Loading...
HomeMy WebLinkAboutC7.52_Drainage & Utility Plan Basin Details 1 AREA 1 INFILTRATION BASIN: VE) FOOTPRINT: 141 SF Sheet Notes:2550 I I BOTTOMQ PRIMARY VOLUME: 1079 CU FT i i i i i � 2548 1. CONTRACTOR SHALL COMPLY WITH GENERAL NOTES, PLAN SHEET C1.00. EST. SHGW: 2542.83 I � I 2. LONGITUDINAL SLOPE OF ALL SIDEWALKS SHALL NOT EXCEED 5.00%. CROSS INFILTRATION WINDOW: 186 SF I I I SLOPES OF ALL SIDEWALKS SHALL NOT EXCEED 2.00%. SLOPES WITHIN INFILTRATION RATE: 2 IN/HR (GP-GM LAYER) I I PEDESTRIAN RAMPS SHALL NOT EXCEED 1:12 SLOPE IN ANY DIRECTION. EST. BOTTOM OF AMENDED NATIVE MATERIAL: 2542.52 I I I THERE ARE NO TOLERANCES ALLOWED ABOVE THE MAXIMUM SLOPES. I � N$ 3. SPOT ELEVATIONS INDICATE TOP OF CONCRETE UNLESS INDICATED `t5 OTHERWISE BY THE FOLLOWING ABBREVIATIONS: - - �- _ -- - - - - _ - - - - - - - - - - - -- I BB- BOTTOM OF BASIN 57-21, - -I- mac- - - - - - R/ R/W R/W R/W R/W BM-BOTTOM OF BERM FF-FINISH FLOOR ` 9: 8.3' I I I 1 1 9 FL- FLOWLINE I c's I I TB: 2547.86 I 1 F -FINISHED BADE BB: 2545.93 19 I8.2 I I _ I I GB-GRADE BREAK HP-HIGH POINT 2548 \\ LIP-LIP OF CURB \ LP- LOW POINT 23.6' \ MX-MATCH EXISTING ;,foi - - - - - - - - - - - - - TA-TOP OF ASPHALT + 7 TBC-TOP BACK OF CURB El AREA 2 INFILTRATION BASIN: I 2548 TB TOP OF BASIN L I 1 BOTTOM FOOTPRINT:408 SF I I I 1 WS: 2547.36 \ \ 1 I TC-TOP OF CONCRETE / I 1 PRIMARY VOLUME: 2378 CU FT I I I 1 a I \I4:1I 3 1 TM -TOP OF BERM GRAVEL 1 I 1 EST. SHGW: 2542.32 I _ I I I I O D TR-TOP OF BRIDGE TW-TOP OF WALL SD CB 1 WS-WATER SURFACE 10' I I I I 1 a, I I I I SD S C 5 I I I I I I °° I I O I 4. ADD 2,500-FT TO ALL SPOT ELEVATIONS TO GET ACTUAL ELEVATION. FrF I ' 4:1 I I I SGT 1.5 . FOR ADDITIONAL STREET GRADES AND STATIONS, SEE ROADWAY PLAN AND o M I I I 1 12-IN PVC I 5 0 0 S G S S 0 S, S 0 I r; 1 r 8 I 1 \ PROFILE SHEETS. ' I I I I 1 I IE: 2545.35 a, 1 o / B L1 I I N I 6. FOR ADDITIONAL INFORMATION ON STORM SYSTEM, SEE THE DRAINAGE AND cw / I I 238,293 Co -SF 1 I �� 6B: 2545.35 ` UTILITY PLANS. I I N - ----25J-_- 26.5' / I �� � N I Sheet Legend: 12-IN PVC I I 1 I � � IE: 2545.36 cc 1 2548 I I I I BB: 2545.36 2547 I I 19.5- SO I I I \ -- \ q I � RIPRAP � 12-IN PVC I I 2546 sD/ � I IE. 2545.81 O I i 1 ti I I I 3 I I I TB: 2547.85 - � I SGT 1.3 � 10, - - - - - I I Keynotes: # - _------ 9.9, I I I 2546 /J / 3 I SGT 1.4 \ 0 1 1. INSTALL INFILTRATION BASIN PER ACHD BMP 10 (DETAIL 1/C6.50). / I TB: 2548.43 I SDCB 1.3 I �2547 WS:2547.36 �/� \ I I 1 2. INSTALL DRAINAGE WINDOW PER DETAIL 3/C6.50. EXTEND 1-FT INTO FREE 25C"J-- - - - - - \ - /� / \� - - - - - - - -1- - - - - - - - - DRAINING SOIL. 1 �0. 1 3. INSTALL INLET PROTECTION APRON AND FLOW SPREADER (RIPRAP OPTION) �. - / 1 AREA 3 INFILTRATION BASIN: 1 1 PER ISPWC (ACHD SUPPLEMENT) SD-628. BOTTOM FOOTPRINT: 330 SF I 1 I I 9 I - - -- - -7-7 - -- - --- - --- - --- - -- - --- - -- - - - - - -- PRIMARY VOLUME: 1570 CU FT I I I 4. INSTALL OPEN DELIVERY CHANNEL. SEE LANDSCAPE SHEETS FOR MORE � 6-51 �T I I EST. SHGW: 2542.22 INFORMATION. o I I N 1 1 - - - - LO 61.08'1 1 /W R/W R/W R/W R/W R/W R/W Area 1 Infiltration Basin Area 2 Infiltration Basin Area 3 Infiltration Basin 1 Scale: 1" = 10' Scale: 1" = 10' Scale: 1" = 10' - - - - - - - - - - - - - - - - - - - - - - - 2549 1 I 1 1 I Id Id I I Id PI - - - - - -- - --- - - - - - -I- - - � � - - - - - - - -� - - P - - - - - T - - Ll 1 2545 TB: 2544.55 1 r I I I 1 a I \ 1 -po Ca \ l Cc 254 Lo I cc I 1 1 1 I I I 254 LI - - I I I I 1 5 25 2544 M � O N i SDCB 1.6 1 I 25' �6 I BB: 2542.55 CA L - - - - - - - - - - - - - J \/r - - - - - - - - - - - - - - - - - - - - - - - - - -2545- - - ■� O 1 1 I 1 I 1 TEMPORARY INFILTRATION BASIN#1:12-IN PVC ■� 4:1 IE: 2545.30 O BOTTOM FOOTPRINT:300 SF 1 I I 1 PRIMARY VOLUME: 600 CU FT 1 I I o06 SD O 4 PHASE 2 EST. HSGW: 2539.6 PHASE 2 � y IN 1 I 4.1 I I 3 1 \\-SGT 1.6 B4 L10 1 � 24.5' CO � � owe � = CO 1 10, B10 L1 I N I Temporary Infiltration Basin #1 o cc � 5 1 46,498-SF I 1 Scale: 1" = 10' N I I 1CcL �20 -1 9, -4 1 I \ WS: 2547.30 j\ I I TEMPORARY INFILTRATION BASIN #2: Revisions 1� BOTTOM FOOTPRINT: 300 SF PRIMARY VOLUME: 600 CU FT 1. 5/30/25-CITY FP COMMENTS PHASE 3 EST. HSGW: 2539.76 1 I I TB: 2547.80 1 1 I AREA 4 INFILTRATION BASIN: �1 1 L- - - - - - - - - - - - - - BOTTOM FOOTPRINT:436SF _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 PRIMARY VOLUME: 2004 CU FT T6: 2544.05� 1 I EST. SHGW: 2542.23 25R� I -2544 - I I r 2549 I Area 4 Infiltration Basin - N Scale: 1" = 10' / / 2 �s I i ��jONAL ECG �C0 �1 L 25 568 s0 5/30/2025�0 I q P 2542.05 I TE OF �0 a 25 �'6 I f`4�ESW.NMI �VV - - - - - - - - - - - - - - - - - - Project No.: 123200 60 1 I Date of Issuance: 4.15.2025 Project Milestone: Permit Set Drainage & Utility Plan co 1 Basin Details -T Temporary Infiltration Basin #2 s Scale: 1" = 10' C7m52 Mao