Loading...
HomeMy WebLinkAboutL1.52_Landscape Details CLM 3/8"CARRIAGE BOLT. MAX. 6'O.C. MAX. 6'O.C. Q 2X6 GUARDRAIL TOP. SECURE TO POST. 7'-9"CLEAR. COUNTER SINK ON MAX. 6'O.C. 2X8 BEAM. BOLT TO BOTH DRAIN TOWARD BOARDWALK. BACK SIDE OF POST. 2X6 GUARDRAIL TOP SIDES OF 6X6 POST 47 BOARDWALK, 1 � � O 2X6 RAIL. SECURE TO POST 2X6 RAIL 0 , SEE DETAIL /L1.5 2 2X8 JOIST, LAP JOINT AT = B 4"x6"x""THICK BEARING 2"X 2"8-GAUGE GALVANIZED WELDED WIRE MESH. 2X8 JOIST, OVERLAP EVERY 2"X 2"8-GAUGE GALVANIZED WELDED WIRE MESH. EVERY OTHER BEAM TO° HSS 4x4 X 3"BEAM a SECURE BETWEEN RAIL AND POST. SECURE - SECURE BETWEEN RAIL AND POST. STAPLE 16 PLATE WELDED TO HSS BEHIND TOP, MIDDLE,AND BOTTOM RAILS 6"O.C. OTHER BEAM AND SECURE TO M BEHIND TOP, MIDDLE,AND BOTTOM RAILS 6"O.C. BEAM, SEE FRAMING PLAN. 4X4 POST 2X6 PLANK T 4X4 POST rC 1/2" BOLT, COUNTERSINK ON 4— 2X6 PLANK HHHH111111T BACK SIDE OF 6X6 POST 2X8 JOIST 5/8 BOLT -ice, SIMPSON SSTB16 ANCHOR, GALV. 6X6 PRESSURE TREATED COLUMN. o 2X8 BEAM, INSTALL ON (1) EA. HSS BEAM AT INSIDE \/\/ ------ BOTH SIDES OF 6X6 POST CONCRETE w / 5/8"BOLT (2) 2X8 BEAMS, SEE � `� HIGH WATER 6X6X14 PRESSURE TREATED I I #4 CONT. \ ABUTMENT r�N 6 6" CB66SS BY SIMPSON STRONG TIE.WET SET FRAMING PLAN T LEVEL COLUMN. CENTER IN FOOTING. O° * * z INTO CENTER OF CONCRETE FOOTING. #4 @ 12"O.C. INSTALL PER MANUFACTURER'S r 1' _ N ,�`, RECOMMENDATIONS. `�`,+ CONCRETE FOOTING z FINISHED GRADE BIGFOOT BF-28. CUT TOP OF BIG FOOT TO ACCEPT 6X6 COLUMN 3 #4 CONT. To O 12.02"DIA. CONCRETE FOOTING. INSTALL PER �, CONCRETE FOOTING 2X4 PLANK, EXTEND TO OUTER 2' MANUFACTURER'S RECOMMENDATIONS. EDGE OF 6X6 COLUMN 12"-DEPTH SUBBASE COURSE AND 6"DEPTH AGGREGATE BASE a a a a a a a a PREPARED SUBGRADE PER SECTION ELEVATION FRAMING PLAN GEOTECHNICAL REPORT RECOMMENDATIONS. NOTES: 1. ALL WOOD TO BE CEDAR. 2. FACE RAIL SIDE OF GUARD RAIL TOWARDS BOARDWALK Boardwalk 2 Boardwalk Abutment 1 Scale: NTS Scale: NTS 2X6 GUARDRAIL TOP MAX.6'-0"O.C. 2X6 GUARDRAIL TOP. SECURE TO POST. DRAIN TOWARD RAIL SIDE OF FENCE 2X4 RAIL 00 0 0 4X4 FENCE POST, SEE NOTE 00 010 _ BELOW. PROVIDE 1/2"CHAMFER TO ALL EDGES AT TOP OF POST. 0 0 2"X 6"CEDAR RAIL 00 00 00 00 0 4X4 POST o 00 00 3/8"CARRIAGE BOLT. COUNTER SINK ON BACK 010 00 SIDE OF POST. * 6" CHAT LANDSCAPE EDGE PER DETAIL 10/1-1.50 OR ADJACENT LANDSCAPE PER PLANS. CHAT LANDSCAPE EDGE PER - 211- DETAIL 10/1-1.50 OR ADJACENT N LANDSCAPE PER PLANS. 2"X 2"8-GAUGE GALVANIZED WELDED WIRE MESH. SECURE BETWEEN RAIL AND POST AND SUITABLE FREE DRAINING BEHIND TOP, MIDDLE,AND BOTTOM RAILS 6"O.C. > > o COMPACTED BACKFILL O O O O O O O�C ELEVATION D, O 6"DEPTH GRAVEL NOTES: C �k 1�n�, 1. ALL WOOD SHALL BE CEDAR SECTION 2. FACE RAIL SIDE OF GUARDRAIL TOWARDS PATHWAY UNLESS OTHERWISE NOTED Guardrail 3 Scale: NTS r O y v C J = J O cc O y � •— O DID y � O � O CA = N A �+ M M _ M � o ANN O 2� ~ i Revisions 1. OF DgyO/��i - � r c , LA-1 589 NDSCAP�' �7�/111110412512025 43 Project No.: 123200 Date of Issuance: 4.15.2025 Project Milestone: CDs Landscape Details L1i. 52