Loading...
HomeMy WebLinkAbout2025-06-30 NMID1503 First Street South Nampa, ID 83651-4395 June 235 2025 City Clerk's Office City of Meridian 33 E. Broadway Avenue, Suite 102 Meridian, ID 83642-2619 Website: nmid.org RE: H-2025-OOi2/ E Franklin Rd; Touchmark Mixed Use To Whom It May Concern: Office: (208) 466-7861 Shop:(208)466-0663 `� .L i V Ed U �I"fY CLERKS OFFICE Nampa &Meridian Irrigation District (NMID) requires a filed Land Use Change Application to review prior to final platting. All private laterals and waste ways must be protected. • The Districts easement for the Ridenbaugh Canal at this location is a minimum of one hundred feet (100') total, fifty feet (50') each side. • The Districts easement for the Barker Lateral at this location is a minimum of fifty feet (50') total, twenty-five feet (25') each side. • The Districts easement for the Snyder Lateral at this location is a minimum of forty feet (40') total, twenty feet (20') each side. • The Districts easement for the Chaffin Drain at this location is a minimum of sixty feet (60') total, thirty feet (30') each side. This easement must be protected. Any encroachment without a signed License Agreement and approved plan before construction is unacceptable. All municipal surface drainage must be retained on site. If any municipal surface drainage leaves the site, NMID must review drainage plans. Developer must comply with Idaho Code 31-3805. Please feel free to contact me for further information. Sincerely, Paul Huddlestun Asst. Water Superintendent Nampa & Meridian Irrigation District PH/ eol Cc: Office/ file D. Duvall A. Wolfe Applicant