Loading...
HomeMy WebLinkAboutCC - Sign Off REF #REVIEWED BYTYPEVIEW 15Parks ReviewComment Kimberly WarrenNo multi-use pathways are required with this plan. If the applicant wishes to provide multi-use pathway 5/23/25 4:43 PMalong the Kennedy Lateral (as shown) to satisfy open space and/or amenity requirements, please dedicate a pedestrian access easement. Obtain permission from the governing irrigation district to pipe the lateral, and to construct improvements within the irrigation district easement. 2Planning ReviewComment Nick NapoliDepict a paved 5-foot micro-pathway through Lot 19, Block 1 per Annexation conditions. 5/6/25 11:51 AM 3Planning ReviewComment Nick NapoliPave the gravel path leading to the Kennedy Lateral/fire pit and enter into a license agreement with NMID 5/6/25 11:52 AMfor the use of the access road. 4Planning ReviewComment Nick NapoliProvide an open vision fence along Pine Avenue where the open space is. It currently is a semi-private fence 5/6/25 11:53 AMbut needs to be open vision. 13Wastewater Modeling ReviewMarkup open Vicki LyConstruction Drawings.pdf 5/16/25 3:25 PMChangemark note #01 Common driveways with 4 or less lots can connect directly to the main. Sewer mains in common drives are to be privately owned and maintained by the HOA 14Wastewater Modeling ReviewComment Vicki LyFlow is committed 5/16/25 3:25 PM 5Water Modeling ReviewMarkup open Tyson GlockLandscape Plan.pdf 5/7/25 9:26 AMTLG #01 Fence cannot be within 5' of the fire hydrant. 6Water Modeling ReviewMarkup open Tyson GlockLandscape Plan.pdf 5/7/25 9:26 AMTLG #02 Fence cannot be within 5' of the water service up to the water meter. 7Water Modeling ReviewMarkup open Tyson GlockLandscape Plan.pdf 5/7/25 9:26 AMTLG #03 Fence cannot be within 5' of the water service up to the water meter. 8Water Modeling ReviewMarkup open Tyson GlockConstruction Drawings.pdf 5/7/25 10:03 AMTLG #07 This needs to be a 4" blow-off since the property to the south is not a phase of this project. 9Water Modeling ReviewMarkup open Tyson GlockConstruction Drawings.pdf 5/7/25 10:03 AMTLG #05 Provide valve on west leg. 10Water Modeling ReviewMarkup open Tyson GlockConstruction Drawings.pdf 5/7/25 10:03 AMTLG #06 This needs to be a 4" blow-off since the property to the south is not a phase of this project. 11Water Modeling ReviewMarkup open Tyson GlockConstruction Drawings.pdf 5/7/25 10:03 AMTLG #08 There is a question as to whether the current casing provides the City access at to our water main at all times. The casing does not look like it is long enough on the north side. Please verify this is the case with the irrigation district and provide a copy of the agreement. 12Water Modeling ReviewMarkup open Tyson GlockConstruction Drawings.pdf 5/7/25 10:03 AMTLG #04 Provide connection back to pine to eliminate dead-end. Ensure you meet separation requirements from infiltration trench. ENTER YOUR COMMENT RESPONSE HERE Micro path depicted. This is now shown to be paved. Open vision fence now provided. Understood. Fence has been adjusted. Note added. Fence has been adjusted. Note added. Fence has been adjusted. Note added. Blow off has been added. This is a hot tap, so we are showing a valve on the south leg. Blow off has been added. Casings have been lengthened. The Horse Meadow 3 Plans are being reviewed currently by NMID. Connection back to Pine has been added in. A casing has been shortened and a sleeve provided for the water main in the plans. DISCUSSIONCYCLESTATUS 1Info Only (old) 1Unresolved 1Unresolved 1Unresolved 1Info Only 1Info Only 1Unresolved 1Unresolved 1Unresolved 1Unresolved 1Unresolved 1Unresolved 1Unresolved 1Unresolved