Loading...
HomeMy WebLinkAboutC8.01_Gravity Irrigation Plan & Profile Baratza Delivery CD LLJ cc ° �� �� Sheet Notes: p 2.1 GIRR DELIVERY 03 1. ALL WORK SHALL BE COORDINATED WITH SETTLER'S IRRIGATION DISTRICT(SID). ANY Q 8LL CONNECTIONS TO SID FACILITIES SHALL BE CONSTRUCTED, INSPECTED,AND APPROVED PRIOR TO THE START OF IRRIGATION SEASON. VERIFY EXACT DATES WITH O I I I SID. I II 9L I 2. CONTRACTOR SHALL NOTIFY THE IRRIGATION DISTRICT TWO (2)WORKING DAYS PRIORC.D CD = a w p LU I I I `o I - TO BEGINNING WORK. ALL TRENCHES SHALL BE LEFT OPEN FOR OBSERVATION. A a INEEM J o� I I I MINIMUM OF 48 HOURS NOTICE IS REQUIRED FOR ALL INSPECTIONS. p I I CC 3. ABANDONED BUILDINGS,TEST PITS, OR WATERWAYS LOCATED WITHIN CURRENT OR 7 I w � V � I �,I i I ro B5 L2 FUTURE IRRIGATION STRUCTURES SHALL BE RE-EXCAVATED TO NATIVE SOIL AND of4 p p N 4,000-SF BACKFILLED WITH STRUCTURAL FILL PER THE REQUIREMENTS OF THE PROJECT I V GEOTECHNICAL REPORT AND GEOTECHNICAL ENGINEER. p I p PHASE 3 U CD � CD o � 4. CONTRACTOR TO FIELD VERIFY ALL EXISTING CURB &GUTTER, STORM DRAIN, `�� LU `L' I+ II p + z CHANNEL CROSSINGS, AND SEWER ELEVATIONS OR INVERTS PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER WHEN ELEVATIONS OR INVERTS DO NOT MATCH PLANS. I' 9L o I I p 1 5. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN APPROXIMATE gfA`,o LOCATIONS. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL �� w p � I I S �T EXISTING UTILITIES BEFORE COMMENCING WORK. HE AGREES TO BE FULLY o I I I S CD RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT OCCUR BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. I �w p w I I S I I I 6. ALL PIPE SHALL BE PER ASTM D3034 SDR 35 PVC, ASTM C76 CLASS III RCP WITH I I I RUBBER GASKETED JOINTS PER ASTM C443 OR ASTM F 2764 46 PSI PP, AS NOTED ON I I Iald b ald t� Id ab PLANS. p GIRR-06A(EXISTING) - w°C % 7. PIPE COVER SHALL BE A MINIMUM OF 18-IN. REFER TO PLAN AND PROFILE FOR FOR p p I I I ► I GIRR DELIVERY 01 2.6 2.1 1 _ 2.1 GIRR DELIVERY 02 ELEVATIONS. p ITU / 13-LF OF EXISTING 12-IN PVC STUB AT 0.25% 1+00 2+00 3+00 4+00 Q p HH19 1l aalo"ZI aalJ zl ublo"ZI HH1911ZI I HH19 zl bal �zl-358-LF OF 12-IN PVC AT 0.25% 75-LF OF 12-IN PVC AT 0.25% 8. PIPE BEDDING AND BACKFILL SHALL BE PER ISPWC SECTION 305. ALL PVC PIPE SHALL J I w p I p UTILIZE A CLASS A-1 BEDDING SYSTEM. RCP PIPE SHALL USE A CLASS B-2 BEDDING 3.1 SYSTEM. G) p B1 L2 B1 L18 � p 512,865-SF 7,600-SF a 9. PIPE 24-IN OR LESS SHALL BE PRESSURE TESTED IN ACCORDANCE WITH ISPWC � SECTION 501 PART 3.4. p 10. MAINTAIN HORIZONTAL AND VERTICAL SEPARATION OF POTABLE AND NON-POTABLE p I p \ LINES PER ISPWEC SD-407 II I p � �, 11. ALL BOXES SHALL BE CAST-IN-PLACE REINFORCED CONCRETE. CONCRETE MIX DESIGN II p SHALL BE CLASS 4000 PER ISPWC SECTION 703. ALL BOXES SHALL HAVE FIBERGLASS � I p 0 bald b H bald HUI&b P a; MANHOLE STEPS INSTALLED ON THE UPSTREAM SIDE OF THE STRUCTURE. BOXES v� SHALL BE PLACED ON A MINIMUM OF 4 INCHES OF TYPE i BEDDING ON PREPARED w I J SUBGRADE PER ISPWC SECTION 305- PIPE BEDDING, AND EXTEND A MINIMUM OF w I w I i I 12-INCHES BEYOND THE LIMITS OF THE BOX. 1 12. EXCEPT WHERE NECESSARY FOR INSTALLATION OF POPE OR STRUCTURES OR WHERE I I I � INDICATED OTHERWISE, EXISTING CANALS AND DITCHES SHALL BE PRESERVED. I � I I I i I 3 cc 13. CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE IRRIGATION 9L DISTRICT, ADA COUNTY HIGHWAY DISTRICT,AND CITY OF MERIDIAN. p PRE-CONSTRUCTION MEETING SHALL BE HELP PRIOR TO THE COMMENCEMENT OF ANY w p I Qo p WORK. �I CD w I w Cr I p 14. CONFIRM ALL EXISTING UTILITY ELEVATIONS PRIOR TO CONSTRICTION. NOTIFY o I i ENGINEER IMMEDIATELY OF ANY DISCREPANCIES. II p B5 L16 B5 15. FUTURE IMPROVEMENTS SHOWN FOR REFERENCE ONLY. I I I p 4,000-SF 4,00 CC i w I o I Keynotes: LU I w O° 1. POTABLE WATER MAIN CROSSING- SEE CITY OF MERIDIAN SEWER NOTE NO. 2 ON I SHEET C0.00. FOR EXISTING STRUCTURES, CONFIRM PIPE TYPE, DEPTH, AND Gravity Irrigation Plan & Prof flemBaratza Delivery 0 20' 4 1 0' CONDITION PRIOR TO CONSTRUCTION. INFORM ENGINEER OF ANY DISCREPANCIES. Horizontal Scale: 1" = 20' 2. INSTALL GRAVITY IRRIGATION STRUCTURE: 2.1. 48-IN MANHOLE PER ISPWC SD-611 2.2. 4-FT STANDARD IRRIGATION BOX PER ISPWC SD-619. 2.3. CAST IN PLACE CONCRETE INTAKE STRUCTURE PER DETAIL 1/C8.04. 2.4. BARATZA RETURN LINE PUMPHOUSE, SEE PRESSURIZED IRRIGATION PLANS. 2.5. TURNOUT GATE PER DETAIL 3/C5.03. 2.6. POND LEVEL CONTROL VAULT; SEE PRESSURE IRRIGATION PLANS FOR MORE INFORMATION 2554 GIRR - BARATZA DELIVERY: Sta. -0+50 - 5+00 2554 3. CONNECT PIPE TO EXISTING IRRIGATION SYSTEM: 3.1. CONNECT TO EXISTING GRAVITY IRRIGATION STUB. HORIZONTAL SCALE: 1 = 20' 3.2. POUR CAST-IN-PLACE STRUCTURE AROUND EXISTING PIPE. CUT EXISTING PIPE VERTICAL SCALE: 111 - 21 1 TO FIT AND SEAL PER IRRIGATION DISTRICT STANDARDS. 2552 2552 4. INSTALL 5'x 10'x 1'THICK (MIN.) LOOSE RIPRAP APRON PER ISWPC SECTION 206. POND LINER PENETRATION PER LINER MANUFACTURER'S RECOMMENDATIONS. TIME O 2550 2550 y C.3 C 2548 2548 O 1 = cc PROPOSED GRADE AT 2546 CENTERLINE OF PIPE 2546 ■� y � EXISTING GROUND AT - ---- ---------- ---- ---- - CENTERLINEOFPIPE -- - - ■- y 2544 --- ---------- ------- - - - - ---- ---- --- 2544 � O 2542 13-LF OF EXISTING 12-IN PVC STUB AT 0.25% 4-IN PRESSURE 2542 y = IRRIGATION CROSSING CO 2540 358-LF OF 12-IN PVC AT 0.25% 2540 cc U o 75-LF OF 12-IN PVC AT 0.25% Cc25 3.1 108-LF OF 12-IN PVC AT 0.25% � � 6-IN PRESSURE z IRRIGATION CROSSING 2538 80 1 2538 Revisions GIRR DEL VERY 01 GIRR-06A 2 6 POND CONTROIL VAULT WEIR BOX EXISTING GIRR DELIVERY 02 2•1 1' 6-FT S Q (EXISTING) STRUCTURE PER ISPWC SD-611 8-IN WATER MAIN 48-IN MH PER ISPWC SD-611 2536 STA: o+oo STA: 3+70.76, 0.00' CROSSING STA:4+45.66, 0.00' 2536 RIM: 2551.00± RIM: 2546.07+ _ RIM: 2545.93± SUMP: 2537.93 SUMP: 2538.00 SUMP: 2537.82 IE IN: 2539.00, 12-IN PVC (N) IE IN:2538.82, 12-IN PVC (N) IE O 2 2539., 12 2 PVC C ( IE OUT: 2539.00, 12-IN PVC (S) IE OUT:2538.82, 12-IN PVC (E) IE OUT: 2539.93, 12-IN PVC (S) 2534 2534 2532 2532 8-IN SEWER MAIN CROSSING SAL �V f 2530 2530 568 04/15/2025 EXISTING GROUND ELEVATION PROPOSED GROUND ELEVATION OF AT CENTERLINE OF PIPE AT CENTERLINE OF PIPE a 2528 2528 � ftw•� CDCDco O Lf) co N O c0 I� O LO co N O) N O) O co Co LO I� O � ` Ln O) O. CDCDN N O O O N N O O) O) O N ,a CDN CD co T Ln T I` T O CDN coT coCDN � Ln CO T co O) � coO) CO T CDr co M L6 L6 � Lf") � L6 � LP � � � � � (.O � � � � � � � LP � L6 co L6 M LP � LP ' � � � Ln L, Ln L, Ln L, Ln L, Ln L, Ln Lo Ln Lo Ln L, Ln L, Ln L, Ln Ln Ln Lo Ln LA Ln LO Ln LO Ln LO Ln L, Ln L, Ln Lo Ln Lo Ln LO Ln LO Ln Ln Ln LO Ln Lo Ln Project No.: 123200 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Date of Issuance: 4.15.2025 -0+50 -0+40 -0+20 0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00 4+20 4+40 4+60 4+80 5+00 Project Milestone: Permit Set i Gravity Irrigation Plan & Profile Baratta Delivery 3 Q3 C8m01 ��o