HomeMy WebLinkAboutApplicant Response to Comments
..~.
,.
BRIG HTON
CORPORATION
March 9, 2007
Mayor and City Council
City of Meridian
660 E. Watertower, Suite 200
Meridian,ID 83642
RECEIVED
MAR 1 3. 20G7
City of Meridian
City Clerk Office
Re: File No. FP-07-004 Paramount Subdivision No. 15
Our response to the City's Site Specific Comments for this project is as follows:
Site Specific Requirements
1) All terms of the approved Preliminary Plat (PP-03-004), Conditional Use
Permit (CUP-03-008) and Development Agreement (lust. No. 103137116)
have been met.
2) Agree.
3) Agree.
4) This project has a private well as a year round source of water supply for
the pressure irrigation system.
5) Agree.
6) Sewer and water mains will be constructed through this phase of
development by connecting to existing extensions from previous phases.
7) The water main located in W. Producer Dr. has been designed as a 12-inch
mam.
8) The pressure irrigation in this phase has been designed so that additional
Public Utilities, Drainage and Irrigation Easement widths would not be
required - they have been moved into the common area. However, if staff
feels that there are areas that will require additional easement widths,
those areas will be graphically depicted on the final plat.
9) We are ok with this one.
10) Agree.
11) Agree.
12) A copy of the "Final" street name review from the Ada County Street
Name Committee will be provided prior to final plat signature.
13) Agree.
14) Agree.
Citv of Meridian - General Requirements
The developer agrees to all the general requirements contained in the staff report
dated March 8,2007.
BestRe~ards, ~
L\~~
Jay Walker, PM
Brighton Corporation
Xc. Gene Smith, PE - Engineering NW