Loading...
HomeMy WebLinkAboutL1.51_Landscape Details NOTES: NOTES: 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO Q STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; YEAR WARRANTY PERIOD. IMPROPERLY PRUNED TREES (AS DETERMINED BY THE YEAR WARRANTY PERIOD. IMPROPERLY PRUNED TREES (AS DETERMINED BY THE SHRUB 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. od a W Z NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. a BOULDER, LOCATED, SIZE AND TYPE PER 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO PLANS. INSTALLATION OF PLANT MATERIAL. INSTALLATION OF PLANT MATERIAL. ° a 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE PREVAILING WIND DIRECTION 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR PREVAILING WIND DIRECTION COMPACTED SUBGRADE AS STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH TREE WRAP TRUNK PROTECTION FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO a REQUIRED GALVANIZED NAILS TO PREVENT SLIPPAGE. , PREVENT SLIPPAGE. _ 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. REMOVE AFTER INSTALLATION 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. o o RUBBER CINCH TIE FINISH GRADE I 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE RUBBER CINCH TIE 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE _ ARCHITECT IMMEDIATELY. ARCHITECT IMMEDIATELY. �� o0 2"x 2"x 8'CEDAR STAKE- DO NOT PENETRATE ROOTBALL. 2"x 2"x 8'CEDAR STAKE- DO NOT PENETRATE ROOTBALL. ROOT PROBE SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. ROOT PROBE SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. 0 SOIL LINE MULCH LAYER KEEP MULCH 3"AWAY FROM SOIL LINE MULCH LAYER KEEP MULCH 3"AWAY FROM IN TRUNKI /JJL TRUNK UTILIZE SOIL/ROOT PROBE AROUND TRUNK \ BACKFILL WITH SOIL PLANTING MIX. SEE UTILIZE SOIL/ROOT PROBE AROUND TRUNK T BACKFILL WITH SOIL PLANTING MIX. SEE (APPROX. 34"AWAY FROM TRUNK)TO LOCATE 3" SPECIFICATIONS FOR ADDITIONAL INFORMATION. (APPROX. 3-4"AWAY FROM TRUNK)TO LOCATE 3" SPECIFICATIONS FOR ADDITIONAL INFORMATION. HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. FINISH GRADE POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. FINISH GRADE REMOVE BURLAP,TWINE, AND WIRE BASKET FROM TOP /\\/\\ �� \� /\/ \ \/ � � � � // //\\// REMOVE BURLAP,TWINE, AND WIRE BASKET FROM TOP 2 OF ROOTBALL, REMOVE ALL NAILS,TIES,AND PLASTIC \ \ / / COMMERCIAL SLOW RELEASE FERTILIZER TABLETS 2 OF ROOTBALL, REMOVE ALL NAILS,TIES,AND PLASTIC \ w / COMMERCIAL SLOW RELEASE FERTILIZER TABLETS NOTES: FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO \/\\ \ \\'x FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO // /j 1. NOTIFY LANDSCAPE ARCHITECT WHEN PLACING BOULDERS FOR APPROVAL. WRAP THE ROOTBALL, IT SHALL BE COMPLETELY WRAP THE ROOTBALL, IT SHALL BE COMPLETELY \�/� \ //�/j// 2. PLACE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION SYSTEM. REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE \/\/� REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. \\\/ \/�\/�\/�\/�\/�\\\/�\/�\//\/\ // LEFT ON THE BOTTOM OF THE ROOTBALL. \\%\\ \\//\\%\\/%\/%\//\\//\\//\\//\\//\//\ \\\/ 4.WHEN PLACING BOULDERS, BURY 1/4 TO 1/3 OF BOULDER BELOW FINISH GRADE. SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL \\\ \\jj\\/\\jj\jj\jj\\jj\\jj\\jj\\jj\\jj\\j j SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL 5. DO NOT SCAR OR DAMAGE BOULDERS. 2x ROOTBALL DIAMETER 3x ROOTBALL DIAMETER Deciduous Tree Planting 2x ROOTBALL DIAMETER Coniferous Tree Planting Boulder Installation 3x ROOTBALL DIAMETER 1 Scale: NTS 2 Scale: NTS 3 Scale: NTS SALVAGED STUMP. DEBARK STUMP COUNTER SINK WASHER AND BOLT PROVIDE LENGTH OF ANCHOR BOLT AS NECESSARY AND REMOVE BRANCHES. SAND DOWN APPROXIMATELY 4"INTO LOG. GLUE WOOD TO EXTEND THROUGH UPPER LOG AS SHOWN. SHARP BRANCH STUBS. PLUG APPROXIMATELY 2" DEEP IN VOID TO BE CUT LOWER LOG APPROXIMATELY FLUSH WITH ADJACENT LOG SURFACE. PROVIDE LENGTH OF ANCHOR BOLT AS NECESSARY 2"TO FIT UPPER LOG. COMPACTED GRAVEL BASE TO EXTEND THROUGH UPPER LOG AS SHOWN. SALVAGED LOG. DEBARK LOG AND REMOVE BRANCHES. SAND DOWN PLAYGROUND ENGINEERED WOOD PLAYGROUND ENGINEERED WOOD PLAYGROUND ENGINEERED WOOD PLAYGROUND ENGINEERED WOOD x SHARP BRANCH STUBS. FIBER, SEE DETAIL#/L#.50. FIBER, SEE DETAIL#/L#.50. FIBER, SEE DETAIL#/L#.50. FIBER, SEE DETAIL#/L#.50. CD Q 611 61, 611 611 e 611 Lq /V//V//V//V// /V - ° V//V//V//V//V//V/� /V//V//V//V//V//\ ° °- V//V//V//V//V//V/� /V// //V//V//V//V - °• V//V//V//V//V//V/� �//V//V//V//V//V//\ ° °- V//V//V//V//V//V/� %AA/AA/AA/AA/AA VA/ � X PROVIDE FOOTING AT BOTH X/ oo LAT LOG PLUS , CL r A �A/AA/AA/AA/. \/AA/AA/AA/AA/��/ A/AA/AA/AA/AA/� /AA/AA/AA/AA/AA/ a A/AA/AA/AA/AA/ /AA/AA/AA/AA/�A/ A/A Nx WHEREVER UPPER LOG VAA VAA Co �AANAANAANAA�A� . ° VA�AA�AA�AA�A� �AA�AA�AA�AA�AA . ° VA�AA�AA�AA��� �A�AA/VA�AA�AA/�� VAA�AA��<V� cam // // // // /j /j /j /j /j /j /j /j /j /j /j /j /j /j /j /j/j /j /j/j /j /j /j /j CROSSES LOWER LOG. /V/ . V/V � SOIL i\/A/A/A \/ /A/A/� i\/A/A/A/A/ /A/A/A COMPACTED S 0 / / / / /° - / / / 1 1/2 D IA.THREADED ANCHOR BOLT CENTERED / / / / / / / / / IN CONCRETE FOOTING. A//A//A//A//A// DRAINAGE V�VA/VA/V/VA ° VA/VAS V�VA/VA/VA/V� EXTEND PORTION V/VA/VA/VA/VA VA/VAS V�VA/VA/VA/VA \//\//\ \// // %//\//\//// //\� OF LOG THAT TOUCHES THE //\//\//\// //\/ ,\//\//\//\// \\�AA�A ° VA AAA iVAVAVA /\\ iVA VA VA A\\ iVA�A�A \ \ \ \ \ \ \ \ \ \ \ \ GROUND �% 7/07 6" DEPTH COMPACTED GRAVEL BASE //�// � TYPICAL SECTION STACKED LOGS -VIEW A STACKED LOGS VIEW B FLAT LOG COMPACTED GRAVEL BASE NOTES: NOTES: 1. CONTRACTOR SHALL FURNISH LOGS IF SALVAGED LOGS ARE FOUND TO BE INADEQUATE FOR PLAYGROUND USE. 1. CONTRACTOR SHALL FURNISH STUMP IF SALVAGED STUMP IS FOUND TO BE INADEQUATE FOR PLAYGROUND USE. Playground Log 5 Playground Stump 4 Scale: NTS Scale: NTS CD APPROX. 2' H X 3.5' BOULDER I y PLANTING PER PLANS I Cc WETLAND PLANTING PER PLANS w_ o APPROX. 2' H X 3.5' BOULDER^^ Y O WETLAND PLANTS PER PLANS w BENCH PER PLANS BOARDWALK, SEE DETAIL 1/1-1.52. o II PLANTS PER PLANS o o SPLIT RAIL FENCE WITH WIRE APPROX. 2� H X 3.5� BOULDER \ ®\`, s �� LU � PLANTS PER PLANS � �� �������� �� � °<�, � MESH, SEE DETAIL 7/1-1.51. WETLAND PLANTS PER PLANS - ` APPROX. 2'X 3.5' BOULDER � POND WATER LEVEL POND WATER LEVEL I y WETLAND PLANTS PER PLANS . . ■� POND WATER LEVEL PREPARED BASE BY ■� y WETLAND CULVER STRUCTURE, CONTRACTOR I NOT SHOWN. COORDINATE PREPARED BASE WITH CIVIL DRAWINGS WETLAND CULVER STRUCTURE, BY CONTRACTOR WETLAND CULVER STRUCTURE, NOT SHOWN. COORDINATE WITH PLANTS PER PLANS NOT SHOWN. COORDINATE WITH NOTES: CIVIL DRAWINGS NOTES: CIVIL DRAWINGS NOTES: CA O 1. CONTRACTOR SHALL PROVIDE STRUCTURAL ENGINEERING FOR BOULDER RETAINING WALL. 1. CONTRACTOR SHALL PROVIDE STRUCTURAL ENGINEERING FOR BOULDER RETAINING WALL. 1. CONTRACTOR SHALL PROVIDE STRUCTURAL ENGINEERING FOR BOULDER RETAINING WALL. 2. ALL DIMENSIONS PROVIDED ARE APPROXIMATE. SEE GRADING PLANS FOR FINAL ELEVATIONS. 2. ALL DIMENSIONS PROVIDED ARE APPROXIMATE. SEE GRADING PLANS FOR FINAL ELEVATIONS. 70 2. ALL DIMENSIONS PROVIDED ARE APPROXIMATE. SEE GRADING PLANS FOR FINAL ELEVATIONS.3. FINAL BOULDER TYPE AND COLOR SELECTION AT TIME OF SUBMITTALS. 3. FINAL BOULDER TYPE AND COLOR SELECTION AT TIME OF SUBMITTALS. 3. FINAL BOULDER TYPE AND COLOR SELECTION AT TIME OF SUBMITTALS. cc Wetland Cross Section A Wetland Cross Section B Wetland Cross Section C _ 00 6 Scale: NTS 7 Scale: NTS 8 Scale: NTS i 25 ti cle) CD I Revisions GUARDRAIL, SEE DETAIL 15/1-1.50 I 1. PLANTS PER LANDSCAPE PLAN I 0 WETLAND PLANTING PER PLANS PLANTING PER PLANS w „ APPROX. 2 H X 3.5 BOULDER o LU 2� Y o � LINER PER DETAIL 2/C5.03 WETLAND CULVER STRUCTURE, w NOT SHOWN. COORDINATE / ti ° a POND WATER LEVEL I WITH CIVIL DRAWINGS "'' I ao POND WATER LEVEL IBOULDER RETAINING WALL. OF I PREPARED BASE BY �dr PREPARED BASE BY CONTRACTOR � ° ° CONTRACTOR = W v LA-1 589 NOTES: NOTES: - - - - - - - - - - - - - - - - � 1. CONTRACTOR SHALL PROVIDE STRUCTURAL ENGINEERING FOR BOULDER RETAINING WALL. 1. CONTRACTOR SHALL PROVIDE STRUCTURAL ENGINEERING FOR BOULDER RETAINING WALL. ��/L`�AIDSCAP�' 2. ALL DIMENSIONS PROVIDED ARE APPROXIMATE. SEE GRADING PLANS FOR FINAL ELEVATIONS. 2. ALL DIMENSIONS PROVIDED ARE APPROXIMATE. SEE GRADING PLANS FOR FINAL ELEVATIONS. Mim 3. FINAL BOULDER TYPE AND COLOR SELECTION AT TIME OF SUBMITTALS. 3. FINAL BOULDER TYPE AND COLOR SELECTION AT TIME OF SUBMITTALS. 0q/15/2025 43 Project No.: 123200 Date of Issuance: 4.15.2025 Wetland Cross Section D Boulder Retaining Wall Project Milestone CDs R 9 O Scale: NTS Scale: NTS Landscape Details g L1 . 51