing would sit atop fill material, 17_ The design engineer slial l be required to cent fy that the street ocnterl ine elevations are act a minimum of 3-feet above the highest established peak groundwater elevalion_ This is to ensure thal the bottom elevation of the crawl spaces of horn es is at least I-foot above_ 18_ The appl irants design enginver shall ho responsible for inspection of al l irrigation andior drainage facility within this project that do not fall under the jurisdicticm of an irrigation distract or ACHI).Ric&sign cnginccr shall provide ccrufication that the facilities h tvc been irnstallcd in accordance wilh the approved design plans.This certification will be required before a certificate of occupancy is issued for any structures within the project. 19_ At the completion of the project,the applicant shall be responsible io submit retard drawings per hhe City of Meridian AutpCAD standards. Thrsc mcord drawings must be rL!crivt!d,rod:ipprL1vud prior w the issuance of a certification of occupancy for any sttuetures within the pmlcct, 20, A strccl light plan will need ua be included in the giviI sonstruciion plans.$trset light plan requirements are listed in section#-5 of the Improvement Standards for Street Lighting.A copy of the standards can be found ai htiol7ww.w_meridiatttity_or rttiublic works.aspOide272, 21_ The City of Meridian Foguires that thr owner past to the C ty a performance surely in thi amount of 125%of the town ccrostructipn east for all incomplrir sewer,water and rouse irhfrastruct urc prior to final plat signature.This surety will be verified by u line item cast cstirnaic provided by the owner to the City.The surety=be posted in the fonn of an irrevocable letter of cwd i 1.cash deposit or bond.Applicant must file an application for surety,which can be found on IN Community Development Departm on i website. please contact Land Development Sen-ic( for more information at 8$7-221 1. 22_ Thr City of Meridian eloyuircs that the owner prxst ho the City a wan-nty surrty in the amount of 215%of the total const uctian cost for all eohrhpl cted sewer,wutCr and rcusc infrastructure for duration of two years_This surety will be verified by a line item cost estimate provided by the owner to the City_The surety tan be posted in the form of an irrevocable letter of credit,cosh deposit or bond.Applicannt must File an application for surety,which can be found on the Caffi hunily De~vrlopmcnt Drpwtmeni wrhsite. Please contact Land DrrelopmolSetvict! for more inForrnation at P7-2211, City of Meridian I Department Report IV. City/Agency Comments &Conditions 164 C. West Ada School District(WASD) or Other District/School MEMORANDUM: SCHOOL IMPACM CifER,1DIAN�.- COMMUNITY DEVELOPMENT DEPARTMENT June 18,2025 TO; Nick Napoli,Associate Planner CC: Bill Parson,Current Planning Supervisor FROM; Hether Hill,Long Range Associate Coordination Planner RE: H-2025-0019:Gramercy Townhomes MDA, PP R2 CUMULATIVE IMPACTS ON SCHOOLS The proposed residential development application is located at 1873,1925 and 2069 Wells Avenue, Meridian,This section of the memo looks at cumulative Impacts over a broad area and provides entitlement data in areas affected by the subject application,The following information is intended as a referen re,rather than a decisive tool,and serves to forecast the number of school-aged children,enrolled in both public and private schools,using city-wide census data_To date and w thin the last five years,there have 387 entitled units(232 single. family and 655 multi-family)approved within a 1-mile radius of the project location resuItIng In approximately 530 school-aged children, Forecasted Students Erased on Entitlements goo � 500 qw 300 ra Elemenury+ Middle High Total ■Total skKk4As ■ftMl€ ■wlvate Note_Tots+#units der+ved from enterprise Cato far pre;imOnary pats and unrelated Wadi tionai use permits in the Last 5-years. This data reftects approved projects only and excludes pending oppilicotions, including the subject application.American Community Serrvey 5-year data is used to determine persons perhausehold oad enrolment by grodes forpUNIC arrd private schools_ City of Meridian I Department Report IV. City/Agency Comments &Conditions 165 WEST A D A SCH00L DISTRICT-STUDENT G EN E RATION RATES West Ada School District(WASD)uses a Student Generation Rate(SA3R)to determine what Im pact fut,jre development,ulII have on enrollments_Using WASU.%SGR,the following IS Clty stafPS assessment;The SG for Pepper Ridge Elementary School i50.22 for single`famlly and 0.12 for multi-family. Based on the submitted application materials,the proposed project will contain 92 single family units and 0 multi-famiIV units resulting in approximately 19 school- aged children across all grade levels,The proposed project Is within the follow Ing school boundaries,currently,and approval-of the project may affect enrollments at these schools; Srhuul AttencWnce Areas 24-ZV Enrullrnerd Architectural Program CapaEhy capaEdy Pepper Ridge Elementary School 471 675 515 Lewis and Clark Midd le School 999 1000 - Mountaln+flew High Schaal 2479 2175 Bate.Student Generation Rates-ore cakWated in reference to the designoted elementary sehacd within the subject property's assodoted schml attendance area. Thk information is Mriprrded as o reference, ratber than a decisive tool. City of Meridian I Department Report IV. City/Agency Comments &Conditions F166] D. Ada County Highway District(ACHD) Standard C*ndW*ns of Appruval f, ,All proposed irrigation facllldes shall be located outside of the ACHD right-of-My (Irtcluding elk easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way {including all easements). 2. Prlvate Utilities including sewer or water systerns are peohlblted from be6g Iocaled within the ACHD right-of-way, 3. In accordance with district policy, 7203.3, the applicant may be required to update any existing non-compliant pedestrian improvernenta abutting the site to most current Public Rlghl-of-Way Accessibilily Guidelines (PROWAG) requtremenls_ ThQ en ins r sho i documentation of compliance to District Development Review staff for review. 4. Riapiace any existing damaged curb,gutter,and sidewalk and any that may be damaged during the coristnuction of the proposed development_ Contact Consbipcti❑n Services at 2-D8-387-6280 (with file number)for details, 5. A license agreement and compliance with the Districd's Tree Planter pDliry is required for all landscaping proposed within ACHD right-of-way or easement areas_ 6. All utility relocation costs associated wkth Improving street fronlages abutling the rile shall be borne by the developer. 7. It is the responsibility of the applicant to verify @U axisting utilities within the right-of-way. The applicant at no cost tin ACHD shall repair existing utilities damaged'by th9 applicant_ The applicant shall be required to call DIGLINE (1-811-342-1585) al least two full business days prior to brew king ground within ACHD right-of-way, The applicani shall contact ACHD Tragm Operailcna 387.6190 in the event any ACHD conduits(spare or filled)are compromised during any pham of construction. 8. Utility street outs in pavement less than Five years old are not alWwod unless approved In writing by the Distriol. Contact the District's Utility Coordinator at 208-387-6258(with file numbers) for details, 9. All design and construction shall be in amxordanc4 with the ,ACHD Policy Manual, 15PVVC Standards and approved supptaments, Conslruclion 5orvioes procedures and all applicable ACHD Standards unless speciflcally waived herein. An engineer registered In the State of Idaho shall prepare and Certify all improvement plans. 10_ Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions or this approval shah be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of.ACHa. the burden shall be upon the applicant to obtain written confirmation of any change f Drn ACHD. 12. If the site plan or use should change in the future,ACHE)Planning Review will:review the bite plan and may require additional improvements to the transportation system at that time. Any charige in the planned use of the property, which is the sub)ect of this applicationr shall require the applicant to comply with ACHD Policy and Standard Coalitions of Approval in place at Thal time unless a walverNariance of the requirements or ciher legal relief is granled Dy the ACHE] Commission, V. FINDINGS A. Rezone(UDC 11-511-3E) Upon recommendation from the commission,the council shall make a full investigation and shall, at the public hearing,review the application. In order to grant an annexation and/or rezone,the council shall make the following findings: 1. The map amendment complies with the applicable provisions of the comprehensive plan; Stafffinds the map amendment complies with the applicable provisions of the Comprehensive Plan in regard to the MU-R future land use map designation for the site. City of Meridian I Department Report V. Findings 167 2. The map amendment complies with the regulations outlined for the proposed district, specifically the purpose statement; Stafffinds that the proposed map amendment and subsequent development will contribute to the range of housing opportunities available in the City. 3. The map amendment shall not be materially detrimental to the public health, safety, and welfare; Stafffinds the proposed zoning amendment will not be materially detrimental to the public health, safety, or welfare. 4. The map amendment shall not result in an adverse impact upon the delivery of services by any political subdivision providing public services within the city including,but not limited to, school districts; and Stafffinds that the proposed amendment will not result in any adverse impact upon the delivery of services by any political subdivision providing public services to this site. 5. The annexation(as applicable)is in the best interest of city. This is not applicable due to this application being a rezone. B. Preliminary Plat and Short Plat(UDC-613-6) In consideration of a preliminary plat,combined preliminary and final plat,or short plat,the decision-making body shall make the following findings: 1. The plat is in conformance with the comprehensive plan and is consistent with this unified development code; Stafffinds the proposed plat is in conformance with the Comprehensive Plan and Unified Development Code. 2. Public services are available or can be made available and are adequate to accommodate the proposed development; Stafffinds that public services are available and can be extended into the site to accommodate the proposed development. 3. The plat is in conformance with scheduled public improvements in accord with the city's capital improvement program; City water and sewer and other utilities will be extended by the developer at their own cost, therefore, staff find the subdivision will not require the expenditure of capital improvement funds. 4. There is public financial capability of supporting services for the proposed development; Stafffinds there is financial capability of supporting services for the proposed development. 5. The development will not be detrimental to the public health, safety or general welfare; and Stafffinds the proposed development will not be detrimental to the public health, safety, or general welfare. 6. The development preserves significant natural, scenic or historic features. Stafffinds there are no natural, scenic, or historic features that need to be preserved with development of this property. City of Meridian I Department Report V. Findings 168 VI. ACTION A. Staff: Staff recommends approval of the proposed modification to the Development Agreement, Rezone,and Preliminary Plat with the modified provision listed in Section IV. B. Commission: Pending C. City Council: Pending City of Meridian I Department Report VI. Action 169 C �84 OYE_RLANlop Aua Vo, . ��� i .,� ■■fI♦ __ }. �/ dam.- .a i a 84 — J- 01/ERL--AND yy +pma �f 1 i as Q !■i�i i... �- • _. f.��i:lama ri arrlid 8RR T lid l�J •►pG 1 ma i f ♦s + uun n ♦�:.:. ♦ � Rio � a A • uu! �w MEN man � �nu■■■ n /rar�i Sonor nnnl� Ir` ■■■■■r P --ua+■u■■ ��t� ►•J�aq L■� ■ra#rruR Z-_ ..r.ru/■/■1/i :r� . �■�I '�11 r■t�{11lIIlIpllQpilft /� -- .,. ■unam ■ :- _ a s NIa r r1 r �,w �m �1 � ��14■4a rtlana/ '� • Ilhipri3j� �e■r,aaaa �r .rare Tarr 1� ♦*nrnall■aanr ,4 = w�l, 1/t_Ina _ ' �q+ *�L♦� ■ na�r� IiiII1 • s■nnr! == °"'"' - r■aaa , �. #t#►♦ � ++ lra. 11a ♦R R� a a =inuu loci w'��� �s■s a o s . �r�.� � ■!!!!n a �RRw�y_ ♦ ♦ ' ■o. s a O Illlxwn� iinR C��� �['Rf �s rr� rrr w �■■ n!m■_ ,na _ a�+'r i^ii aC r ■, ■aa a. un uuwq- rr ►. •nj , � �__ --_ •err. , Ili - R r ru■r. ♦ C!�r+i.�. •�' �'���_-�lni a iiiii ;�� '4�.atr:�!liiliirlrl ���ii�������.��. •�■itnur�ra�.'.� rarr ' rw �I� t ar nn#a III _ _ .� �* ♦�l. •' _ .� a aaa/� ��■aa■■uus■.a r.��r.a#IIn � .�� ..•+ i�:snu ■nni.plry +$ s�s Pnnurr s►� ♦ a ++■■nlana�1111 r • . ■ ra�►�! as arr■ 11 w aarla rrral+ one,., !! ��:::aaalllllt loll :"ar�,►a�ran irM h11� •�♦ .■■■�w��ii �a R. ann �n�j •r.al���.�n n.n ■u �m Illli �I ► s -• ■r -r n_. I#a# =a■i■■��u'as r 1 --w.ram ll1a� � 1 - ionnl��trn11L �1 �1..■C' � J LU n.■mamma O VERLAND ■■■OO■.np�'� �- ■I�u■f>tME --wnor:i me w •■ �1��rl� ■o. Ii a r� Au.....r. �� �*� ♦� 1LLNi = uun.1 III. +'-.�♦ Q ♦ �juu.m..■ � �, � _- '�.L�rr,►9Y ♦�� ♦ �j� ♦+♦�'i♦�iiiiiiiii� _ ♦ f♦ ♦ ♦♦ �uu■L.= r� an■■■■■ �111 �J ■■■■A Y i li'irr.rrr■■■111 !� w� .ti err +�. .,■..■ �awnr�llroile4uir / ♦j�.i ♦\♦. +♦r■r ♦� •�al�`�O�iiiiiiilliieiii��' �ii"" n■nr _♦�.■.r■■u■r�■ •" LL ♦♦ AR ♦ -- +i��■ ,�,� . lily 1♦A � ■r. 111'• �`\\� \a• ... - �S. �� =IIIIIII 111■p...: wr■■r��r.■ r,♦♦7 11 ♦F♦��_ ♦♦♦�♦♦+�1 � ■����.�� Igp�lwul Ihi11�+����i��\+�-ii� Boom HE 12 p +�.Ss - -- - 1r�i.Mind►�1 �• rrr■nlr■ �1MEN �� 7q# .I w\�■ - . / - ♦ ■111111.1 �as h�.�♦�� AN, woo to■1 ♦ �.���■rL.....wllll r +. ..aN �#ra■r - • - • �■.'un.rl.r 1111 ■..'.'•■'�r 1 _ INN Ills: mill` _ 4.r.�__a...r....■.r�.. ;N ■■■■■n� �� OYE84 RL--AND 1+i■as�Iin■��■sna��iu � 'y S�;i�►': ���I■� Ii � _I mnwunul t�w ww�� ■ur■w ■■ >a � � .w=lmnwnn3n IIIIIIiIIHI - •••- �:••l. •� ���■��■�-,■ ti� i Illtlllllllllli- fi~�"-■I�nr-:iiiii�:lr � "`"'l'� ■�l6mrtumll �IlNlllhi r f��i�..s■■�i..■� r tall ■w ■■■. ■■I. ■■ ■E�■::::iiiiW: INN■ ► ♦ ,Aiiis:::rn C ■� 1'� � r� � AlY ♦ • uum: arum ".�■ _r.� Il* f �♦ �L..1■a ;upur y Nil �. 4�'► ♦ �uon :.■■■-■■;F iiiiiii�iiiiiiii r ■■ � ■■ r� ■umEMmnu 1��e♦e J_laab nn■n■�I�h1; ■ 1■. ■� -_-uI ■nwn ■■■■■ ■.U* Jam' .N� ■r■ ■n■� - _ �1 I■'���■� a.r�.r1111P11 n� : fir" ■r11►♦♦ {1.1In1 � ♦w.■■� 111111111fr � �■Af■ � nr■uq ■"- �.-.I oo� .. r ♦ • � r.► 4n. rl.u■rL ■urr■■ r, l ,I A� ��♦ L. r�arr ■1�►♦ AI' ♦*nwr11■L#nr ,.�� =' ta' -��S�iii ii� � ■js .� � LL��nq■� � r r■ � _nlnn ��11�Iru al ■.�, :i, �,� Il■� 1i..�q m. 11 \`�;.#. a*/fir 7 =liuui�...L =■■s��o■+ TL:...LIB i �I ■■r� \■ �- ���� f �■ Y � � �q ♦ + ♦f �- _ • ii.... - 8,�171111111111i ulll ■1, o \..�*�i �n mnn�.-- � A r■■ _ �tea•■■■■��1 vnw Illmlrl�--- w � M ,■■,i'' rw�.+s ♦• Syr I.--___=__ ■.n■■�'3�I+� v� ��i`s:�finrfl Hall Illm/�■ r�rY�nnu�y�?i,, ee:��!"_ ■un ►a►�,, ��r Q'i:■:i■li III io�\uuln■na I s �� •♦{e r 111111.■ W�•Icl':r �•. R'■ n'� . ���♦�rlllllllli 1*.-r rn■nu■. �tt\�\1'�:�i�•.L.111��J1 ,C it ifii►?y ..■■.■ 1�. ..nn■Y■Illl y f rr�Innu■r■r�r ♦ ♦♦ -w:::nnu■■IIIVr iih'�1-.i ::ii ter? ql 11u�►4[.p ti/I�♦ r■a.rn 1!: + r��ar�iiipi�LLI fh� ��r'-.nr.rrrr I�ar _,1�.��1..-s��r r�■_ 1aLirwLa p � � •r■.„■ � -� 1�■ #r#r r■.n�r� d 0 ntiR,.■.... ■■s ■I- 1-�11H� /1 ,E.■ -• j■�I■■ �. n"--._#r#### 1�l-�i■■gnu■ �� �Q ��r A„;u.._ N � B. Service Accessibility Report Overall Score: 35 68th Percentile Description . e. Lc.-ation In City Limits GREE Extension Sewer Trunkshed mains � 500 ft.from parcel GREEN Floodplain Either not within the 100 yrfloodplain or > 2 ati--e£ GREEN Emergency Services Fire Response time 5-9 min. YELLOW Emergency Services Police Meets response time goals most of the time GREEN Pathways Within 1/4 mile of current pathways GREEN Transit Within 1/4 mile of current transit route GREEN Arterial Road Buildout Status Ultimate configuration (#of lanes in masts =t-eet-- GREEN plan) matches existing (* of lanes) School Walking Proximity Within 1/2 mile walking GREEN Either a High School or College within 2 miles OR a School Drivability Middle or Elementary School within 1 mile driving GREEN (existing or future) Either a Regional Park within 1 mile OR a ParkWalkability Park within 1/2 mile OR Neighborhood Park .:i GREEN 1/4 mile walking City of Meridian I Department Report VII. Exhibits 172 C. Site Plan(date: 5/28/2025) I L I , ME OD ZME � I - _ FF IS � 11111}I11 - 11 1 P1-1 City of Meridian Department Report VII. Exhibits 173 D. Landscape Plan(date: 5/28/2025) LANDSCAPE NOTES: _-_ _ 4 i� CRAi1ERCY TOLYHHOMES RSAl,-N-IOAHO l I sfiCH LGLG ate' 1 NOT A 1 PART 1 .... _ ......'__.....�mm ry__�_..._ � i� � i.. �•, ; 41V ICIN�TY O e= r.ox• __ _ -._.... i r $F{E L1,2 f• LANDSCAPING INFORMATION �� IMGATION NOTES: •,z d DISCLAIMER: k k QM'LDPER•F_NGNEER ■ — `_NOTA ` 91RYEYCYi LANOSCAPF /J'10VERALL r•, � J ARCHITECT LANDSCAPE PLAN LANDSCAPE SET SHEET INDEX SHEETS L 1.1-WaDETwnED uw$a q S. 2 S4 a u-OPEN SPADE AND AWNMEg PUN. L1.0 $MEET L2 1-LPIK SCePF MOTES AND oE�mts LANDSCAPE LEGEN❑ .� . MOT A PART .. •.M-__—_- rf{J'.,�,T:-e. ...... «e..- I� �?-!-�0' ^� I PLANT SCHEDULE - 1 = UrrA .. PART ❑`-` _ _ - ------ ---- --- ----- - --- ---- ---- ..--r....«_ it ..,.._ ... 9 41 .t I 1 ti{!! i .r' I C .r.. Z . d =.' .. .. LVITCHL�-86EL1� _� -.w�.` • ••." k. 4 TT71'�7T�['IIICT" CALLOUT LEGEND (11LRNaS1', E PLAN Z [il Y. •.-p. O x....,.......,,.-~ • CD d r --F r A . II'- M 0 City of Meridian Department Report VII. Exhibits 174 1 1 LANCS&PE LEGEND ••• I NOT A •TCHLINE-5EE L7 7 • l PN2i �� qc••_ .. y.w ,��5.---.f • - TCHLINE-SEEU22 • .. _ ::�5'm-.= - PLANT SCHEDULE ■'� 0- - o` ..�..�..�..�..� .gC141Nf-SEE U2 .�.. .�..� ..� _ ••�- ALAiCHLiNE-SFE L1,9 • � a ••� � •-- ��LANWCAPE PLAN CALLOW LEGEND d FL1.2 6 f _ LANDSCAPE LEGEND Ef ..�..�..�..�..�.. AWlCHUNE-SEEiL2 .�..�..�..� .�..�. ..�.w.... �I TCHLJNE•SEE L73 •• � — .::�m'«"'^R »�..�.. "- «• L PLAh1TSGHEDULE • W I f�l I ;� ICI •ICI ,� - � _ — �: :.,:��� oYa-- _ RIM Zia ---__--------------------------------------------------- _ . .._ s —I o- - b — ---------------------------------------------------------------------- W f .... : y iNOTA PART�� ._• - -._ - -- _ - -- CA LL OUT LEGEND P am A DSCAPE PLAN d LI.3 # City of Meridian Department Report VII. Exhibits F 75 E. Qualified Open Space Exhibit(date: 5/27/2025) OPEN SPACE AND AMZNMES PLAN - - - - -- -- AMENITYLEOEND DEVELOPMENT FEATURES �F OPEN SPACE LEGEND�. LL2.Oji City of Meridian Department Report VII. Exhibits Fl 76 F. Preliminary Plat(date: 5/28/2025) PRnAMMAY PLAT SHOWANr GRAMERCY TONWHOMES Wir ------------- ...... ....... wwffymM -ak 9D -low F FEW? AM IN 3; ML Pi-O City of Meridian Department Report VII. Exhibits 177] G. Building Elevations(date: 5/28/2025) 'i1Y5 .ate Ip rl FRONT ELEVATION-&PLEX .+ � F IUY 7076 S REAR ELEVATION•6-PLEX o scow:ucr.��uu _ P C ySIOE ELEVATION•fi FLEX w E� g` City of Meridian Department Report VII. Exhibits 178 H. Rezone Legal Description&Exhibit Map lum 7:F.GIH{4tIH4 April 2,3On 'PraFnrl rm:24-194 EeWhlt A LDFI DesrrFptkan WARmone EnTWlS A parml of Land bring all of Lot 1,Bark 3 urGramercy Subdivision ka 1{L3eok 99,Pages 32819-31622. rmwdn of Ada County,Idaho}and all of f ranercy Suhdiui&:iw Nu.T_I&mk 100.Pager T 2961-12.952. records of Ada County,Idaho}and furrrmr uivaied in a pinion e F the Nomheast 114 or Section N. Township i Nnrtl�,Rarge 1 East,B.M.,Coy of Mcrldian,Ada County,Idaho being nwne partlrulaii♦ dR=bgd as Wows: romirinncing atthp mvm'3/4 mrnpr nF42d sectirtn Mwhich boars NOC 24'04'E a distance of 2,6i5.55 fW from the rwnter 114 mrmr of ald Sor[ion 20,thence following the westrvly line of said Nonpeeil 114,SW'24'h4'W a distance of r4X.00few Co a 1f2-larch rehar marking Oc ncrriiwes[ua•ner of said Lilt 1,1 3 and hplrg the POrr[r OF BE-MNNING. Yhpncp 1aawnng fard woovi ly Line ann FnlumniE tho northerly line of said I-W 1,Stock 9,599'35WE a distance of J"JM feet top 1lp-mr;h rehar madungthe ngriieasi aonneraf said Lai 1,Omck 3; 1h,gnna laauing;aid noathudy Imo-and following llrecastwly line of said Lot A,9kxk3,S4U'13'S8"E a distanpn of n7jgq F4Wtna➢f2-ipich reha r marking the sourhoast corner ZTf said Lot 1,9kxk 3 arebplrqg on the nnrthpnlyrhno pfsaid Gmnwnry Suhdrridon No_2; Fhcnee lea-Ang said wasierlq tine and following said rroritrerly line,599'3S'56"F a dislancrof 90.33feet to a IJB ir6 reharma:rkvtg the northeast mrncrof said Gra rcy5uhdkvi ib W..2; Therroe Ienring said narumr line and iollcwvig the ea5Ler2y Jine or Said GrBenercy SubdioSbh Ntr.7,. 5WIrS9'6 a distance of 501.;5 Feet to a Sf$inch rebur marking Lhe viu[hek9 cbrmr br upi Gramercy Subdivision NO-2; Them leaving said eastorly line and N A"ing the sovlhuly line of sa id Gramercy SvbeFai 3n fW.2, PtO'3$'$V W a 4%tancr of 42p.W FRgt to a S02 inch rehar marling the sAuth vest corner of Saki Gramerpy$ybdrarsipn no.7 end arw heinS on$ad wnsterifruseofthe korlhmst ifa; Thenpe tpasrrng Said SpUtheTbi Imp pnd'pllpwing thcwpgtuk Gnc of sad Grarrrrry Subdivision Na 2 �adso be-jigsaad westa0v lirw ofthc N4rthewst 1�41,+JQWZ WF ji distance of 50732 feet Ara S4 inch rebar marling the rbr Vi eat corner 0 said 4rnrnercy SVbdi-fi4n Hv.2(aka toeing thr southwest carrier¢f said Lot 1,gapck 3 of c+ra--cf€y5u4droiwn No.1I. Thence Ieawna the vr"eriv line of saici Gfamcr4;y$Ubdivbkw No.T and fo114vingOmvwrsterly lino of said Lot 1,BWh 3(also treinP said weskerlp Into of the Northeast 1141.NW CF a distance of 257.00 feet co thi mwr CW REGINWING, Sa,W parcel contains a total of fi.993 acres,rnore or less. r ' Attaolted Ilcraro is FrlrrLi[R arm by ibis refererxe 15 made a pa t hemO 124 9'n 03 5721 Hank 6lsmumFy Way•BaLse,Idaho 03753•298.639.6939 tmenffIp.cori City of Meridian I Department Report VII. Exhibits 179 .. erfand Rd. POEw1 OF :OuheNCI-'VENT 43RTH 1J4 C4;+E!R SECfM 2P 5a" 30D' -13v I rt Plan Scala:S"=SSff Lit i.Blurk 3 LQL3,9101d305 r C+. LmF �S ses'3o'S51: �34.9a' �.�u Pn T OF ? BE61E+H�sti[ ' 0 h � Loe 1,&Ibck 3 � rn w lot 4.Bkxk 9 Ed S�0`35'78'E 4Ea 33` yr to Parcel A,R06 No.13%7 ae,o z Intermountain Pacific,ULC m AfN:P32385l0240, g $ R3238526110&RM9524210 WE 5,efock 3 P, tone:Chi n `" $ Proposed Zone:TN-F o o " Area;$,3B3i AC "" P n IA7�,Block 3 Pa[x.l B,RpS 1+0.1i 9�+7 r. N69'33'3E�7r C�7.o4' E �a011♦Sd01Cf�St Lot 9,@lock 3 � krn I WrT COtaHE SECTIoU Wn �a E M 6 I H E E I I H G �rri w7.r, Exhibit 8 ncu.7[[I�}aky Rex aye From C-6 W TH-R SHEET: AIFadL0t1,Falk3aFSramsrry5ub,Nue L&axvr4rmr�ffcw5ub.No.2 1 OF 1 LAtualod kn 1Ai NE 1/4 uT Secdrn 20,T3N.R1E,Bm,GRy of wleridlw,ada CDU",baho City of Meridian I Department Report VII. Exhibits Fl 80 E IDIAN;--- Applicant Presentation GRAMERCY 5.20217.70Meridian Planning and Zoning DA ModificationRezonePreliminary Plat TOWNHOMES Gramercy Townhomes ELTON DEVELOPMENT DEVELOPER INTRODUCTIONGRAMERCY TOWNHOMES | 2 5.20217.7| 0Meridian Planning and Zoning | Gramercy Townhomes SITE DEVELOPMENT HISTORY and other conceptsmedical office, flex industrial, destination retail, Conceptual exercises with office, –2024 -2023Elton Development; concept killed by cost inflation55+ apartment predevelopment by –2022 -2020owned by St. Luke’s, the Y, & Charter SchoolNo active development; parcels –2019 -2016New YMCA/St. Luke’s, adjacent to –2015 -2014 SITE HISTORYGRAMERCY TOWNHOMES | 3 5.20217.7| 0Meridian Planning and Zoning | Gramercy Townhomes SITE VEHICULAR ACCESS SITE ACCESSGRAMERCY TOWNHOMES | 4 5.20217.7| 0Meridian Planning and Zoning | Gramercy Townhomes SITE DESIGN SITE DESIGNGRAMERCY TOWNHOMES | 5 5.20217.7| 0Meridian Planning and Zoning | Gramercy Townhomes SITE DESIGN SITE DESIGNGRAMERCY TOWNHOMES | 6 5.20217.7| 0Meridian Planning and Zoning | Gramercy Townhomes *Material colors not finalized Bedrooms/Laundry–Third Floor –Second Floor Garage/Bedroom/Bathroom–First Floor Three story design•Bedroom Models-and Four-Three•sale homes-For•TOWNHOME DESIGN TOWNHOME DESIGNGRAMERCY TOWNHOMES | 7 5.20217.7| 0Meridian Planning and Zoning | Gramercy Townhomes Garden City, ID Parkway Station Townhomes TOWNHOME DESIGN TOWNHOME DESIGNGRAMERCY TOWNHOMES | 8 5.20217.7| 0Meridian Planning and Zoning | Gramercy Townhomes COMPREHENSIVE PLANNING COMPREHENSIVE PLANNINGGRAMERCY TOWNHOMES | 9 5.20217.7| 0Meridian Planning and Zoning | Gramercy Townhomes o 15-G and R-existing CAdds to buffer between o Already exists on south o Density is appropriate o Emphasizes alley load o R-TN•G uses-and access for CInadequate visibility •ZONINGGRAMERCY TOWNHOMES | 10 5.20217.7| 0Meridian Planning and Zoning | Gramercy Townhomes TRAFFIC IMPACTS TRAFFIC IMPACTSGRAMERCY TOWNHOMES | 5.20217.7| 0Meridian Planning and Zoning | Gramercy Townhomes PHASING PLAN PHASING PLANGRAMERCY TOWNHOMES | 5.20217.7| 0Meridian Planning and Zoning | Gramercy Townhomes PLAN UPDATES PLAN UPDATESGRAMERCY TOWNHOMES | 5.20217.7| 0Meridian Planning and Zoning | Gramercy Townhomes PLAN UPDATES PLAN UPDATESGRAMERCY TOWNHOMES | 5.20217.7| 0Meridian Planning and Zoning | Development Agreement Modification Hearing VICINITYNEIGHBORHOOD CONTEXT | 6 1.20225.5| 0Meridian City Council|